HomeMy WebLinkAbout2011-12-15-Resolutions 11-235_Public Works Facility - Change Order-FinalTHE CITY OF WAUKEE,row A RESOLUTION 11-235 APPROVING CHANGE ORDER (FINAL)TO CONSTRUCTION SERVICES,INC., FOR THE WAUKEE PUBLIC WORKS FACILITY IN THE AMOUNT OF $0.00 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,the City of Waukee,Dallas County,State of Iowa,is a duly organized Municipal Organization;AND, WHEREAS,on March 8,2010,the Waukee City Council approved the adoption of plans, specifications,form of contract and estimate of cost for the Waukee Public Works Facility Project (Resolution #10-51);AND, WHEREAS,Design Alliance,Inc.,architect for the Project,recommends the City of Waukee accept Change Order (Final)as noted on the Contracts Summary dated October 5,2011,and which is attached hereto as Exhibit'A.' NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 15th day of December,2011,that it hereby approves Change Order (Final)to Construction Services,Inc.,for the Waukee Public Works Facility in the amount of $0.00 ROLL CALL VOTE Shane Blanchard Dan Dutcher Casey L.Harvey Shelly Hughes Mike Watts AYE X X X X NAY ABSENT ABSTAIN X October 5,2011 Revised October 13,2011 John Gibson Pubiic Works Director City of Waukee 230 Highway 6 Waukee,Iowa 50263 Re:New Public Works Facility Dear John: The purpose of this letter is to recap the New Public Works Project change order process and make a recommendation about your project.The change orders address the changes to the contractor's contracts addressing back charges needed to complete Iresolve specific construction Issues. Based on the change order process utilized and the quality of the low bid contractors, Design Alliance recommends the City of Waukee accept the change orders for: Allegro -Commercial (Acom) The contract is changed as follows: 1.Labor and material to add blocking at windows. 2.Cost to complete A-Cam's contract. 3.Temporary enclosures. 4.Capital Fire Equipment inspection. Deduct: Deduct: Deduct: Deduct: ($2,867.00) ($24,450.00) ($3,138.00) ($179.14) Total:Deduct:($30;6:34.14 ) BAKER ELECTIC The contract is changed as follows: 1.Miscellaneous door work/charges. 2.Additional wiring for overhead door. 3.Labor and material to complete electrical requirements on project. 4.Labor and material to complete electrical punch list. Total: Add:$3,430.00 Add:$550.00 Add:$27,239.25 Add:$4,200.31 Add:$35,41:9:5tl - ~ Add:$970,56 Add:$2,395.36 Add:~3,365.92 CK Fairco The contract is changed as follows: 1.Miscellaneous caulking. 2.Labor and material to cut out and re-caulk paving joint. Total: Danielson/Tech.Supply,Inc. The contract is changed as follows: 1.Repair 2"waste line at east bay.Deduct:($568.85) 14225 Uni'lCfslty Stille 110 Waukee,IA 50263 nL 515,225 ..34139 fAX 515 ..225.%49 OStgnMJ1.lnceJn~.cn ..n Total:Deduct:{$568.85) Doors,Inc. The contract is changed as follows: 1.Cost to cut down three doors/frames. 2.Drill holes in doors not prepared. Add: Deduct: $302.00 ($327.00) Total:Deduct ($25.DO) Edge Commercial,LLC The contract is changed as follows: 1.Cost to cut down three doors/frames.Deduct: 2.Labor,Material and equipment for concrete wall cutting.Deduct: 3.Labor and material to grout columns.Deduct: 4.Install steel attachments for mechanical units and fans.Add: 5.Replace three exterior wall panels.Add: 6.Field cut wall opening.Add: 7.Modify base plates at column footings.Add: ($302.00) ($2,160.00) ($372.90) $1,730.00 $1,637.00 $2,287.00 $528.00 Total: Edge Commercial,LLC The contract is changed as follows: 1.Alternate wall insulation system. 2.Concrete footing allowance Deduct: Deduct: ($7,770.00) ($10,000.00) Total:Deauct:($iT,770.