Loading...
HomeMy WebLinkAbout2010-04-19-Resolutions 10-100_Public Works Facility - Contracts-BondsRESOLUTION #10-100 RESOLUTION APPROVING CONSTRUCTION CONTRACTS AND BONDS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, IOWA: That the construction contracts and bonds,listed in attached Exhibit A,executed and insurance coverage for the construction of certain public improvements described in general as Public Works Facility,and as described in detail in the plans and specifications heretofore approved,and which have been signed by the Mayor and Clerk on behalf of the City be and the same are hereby approved. PASSED AND APPROVED,this 19th day of April,2010. ATTEST: Cit ROLL CALL VOTE Shane Blanchard Dan Dutcher Casey L.Harvey Darlene Stanton Mike Watts AYE X X X X X NAY ABSENT ABSTAIN Confidenlial Exhibit 'A' ProjedOwner:City of Waukee Project Name'Waukee Public Works Facility I.o<atio'"waukee,Iowa ~"",le Level'Contracts Consulting -ConstructIon Management 4-14-2010 CONTRACTS BP 1.01 -Testing and Special Inspections:Olsson &.Associates BP 1.02 -survey Staking:Snyder &.Associates BP 1.03 -Erosion Control:Environmental Solutions BP 3.01 -Concrete Ftgs,Reinf.&.SOG:Jensen Builders (Alt.15,Alt.Hardener,Rebar) BP 3.02 -Concrete Paving:TK concrete (Alt.6[Alt.21[Alt.23) BP 3.03 -Precast Hollow Core:Molin Concrete BP 3.04 -Precast Wall Panels:MPC Enterprises (Alt.1) BP 4.01 -Masonry:Forrest &.Associate (Alt.11) BP 5.01 -Steel Fabrication:Majona Steel BP 5.02 -Precast and Steel Erection:Northwest Steel Erection BP 6.01 -Rough and Finish Carpentry:ACOM (Alt.12) BP 6.02 -Architectural Millwork -Moehl Millwork BP 7.01 -Joint Sealants:CK Fairco BP 7.02 -Precast Grouting:Northwest Steel Erection BP 7.03 -Exterior Sheet Metal-Academy Roofing BP 8.01 -HM Doors,Frames &.Hardware:noors,Inc.(Alt.Pre-Finish Doors) BP 8.02 -Overhead Sectional Doors:Overhead Door Company (Alt.Vents,Locks) BP 8.03 -Aluminum Windows &.Glazing:Two Rivers Glass BP 9.01 -Gypsum Board Assemblies:Olympic Companies BP 9.02 -Acousitical Ceiling Tile:Heartland Finishes BP 9.03 -Flooring:Premier Flooring BP 9.04 -Painting:Heartland Finishes (Alt.1[Alt.11/Alt.Pre-Finish Doors) BP 10.01 -Lockers:Direct Office Solutions BP 10.02 -Signage -Signs Now BP 12.02 -Office Furniture:Workspace,Inc. BP 13.01 -Metal Building Material:Edge Commercial BP 13.02 -Metal Building Erection:Edge Commercial BP 14.01 -Overhead Crane:Skarnes,Inc. BP 14.02 -Misc.Equipment:Seneca BP 14.02 -Misc.Equipment:Tech Supply BP 21.01 -Fire Suppression:Fireline Sprinkler BP 22.01 -Mechanical:Mechanical Comfort (Alt.13) BP 26.01 -Electrical:Mechanical Comfort (Alt.25) BP 31.01 -Earthwork:Vanderpool Construction (Alt.6[Alt.14) BP 31.02 -Site Utilities:Young Mechanical (Alt.4) BP 32.01 -Landscaping:RJ Lawn Service $10[298 $7,400 $13,134 $584[268 $318/938 $78,268 $269,400 $295,960 $72,500 $78,075 $39,545 $18/900 $20,610 $11,240 $3[500 $51[378 $113,000 $47,750 $96,922 $16[750 $27/890 $33,250 $6,925 $14,836 $53,925 $513/749 $337,100 $86,243 $145[734 $126[907 $78,888 $653,300 $567/420 $55,225 $190[100 $29/111 Contracts Total $5,068,439