Loading...
HomeMy WebLinkAbout2017-04-03-Resolutions 17-175_Gas Main Blanket BidTHE CITY OF WAUKEE,IOWA RESOLUTION 17-175 APPROVING GAS MAIN BLANKET BID PRICING 2017 FROM INFRASOURCE IN THE NAME AND BY THE A UTHORITY OF THE CITY OF WA UKEE,108'A WHEREAS,the City of Waukee,iowa is a duly organized municipality within Dallas County; AND, WHEREAS,the City contracts with certain companies for gas main installation,steel gas pipe replacement,large service line installation and repair during the construction phase of new subdivisions in the City;AND, WHEREAS,Waukee Public Works requested blanket bids for such services;AND, WHEREAS,using the blanket bids,the Waukee Public Works Department computes the lower bidder for an average City project and awards the contract based on that analysis with the low bidder for the work to be completed. NOW THEREFORE BE IT RESOLVED that the blanket bid from InfraSource,attached hereto as Exhibit A,should be and the same is hereby approved. Passed by the City Council of the City of Waukee,Iowa,and approved this the 3"day of April, 2017. Wi am F.P ard,Mayor Attest: Rebecca D.Schuett,City Clerk ROLL CALL VOTE Anna Bergman R.Charles Bottenberg Brian Harrison Shelly Hughes Larry R.Lyon AYE X X X X NAY ABSENT ABSTAIN X City of Waukec —Blanket 2017 Infrasourcc Construction,LLC 3/23/2017 n na.Onnca .onslvaonon 4033 E Rior nn Road,Ypsiland.Ml 48I97 Int'raSource Construction,LI.C "1033 L.Ivloi'gan f(oad Ypsilanti,iVII -18197 City of'V'aulcf c Attention:Dave Dezeeuw 805 Unfvel'sits'Avcnilc %Yankee,IA 50263 Ref:City of Waul&ca Blanket 2017 Dear Dave: InfraSource Construction,LLC,a Quanta Services Company.is pleased to submit our proposal for the City of Vraukee 2017-18 13lankct contlvlct.'vVe arc excited by this opportunity,and svc arc confident that our team has the abilits'and experience needed to successfully complete ihe scope of vvork, ~prIC Inn Please see unit rates attachfd.Pricing has been provided for years 2017 and 2018.2019 ivill need to be negotiated upon completion of 2018. ~Orderin Upon submission ot'a specitic project,pricing svill conform to the pricing sebi(hilt',attachefl to this document.Schetluling ot services is based on availability. Exc lusl vi tv This contract does not obligate the City of'Vfaukee to utilize the services of InfraSoin'cc Construction LLC under this proposal.InfraSource Construction LLC understands and offers its services on a project basis based on the pricing scheduled contained therein. 'IVe thank you for this opponunity encl look forsvard to fvorking with you tofvard a successf'ul 2017.If &ou have questions or require additional information,please don't hesitate to contact me. Regards. Rite kvan Senior Contracts ivlanagcr InfraSource Construction.LLC n Ial oul'ca ons I'uc lon -1033 E.Morgan Road,ypsit;Inli,Mt dg tez 'I'echnictll Ufal ftlcatlons ~Proposal is bised on a 50 hour uork ueek.Dclais clue to others may result in a chan c oriler I'or labor a&id eciuipmc.ni, ~Pricin is based on "nc&va installation. ~Delais cnuiteil by others or by I&rcheologicalihaxt&rclous material discoveries n&ai be a«gun&lied thl'ough I eh&loge',&1&'cfelx ~Proposal &loca nol include the cost of cri!p clamage iiithin the project boundaries.An&'crop damage cost associated iiith normal consiruction activities iiould be ihc responsibility ol'the others unless noted in thc RPP. Pricing bnsed on any excess fill