(0) Forrest &Associates,Inc. The contract is changed as follows: 1.Labor and materials to replace two bumished blocks.Add: Total: Heartland Finishes 095100 The con.tract is changed as follows: 1.Repair and replace ceiling tiles. 2.Miscellaneous backcharges to Mel. 3.Install 3 projection screens and 3 projectors lifts. 4.Repair,replace,and reinstall ceiling tiles. Add: Add: Add: Add: $352.00 c$352:00 $466.00 $860.00 $3,648.52 $379.00 Total:Add:$5,363.52 Heartland Finishes The contract is changed as follows: 1.Paint diffusers for locker rooms.Add: 2.Labor and material to replace behind jamb seal removed during painting.Deduct: 3.Painting backcharges to MCI.Add: 4.Stain and finish wood Room 109 and repaint wall.Add: $180.00 ($615.60) $1,270.00 $485.00 Total'Add'$1,319.40 14225 ijnNer$ity Suite 111) Waukce-.lli 50263 ra 515/22,'5.3469 fAX 515.225.9549 OeslgnAllianc-<l!llc.tool Jensen Builders,Ltd. The contract is changed as follows: 1.Labor,material,and equipment to load and haul excess dirt. 2.Labor,material,and equipment to load and haul excess dirt. 3.Dig out precast panels and pump water. 4.Repair underground plumbing in north bay. 5.Prep and pour dumpster pad. 6.Modify base plates at columns footing. 7.Complete punch list for TK Concrete. 8.Labor,material,and equipment to remove and replace a section of paving. :&-{i Deduct:($2,360.00) Deduct:($660.00) Deduct:($583.63) Deduct:($931.08) Add:$1,568.00 Deduct:($528.00) Add:$855.00 Add:$2.988.00 -9 Add:,$i34!7",{;'7~'-'1"';l.'1 ..Q.I?> .:?e:)~Total~ Jensen Builders.Ltd. The contract is changed as follows: 1.Deduct for the concrete footing ailowance in the contract.Deduct:($7,916.00) ,olatc ($'7,9i6AJO) Kone,Inc. The contract is changed as follows: 1.Elevator re-inspection charge. ····I')educt: Add:$911.84 Total:-$91-HI4 Majona Steel Corporation The contract is changed as follows: 1.Labor,material,and equipment to modify base plates. 2.Labor,material,and equipment to re-work mezzanine guardrail. 3.Labor,material,and equipment to re-work overhead door jambs. 4.Labor and materials to load and unload stairs. 5.Labor to modify and field fabricate handrails. 6.Miscellaneous modifications. Add:-- Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: ($412.00) ($288.00) ($2,384.00) ($447.00) ($576.00) ($638.00) Total:{$4,745.00) Mechanical Comfort,Inc.-Electrical The contract is changed as follows: 1.Repair and replace damaged conduit. 2.Replace concrete for conduit extension. 3.Cadweld material. 4.Elevator re-inspection 5.Reseal,repair,and replace damaged tiles. 6.Re-c1eaning lot from backfill of tranches. 7.Progress cleaning . 8.Miscellaneous charges from Heartland 9.Miscellaneous charges from Olympic. -··Deduct:- Add: Deduct: Add: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: $701.80 ($252.00) $136.00 ($911.84 ) ($466.00) ($975.00) ($1,215.32) ($860.00) ($751.00) 14225UnivetS1W Suite 110- WaUkea,!A .002&3 ill 515<22.5,3469- FAX -515.225.9649 Oesigi1AlHancefJ\c.COOI 10.Install 3 projector screens and 3 projector lifts. 11.Replace broken conduit at west overhead door. 12.Patch can light with sheetrock. 13.Miscellaneous cleaning backcharges. 14.Cleaning parking lot and driveways. 15.Vanderhart charges. 16.Charge for crane delivery. 17.Charges for temporary heat. 18.Repair,replace,and reinstall ceiling tiles. 19.Miscellaneous caulking. 20.Painting backcharges. 21.Masonry punch list work. 22.Install attachments for mechanical units and fans. 23.Replace damaged wall panels. 24.Labor and materials to complete electrical work on project. 25.Labor and materials to complete punch list. 26.Labor and materials to replace VCT tiles. Deduct: Add: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: ($3,648.52) $836.07 ($687.00) ($6,380.36) ($400.00) ($1,960.00) ($1,100.00) ($1,277.18) ($379.00) ($272.60) ($1,270.00) ($2,665.00) ($1,730.00) ($1,637.00) ($27,239.25) ($4,200.31 ) ($850.00) Mechanical Comfort,Inc.