Loading...
HomeMy WebLinkAbout2013-02-19-Resolutions 13-040_Alice's Rd Corridor - Ashworth to University - Engineer Agr Amendment 3THE CITY OF WAUKEE,IOWA RESOLUTION 13-040 APPROVING ENGINEERING SERVICES AMENDMENT NO.3 BY AND BETWEEN FOTH INFRASTRUCTURE AND ENVIRONMENT,LLC,AND THE CITY OF WAUKEE RELATED TO THE ALICE'S ROAD CORRIDOR PROJECT IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,the City of Waukee,Dallas County,State ofIowa,is a duly organized Municipal Organization;AND, WHEREAS,the City of Waukee has previously entered into an Agreement for Engineering Services with Foth Infrastructure and Environment,LLC for services related to the Alice's Road Corridor, Ashworth Road to University Avenue Project (Resolution #08-201),as well as Engineering Services Amendment No.2 (Resolution #11-221);AND, WHEREAS,the project has since expanded to include a regional storm water facility,wetland mitigation,additional traffic signalization,grade separated pedestrian facilities and capacity improvements. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee that the Engineering Services Amendment No.3 related to the Alice's Road Corridor,Ashworth Road to University Avenue Proj ect,attached hereto as Exhibit A,is hereby approved. Passed by the City Council of the City of Waukee,Iowa,and approved the 19th day of February,2013. Attest: jfjUJ()VfJ J@cv1 McIGnlee Gibson,City Clerk ROLL CALL VOTE Shane Blanchard Dan Dutcher Casey L.Harvey Shelly Hughes Mike Watts AYE X X X X NAY ABSENT ABSTAIN X EXHIBIT A Foth Infrastructure and Environment,LLC Project Number 08W051.00 Alices Road Ashworth Road to University Avenue Waukee,Iowa ENGINEERING SERVICES AMENDMENT NO.3 PROJECT NO._ Rbl'ldtiNilcll& THIS AMENDMENT,made and entered Intothls ,I~tIt\day 01~m~'1;tby.and between,the CITY OF WAUKEE,IOWA,hereinalter referred to as the "City",and FOTH INFRASTRUCTURE AND ENVIRONMENT,LLC., hereinafter referred to as the "Engineer",for professional services in connection with the conceptual development traffic Lewlew and 811tilv;$J§!1.nrellmi.natv survey and mimplng.pf'{;litnlO,Giry designjftnal :pl'ans,andspeeiflcfiUons.fbtthe-btofi!.Q§ed cons!ruciiondf AlJo<'>'LRo"d from Ashworth Road to l\ist south of University Avenue,hereby amends the original Agreement dated August 18",2008 as follows: The City and Engineer agree to amend the original Agreement to include additional services associated with: •Development of the Alices Road Greenbelt Regional Storm Water Facility •Alices Road Mitigation Plan and 404 Permit •Traffic Signalization at Alices Road and Ashworth Road and traffic signal modification to Ashworth Road and University Avenue •Design of grade separated pedestrian facilities •Design of Alices Road and University Avenue Intersection Capacity Improvements •Additional Right-of-Way Assistance TASK A -Development of the Ailces Road Greenbelt Regional Storm Water Facility: This task includes the conceptual design,preliminary design,final design,and geotechnical exploration of a proposed 490 acre regional storm water facility.Proposed facility starts downstream near the east property line of Ashworth Properties and continues upstream crossing Alices Road and Westown Parkway to the Giles Property.Includes a regional storm water analysis of the proposed land uses and associated detention required based on these land uses.It is assumed that no special control structures or weirs will be required to achieve the necessary detention. Task A.1 InventoryJheExfsting and Proposed Hydrologic and Hydraulic ConliilUons Inventory existing hydrologic and hydraulic condition.Review current storm water detention policy. Analyze the impacts the proposed land use from the recently completed planning study will have on the area wide drainage patterns.Quantify impacts proposed land uses and develop alternatives to maintain agreed upon maximum release rate.Document detention capacity associated with benefited property. Task A.2 Prepare Storm Water Facility Concepts Prepare conceptual layouts of regional ponds that provide detention required based on hydrologic and hydraulic analysis.Review concepts with City staff to build consensus on pond size and shape and detention capacity.Develop proposed grading contours and estimated quantities to develop conceptual level planning cost estimate.For estimating purposes,it is assume that a maximum of three (3)concepts will be developed. Task A3 individuai Property Owner Meetings The Engineer will conduct meetings with individual property and the City.During the scheduled individual property owner meeting times,the Engineer's project manager will discuss the specifics of the project as it relates to their property,obtain information regarding any issues the property owner feels is important,and get input regarding their expectations about the project.The Engineer will share detention design calculation and methodology used to size the proposed detention facilities. The information gathered at this time will be used in developing the project documents and negotiating Page 1 Foth Infrastructure and Environment,LLC Project Number 08WQ51.0Q Alicea Road Ashworth Road to University Avenue Waukee,Iowa the required right-aI-way.It is anticipated that three (3)meetings with 5 Individual property owners lor estimating purposes. Task A.4 Pretiminary Grading Plan After approval of the conceptual design,prepare preliminary grading plan with proposed contours, erosion control and surface restoration and incorporate Into overall project plan set.It is anticipated that no special outlet control structures will be required to accommodate necessary detention for this project.Prepare preliminary quantities necessary to track the overall project costs. Task A.5 Prepare Acquisition Plats Prepare acquisition plats and legal descriptions for property to be acquired for the regional storm water facility and additional plats and easements for the roadway Improvements.Perform land corner and lot surveys as needed for the preparation of the acquisition plats and legal descriptions for each parcel.Said plats and legal descriptions shall comply with requirements of the Iowa Code and shall be prepared by or under the direct supervision of a licensed land surveyor under the laws of the State of Iowa.The original and revised number of assumed plats are listed for estimating purposes: Original No.Revised No. Permanent Right-aI-Way Temporary Construction Easement Permanent Easement (Drainage/PUE) 5 5 8 14 13 8 Task A.5.1 Monumentation of Acquisitions Plats This task consists of monumentation of the