remaining on the property uh«rc it uas eicaiatcd.No haul ofTof'excess spoil is inclilded &uiit iiill bc billed at li&n«nncl nultcrial rates;&&tacked. Extensiic deivatering is not included,anil «oulcl need io be billed acconlantlv. Proposal does not include thi.'cost ol'pel'nlitting.All permitting to be provided by othiri. Proposal assum«s that native lill !vill be us«d.Inl'raSource has included the cosi to m.liniain tile top soil I'rom I'rcexing throughout the project. Service pricing based on receiving a P.a or I"I'LS I lot Tie In Unit paicl I'or «&&eh seri ice. Plcasc note ue added an aclditional Unit to cover 2"PLS I lot Tie Ins -this unit is highlinhted in yelloii. ~lnfraSource currently maintains ccluip&t&ent io perforln up to 4"I oil pressure taps.Any other taps flcrl'ormcd uould h«subcontract«el and billed at cost plus I 5%&. Any subcontracting and or matemals purchasecl to be invoicecl at cost (including any ancl all taxes,fees etc.)plus I 5%&k By passes ivoulcl be project specific and priced per each at thai time. Terms -;acct 50, ~Proposal does not.inclucle the cost associntcd iviih borfntdtrcnching in rock.If'roclc is encountcrcil,it !vill hc billed ai 0 rntc ncgotiatcd beiiveen InfinSource ancl thc Ovvncr. ~ivlilestones mill n«cd to be adjusted if rocl&is encountered. Acceptecl bv. Customer:City of'Waukcc By —Print;t&&illiam F pe d Sign&ital'«n Title;&cayor Date;04/03/2017 PO Number: vs ttncis —Flint Rebecca D schuerr Slgnalul'c'+~@,~~ Title,City Clerk Date:04/03/2017 ii Iii I \I. 40 &3 fc Vtur an tiuad,Ynsilmiti,Xtl 48&07 yOL...j4 WaukE.e THE KEY TO GOOD LIVING City of Waukee Blanlret Bid Pricing 2017-2018 Addendum ff 1 2017 2018 6"PE Ball Valve Install Deep Bell Hole Adder per fl,over 6'deep 2"PLS Hot Tie-in T 8 Mfcost +12% 5316.86 $323.20 $447.55 5456.50 Submitted by InfraSource —lvlarch 1,2017 inlrcSomce Pncing -Subnnllacl Maich I 2017 CITY OF WAUKEE BLANKET BID PRICING MAIN 2"PLS TRENCH (30"fvilN ) 4"PLS TRENCI-I (30"IVIIN ) 6 "PLS 'TRENCH (30"MIN j 8 "PLS TRENCH (30 'MIN ) 2"STEEL TRENCI-I (30"IVIIN.) 4"STEEL TRENCI I (30"MIN.) 6"STFEI TRENCH (30"IUIIN ) TOTAL 2017 PRICING 4 62 6.0 I 10 76 '14.69 13 11 16.39 20.90 86.48 2018 PRICING 4.71 5.1 3 10.98 14.98 13.37 16.72 21 32 88.21 BORE (DIRECTIONAL) I/2"(PER FOOT) 1"PLS (PER FOOT) 2"PLS (PER FOOT) 4"PLS (PER FOOT) 6"PLS (PER FOOT) 8 "PLS (PER FOOT) 1"STEEL (PER FOOT) 2"STEEL (PER FOOT) 4"STFFL (PER FOOT) 6"STEEL (PER FOOT) 8"STEEL (PER FOOT) TOTAL 12.67 12.67 12.67 17.73 31.66 42.83 13.93 19 00 32.94 55 07 265.10 12 92 12.92 12.92 18.08 32.29 43.69 14.21 14,21 19.38 33 59 56.17 270.40 SERVICES 1/2"PLS (PER FOOT) 1"PLS (PER FOOT) 2"PLS (PER FOOT) 4"PLS (PER FOOT) 6"PLS (PER FOOT) 1"STEEL (PER FOCI') 2"STEEL (PER FOOT) 4"STEEL (PER FOOT) 6"STEEL (PER FOOT) TOTAL 8.23 9.50 19.58 24.47 12.6? 15.20 22 03 30 59 150,50 8.40 8.40 19.98 24.96 12.92 15 50 22 47 31.20 153.51 HOT TIE IN 1/2"PLS 1"PLS 4"PLS 6"PLS 8"PLS 'I"STEEL 2"STEEL 4"STEEL 6"STEEL 8"STEEL TOTAL 253.49 151.49 570.35 753.91 1,284.92 570.35 753.91 994.29 1,584.30 1,900.08 8,817.10 $ $ 258 56 154.52 581 76 768.99 1,310.62 581.76 768 99 1,014.17 1,615.99 1,938.08 8,993,45 STEEL WORK 1"STEEL SERVICE RETIRE 2"STEEL SERVICE RETIRE 4"STEEL SERVICE RETIRE 6"STEEL SERVICE RETIRE TOTAL 688 '14 688.14 979.20 1,468.80 3,824,29 701.91 701.91 998.78 1,498.18 3,900.77 FROST CHARGES 6"TO 12"TRENCH 13"10 18 "TRENCH 19"TO 24"TRENCH 6"TO 