-Mechanical The contract Is changed as follows: 1.Labor,material,and equipment to load and haul excess dirt. 2.Paint diffusers at locker room. 3.Dig out precast panels and pump water. 4.Repair underground plumbing in north bay. 5.Repair damaged sewer line in north bay. 6.Repair underground plumbing In east bay. 7.Core drill precast panel. 8.Repair 2"waste line at east bay. 9.Miscellaneous caulking. 10.Re-install second floor lavatory. Deduct: Deduct: Add: Add: Add: Add: Add: Add: Deduct: Add: ($59,453.51) ($495.00) ($180.00) $583.63 $931.08 $345.69 $1,026.56 $299.00 $568.85 ($450.32) $520.00 Total'$3,14949 Moehl Millwork,Inc. The contract is changed as follows: 1.Cut finished bathroom valances and re-edge band. 2.Stain and Finish wood Room 109 and repaint wall. 3.Labor and materials to remove and replace lavatory. .Add: Deduct: Deduct: Deduct: ($442.00) ($435.00) ($520.00) Total:($1,397.DO)Deduct: MPC Enterprises,Inc. The contract is changed as follows: 1.Labor,materials and equipment to weld angles,braces and quick bolts.Deduct: 2.Labor,materials and equipment to re-drill holes.Deduct 3.Labor,materials and equipment to remove and replace two precast panels.Deduct 4.Labor,materials and equipment to layout and drill holes in precast paneis.Deduct ($2,176.00) ($769.00) ($1,442.00) ($330.00) 14225 Unl'lersily Suttell0 Waukee,IA 50263 HI,S15,_22S~J469 fAX 515.225.9649 DesfgnAlllanceillC.COO1 5.Labor,materials and equipment to add embed plates on wall panels. 6.Cost associated with delay of crane. 7.Cost associated with truck delay. 8.Core drill precast panel, Deduct: Add: Deduct: Deduct: ($186.00) $1,200.00 ($1,932.00) ($299.00) Totai:($5,934.00)Qeduct: Northwest Steel Erection The contract is changed as follows: 1.Labor,materials and equipment to weld angles,braces and qulckbolts.Add: 2.Labor,materials and equipment to re-drill holes.Add: 3.Labor,materials and equipment to modify base plates.Add 4.Labor,materials and equipment to remove and replace two precast panels.Add: 5.Labor,materials and equipment to layout and drill holes in precast panels.Add: 6.Cost associated with down time waiting for water to be pumped out of footings,Add: 7.Labor,materials and equipment to add embed plates on wall panels.Add: 8.Labor and material to re-work the mezzanine guardraiL Add: 9.Cost associated with delay of crane.Deduct 10.Cost associated with truck deiay.Add: 11.Labor and materials to re-work overhead door jambs.Add: 12.Labor and materials to load and unload stairs.Add: 13.Labor to modify handrail at stairs.Add: 14.Misc.field adjustments.Add. 15.Repair of damaged sewer line.Deduct: 16.Repair of underground plumbing.Deduct: 17.Field cut wall openings.Deduct: $2,176.00 $769.00 $412.00 $1,442.00 $330.00 $421.00 $186.00 $288.00 ($1,200.00) $1,932.00 $2,384.00 $447.00 $576.00 $638.00 ($345.69) ($1,026.56) ($2,287.00) Olympic Companies,Inc. The contract is changed as follows: 1.Labor and materials to add blocking at windows. 2.Labor and materials for barricades and floor opening coverings safety items. 3.Labor and materials to complete A-Cam's contract. 4.Miscellaneous framing,drywall repair,re-installation and re-setting of misc.items. 5.Cut finished bathroom valances and re-edge band. 6.Patch can lights holes with sheetrock. 7.Drill holes in door not prepared. 