HomeMy WebLinkAbout2017-07-10-Resolutions 17-317_Alice's Rd Corridor Phase 4 - Duct Installation AgrTHE CITY OF WAUKEE,IOWA RESOLUTION 17-317 APPROVING WEBSTER ELECTRIC,INC.,PROPOSAL [ALICE'S ROAD CORRIDOR PHASE 4 PROJECT,DUCT INSTALLATION] IN THE NAME AND BY THEA UTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,the City of Waukee,Dallas County,State of Iowa,is a duly organized Municipal Organization;AND, WHEREAS,the City is currently construction public improvements as part of the Alice's Road Corridor Phase 4 Project;AND, WHEREAS,on July 10,2017,the Waukee City Council approved a proposal from MidAmerican Energy Company to relocate a transformer at 1100 SE Alice's Road (Resolution 017-316);AND, WHEREAS,as part of the transformer relocation,the City of Waukee shall be responsible for the installation of a primary duct from the existing transformer location to the proposed location; AND, WHEREAS,Webster Electric,Inc.,has provided a proposal,attached hereto as Exhibit A,for the duct installation;AND, WHEREAS,City staff recommends approval of the agreement. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 10'"day of July,2017,that it hereby approves the Webster Electric,Inc.,proposal [Alice's Road Corridor Phase 4 Project,Duct Installation]. lliam .P card,Mayor Attest: Rebecca D.Schuett,City Clerk ROLL CALL VOTE Anna Bergman R.Charles Bottenberg Brian Harrison Shelly Hughes Larry R.Lyon AYK X X X X X NAY ABSENT ABSTAIN May 11,2017 Giicrest Jewett 1100 SE Alices Rd Waukee,IA 50263 Re:Electncal Transformer relocation Maintenance Shop /Windows &Doors Waukee,IA Site Utilities: Install 500'of 1 —4"empty underground conduit for Mid American Energy. Install 3 phase transformer pad with oil containment. Maintenance Bvildin Install 300'-new underground secondary conduit and conductors from the existing meter setting to the new transformer Provide a 1 day generator rental with connections Windows tl Doors Buildin Install 250'—new underground secondary conduit and conductors from the existing meter setting to the new transformer. Provide a 1 day generator rental with connections. Miscellaneous: All labor included. All materials included. Al!boring /backhoe /trenching. Concrete cutting /removal /replacement at 2 locations Old concrete transformer pad removal ~AM !95 Ati e's Road Suite 8 ~teaitl&ee,In va 50263 Ptnoe 515-987-49a9 Fax 515-987-5065 CJL Co Cont. I Total:$38,900.00 (Thirty Eight Thousand Nine Hundred Dollars} BREAKDOWN City of Waukee Responsibilities: Install 1 —O'Primary duct for Mid Amencan Energy from the east easement area by SE Alices Road to the new transformer site.$7,50Q.OO Mid American Energy charges OO,OQ Total $7,500.00 GIIcrest Jewett Responsibilities: Transformer pad with oil containment Install 2 new secondary's from the new transformer to Windows 8 Doors and Maintenance Shop buildings. All other associated turnkey items.$31,400.00 President