permanent acquisition acquired as part of this project which will be performed upon completion of construction of the proposed improvements.The monumentation shall comply with requirements of the Iowa Code and shall be performed by or under the direct supervision of a duly licensed land surveyor under the laws 01 the Slate 01 Iowa. This task does not include monumentation of any existing right-at-way pins that are disturbed during construction activities. Task A.S Final Grading Plan After approval of the preliminary design,prepare final grading plan with proposed contours,erosion control and surface restoration and incorporate into overall project plan set.Incorporate changes from final design review meetings.Prepare specification and final quantities and incorporate into project manual. Task A.?Geotechnical Exploration This task consists of securing a subsurface exploration based on proposed regional storm water lacility.This task Includes completing 9 borings between 10 to 30-1t deep,laboratory testing, engineering analysis,written report,soil boring layout survey,and incorporation of soils materials in project plans and cross sections.Engineering analyses and report will include general project information,subsurface conditions including geology and groundwater,Vicinity map and boring location diagram,subgrade earthwork preparation,settlement analysis,slope stability,culvert foundation design,subsurface drainage,site grading,excavation stability and backfill,pavement thickness design,and review of the final plans for concurrence with the final soils report. Page 2 Foth Infraslructure and Environment,LLC Project Number 08W051.00 Alices Road Ashworth Road to University Avenue Waukee,Iowa Task A.8 Coordination with Iowa DNR The Engineer will coordinate with the Iowa DNR Floodplain Management and Dam Safety.It is anticipate that the proposed regional slonm water facility will not require any additional permits associated with construction of a Dam.This is a courtesy submittal and is anticipated that no further action will be required by the Iowa DNR. Task A Subtotal-$177,400.00 TASK B -Alices Road Mitigation Plan and Section 404 Permit: Wetland delineation surveys were completed in 2008,2010 and 2012 at various locations on the corridor.Subconsultant, Terracon,will prepare and submit a Section 404 Permit Application containing the applicable data,wetland jurisdlctlonal rationale,and proposed project information to the USACE,Iowa Department of Natural Resources (iDNR)Flood Plain Section,and IDNR Sovereign Lands Section necessary to receive environmental approval.The City shall understand that the Engineer or Subconsultant cannot guarantee that the USACE or other relevant governmental agencies will ultimately approve the prepared application,since such authorization is beyond their control. Task B.1 Coordination with other Regulatory Agencies Terracon will prepare and submit a Section 404 Permit Application containing the applicable data,wetland jurisdictional rationale,and proposed project information to the USAGE,Iowa Department of Natural Resources (IDNR)Flood Plain Section,and IDNR Sovereign Lands Section.We will also prepare a Mitigation Planforthe project to meet Section 404 permitting requirements.Terracon will contact the IDNR regarding potential threatened and endangered species that may be affected by the project.The Mitigation Plan will summarize each wetland and WUS area that will be impacted by the project based on the findings in our Wetland Delineation Report dated January 9,2012 and the proposed site layout plan for the project. Task B.2 Coordination with Voas Mitigation Bank Terracon will coordinate with the Voas Wetland Mitigation Bank regarding the purchase of credits for emergent and wet meadow wetland impacts.Please note that the Voas Wetland Mitigation Bank does not offer credits for forested orshrub/scrub wetland Impacts or for stream mitigation.The USAGE may require onsile mitigation of forested wetlands,trees plantings,and/or stream mitigation measures to offset potential Impacts from the proposed project. Task B.3 Mitigation Plan During the preparation of the Mitigation Plan,Terracon will coordinate with the USACE to assess what mitigation measures will be required based on the proposed impacts.The Mitigation Plan will include a discussion of the proposed impacts and a summary of the credits that will be purchased from the Voas Wetland Mitigation Bank.If required by the USACE,the Mitigation Plan will include details regarding WUS replacement or enhancement and/or tree and shrub planting.IfWUS mitigation is required,Terracon will coordinate with Foth and the City of Waukee regarding potential stream mitigation locations.Stream mitigation may include creating floodplains or riparian buffers,constructing habitat features,channel restoration,streambank stabilization,or removal of in-stream structures and/or debris.We are proposing to utilize the Missouri Stream Mitigation Guidance as a guideline forevaJuating potential stream mitigation measures.Fees assume that Foth and the City of Waukee will identify locations for stream mitigation if it occurs off-site.Additional fees will be needed If hydraulic modeling Is needed for the design of the stream mitigation features, Fees assume that the Gity of Waukee will Investigate and provide the required financial assurances that maybe required by the USAGE for the project,including construction bonds and escrow accounts.Because the City of Waukee is a public entity,the USAGE may accept a Letter of Commitment in lieu traditional financial assurances. Page 3 Foth Infrastructure and Environment LLC Project Number 08W051.00 Alices Road Ashworth Road to University Avenue Waukee,Iowa The City should understand that a mitigation plan is a conceptual design to outline the detaiis of mitigation activities proposed for the site for regulatory approval.It should not be relied upon for construction.If WUS mitigation or tree/shrub planting Is required by the USAGE,we recommend that detailed engineering plans and specifications be developed upon USAGE approval of the mitigation plan and prior to construction.Foth shall understand that Terracon cannot guarantee that the USAGE or other relevant governmental agencies will ultimately approve the prepared application,since such authorization is beyond their control. Task 8.4 Alternative Analysis If an Individual Permit will be required for the project,the USAGE will require an Alternative Analysis for the project In addition to the Mitigation Plan.Terracon will prepare