8.Deduct for stain and finishing wood Room 109 and repairing waiL 9.Labar and materials to replace two burnished blocks. Add: Add: Add: Add: Add: Add: Add: Deduct: Deduct $3,244.00 $1,623.00 $24,450.00 $751.00 $442.00 $687.00 $327.00 ($5000) ($352.00) Total:$31,122.00Add: 14225UnNcrsity Suite no waukee,lA50203 ret 5t5,225,3469 fAX 5t5.22fi.954!l DesigMJlian(;(!lr.c.COtn Overhead Door Company The contract is changed as follows: 1.Labor and materials to replace behind jamb seal removed during painting.Add: 2.Deduct for miscellaneous door workfcharges.Deduct: 3.Additional cost for electric wiring for overhead doors Deduct: $615.60 ($3,430.00) ($550.00) Total'($3,364.40) Premier Flooring,Inc. The contract is changed as follows: 1.Provide labor and material to replace VCT. Deduct: Add:$3,420.00 Total:$3,420,00 RJ Landscaping. The contract is changed as follows: 1.Cost of labor and material associated with deletion of Landscape edging. Add: Deduct:($3,297.00) Seneca Construction,LLC The contract is changed as follows: 1.Adjust the contract to match executed document.Add:$9.00 . Total:-$9,00 TKCONCRETE The contract is changed as follows: 1.Labor and material to remove and haul concrete. 2.Extend electrical conduit out of paving. 3.Deduct for Jensen to prep.and pour dumpster pad. 4.Deduct for re-striping the parking lot. 5.Deduct for miscellaneous caulking. 6.Deduct for Jensen to complete punch list. 7.Labor and material to cut out and re-caulk paving joint. 8.Labor,materials and equipment to remove and repiace a section of pavinq due to improper drainage. Add: Deduct: Add: Deduct: Deduct: Deduct: Deduct: Deduct: Deduct: ($130.00) $504.00 ($1,568.00) ($395.00) ($247.64) ($855.00) ($2,395.36) ($2,988.00) TDtal:($B,076.00) Two Rivers Glass &Door,Inc. The contract Is changed as follows: 1.Cost of labor and material associated with deletion of existing foam tape glazing gasket. Deduet: Deduct:($1,200.00) Total:($1,200,EJO) Vanderpool Construction,Inc. The contract is changed as follows: 1.Labor and material to remove and haul concrete. 2.Find and repair broken conduit at west overhead door. Deduct: Add: Deduct: $130.00 ($836.07) 14225 UnNersilysuueno Waukee.!A 50263 tEL -515,225.3469 fAX 515.U5.9649 Desigr.Allla.llC4[nc.com 3.Deduct for cutting slabs for conduit ripped by dozer. 4.Gravel parking and staging area. Deduct: Deduct: ($250.00) ($13,125.00) Total:DeCluct:($14,081.07) .Workspace,Inc. The contract is changed as follows: 1.Labor and material to replace damaged VCT.Deduct: ($2;51'0.00)Total:Qeauc!: Young Mechanical and Plumbing The contract Is changed as follows: 1.Cost to repair and replace damaged conduit caused by Young Mechanical. 2.Labor,material and equipmentto load and haul excess dirt from Jensen Builders work.Dig and fill rock around footings. 3.Labor,material and equipment to load and haul excess dirt from previous work. 4.Cadweld GRC182L,provided by Mechanical Comfort. Deduct: Add: Add: Deduct: ($2,570.00) ($701.80) $3,040.00 $2,590.00 ($136.00) $zI,T92,20 . CSI -General Requirements The contract is changed as follows: 1.Labor,materials and equipment to cut wall. 2.Adjust the contract to match executed document. 3.Labor and materials to add blocking at windows. 4.Laborand materials for barricades and floor openings safety items. 5.Cost associated with down time waiting for water to be pumped out of footings.Deduct: 6.Labor,materials and equipment to haul fill rock.Deduct: 7.Labor,materials and equipment to load and haul excess dirt.Deduct: 8.Cleaning the lot.Add: 9.Progress cleaning.Add: 10.Temporary enclosures.Add: 11.Cutting slab for conduit ripped by dozer.Add: 12.Miscellaneous cleaning backcharges.Add: 13.Cleaning parking lot and driveways.Add: 14.Vanderhart charges.Add: 15.Charge for crane delivery.Add: 16.Charges for temporary heat.Add: 17.Capital Fire Equipment inspection.Add: 18.Masonry punch list work.Add: Add: Deduct: Deduct: Deduct: $2,160.00 ($9.00) ($377.00) ($1,623.00) ($421.00) ($680.00) ($1,435.00) $975.00 $1,215.32 $3,138.00 $250.00 $6,380.36 $795.00 $1,960.00 $1,100.00 $1,277.18 $179.14 $2,665.00 Subtotal:Add:$17,550.00 CSI-General Conditions ;;'>- 14225lJnWl!rsit'/ Solie 110- Waukee,IA SOiB3" 'tEL 515.225.:1469 fAX flts'22.5.00A9 OesignAllia:ncelr.C.N1ll 1.Labor and material to grout columns. 