HomeMy WebLinkAbout2017-12-04-Resolutions 17-562_Alice's Rd Corridor Phase 4 - Engineering Agr Amendment 1THE CITY OF WAUKEE,IOWA
RESOLUTION 17-562
APPROVING ENGINEERING SERVICES AMENDMENT NO.1 BETWEEN THE CITY OF
WAUKEE AND FOTH INFRASTRUCTURE AND ENVIRONMENT,LLC [ALICE'S ROAD
CORRIDOR IMPROVEMENTS PHASE 4]
IN THE NAMEAND BYTHEAUTHORITYOF THE CITY OF WAUKEE,IOUS
WHEREAS,the City of Waukee,Dallas County,State of Iowa,is a duly organized Municipal
Organization;AND,
WHEREAS,on July 18,2016,the Waukee City Council approved an Agreement for Professional
Consulting Services with Foth Infrastructure &Enviroiunent,LLC [Reconstruction Design Services,
SE Alice's Road North of University Avenue to North of SE Olson Drive (Phase 4)](Resolution ¹16-
307);AND,
WHEREAS,Foth Infrastructure &Environment,LLC,has submitted Amendment No.I to the
agreement for additional services associated with project coordination,design services,and final plan
modifications related to adjacent development agreements;and construction administration for the
second construction season;AND,
WHEREAS,the engineering services agreement has been reviewed and approved by the Waukee City
Attorney.
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee that the
Engineering Services Amendment No.I between the City of Waukee and Foth Infrastructure and
Environment,LLC [Alice's Road Corridor Improvements Phase 4],attached hereto as Exhibit A,is
hereby approved.
Passed by the City Council of the City of Waukee,Iowa,and approved the 4'"day of December,2017.
Anna Bergman,M or Pro Tem
Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Anna Bergman
R.Charles Bottenberg
Brian Harrison
Shelly Hughes
Larry R.Lyon
AYE
X
X
X
NAY ABSENT ABSTAIN
X
X
Foth Infrastructure end Environment,I LC
Project Number 16W021 01
SE Atices Road
North of University Avenue to North of Olson Ddive (Phase 4)
Weukee,lowe
ENGINEERING SERVICES AMENDMENT NO.1
PROJECT NO.16W021.01
THIS AMENDMENT,made and entered into this (@ day of ~0+9 2017byandbetween,
the CITY OF WAUKEE,IOWA,hereinafter referred to as the "City",and FOTH INFRASTRUCTURE AND
ENVIRONMENT,LLC.,hereinafter referred to as the "Consultant",for professional services in connection with the
relimina surve and ma in functional desi n ro'ect coordination relimina desi n final lans and
s eciftcations for the ro used construction of SE Alices Road from North of Universit Avenue to North of Olson Drive
~Phase 4 hereby amends the original Agreement dated June 20th,2016 as follows:
The City and Consultant agree to amend the original Agreement to include additional services associated with:
~Additional Project Coordination to finalize adjacent Development Agreements
~Additional Design Services to incorporate adjacent Development Agreements
~Final Plans Modiftcations for adjacent Development Agreements
~Construction Administration for second Construction Season
I.Basic Services of the Consultant
TASK A —Additional Project Coordination to finalize adjacent Development Agreements
The Consultant completed the following project coordination as part of the project.
Task A.1 Exhibit Pre aration
Exhibits for the project meetings consisted of aerial mosaics for the project with the major project features
indicated on the aerial photograph.Include coloring,lettering,and other techniques to delineate the
proposed design concepts and right of-way needs,including typical sections of the roadway.The figure
indicated right-of-way needs,property lines,property ownership,access control lines,grading limits,and
new project improvements.
Task A.2 Pro'ect Coordination with Ad'scent Landowner's En ineerin Consultant
The Engineer conducted meetings to address specific conflicts and concerns.Two (2)meeting(s)were held
with representatives of the adjacent Landowner.The first was to advise of the nature and extent of the
improvements and any potential conflicts with existing or proposed utility systems,and the second addressed
preliminary/final design review and coordination meetings.