an Alternative Report that will include the following discussions: •Project Purpose •Project Need •Alternate Site Analysis •Avoidance of Impact •Minimization of Impact •Compensatory Mitigation The Alternative Analysis will be based on the Memorandum of Agreement (MOA)between the Environmental Protection Agency (EPA)and the Department of the Army concerning the Determination of Mitigation Under the Glean Water Act Section 404(b)(1)Guidelines,dated February 6,1990.As indicated in the MOA,when evaluating 404 permit applications,the USACE follows the steps listed below: •determines that potential impacts have been avoided to the maximum extent practicable; •determines that the remaining unavoidable impacts will then be mitigated to the extent appropriate and practicable;and •compensates for aquatic resource values. Followlnq submittal of the Alternatives Analysis,Terraeon will coordinate with the USACE to facilitate issuance ofthe Section 404 Permit.If an Alternate Anaiysis is required,Foth and the Gity of Waukee will need to provide background and supporting information,such as alternate sites evaluated or demographic information.The proposed fees for the alternatives analysis assume that the dient will provide Terracon information required to generate the Alternative Analysis report. Task 8.5 Plan Sheets and Planting Specifications Following issuance of a permit by the USACE,Terracon shall provide plan sheets and planting specifications for the mitigation site for inclusion in the constructlon plan and contract documents prepared by Foth and the City of Waukee.These documents will provide details regarding earthwork and seed mixtures for the stream mitigation site.The specifications will contain an implementation plan that includes the following: •Final grading plan with cut/fill volumes •Siltation Control •Seed bed preparation •Seeding and planting plan •Implementation Schedule Terracon will also prepare an approximate engineering cost estimate for the construction of the mitigation area. Page 4 Foth Infrastructureand Environment,LLC ProjectNumber OBW051.00 Allces Road Ashworth Road to Unlverslty Avenue Waukee,Iowa Task 8.6 Additional Services beyond base Services Fees assume that wetland mitigation will occur at the Voas Wetland Mitigation Bank and that stream mitigation will occur near the project area;additional fees may be incurred if mitigation occurs at an alternate location. Banking fees are nolincluded in the scope of this proposal.Fees do not include hydrologic modeiing that may be needed for the design of WUS mitigation.Fees do not Inciude Cultural Resource or Threatened and Endangered Species surveys.Fees for addressing USAGE or other agencies comments during the permitting process will be invoiced on a time and material basis based on Terracon's current fee schedule.Additional fees for construction observation,annual monitoring,or deed restriction preparation may be Incurred if tree/shrub planting or WUS mitigation is required. This proposal does not include fees for Wetland Dalineation.Phase I Cultural Resource Survey and topographic survey services that may be required if an off-site mitigation area is selected.Fees for those surveys have not been included in this proposal,but will be provided when the mitigation site is identified.This proposal does not Include property negotiations or [egal fees necessary for the purchase or easement of the land selected for off- sUe mitigation. Task B Subtotal-$35,850.00 TASK C -Traffic Signalization at Alices Road and Ashworth Road and traffic signal modification to Ashworth Road and University Avenue The south leg of the Alices Road and University Avenue Intersection and traffic signals was original designed for a 4-lane divided facility.University Avenue was designed to accommodate a similar configuration.The proposed B-lane divided facility in combination with dual left tum movements on University Avenue will require modifications to the existing traffic signalization system and lane configuration at University Avenue.Permanent traffic signals will also be Installed at Allces Road and Ashworth Road with along with a traffic signal interconnect between the two intersections.This project will be let through the Iowa DOT and managed as a separate Local Systems project in an effort to utilize the federal funding assigned to this project. Task C.1 Project Management The project manager will be responsible for the development and tracking of the project plan for the project development.This includes task identification,staff scheduling and coordination,project communications, monthly progress reporting and invoicing,Subconsultant coordination and other important elements of the project. The project design duration is assumed to be six (6)months during the 2013 calendar year and project construction duration is assumed to be six (6)months during the 2013/2014 calendar year. Task C.2 Coordination with Technical Advisory Committee Maintain communications with the Technical Advisory Committee (TAC),including the City and Iowa DOT. Meet with the Technical Advisory Committee to review progress and to discuss specific elements of the project design.The meetings will also serve to establish schedules,develop project goals,establish initial design parameters.promote a dialog between the various entities,improve the decision-making process,and expedite design development.Prepare minutes of meetings and keep documentation of other communications.For budget purposes,itis assumed that the meetings wiii be attended by three (3)staff members of the Consultant. The followlnq TAC meetings are included with the scope of work: Preliminary Design Phase -Three (3)meeting Final Design Meeting -one (1)meeting Page 5 Foth Infrastructure and Environment,LLC Project Number 08W051.00 AJlces Road Ashworth Road to University Avenue Waukee,Iowa Note:There is one (1)additional meeting included for miscellaneous purposes. Task C.3 Union Pacific Railroad Goordination The Engineer will conduct meetings with the Union Pacific Railroad to address issues of specific concern to their facility.These meetings will be held in concert with the Technical Advisory Committee meetings.During the scheduled meeting,the Engineer's project manager will meet with the railroad to discuss the specifics olthe project as It relates to their facility,obtain information regarding any issues the railroad feels is important,and get input regarding their expectations about the project.The Engineer shall record all correspondence with railroad and incorporate suggestions