2.Extend electrical conduit out of paving. Add: Deduct: -----------------;::S-u'C"bt'C"o-;-ta-;I-:--A'C"d-;-d'C":----.-::o$-::c1-2=e.-::.ee"'·::::--;-t"':l'O:'t,J1DJlla Total:.Add: CSI -General Requirements The contract is changes as follows: 1.Provide and install edging. Total: Add:$3,297.00 Add:$3,297.00 4 Add:$7,770.00 Add:$7,916.00 Add:$10,000.00 Add:$13,125.00 Add:$1,200.00 Add:$40,011.00 C,'$W3,30B.U0.t: Subtotal: CSi -Alternate Purchase Allowance 1.Wall insulation system change. 2.Concrete footing allowance. 3.Footing design allowance 4.Gravel parking and staging area. 5.Deletion of existing foam tape glazing gasket. Subtotal: We have evaluated the prices;find them to be within standard building practices,and the changes work within the project budget.We would recommend acceptance and move forward with change order signatures. If you should have any questions,please do not hesitate to call. Sincerely, DESIGN ALLIANCE,INC.l/~ Jerry Purdy,AlA JP:bv t4225\Jnivtltsity Suite 110 Wauket\1A502.GJ TIl 515,125.3469 fAX:515225.9549- Oe-sl9.Ml.I!ei,cclnc.cOil1" Design Alliance Summary"Revised October 13,2011 Allegro -Commercial (Acorn) Baker Electric CK Fairco Danielson(Tech Suppiy Inc Doors Inc Edge Commercial LlC Edge CommercfaJ LLC Forrest &Associates Inc Heartland Finishes 095100 Heartland-Finishes Jensen Builders Ltd Jensen Builders ltd xone,me Majona Steel Corporation Mechanical Comfort Inc -Electrical Mechanical Comfort Inc -Mechanical Moel Millwork Inc MP(Enterprises Inc Northwest Steel Erection Olympic Companies Overhead Door Company Premier Flooring Inc RJ Landscaping Seneca Construction LLC TK Concrete Two Rivers Glass &Door Inc Vanderpool Construction Inc Workspace Inc Young Mechanical &Plumbing (51-General Reauirements CSI-General Requirements &Alternate Purchase Allowance $(30,634.14) $35,419.56 $3,365.92 $(568.85)s (25,OO)s 3,347.10 $(17,770,OO)s 352.00 $5,353.52 5 1,319.40 $348,29 $(7,916.00) ~~11,tl4 $ $ (4,745.00) (59,453.51)s 3,149.49s(1,397.00) $(5,934.00) $7,141.75 $31,122.00 $(3,364.40) $3,420.00 $(3,297.00)s 9.00 $(8,075.00\ $(1,200.001 $(140081.07)s (2,570.00)s 4,792.20s17,670.90s43,308.00 �~City of wacxee.".."'",=Waukee:Public Works Facility t="'",Waukee,Iowa ....,;,..,!>....I Change Orders Exhibit 'A' October 5,2011 Change Orders CSI-2 CSI-2 CSI-2 CSI-2 CSI-2 CSI-2 CS!~2 CSI"2 CSi-2 CSI-2 CSI-2 CSI-2 CSI-2 CSI-2 CSl-2 GSl·2 CSI-2 CSI-2 CSI-2 CSI-2 CSI-2 CSI-Z CSI-2 CSI-2 CSI·2 CS1·2 ACOM-a AGOM-9 ACOM-9 ACOM-9 B ..!re(-1 Ba!ler-1 Bt'J<er-t Bilker-l CK-1 CK-1 OOOr5-6"""~-6 E<!ge-2 E1:Ige-2 E1:Ige-2 Eilgc-2 Erlge-2 Ellge-2 Edgll-2 EdQr:-2 E<lg,,-2 Fmrest-5 HF-:! HF-3 HF-J HF-3 HF-5 HF-5 HF-5 HF-5 JEl'!sen-4 Jensen-4 Jans<lo4 JensEn-4 Jansen4 J.mslla4 Jensen4 ~ensefl..tl JenSi':!l-4 KOf1o-l MAJ-a MAJ-8 MAJ--3 MN·3 MA.HJ CSI -General aequvemeots CSI -General Requ,rements CSI-Genllral-Requlremenls CSI·General Reqll,remenls CSt-Gcneral Requirements eSI-General Requkements CSr ~Gll!lelill Reqlliremenls eSI-General Requirements GSI-General Requirements CSI-aenerar aeqcrrerueots CSt -uenerar Requ!remenl; CSt -General Requirements CSt·Genaral Reqelrcments CSt-General Requlramenls CSI-General Requirements CSI-Gene"ll ReqUiremenis CSI-eeneret Requlremenls CSI-GcllIlral Requirements CSI-General Requirements CSI -Geoalal Condilions CSI -General Com(,fums CSI-Generat Requlrements eSI •GeneraIRe'llJlfl!mellts eSI-OenEllal Requiremlffits CSI·General