WHEREAS,the plans,specifications,form of contract and estimate of costs for the
Public Works Facility (the "Project")have previously been approved;and
WHEREAS,the Notice to Bidders for the taking of bids for the Project has been
published,the bids have been received and opened at a public meeting,and the results of
such bids have been considered at a public hearing;
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WAUKEE,IOWA:
That the bids described on Exhibit A,for the various packages of the
Project,as described in the plans and specification adopted by the City of
Waukee be and are hereby accepted,the same being the lowest responsible
bids received.
That the City Administrator is hereby authorized and directed to obtain the
necessary executed contracts,bonds and certificates of insurance for the
Project as described in the plans and specifications therefore,and that upon
receipt of the same in accordance with said plans and specifications,the
Mayor is hereby authorized and directed to execute said documents on
behalf of the City of Waukee,Iowa,the same being hereby approved and
accepted by this City Council;and the City Clerk is hereby authorized and
directed to attest to the signature of the Mayor thereon.
PASSED AND APPROVED,this 8th day of March,2010.,J4L1Ztyor
ATTEST:jpli
ROLL CALL VOTE
Shane Blanchard
Dan Dutcher
Casey L.Harvey
Darlene Stanton
Mike Watts
AYE
X
X
X
X
X
NAY ABSENT ABSTAIN
Confidential
Exhibit 'A'
Contract!:Summan,'
P,,,)oct Ow"e,:City of Waukee
Project Name:Waukee Public Works Facility
locatiorl:Waukee,Iowa
Estimate level:Contracts 03-08-2010
CONTRACTS
BP 1.01 -Testing and Special Inspections:Olsson &Associates
BP 1.02 -Survey Staking:Snyder &Associates
BP 1.03 -Erosion Control:Environmental Solutions
SP 3.01 -Concrete Ftgs,Reinf.&SOG:Jensen Builders (Alt.15,Alt.Hardener,Rebar)
BP 3.02 ~Concrete Paving:TK concrete (Alt.6,Alt.21,Alt.23)
BP 3.03 -Precast Hollow Core:Molin Concrete
BP 3.04 -Precast Wall Panels:MPC Enterprises (Alt.1)
BP 4.01 M Masonry:Forrest &Associate (Alt.11)
BP 5.01 ~Steel Fabrication:Majona Steel
BP 5.02 -Precast and Steel Erection:Northwest Steel Erection
BP 6.01 -Rough and Finish Carpentry:ACOM(Alt.12)
BP 7.01 -Joint Sealants:CK Fairco
BP 7.02 -Precast Grouting:Northwest Steel Erection
BP 8.01 -HM Doors,Frames &Hardware:Doors/Inc.(Alt.pre-Hnlsh Doors)
BP 8.02 -Overhead Sectional Doors:Overhead Door Company (Alt.Vents,Locks)
BP 8.03 ~Aluminum Windows &'Glazing:Two Rivers Glass
BP 9.01 -Gypsum Board Assemblies:Olympic Companies
BP 9.02 M Acousitical Ceiling Tile:Heartland Finishes
BP 9.03 -Flooring:Premier Flooring
BP 9.04 -Painting:Heartland Finishes (Alt.1/Alt.11/Alt.Pre-Plnlsh Doors)
BP 10.01 M Lockers:Direct Office Solutions
BP 12.02 -Office Furniture:Workspace,Inc.
BP 13.01-Metal Building Material:Edge Commercial
BP 13.02 -Metal Building Erection:Edge Commercial
BP 14.01-Overhead Crane:Skarnes,Inc.
BP 14.02 -Misc.Equipment:Seneca
BP 14.02 -Misc.Equipment:Tech Supply
BP 21.01 -Fire Suppression:Fireline Sprinkler
BP 22.01 -Mechanical:Mechanical Comfort (Alt.13)
BP 26.01 -Electrical:Mechanical Comfort (Alt.25)
BP 31.01 -Earthwork:Vanderpool Construction (Alt.6/Alt.14)
BP 31.02 -Site Utilities:Young Mechanical (Alt.4)
BP 32.01 -Landscaping:RJ Lawn Service
$10,298
$7AOO
$13/134
$584,268
$318,938
$78,268
$269,400
$295,960
$72/500
$78,075
$39,545
$20,610
$11,240
$51,378
$113,000
$47,750
$96/922
$16/750
$27/890
$33/250
$6,925
$53,925
$513,749
$337,100
$86,243
$145,734
$126/907
$78,888
$653,300
$567,420
$55,225
$190,100
$29,111
Contracts Total $5,031,203