as appropriate. It is anticipated that there will be three (3)meetings with representatives from Union Pacific. Task C.4 Quality Control Plan Establish review and checking procedures for project deliverables.Designate responsibility for implementation of the plan, Task C.5 Traffic Signal Warrant Analysis Complete a Traffic Signal Warrant Analysis at the intersection of Alices Road and Ashworth Road to determine traffic signal requirements. Task C.6 Preliminary Plans The level of detail forthis task shall be according to the Guidelines for Design and Development of Local Pubic Agency (LPA)Preliminary Plans for Federal-Aid Projects,Upon completion of the preliminary plans,the design plans will be approximately 45 percent complete.The submittal of preliminary plans shall be completed on or before the date established In the "Critical Path for Project Development"schedule, TaskC.6.1 Plan Prepariition-Tlt]e SMet80d TyPical SoiltlQn$(A~nq B Sheets} Prepare title and typical section sheets for each of the proposed project segments.Include the mainline and side roads as applicable in typical sections. Task C.6.2 Plan Preparation Estimate of Quantities (C Sheets) This task consists of a preliminary determination of the bid items to be included in the project,along with their appropriate tabulations. Task C.6.3 Plan Preparation -Traffic Signal Plans eN Sheets) This task consists of the development of preliminary traffic signal plans at the intersection of Alices Road and Ashworth Road and preliminary traffic signal modifications at Alices Road and University Avenue using available design standards of the City and the Manual on Uniform Traffic Control Devices (MUTCD).Signal Layout,signal timing,coordination plans,wiring diagrams,majorequipmenl,poles signal heads,interconnect and special provisions will be developed. Task C.6.4 Opinion of Probable Construction Cost -Preliminary Prepare a preliminary opinion of probable construction cost for the project.Preliminary cost estimates shall be based on representative major project elements and based on recent bid lnformatlon.Detailed quantity takeoffs will not be developed for the preliminary cost estimate. Task C.6.S Quality Control -Plan Set Involve ongoing quality control input from the Project Team and the design engineer's senior technical staff throughout the development of preliminary plans and documents for each project segment.The design Page 6 Foth Infrastructure and Environment,LLC Project Number OBWQ51.00 Allces Road Ashworth Road to University Avenue Waukee,Iowa engineer Is responsible for making specific recommendations and ensuring that critical issues are discussed and resolved prior to submittal of the preliminary plan set to the Project Team. Review the preliminary engineering plan set for technical accuracy,as well as for general constructability and conformance with the project design criteria. Task C.7 Field Exam, A Field Exam will be held With the Project Development Team to discuss key issues and design concepts, including drainage,access control,traffic control/stage construction and right of-way.The review will determine the completion of the plan design,Identify needed adjustments to minimize potential property Impact and confirm the proposed staging plans.Revisions wi!!be noted for preparation of the final design.Completion of the Field Exam will allow preparation for the Field Exam. Task c.a Check Plans The level of detail forthis task shall be according to the Guidelines for Design and Development of Local Pubic Agency (LPA)Final Plans for Federal-Aid Projects.Upon completion of the Check plans,the design plans will be approximately 90 percent complete.The submittal of check plans sheJi be completed on or before the date established in the "Critical Path for Project Development"schedule. Task C.8,1 Incorporate Comments from Preliminary Plan Review and Field Ex~tm The Consultant will respond to comments resulting from the Iowa DOT Preliminary Plan Review and Field Exam.Recommended modifications will be incorporated into the plan set. Task C.B.2 Check Plan Preparation The Consultant will prepare final plans,which wlli generally include the following tasks for this project: Task C.8.2.1 Title Sheets fA Sheets) This item consists of finalizing the title sheet.The title sheets will include the following:Index of Sheets, Index of Standard Road Plans,Mileage Summary,Legend,Location Map,Project Number,Letting Date and Design Designation Task C.a.2.2 Estimate of Quantities IC Sheets) This item consists offinal bid items to be included in the Project as well as final quantity tabulations and the development of the general notes and estimate reference information.This item also includes the final design and tabulation of the erosion control measures to be provided on the Project. Task Ca.2.3 Traffic Signal Plans fN Sheets) This task consists of the final design and drafting of traffic signals at the designated location.Included in this task will be the signal layout and signal interconnect system plans,wiring diagrams,major squiarnent, poles,signal heads,quantities,special provIsions,conduit,wiring and other elements of the traffic signal installations,as necessary to accommodate the roadway design,as well as phasing and timing of traffic signals. Task e.g Prepa.ration af Supplemental Specification The task consists of preparation of Supplemental Specification to be included with the final contract documents.The Iowa DOT Standard Specifications for Highway and Bridge Construction shall be utilized for this project. Page 7 Foth Infrastructureand Environment,LLC Project Number 08WD51.00 Alices Road Ashworth Road to UniversityAvenue Waukee,Iowa Task C.10 Opinion of Probable Construction Co~l Prepare an opinion of probable construction cost for the project.Cost estimates shall be based on representative major project elements and based on recent bid information, Task C.11 Final Plans The level of detail for this task shall be according to the Guidelines for Design and Deveiopment of Local Pubic Agency (LPA)Final Plans for Federai-Aid Projects.The submittal affinal plans shall be completed on or before the date established in the "Critical Path for Project Deveiopment"schedule. Task C.11.1 Incoroorate Comments from Check Plan Review The Consultant wlli respond to comments resulting from the Iowa DOT Check Plan Review. Recommended modifications will be incorporated into the final plan set.This task also includes final modifications of Special Provisions. Task C.12 Opinion of Probabie Construction Cost -Final Final