Raqu,wmenls CSI ~Gensral R.equiramems ccnsvceucn seraces,inc.Cut B!n.ck w~n ADO Cons1rucUoll SaNkes,inc-Adj"s{contract 10 malch executed do~um"nl DEDUCT Consiruciion SerY'ites,inc.Jl.drJ o!m:king to Ytindows DEDUCT ConsL'tlction Se",i~es,inc.8a'riC<\des and Safely Hems DEDUCT Construction Services,inc.Pump Foo~nss DEDUCT COl'lStrudloD Services,inc.Haut Fill Roct DEDUCT consnucuoe Services,me.Load and Haut Dirt DEDUCT ecneuucuon Services,InC".Clean Parking Lot ADD Genslruc1km Services,inc.Progress Cleaning ADD Construction Services.Inc.Temporary Enclosures liDO Construction Servieea,Inc,Cut Slab for Conduit Repair ADD Construction SeJ'lices.inc.Cleaning Backchal"§l!s ADD Construclklll Services,rnc,Clean lot and 0Ii'll',5 ADD censeucuon servtces.fnc.Vilnd6ll!<lrt cnemea-Site Clean-up ADD Construction Services,inc.c.ene Delivery AOD Comtrudian BeI..-ices,inc.Tempora,y HeaL ADD Comlruct!eo seraces.inc,Capl1MFlre lnspact10n ADD ConslNc~on Services,inc.M ascnrv Pu~ch WOIl<.AOD Donssnction services,mo.Reverse Provide landscape Edging AOD Cons:rucLion Sel"rices,!ne.Grout Columns ADD COl1slrucuon Services.inc..Extend EfecLiool ccncuuat Paving-DEDUCT CoHs:ructllm Services,tac,Wal!insurauen Change ADD- ccnstmcuon Services,sic.Concrete Footing A1lol'lal1C8 ADD Construc1ion Services,Inc.FoaM.!!Oes!;;n AlkY.vanco ADO Conslruc1ioo Serv1cGs,inr:..Gravel Pa,lUng &Slag:!ng ADD Cor.slmcUon Ser",lces,inc.Delele Foam Gasksl;"g-ADO ACQM ArId bloc"4ng to.Windows DEDUCT ACOM Complete ~laul1 CotILr.;ct DEDUCT ACOM Tampnr.l1yEndosuffis DeDUCT ACOM eaplial File lli:specti<m DEOUCT Baker EIl<Cllic Misc.Door'llork ADD 8aker Eleclric-OH DoorWiring ADO Baker Elecl!k.Complete ElsclriC<J1Ra(juirmellts ADD Baker Eloo'.ri1S Complete Bacrncal Pum:h Ust ADD CK Fa!rco Misc.Caulking ADO CK Fairro ?a~ament CaUlking ADO Dams,Inc.Cut down three dOMSlTrames ADD DoolS.mr:.Drm holos indoors nol plOpar12d DEDUCT Edge Commerical Cui down thldG doorsiframes DeDUCT Edge Commerlcal Cu[BTock Wall OEDUCT Edge Commencel Grom Columns DEDUCT Edge Commarica!Install steel/estelle's [or Mech.Equipmen\ADO Edge Commaricai Replace Ihr~exteriorwa!!panels ADD Edge Gommericai Field Cut Wall Opening ADD Edge Ccmmerical Modify Base platesal Column FwUJ1gs AD.O Edge Commerical Wall InsulaUon-Change DEDUCT Edge Commerioal Fooling Oaaign AJlow=~"DEDUel ForreslMaOOfll)'Replilce !WObumislled blocki ADD Heartland Fif)ishes (Ceiling)Repair aM Replace Ceiling Tiles AOD H<'!art!and Finishes {Ceaing}Misr:.Backcharges:O MCI ADD Heartlaml finishes {Ceiling}Install Projllction Screens amJUfls ADD HearlJ<Illd Finl.shes {Cemn.g}Repair.Rep;acc,Reinstall Cl!nlng Tiles ADD .Heartland finishes {Painting)Paint Diffusers ADD Heartland Finishes (PalnUng)Rep!"ece 01-1 Door Jamhs DEDUCT Heartland finishes (PlIinUng)Painling 8aG(-lcharges!o MGI ADO Heaf'Jand finiShes {P:ointing1 Slain ami Finish Wood at Rm 109 ADD Jensefl Builders load and H1...1 Dirt DEDUCT Jensen SuUders Load and HalJt DiI1.DEDUCT Jansen 8u)[ders-Dig oul Preeasl and Pl.mp Waler DEDUCT Jensen 8ull<:!ers Hep,,'r Undergro~md Plumbmg OEDUCT Jensen8t;ilders Prep and Pnur Dumpsler Pad ADD Jensen Builders tt!ooify Bose plates al Column i'oollf\gs DEDUCT Jerulim BundefS Complete Punch lIems for TK AOD Jensen Bu1rden;ReJilaca Paving Se~Uon ADD Jensen Bu!lders Concrele footing AJI:umflce DEDUCT KONE.lnr:.Ele'latorRe;nspection Charge ADD Maj:ma Steel COJP.Modify Base Plales DEOUCT Majona Slael Corp.Re·Wort!:Mezzanine Rail DEDUCT Majerl3 Steel Corp.Re-Wor.<DH Door Jambs DEDUCT Majena Sloal Cmp.load amI Unload Slalr'5 DEDUC-T Majllr>.a Steel Corp.MndUy Handrails-DEDUCT S2,160.01l {S3J:>Qj (S'JH.Ut:!) {S1,li2J.lfJj 0421:·{lO} (S61KLOO) {~j.~~5.(''{;) ·1'975.00 SI.215.32 53,138.00 $250.00 56,380.36 S7S5.00 S1,llSO,CO Sl,tOO.OO .