Loading...
HomeMy WebLinkAbout2011-01-24-Resolutions 11-17_Library HVAC - Set PHRESOLUTION #11-17 RESOLUTION ORDERING CONSTRUCTION OF CERTAIN PUBLIC IMPROVEMENTS,AND FIXING A DATE FOR HEARING THEREON AND TAKING OF BIDS THEREFOR (LIBRARY HV AC IMPROVEMENT PROJECT) WHEREAS,it is deemed advisable and necessary to construct certain public improvements described in general as Library HV AC Improvement Project,and has caused to be prepared plans,specifications and form of contract,together with estimate of cost,which are now on file in the office of the City Clerk for public inspection,for the construction of the public improvements,and the plans,specifications and form of contract are deemed suitable for the making ofthe public improvements;and WHEREAS,before the plans,specifications,form of contract and estimate of cost may be adopted,and contract for the construction of the public improvements is entered into,it is necessary,pursuant to Chapter 26 of the Code ofIowa,to hold a public hearing and to advertise for bids: NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE,IOWA: Section 1.That it is hereby determined that it is necessary and advisable to construct certain public improvements described in general as Library HV AC Improvement Project,in the manner set forth in the plans and specifications and form of contract,above referred to,the cost thereof to be paid in accordance with the provisions as set out in the published Notice of Hearing and Letting;the public improvements being more generally described as follows: Library HV AC Improvement Project The project includes renovations to the existing lihrary heating,ventilation and air conditioning system to provide a variable air volume (VA V)distrihution system with fan powered,electric reheat terminal boxes.The existing air distribution will be modified by removing the existing supply diffusers and replacing them with new linear plenum slot diffusers.Modification to the existing direct digital temperature controls system will be made as required for the new VA V terminal boxes.Additional upgrades will be made to the existing control system to provide a web-based and graphical interface and control strategies for improved energy efficiency.New electrical distribution will be added as required for power to the fan powered V A V boxes.Removal and reinstallation of the existing ceilings systems as required to accommodate the new HV AC and electrical work. Section 2.That the amount of the bid security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders approved as a part ofthe specifications. Section 3.Bids will be received and opened under the supervision of the City of Waukee,Iowa,at 2:00 P.M.,on the 24th day of February,2011.Bids will then referred to the City Council for concurrence upon the low bids at a meeting to be held at the Council Chambers,City Hall,230 W.Hickman Road,Waukee,Iowa,on the 28th day of February,2011,at 5:30 P.M. Section 4.That the City Council hold a public hearing on the matter of the adoption of proposed plans,specifications and form of contract for the making of the improvements,which documents are now on file in the office of the City Clerk,the hearing to be held at the Council Chambers,City Hall,230 W.Hickman Road,Waukee, Iowa,on the 28th day of February,2011,at 5:30 P.M.,and that the City Clerk give notice of the hearing by publication once in a local legal newspaper,printed wholly in the English language,not less than four clear days nor more than twenty days prior to the date fixed therefor. PASSED AND APPROVED,this 24th day ofJanuary,20 ATTEST: ROLL CALL VOTE Shane Blanchard Dan Dutcher Casey L.Harvey Darlene Stanton Mike Watts AYE X X X X X NAY ABSENT ABSTAIN