HomeMy WebLinkAbout2010-03-08-Resolutions 10-52_Public Works Facility - Award ContractsRESOLUTION #10-52 RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACTS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, IOWA: WHEREAS,the plans,specifications,form of contract and estimate of costs for the Public Works Facility (the "Project")have previously been approved;and WHEREAS,the Notice to Bidders for the taking of bids for the Project has been published,the bids have been received and opened at a public meeting,and the results of such bids have been considered at a public hearing; NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE,IOWA: That the bids described on Exhibit A,for the various packages of the Project,as described in the plans and specification adopted by the City of Waukee be and are hereby accepted,the same being the lowest responsible bids received. That the City Administrator is hereby authorized and directed to obtain the necessary executed contracts,bonds and certificates of insurance for the Project as described in the plans and specifications therefore,and that upon receipt of the same in accordance with said plans and specifications,the Mayor is hereby authorized and directed to execute said documents on behalf of the City of Waukee,Iowa,the same being hereby approved and accepted by this City Council;and the City Clerk is hereby authorized and directed to attest to the signature of the Mayor thereon. PASSED AND APPROVED,this 8th day of March,2010.,J4L1Ztyor ATTEST:jpli ROLL CALL VOTE Shane Blanchard Dan Dutcher Casey L.Harvey Darlene Stanton Mike Watts AYE X X X X X NAY ABSENT ABSTAIN Confidential Exhibit 'A' Contract!:Summan,' P,,,)oct Ow"e,:City of Waukee Project Name:Waukee Public Works Facility locatiorl:Waukee,Iowa Estimate level:Contracts 03-08-2010 CONTRACTS BP 1.01 -Testing and Special Inspections:Olsson &Associates BP 1.02 -Survey Staking:Snyder &Associates BP 1.03 -Erosion Control:Environmental Solutions SP 3.01 -Concrete Ftgs,Reinf.&SOG:Jensen Builders (Alt.15,Alt.Hardener,Rebar) BP 3.02 ~Concrete Paving:TK concrete (Alt.6,Alt.21,Alt.23) BP 3.03 -Precast Hollow Core:Molin Concrete BP 3.04 -Precast Wall Panels:MPC Enterprises (Alt.1) BP 4.01 M Masonry:Forrest &Associate (Alt.11) BP 5.01 ~Steel Fabrication:Majona Steel BP 5.02 -Precast and Steel Erection:Northwest Steel Erection BP 6.01 -Rough and Finish Carpentry:ACOM(Alt.12) BP 7.01 -Joint Sealants:CK Fairco BP 7.02 -Precast Grouting:Northwest Steel Erection BP 8.01 -HM Doors,Frames &Hardware:Doors/Inc.(Alt.pre-Hnlsh Doors) BP 8.02 -Overhead Sectional Doors:Overhead Door Company (Alt.Vents,Locks) BP 8.03 ~Aluminum Windows &'Glazing:Two Rivers Glass BP 9.01 -Gypsum Board Assemblies:Olympic Companies BP 9.02 M Acousitical Ceiling Tile:Heartland Finishes BP 9.03 -Flooring:Premier Flooring BP 9.04 -Painting:Heartland Finishes (Alt.1/Alt.11/Alt.Pre-Plnlsh Doors) BP 10.01 M Lockers:Direct Office Solutions BP 12.02 -Office Furniture:Workspace,Inc. BP 13.01-Metal Building Material:Edge Commercial BP 13.02 -Metal Building Erection:Edge Commercial BP 14.01-Overhead Crane:Skarnes,Inc. BP 14.02 -Misc.Equipment:Seneca BP 14.02 -Misc.Equipment:Tech Supply BP 21.01 -Fire Suppression:Fireline Sprinkler BP 22.01 -Mechanical:Mechanical Comfort (Alt.13) BP 26.01 -Electrical:Mechanical Comfort (Alt.25) BP 31.01 -Earthwork:Vanderpool Construction (Alt.6/Alt.14) BP 31.02 -Site Utilities:Young Mechanical (Alt.4) BP 32.01 -Landscaping:RJ Lawn Service $10,298 $7AOO $13/134 $584,268 $318,938 $78,268 $269,400 $295,960 $72/500 $78,075 $39,545 $20,610 $11,240 $51,378 $113,000 $47,750 $96/922 $16/750 $27/890 $33/250 $6,925 $53,925 $513,749 $337,100 $86,243 $145,734 $126/907 $78,888 $653,300 $567,420 $55,225 $190,100 $29,111 Contracts Total $5,031,203