$1,277.18 5179.14 $2,655.00 $3,2.91.00 $372;90 (5:lli200} S7,nO.0J) $1,916.00 $10,000.00 !;i13,t25.00 $1,2CO.00 {52.W7.vOi t:$2'iA5!lGO) {~,t:J!J.(j(j) {$ttS.14) SJ,430.00 5550.00 527,239.25 54,200.31 5910.5;; 52,395.:}6 530-2.00 {$32f_OQ} {S"JIJ?.UU} [S2,maOO} {,$;l12.tlO} Sl,130.00 $1,637_00 52,287.00 552&.00 ~~",7N.W} l;ilQ.COO.Wt $352.00 5485,00 $880.00 $3,648.52 $379.00 $160.00 {$a15.6:}J S1,271}.OO S4lJ5.00 {Sl,:¥".>O.OO) .($l:OOJ}(l} \$SBJ.63i tS~i_G&) $1.5£8.00 {S526.G-:1-) 5355,00 S2,9118.00 (.$1,9ii";LC,;}) $911.84 ~1l.!¥3; (!illL't·r,;.:<i {$2,:Ja,LUil:; {S·H7.C-i!} {$S11L{H;} Cor.fidefllrai MAJ-'.l MC1M·a MC1M-8 MCIM-8 MCIM-a MCIM-8 MCIM-8 MClM-8 MCIM-S MCIM-8 MC1M-8 MCIE-23 MCIE-23 MCIE-23 MCIE·23 MCIE-23 MCIE·23 MC1E-23 MCtE·23 MCIE-23 MCIE·23 MCIE·23 MC!E·23 MC1E·23 MC1E-23 MC1E-23 MCIE-23 MeIE-2:) MCIE-23 MCIE-23 MCIE-2J MCIE-23 MCIE-2J MCIE·2J MCIE-23 MCIE-23 MCIE-23 Moehl-5 Moahl-5 Moeti!·5 MPC-1 MPC·1 MPC·l MPC·1 MPC-1 MPC-1 MFG·l MPC.1 NW-2 NON-2 NW-2 NW-2 NW-2 N\V-2 N\V'_2 NW---2 N'tl¥2 NW-2 NW~2 WN-2 NW-2 NW-2 NW-2 NW-2N'N.' OlY-5 Ol'{-5 OlY.S OlY-5 OLY-5 OLY-5 OlY·S OlY·S CD'·S OH-1 OH·\ OH-1 Pmrn-6 RJ-Z SEN-2 DAN-1 TK-5 TK-5 TK-S TK-5 TK-S TK-5 Majima Steel Corp. Mechanical Cmllfmt{Mech) Mechartkal Comfort (Meeh) Mechanical Comfort {Mech} Mechanical Comfort {Meehl Med1anieill Comfort(Mech} Med;allical Comlort(Mech) Mechellical Comfort{Mechl Mechanlcal Comfort (Medl) Mechallical Comlolt (Meeh) Mechanical C(Jmfor1 (MElch) Mechanical Comfort (EleeO MaclJeni~1 Comfort (Elect) Mewan1ca!Comfort (Elect) Mechanl!;;>l COlll/ort (Elee!) Mechanical Comfort (ElecT) MeChliriit<ll Comfort (Elael) Mechanical Comfort (aIlCl) MeChanical Comfort (Elecl) Maehanical Comfort (Eled) MeChanl~1 Comfort (Elect) Mechanical Comfort {Elec\) MechanicaL Comlori"(Electj Ma-chanlca!COmlort (ead) MedlilnicaL Comfort (Elect} Mechanical ccmrcn (Elect} Med!anlcal Comfmt (Elect} MectJ,mical Comfort (Erad) MechaniC<li Com(OIj (Elect) Mechanical Comfort (Elect) Mechanical Comfort (Beel) Mecl1anlcal Comfort (Eloct) Mechanical Comfort (Elecl) Mer:hanicaICOBlfortlEl"ct) Mechanical Comfolt (Elect) Mechanicat Comfort {Etect) Mednlnk ..1Comfort (E!ec\) Meehl Millwork Moehi 1~il1wor" Moahl Mllt.wt!l. MPC Emerprises MPC EnlefllriS&5 MPC En\lirpris:es: MPC Enterprise:> MPC Enterprises MPC Enterprislls MPC Enlerp6s:es: MPC Enterprises Northwost Steel North\vas\Steel Nor'.hwest Sleel Northwesl Sleel Northwest Steel North\'lIlst Steel Northwest Steel North.__mst Sleel Northwest Slcal Northwest Sleel Northwest Stil61 Northwesl51e"t Northwesl Sleel Northwest Sleel Nolilwresl Slf:;al Northwest Steel NortflweGI SieeL Olympic Companies Olympfc Companies 0I~1npic Comp'mias Olympic Companies Olym~Companies Olyr~pic Cornp!lIlies Olymr.~c Companies Of).mpic Companies Olympic Companias O"'emead 0001 Company Overhead Door CompEn\, Overhead Door Company Premiar Rooring RJ Lawn Seneca G(Jmpanles DanialsonlTecll Sup,?l)' TKConcral", TKConcrllle TKCOncrele TKConcrale lKConcrele TKConcrete Misc.Mmlificanolls DEDUCT Load and Haul 01,[OEDUCT PainlOiffusers DEDUCT Oig Ollt Precast ar\d Pump water ADO Repair Uor:!ergmuml Plumi:)ir.g ADD Rl!p<llf darm;ged sewer lins ADO Repair Undelgml.md Plumbing ADD Cora dlill Precast Panel ADD R;:;pa7r2'Wast",Una ADD- MIscellaneous CaUlking DEDUCT Ro·inslaU Lal'olo!)'ADD RepalrlRaplaC'i!Damage Conduit ADD Rep!aca COlldul1 [at Concrete E;i<leilsiot1 DEDUCt CsdwElkl Malelia!ADO E!e\laior Reinspecticn Charge OE;OUCT Repair and Replaca GeUing Tiles DEDUCT Clean farkinglet DEDUCT eroareee Cieanlng DEDUCT MisC'.had'!;harges from Heartland DEDUCT Misc.