opinion of probable construction cost shall be based on representative all project elements and based on recent bid information and detailed quantity takeoffs. Task C.13 Project Permitting The Consultant will assist the City in preparing applications for permits from governmental authorities that have jurisdiction to approve the design of the project and participate in consultations with such authorities,as necessary.The Consultant shall prepare the following documents for the project: NPDES Stormwater Discharge Permit Notice of Publication Pollution Prevention Plan Any fees for construction permits,licenses or other costs associated with permits and approvals shall be the responsibility of the City.The Consultant shall provide technical criteria,written descriptions and design data for the City's use in filing the applications for permits.The Consultant shall prepare the permit applications and other documentation. Task C.14 Prepare and Submit Public Interest Finding The Engineer shall prepare and submit a Public Interest Finding for use of preferred traffic signal equipment Task C.15 Prepare and Submit Project Development .GectJficate The Engineer shall provide the servIces required,except for those specifically Identified to be performed by the Iowa DOT,to submit the Project Development Certificate.This Submittal shall be completed on or before the date established in the "Critical Path for Project Deveiopment"schedule. Task C.16 Letting Services The Engineer will coordinate with the Iowa DOT on the letting process for the project.The work tasks to be performed or coordinated by the Engineer shall Include the following: TaRk C.16.1 Printino of PlAns and Soecifications Task completed by the Iowa DOT. Task C.16.2 Notice of Project The Iowa DOT shall prepare the formal Notice of Hearing and Letting.The City shall handle publication of the Notice of Hearing and Letting.The Engineer shall also prepare and disseminate an informal notice to contractors concerning the upcoming Project. Page 8 Foth Infrastructure and Environment.LLC Project Number OBWQ51.00 AUces Road Ashworth Road to University Avenue Waukee,Iowa Task C.16.3 Plan Clarification and Addenda The Engineer shall be available to answer questions from contractors prior to the letting and shall issue addenda as appropriate to interpret,clarify or expend the bidding documents. Task C.16.4 Letting.Bid Tabs.and Award Recommendation The Engineer shall have a representative present when the bids and proposals are opened,shall make tabulations of bid for the Owner,shall advise the Owner on the responsiveness of the bidders and assist the Owner in making the award of contract,including preparation of necessary contract documents. Task C Subtotal-$94,700.00 TASK D -Design of Grade Separated Pedestrian Culverts The Alices Road Planning process identified two locations for grade separated pedestrian facilities.The following tasks are associated with the development of these facilities.These tasks assume that the proposed culvert will be a standard Iowa DOT box culvert and standard construction techniques incorporated into the existing roadway plan set.They do not include a custom culvert design. Task D.1 Pedestrian Culvert -Structure Concept Development: A pedestrian culvert concept plan will be developed based on the existing mapping and from the roadway preliminary plan.The purpose of this phase is to determine preferred culvert type and location and incorporate into the overall roadway plan. Task D,2 P"destrianCulvtlrl Pmliminarv Desiql1 -Typo,Si",a and LgcaHon ITS&Ll Pia,,"IV Sh""tsJ Prepare 1"-20'scale Type,Size,and Location (TS&L)plans for the proposed box culvert.This task Includes a Situation Plan and a General Elevation consisting of a cross/longitudinal section perpendicular/along the roadway centerline at the culvert/bridge structure.Roadway curve and profile data,hydraulic data,and traffic data will be shown.TS&L plans shall be prepared in accordance with Iowa DOT and Iowa DNR to facilitate preliminary agency review and approval. Task 0.3 Modification to Existing Roadway Plans The Engineer will modify the existing roadway plans to accommodate the revised profiles to accommodate the proposed pedestrian culverts.Modifications include vertical profile adjustment,storm sewer layout,water main layout and cross section modifications. Task D.4 Final Culvert Plans IV Sheets) This task consists of final design and drafting of the proposed pedestrian culverts including situation plans and necessary construction details to accommodate culvert construction. Task 0.4.1 Structural Analysis Calculations The Engineer will determine final member sizes,required reinforcing steel,and connection details for the final plans,based on the approved preiiminary plans.Design shall be in accordance with the MSHTO LRFD Bridge Design Specifications,current edition at the time the design contract is executed,plus current interim specifications.Structures design shall provide for an HL93 loading. Task D.4.2 Final Plan Development -Structural The Engineer will compile plan sheets,specifications,detailed quantities,and standard detail designs for submittal atvarious milestone points for the pedestrian culverts.Special detail designs in regards to aesthetic treatments to structures are not anticipated and are not considered part of this Scope of Services. Page 9 Foth Infrastructure and Environment,LLC Project Number OBW051.00 Allces Road Ashworth Road to University Avenue Waukee,Iowa Task 0.4.3 Final Plan Development -Electrical Show final locations and orientation for fixtures and other equipment on project plan drawings,Show utility service locations that will be required,and identify expected service characteristics.Provide final bills of material and schedule of work units,with construction cost estimates. Task 0.4.4 Quantity Calculations The Engineerwill identify the required culvert unit bid items and calculate quantities for each in accordance wIth the Iowa DOT Standard Specificallons. Task D.4.5 Soecial Provisions The Engineerwil!prepare specifications covering the work to be constructed,consisting of Special Provisions and Special Specifications to be issued in connection with the "Standard Specifications for Highway and Bridge Construction,"Series of 2009,Iowa Department of Trans pori ation,and the current Supplemental SpecIficatIons for Construction Projects, Task 0.4.6 QC Review The Engineer will independently review and check the final culvert design,lncludlnq final plans,special provisions,and construction cost estimates,The