Task A Subtotal -$1 200000
TASK B —Additional Design Services to incorporate adjacent Development Agreements
After SE Alice's Rd was designed the following items were requested by adjacent property owners:
Task B1 Additional To o ra hie Surve
The Consultant performed the following additional topographic surveys to determine the amount of
additional earthwork needed and roadway tie in elevations.This information was used to develop the
existing ground DTM for the Project site.
~Properties adjacent to the proposed Future Rd:Gilcrest/Jewett,S&P Properttes,and DJN,LLC.
Task B 2 Additional Plattin Services
Prepared acquisition plats and legal descriptions for property to be acquired for the Project and perform land
corner and lot surveys as needed for the preparation of the acquisition plate and legal descriptions for each
parcel.Said plats and legal descriptions shall comply with requirements of the lowe Code and shall be
prepared by or under the direct supervision of a licensed land surveyor under the laws of the State of Iowa.The
following numbers of plate are assumed:
Page 1
Fath Infrastructure and Environment,Ll 0
Project Number 16W021.01
8E Alices Road
North of University Avenue to North of Dison Drive IPhase S)
Waukee,lowe
Permanent (Fee Title)Right-of-Way Acquisition Plat
Temporary Construction Easement
Permanent Easements
Sanitary Sewer Easement
Water Main Easement
Storm Sewer Easement
Overland Flowage Easement
Public Facilities and Use Easement
Task B Subtotal -$8,000.00
TASK C —Final Plans Modifications for adjacent Development Agreements
Based upon the approved revised preliminary design,field review,and property owner review,the Consultant
subsequently proceeded with final design,contract drawings,specifications and opinion of probably construction costs
for the plan revision for the construction of the Future Road Extension improvements.
Task C Subtotal -$10,000.00
II.Construction Services
TASK A —ADDITIONAL CONSTRUCTION ADMINISTRATION
The original Agreement assumed one construction project estimated to be 18hrs/week of effort during the 2017
construction season.Currently the project being constructed will require construction Administration Services
during the 2018 construction season and final project close out in mid-2018.
Additional Construction Administration efforts over and beyond the original effort includes additional field visits,
construction meetings,processing of pay vouchers,daily communication and modification of construction
documents .The following assumptions are included:
~Average 12hrs/week beginning in the Winter of 2017 thru Spting 2018
Note —hours were reduced during winter shut down
Task A Subtotal -$13,000.00
In consideration for these services,the City agrees to adjust the Contract Schedule for services performed by the
Consultant under this Contract Amendment of the original project.
Resident Consulting Services
A.Construction Administration
C.Post-Construction Services
January 2017 —May 2018
May 2018-July 2018
Page 2
Foth infrastructure snd Environment,LLC
Project Number 16W021 01
SE Alicss Road
North of University Avenue to North of Qlson Drive (Phase 4)
Wsukee,lowe
jn consideration for these services,the City agrees to adjust the compensation for services performed by the Consultant.
These fees are based on the standard hourly rates of the Consultant's personnel actually engaged in the pert'ormance of
the services,plus direct out-of-pocket costs for expenses incurred by personnel who are actually engaged in the work
and other direct costs.The total Hourly Not-to-Exceed fees for the professional engineering services as described in this
amendment are as follows:
I.Basic Services of the Consultant
Task A $12,000.00
Task B $8,000.00
Task E 10 000.00
Total $30,000.00
IL Resident Consultant Services
Task A $13,000.00
THIS AMENDMENT is subject to all provisions of the original Agreement.
THIS AMENDMENT,together with the original Agreement represents the entire and integrated AGREEMENT
between the City and Consultant.
THIS AMENDMENT executed the day and year written above.
CONSULTANT CITY OF WAUKEE
Name:Patrick P.Kueter P E.
Title:Client Director
BY:
Na:Willia F.Peard
Title:Ma or
WITNESS ATTEST
Name:Dou las Ernst P.E.
Title:Pro'ect Director
Name:
Title:
Ast-2017-1120-Weckee SS At ce'4 Rd Phd-Anmnd No-1 doc
Page 3