<;;hatge,frum Olympic DEDUCT Instal!Projeclion screens ami Lifts DEDUCT Replace conduit at OH 0001 ADD Patch .sheeuock al canjights DEDUCT Mi,,(;~Cleaning Charges DEDurrT Clean P.al!l:'ng and Olives DEDUCT Vand61!1an Chll.1g1lS -Sits rzean-up DEDUCT Crane Deliver)'OEnUCT Tempoffil)'Heat OEnUCT Repair.Replace,xensteu Ci'£ing Tiles DeDUCT Misc.Caulking DEDUCT Painllrlg Badcharges to MCI OEDUCT Masonry Punch Work DEDUCT Ir.slallsteel fastaners fQI Mach.EquIpment OEDUCT RaF~ilca dl!maga wall panels DEDUCT Complele EleClrfal V{flIk -Baker DEDUCT CampJet/!Ptnch llst-Baker DEDUCT Replace-VCT DEnUCT C"t and R,,1rand RHValances DEDUCT St<lio and finish-Wood at Rm lilg-OEDUCT Remove and Replaca-Lavamry DEDUCT Weld Aogl;:;s,Slating DEDUCT Re·DIiU Hol~s DEDUCT Rerno"",and Replata two Pitlwls DEDUCT DrH!Holesal P(eeast DEDUCT ·Add Embed Ptates DEDUCT DorayefCranB ADD TruC:~Delay DEDUCT Corll drilL Precast Panel DEDUCT Weld AngleE,81i1dng ADD He·DrilL Hol.,s ADD Modify Base Plates ADD Removl!and Replaco 1\'10Panels AOD Dr\llho1es ill ProcaEI ADD Dov.n Tim"for Pumping Foolings ADD Emted-Plales ADD Re-Work Meuanine Rail ADD Delay of Crane DEDUCT Tf\lc!<.Deiay ADO fle-Worn OH Door Jambs ADD Load and Unload Siafrs ADO Modify Har.draijs ADD Misc.field Adjllslnleols ADD Repairdamagerf sewer lIne DEDUCT RepairUm!wground-Pfumbing DEDUCT Field Gilt Wall Opening DEDUCT Add blotiiing 10 vlindows ADD 8arricades :and Safaly Ili,lms ADO Cilmpti!teDelault Conlf<ICl-ACOOM ADD fmffiing and Drywall Repair ADD Cut and Rebar.d RR Velence"ADD Palch sheel!ock atcan lights ADD DrIll holes in doors not prepared ADD Dedul for slain amI finiSh Rm 109 DEDUCT Rel!'.ace two bumlshetl tlocks DEDUCT Replace OH Dotlr Jambs ADD Mise Door Work DEDUCT Elec1Jical Wiring DEDUCT Replace VCT AOD Revelse "<,,'lid,,Landscape Edging DEDUCT Adjust con\1acl to match a:<eCUleddocument ADD Repair 2"Waste Une DEDUCT Rl!nlO'Ie and Ha....!ConcreLI!OEaUCT EdeM Elm:!licaIConduil at Pa'Mg ADO Prep and Poor Dumpsler Pad DEDUCT Re-SlJipa Porking LQl DEDUCT Misc.C~lJl~ng DEDUCT CcmJ!lole Punch LiSI •Jensen DEDUCT [Sese.OOl (H&'lJX» (5100Jl(}) $593.63 $931.':18 $345-.69 $1,026.56 5299.00 $566.85 ~5i).32~ 5520,00 $701.00 {$252.QO} $136,00 {:i911.84} 1$i6Q..OOj {i!r7S.W} :(.$1;215.32\ §C50.00} fH5-11lOl {$3,lM&S21 $036.01 {$fiS.,.OOJ tffi.Ja..1.:3(1} {MU.:i.oo} f$U6'..I.OO} tS1,1Q(j.OO} {S',27D6} {$S79.00} {S272:.{J(1} {S1.21QOO} \$1,lIfi5.00} ($1,130,00) {$t.fi,'l7.00j {S21,:r,,"9.25} 1$4.WO;31) i$Jt~·Q;l) {U4Z.WJJ {S4'3~iOOl iS521.Uml ~S2>176.-.:Hl! {S16RU'J} iSI,M2.00j (£:E!l.OOj (51illi.Wj S1,200.00- ~$1.9-nGr,1 {sm.!lO} $2.116.00 $11.09.00 S412.C-o 51,4"42.00 $330.00 $42.1.00 St86.00 5286.00 {S-t..zoo.oo} 51,932.00 52,394.00 S4.41.00 $516.00 ~63S,OO (S34"S.6l'1) {SUnS.55} i$2,:m?OOl 53.244,0.;1 $1,62.3.00 $24,450.00 5151.00 5442.00 S687.00 S:J.27,OO ttOOJ;Q} <&JSUlf.!-) $615.BO (i]:~..1:all,O(i) ($5W.OO) $3,420.00 {$3,2.97.00} $9,00 {55$:[\-S5) {-$13iU'j()j $504.00 t$l,56$.OI}} ~S3g:;.t#} (:S-Z<;7JJ4j !$~SLlt} TK-5 TK·5 TR-J VAN-2 VA."l·2 VAN-2 VAN-2 Wol"kspaC1l·2 YM·5 YM-5 Y1.1-5 YM-S TK Conerate 'tx concrete Two Rivers vaocerncor ccnstructon Vande/pool conseucucn varurerccct ccnstnrcuon Vanderpool ccnswcnon Wcr\<space.lnc, Young Mernandal Young Milci1~lIc1al Young Hechanctat Young Meehan';;,,! Paving CaUlking aencve and Replace Paving Section Delete Foam Gas~e\'l1g Remove OIndHaul ConcrEte Repair iY.oken Coolluit Culling Slab::;forCondufl Ripped GI'il\'a1 Parking &Staging Reprece VCT Repair and Replace Damaged Condu~ load and Haul Oir. Load and Haul Dirt Cadwell:i Malerial OEOUCT OEOUCT DEDUCT ADO oeDUCT DEDUCT DEDUCf OEDUCT OEDUCT ADD ADD DEDUCT fS1,3l'i~L}6i {S2,f!!i8;O'J} {$t<!OO.OOj $130.00 (Sltlil.C7i {S~w.OOj \Sl<i,I.2ti.OO} {S-Uil-<LOO} (tim.!!D} $3,040.00 $2,590.00 tacacm TOTAL:$0.00