Engineerwill address and incorporate review comments into the final submittals. Task 0 Subtotal-$51,900.00 TASK E -Design of Alices Road and University Avenue Intersection Capacity Improvements The current Alices Road and University Avenue Intersection accommodates single left turns in the eastbound and westbound direction on University Avenue.The proposed design calls for expansion of the eastbound and westbound direction to accommodate dual left turn movements.To accommodate this movement,University Avenue will be widen along the south curb line from approximately 800-ft west of Alices Road to 1OOO-fteast of Alicea Road.This will require the lengthening of existing railroad crossing and the possible relocation of transmission electric pores.It is assumed that this project will be locally let as a separate project.Tasks to be completed include: Task E.1 Conceotual Roadway Design An alignmenVconceptual design will be completed using available city mapping to define the proposed alignment,and investigate right-af-way,access and grading impacts.This task also includes the preparation of display materials,cost estimates and hand out information for an informational/coordination meeting.The purpose of this phase is to determine the preferred alignment.For estimating purposes it is assumed that a maximum of one (1)conceptual alignment will be developed. Task E.2 Topographic Survey The Engineer shall perform topographic surveys required for the development of the project.Horizontal and vertical accuracies shall be adequate to produce a map that is compatible with the topographic data for incorporation into the existing mapping.Task includes roadway cross-sectioning at appropriate intervals indicating the location and elevation of key section breaks,including approximate roadway centerline,edge of pavement and/or gutter &top-of-curb,sidewalks and driveways.This information will be used to develop the existing roadway DTM for the Project site. Task E.3 Utility Surveys The Engineer wlJ[contact various utility companies through the Iowa One-Call System to obtain exlsflnq utility mapping and request that buried utilities be marked in the field.The Engineer will survey underground utility locations and Incorporate such available utility information into the base mapping of the project.Utilities to be researched include sanitary sewer,storm sewer,electric,gas,water,telephone, cable television,and fiber optic lines.This includes establishing manhole and intake elevations for existing sanitary,storm sewers and roadway culverts.The utility name and description of utility will be incorporated Page 10 Foth Infrastructure and Environment.LLC Project Number 08W051.00 Allces Road Ashworth Road to University Avenue Waukee,Iowa in the project plans. Task E.4 Preliminary Plans The Engineer will perform preliminary design services in the preparation of design plans and specifications depicting the proposed grading,drainage,paving,signing,utility relocation,and other features of the project. The preliminary plans will include but not be limited to the following tasks: Task E.4.1 Title and General Information Sheets fA Sheets) This task consists of assembling the preliminary title and general information sheets.The preliminary title sheets will include the following:Index of Sheets,Legend,Location Map,Project Number,Design Traffic data. Task E.4.2 Preliminary Typical Cross Sections (B Sheets) This task consists of assembling the Typical Cross Sections to be used for the proposed improvements as well as a preliminary delermination of the limits that each Typical Section will apply. The Typical Cross Sections will include but not be limited to typical sections for the proposed grading, drainage and paving improvements. Task E.4.3 Preliminary Estimate of Quantities rc sheets) This task consists of a preliminary determination of the bid items to be included in the project,along with an estimate of quantities for each item. Task E.4.4 Preliminary Plan and Profiles ID and E Sheets) This task consists of the development of preliminary plan and profile sheets that will show the existIng topography along with the proposed improvements based on the surveyor the office relocation centerline.Proposed Right-of-Way and Construction Easement limits based on the catch point lines will be shown.Included will be the necessary CADD work to show the preliminary design features for the proposed improvements.The scale aflhese sheets will be 1"=50'. Task E.4.5 Reference Ties and Bench Marks IG Sheets) This task consists of assembling reference ties to the plan control points and the benchmark data used to develop the plans and to be preserved throughout construction ofthe project.This task also includes preserving any Government Corners that are found in the vicinity of the proposed construction. Task EA.6 Preliminary Traffic Control and Staging (J Sheets) This task consists of developing a suitable plan for construction scheduling and staging of the Project and for traffic control measures to be implemented during construction. Task E.4.7 Pavement Markings and Traffic Signing (J Sheets) This task consists of the development of pavement marking and traffic signing plans to be placed into service following construction.The traffic control devices,procedures,and layouts shall be as perthe Manuel on Uniform Traffic Control Devices (MUTCD). Task EA.8 Preliminary Intersection Geometries (L Sheets) This task consists of developing and refining the geometric layouts and provides additional horizontal and vertical survey information needed to construct the intersections.The scale of these plan sheets wi!!be 1 "=20'. Task 0.4.9 Preliminary Storm Drainage Design This task will include an inventory of existing hydrologic and hydraulic conditions and analyze the impacts the proposed improvements will have on the area wide drainage patterns.Once the impacts have been quantified,alternatives will be developed to support the proposed improvements. Task 0.4.10 Traffic Signal Design (N Sheets)-Completed under Task C. Page 11 Foth Infrastructure and Environment.LLC Project Number 08W051.00 Alices Road Ashworth Road to University Avenue Waukee.Iowa Task EA.11 Preliminary Slorm Sewer and Water Main 1M Sheets) This task consists of the development of preliminary sanitary sewer and water main plan and profile sheets that wili show the existing topography,proposed improvements,sewer profile,flow line and rim elevations,utility access locations,water main profile,hydrant and valve locations.The scale of these sheets will be 