12"BELLHOLE 12'TO 18"BELLHOLE 18"TO 24"BELLHOLE WELDING WELDER RATE (PER HOUR) WELDER HELPER (PER HOUR) WELDER RIG (PER HOUR) Cl)Y OF WAUKEE BLANKET BID PRICING TOTAL TOTAL 2017 PRICING 2.32 4.61$6.42 6 58.74 138.28 220.27 430.63 89 16 70 42 31.52 191.10 2018 PRICING 2 36 4.70 651 141 05 224 67 439.25 90 94 71.83 32.I5 194.92 LABOR RATES SUPERVISOR (PER HOUR) FOREMAN (PER HOUR) FUSER (PER HOUR) HELPER (PER HOUR) LABORER (PER HOUR) OPERATOR (PER HOUR) PIPE FITTER (PER HOUR) TRENCH DRIVER (PER HOUR) TOTAL 108.52 91.59 73.07 70,42 53.04 73.00 89.16 73.00 631.80 110 69 93.42 74.53 71.83 54.10 74 46 90 94 74 46 644.43 EQUIPMENT RATE PICK UP 1/2 TON PICK UP 1 TON 2 TON DUMP TRUCK WITH TOOLS FOREMAN TRUCK WITH TOOLS FUSER TURCK WITH TOOLS BACKHOE (RUBBER TIRE) BACKHOE WITH BREAKER BACKHOE WITH TAMPER EXCAVATOR MINIEXCAVATOR SIDEBQOM TRACTOR TRENCHER WALK BEHIND TRENCHER WHEEL BORING EQLIIPMENT 2"MISSILE BORING EQUIPMENT 3-4"MISSILE BORE RIG SMALL SKID STEER PIPE TRAILER STICK PIPE TRAILER COIL VACUUM EXCAVATOR PIPE STRAIGHTNER GENERATOR WATER PUMP JUMPING JACK TAMPER AIR COMPRESSOR WITI-I TOOLS TOTAL 26.27 29 42 37.82 26 27 26 27 42.02 47.28 47 28 80.90 43.49 68.29 32.62 103.31 21.75 27.19 326.22 21 75 10.87 5.45 48.94 10.87 545 10 87 5.45 16 32$1,122.34 26.79 30 01 38.58 26.79 26.79 42.86 48 22 48.22 82 51 44.36 69.65 33 27 105.37 22.18 27.74 332.74 22.18 11,09 49.92 11.09 5 w6 11.09 5.56 16.65 1,144.78 STOPPING EQUIPMENT 1"STEEL STOP LOW PRESSURE I"STEEL STOP HIGH PRESSURE 2"STEEL STOP LOW PRESSURE 2"STEEL STOP HIGH PRESSURE 4"STEEL S I OP LOW PRESSURE 4"STEEL STOP HIGH PRESSURE 6"STEEL STOP LO'/i/PRESSURE 6"STEEL STOP HIGI-I PRESSURF 8"STEEL STOP HIGH PRESSURE 2"PLASTIC SQUEEZE -OFF 4"PLASTIC SQUEEZE -OFF 6"PLASTIC SQUEEZE -OFF 8"PLASTIC SQUEEZE -OFF CITY Ol'WAUKEE BLANKET BID PRICIIIG 2017 PRICING 5 6'1.19 T 8 I'rl/Cos I +12% $91 78 T 8 lv1/Cost +12%u $110 14 I &M/Cost +1 2 luI&M,'Cost+12% T 8 M/Cost+12% T &fvl/Cost +12% $6.12 $918 $12 24 $49.16 2018 PRICING 62.41 T 8.Ivt/Cost +12%u 5 93 62 T &IVI/Cost u 12% 5 112 34 T 8 M/Cost u 125u T &M/Cost+12'"u T 8,M/Cost+12%u T 8 M!Cost+12% $6 24 5 93o 5 12 48 $50.15 1/2"-1"SQUEEZE -OFF $6.12 TOTAL 5 345.93 $6.24 $352.85 BY-PASS 1"PLS PY-PASS 2"PLS BY-PASS 4"PLS BY-PASS 6"PLS BY-PASS 1"STEEL BY-PASS 2"STEEL BY-PASS 4"STEEL BY-PASS 6"STEEL BY-PASS 8"STEEL BY-PASS MISC TOTAL $459.00 5 468.18 5 561.00 5 572.22 $734.40 5 749.09$979.20 5 998.78$816.00 5 832.32$1,305.60 $1,331.71$1,958.40 $1,997.57I&Ivl/Cost+12%I 8,M/Cost i 12%I 8 M/Cost +12%I 8 M/Cost+12%$6,813,60 $6,949.87 HAND DIG (PER FT.) SOD REMOVAL &REPLACEMENT (EXISTING) SOD REPLACFMENT (NEW) ASPHALT &REMOVAL &REPLACEMENT CONCRETE REMOVAL 8 REPLACEivlENT SPREADING STONE SILT FENCE ROCK SHIELD (PER FT,) ANODE 1 LB.INSIALLED ANODE 5 LB.INSTALI ED ANODE 17 LB.INSTALLED TEST STATION INSTALLED LINE lvlARKERS INSTALLED MATTING (PER FT.) SEEDING (PER FT.) EXTRA DEPT.DITCH (PER 12") 1"PE VALVE INSTALL 2"PE VALVE INSTALL 4"PE VALVE INSTALL 1"SIEEL VALVE INS1 ALI 2"STEEL VALVE INSTALL 4"STEEL VALVE INSTALL 6"STEEL VALVE INSTALL 31.66 3.80 4.44 I 8.73 22.16 56.99 10.76 12.67 38.01 44,33 189.99 94 99 19.00 1.02 'I 90 105 06 5 157.59 $335 64 $178 60 5 383 47 5 420.24 5 745 93 $32.29 $3.88 4.53 19.10 22.61 5 58.13 5 10.98 5 12.92 $32 29 38.77 $45.22 $'193.78 $96 89 $19 38 $1 04 $1.94 $107.16 $160 74 $342.35 182.17 39I.14 $428.64 Iup 84 GRAND TOTAL 5 25,587.50 $26 009 25$