Loading...
HomeMy WebLinkAbout2004-06-21-Resolutions 04-142_University Ave - Waco to Alice's - EngineerTHE CITY OF WAUKEE,IOWA RESOLUTION 04-142 ] APPROVING VEENSTRA &KIMM,INC.AS ENGINEERS FOR THE UNIVERSITY AVENUE RECONSTRUCTION PROJECT,WACO TO ALICE'S ROAD IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,Veenstra &Kimm,Inc.have presented the City of Waukee with an Agreement for the University Avenue Reconstruction Project,Waco to Alice's Road;AND, WHEREAS,the scope of the project includes the following: The City desires to widen University Avenue on both the north side and south side to continue the previous widening proj ect of University Avenue east of Waco.The project will include new Portland cement concrete pavement with integral curb and gutter widening of the existing slab,spot repairs to the existing slab,a raised concrete median,storm sewer and intakes,stub roadway connection for proposed Joe Brick Road,16-inch water main stub under University Avenue at Alice's Road,street lighting along the Project including alternative pole designs for the City's consideration,grading only for sidewalks,and associated work.The design will not include traffic signals except at Alice's Road. The City also desire to modify and incorporate the previous University Avenue and Alice's Road Intersection Desigu into the overall Project. The scope and extent of the improvements may be modified during the course of the design as necessary to be compatible with the City'S financing program;AND, 1 WHEREAS,Veenstra &Kimm,Inc.shall undertake Design Surveys,hold design conferences and report to the council,prepare plans and specifications,estimate the cost,secure right-of-way, advertise for bids,assist with bid opening and awarding of contract,conduct a preconstruction conference,provide general services during construction and provide a [mal review;AND, WHEREAS,compensation for these services shall be as follows: a.The fee for design surveys,easements,design conferences,plans and specifications, modification to the Alice's Road and University Avenue plans,estimate of cost and bidding services for the project shall be based on standard hourly rates and not to exceed Forty-Two Thousand Dollars ($42,000); b.The fee for preconstruction conference,general services during construction,and final review for the Project shall be based on standard hourly rates and not to exceed Ten Thousand Dollars ($10,000)for the project including the reconstruction of Alice's Road and University avenue Intersection;AND, WHEREAS,above-stated fees do not include compensation for certain items such as borings or sampling pits,changes due to City requests,services associated with right-of-way acquisition, construction staking,condemnation proceedings,or assessment plats and schedules,services I associated with soil or groundwater pollution testing and abatement and services associated with historical/archaeological investigations;AND, WHEREAS,City staff have reviewed and approve the agreement as presented. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 21 st day of June 2004 that it hereby approves designating of Veenstra &Kimm,Inc.as the engineers for the University Avenue Reconstruction Project,Waco to Alice's Road. Mark J.Arentse ,C ty Administrator/Clerk ROLL CALL E AYE NAY Nicholas C.Gruber X Donald L.Bailey,Jf. Bill Peard JeffV.Mertz X Darlene Stanton X ABSENT X X