1"=20'. Task EA.12 Preliminary Speciai Construction Details IU Sheets) This task consists of preliminary design and drafting associated with special project details.Special construction details Include: •Spacial Grading at the northeast corner of Alices Road and University Avenue. Task EA.13 Detailed Cross Sections IW,X,Y Sheets) This task consists of the design and drafting associated with the assembly of detailed cross sections (50'increments)to illustrate typicai conditions,drainage designs,and non-typical conditions as needed for gUidance during design,review,and quantity estimating purposes. Task EA.14 Preliminary Field Review This task consists of the preparation of materials for a field exam,participation in the field exam,and reviewing results of the field exam with the City. Task 0.4.15 Utility Coordination Meetings The Engineer will conduct meetings with individual utility companies to address specific conflicts. It is anticipated that there will be two (2)meetings with representatives of the various utility companies.The first will be to advise of the nature and extent of the improvements and any potential conflicts with existing or proposed utility systems,and the second will be preliminarylfinal design review and coordination meetings. Task EA.16 Meetings It is estimated that the engineer's staffwili aUend two (2)meetings per month with the City,and others to review progress,assist in decision-making,and receive direction from the City.It is understood by the parties that the Engineer wiil attend additionai meetings as needed to complete the Project. Task E.4.17 Project Management The project manager for the Engineer will be responsible for monthly progress reporting,minutes of meetings,interoffice memoranda.and invoicing.This task also includes scheduling of staff, coordinating with Sub-Consultants,review of progress,and senior review of deliverables. Task E.5 Final Plans and Specifications Based upon approved preliminary design,field exam,and public informational meeting,the Engineer shall subsequently proceed with final design,contract drawings,specifications,and opinion of probable construction costs for the award of a single Contract for the construction of the proposed improvements.The work tasks to be performed include the foilowing: Task E cQ,1 Final Plans The Engineer shall provide the City with the following deliverables: Final Title Sheets fA Sheets)~This item consists of finalizing the title sheet.The title sheets wili include the follOWing:Index of Sheets,Legend,Location Map,Project Number and Design Traffic Data. Finai Typicai Sections IB Sheets)-This item consists affinal design and drafting oftypical cross sections to be utilized for the improvements. Final Quantities (C Sheets)-This item consists affinal bid items to be included in the Project, Page 12 Foth Infrastructure and Environment,LLC Project Number 08W051.00 Alices Road Ashworth Road to University Avenue Waukee,Iowa as well as final quantity tabulations,and the development of the general notes and estimate reference Information.This item also includes the final design and drafting of erosion control measures to be provided on the Project. Final Plan and Profiles lD and E Sheets)-This item consists of the final design and drafting of roadway plan and profile sheets,including the detail information required for plan approvals,permitting,and construction of the proposed improvements.This task also consists of the final design and drafting for the installation of new utilities and utility adjustments that can be determined from coordination with the utility companies at the time of design. Final Traffic Control and Staging (J Sheets) This item consists of the final plan for construction scheduling and staging of the Project and for final traffic control measures to be implemented during construction. Pavement Markinas (J Sheets)This item consists of final design and drafting of the permanent pavement marking plans. Final Geometric Staking,Jointing,and Edge Profiles (L Sheets)This item consists of the final design and drafting of jointing details,spot elevations,and geometric layouts for all non- typical pavement areas. Final Design of Storm Drainage SYstems (M Sheets)-This item consists offinal design and drafting of storm sewers,storm sewer inlets,manholes,open ditches,culverts,and other storm drainage related facilities for the Project. Final Traffic Signal Design IN Sheets)Completed under Task C. Final Water Main Pian and Profiles (S Sheets) This task consists of the final design of the sanitary sewer and water main plan and profile sheets that will show the existing topography,proposed Improvements,sewer profile,flow line and rim elevations,utility access locations,water main profile,hydrant and valve locations. Final Soils Design (T Sheets)~This task consists of final design and drafting of the soils information and earthwork quantities. Final Construction Details (U Sheets)~This item consists of the final design and drafting of special project details not covered in other items.Included are such items as special grading details,channel grading,culvert details not included in the standard drawings,special storm sewer or manhole details not included in the standard drawings,special paving details,and other required miscellaneous details found to be required for completion of the project. Final Desian Cross-SActions (W Sheets'-This item consists of the final design and drafting of individual cross sections for the project.Cross sections will be designed and drawn at 50~ foot maximum intervals,with additional cross-sections included as necessary.Cross sections will show the eXisting ground elevations as well as the final project grading, including fore slope and back slope information,special sub-grade treatments,ditches, pavement replacement,and other pertinent information. Page 13 Foth Infrastructure and Environment,LLC Project Number OBW051.00 Alices Road AshworthRoad to University Avenue Waukee,Iowa Task E.5.2 Project Manual This task consists of providing a Project Manual for the Project,including Notice of Hearing and Letting,Instruction to Bidders,Bid Forms,Bond Forms,Agreement Forms,General Conditions of the Construction Contract,Supplementary General Conditions,and Detailed Construction Specifications. Task E.5.3 Opinion of Probable Construction Cost The Engineer shall prepare a preliminary Opinion of Probable Construction Cost for the Project.An updated Opinion of Probable Construction Cost shall be prepared at the time of completion of the plans and specifications.The Opinion of Probable Construction Cost Is Intended for the use olthe City in financing the Project. Task E.5.4 Advertisement for Bids/Bid Phase The Engineer shall assist in the preparation of the notice to Contractors.The Engineer shall disseminate contract documents and be available to answer questions from Contractors prior to the letting and shall issue addenda as appropriate to interpret,clarify or expand the bidding documents. Task E.5.5 Letting,Bid Tabs.and Award Recommendation The Engineer shall have a representative present when the bids are opened,shall make tabulation of bids for the City,shall advise the City on the responsiveness of the bidders,and assist the City in making the award of contract.After the awards are made,the Engineer shall assist in the preparation of the necessary contract documents.\ Task E.5.6 Coordination Meetings and Union Pacific Railroad Coordination It is estimated that the engineers staff will attend two (2)meetings per month with the City,and others to review progress,assist in decision-making,and receive direction from the City.It is understood by the parties that the Engineer will attend additional meetings as needed to complete the Project. The Engineer will conduct meetings with the Union Pacific Railroad to address issues of specific concern to their facility.During the scheduled meeting,the Engineer's project manager will meet with the railroad to discuss the specifics of the project as it relates to their facility.obtain information regarding any issues the railroad feels is important,and get input regarding their expectations about the project.The Engineer shall record all correspondence with railroad and incorporate suggestions as appropriate. Task E.5.7 Project Management The project manager for the Engineer will be responsible for monthly progress reporting,minutes of meetings,interoffice memoranda,and invoicing.This task also includes scheduling of staff, coordinating with Sub-Consultants,review of progress,and senior review of deliverables. Task E Subtotal·$235,SOO.OO TASK F -Right-of.Way Assistance The Engineer shall obtain the outside services from an Abstracting company and Appraiser to provide updated title certificates and appraisal information for the property associated with the Alicea Road corridor.Task included: Task F.1 UQdateRegolt of Record 0wnershiR and Liens (Title Searches) The Engineer shall obtain the services from an abstract company for the purpose of determining ownership interest(s)and instruments affecting title of land to be acquired in the name of the City. For preliminary land survey purposes and for preparation of acqulsltlon documents,the abstract company shall deliver a title report for each parcel affected by the project to provide reasonable assurance of property Page 14 Foth Infrastructure and Environment,LLC Project Number OBWQ51.0Q Alices Road Ashworth Road to University Avenue Waukee,Iowa ownershiplinterests of the real estate.This title report shall identify all mortgages,the last deed and easements of record,real estate tax assessment and payment Information,and liens and claims pending in probate or other proceedings. For land acquisition purposes,a report of record ownership and liens will be obtained for seven (7)roadway parcels and four (4)sanitary sewer parcels in accordance with Iowa Code. 7 Parcels@ $500leach =$3,500.00 (estimated) Task F.2 Updated/Prepare Appraisais The Engineer shall coordinate and obtain the servlces from an independent fee appraiser for the purpose of updating and preparing a value finding appraisal that determines the fair market value of the land and improvements to be acquired for the project,unless in the appraiser's professional opinion a "before and after" type of appraisal is required that addresses the severance damage to the remainder.The appraisals shall be completed using Iowa DOT forms or formats acceptable to the Iowa DOT and meet their standards.It is estimated that two updated appraisals will be required for the roadway and regional storm water facility will be required. Subtotal- Original Before and After Major Update -Giies Minor Update -Giles 2 parceis @ $2,850.00Iea 1 parcei @ 3,350/ea 1 Parcel @ 1,0001ea $5,700.00 $3,350.00 $1,000.00 Task F.3 Negotiation Assistance The Engineer shall meet with the Property Owners and assist the City in answering technical questions as it relates to the proposed improvements and impacts to the respective properties.The Engineer shall review City prepared right-af-way agreements for accuracy and make recommendation as it relates to the technical aspects of the project. Task F Subtotal-$58,510.00 In consideration for these services,the City agrees to adjust the Contract Schedule for services performed by the Engineer under this Contract Amendment of the original project. I.Basic Services of the Engineer -Alices Road RISE Project A.USAGE Permit Approval B.Preliminary Plans G.Final Plans D.Project Letting April 2013 (anticipate) January to February 2013 March 2013 April 2013 I,Basic Services of the Engineer -Alices Road Traffic Signals and Alices Road and University Avenue Intersection Capacity Improvements Projects A.Preliminary Plans January to February 2013 B.Finai Plans March 2013 G.Project Letting Juty 2013 Page 15 Foth Infrastructure and Environment.LLC Project Number 08WQ51.00 Alices Road Ashworth Road to University Avenue Waukee,Iowa In consideration for these services,the City agrees to adjust the compensation for services performed by the Engineer. These fees are based on the standard hourly rates of the Engineer's personnel actually engaged in the performance of the services,plus direct out-of-pocket costs for expenses incurred by personnel who are actually engaged in the work and other direct costs.The total Hourly Not-to-Exceed fees forthe professional engineering services as described in this amendment are as follows: I.Basic ServIces of the Engineer Task A Task B Task C Task 0 Task E Task F Total $177,400.00 $35,850.00 $94,700.00 $51,900.00 $235,800.00 $58.150.00 $653,800.00 THIS AMENDMENT is subject to all provisions of the original Agreement. THIS AMENDMENT,logether with the original Agreement represents Ihe enllre and Inlegrated AGREEMENT between the Clly and Engineer. THIS AMENDMENT executed the day and year wrltlen above. FOTH INFRASTRUCTURE AND ENVIRONMENT,LLC. /)/)Itiff/~15'f j\/',"...J,~______ By:-Jib'1;L ===_ CITY OF WAUKEE,IOWA PatrickP ..Kueteh.Sr,.Erolect Manager X:\DM\IE\2008\Q8W051-00\PROJ\Admln!slralivo\Conlrac[\Agr-2012-1009-Waukee-A!lces Rd-Amend No-3.doc Page 16