HomeMy WebLinkAbout2018-09-17-Resolutions 18-373_Fee Schedule 2018 - Amendment 2THE CITY OF WAUKEE,IOWA
RESOLUTION 18-373
ADOPTING THK CITY OF WAUKEE 2018 FKK SCHEDULE
(REVISION NO.2)
IN THE NAME AND BY THEAUTHORITYOF THE CITYOF WAUKEE,IOP'A
WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas
County;AND,
WHEREAS,as part of the budget review and adoption process,a Fee Schedule for
services provided by the City of Waukee was approved by the Waukee City Council on
March 5,2018 (Resolution 418-083)and a revised Fee Schedule was approved on April
16,2018 (18-155);AND,
WHEREAS,City staff recommends the addition of fees related residential rental
property inspections and fines for non-compliance;AND,
WHEREAS,the revised 2018 Fee Schedule is attached hereto as Exhibit A.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in
session this 17'"day of September,2018,that the City of Waukee 2018 Fee Schedule
(Revision No.2)is hereby approved and shall be in immediate effect unless otherwise
noted in the schedule.
i iam .Peard,Mayor
Attest:
Rebecca D.Schuett,City Clerk
RESULTS OF VOTE:
Anna Bergman
R.Charles Bottenberg
Courtney Clarke
Shelly Hughes
Larry R.Lyon
AYE
X
X
X
X
NAY ABSENT ABSTAIN
X
City of Waukee Fee Sched ule 2018
as adopted by Waukee City Council on 09/17/2018 by Resolution ¹18-373
1.All fees in effect upon adoption unless otherwise noted.
INI ICES F-
Examination and Co in of Public Records*
Photocopies
Electronic media**
Routinel pre ared orboundre orts
$0.25 per page (black 8 white)
$0.50 per page (color)
$5.00 per CD (data files)
$5.00 per DVD (audio/video)
$10.00 per USB drive
$10.00 per GIS layer file
Actual cost s to produce
Hourly rate for clerical time needed for the reproduction of
photoco pica
Actual cost(s)of employee time if time
involved exceeds fifteen (15)minutes
Hourly rate for professional staff time needed to produce or
review documents
Actual cost(s)of employee time if time
involved exceeds fifteen (15)minutes
*Reference policy adopted by Waukee City Council on 08/20/2012 by Resolution ¹12-187
**All open records requests that are responded to by electronic media shall be done so that the document(s)may
not be altered.
Block Party Permit
Bond requirement
Peddler,Solicitor Permit
Application fee (per applicant)
License fee (per group)
Bond requirement (per group)
$250.00,refundable after barricades
are picked up by Public Works
$5.00
$10.00 per day or any part thereof;
$50.00 per week
$100.00 cash or money order,
refundable 30 days after expiration of
license
Displa Fireworks Permit
License fee
Deposit requirement
$10.00
$200.00,refundable upon the clean
up,by applicant,of any debris and in
the sole discretion of the City
*Display Fireworks as defined in iowa Code section 727.2(1)(b)
**Insurance requirements speafied in Waukee Muniopal Code $622.1(2)
Commercial Garba e Hauler Permit
License fee $10.00 perlicense
Insurance requirements speofied in Waukee Muniopal Code $213.5
Page 1 of 11
Collection Fees
NSF fee
City of Waukee Fee Schedule 2018
$30.00
Income Offset Pro ram administration fee $7.00
Miscellaneous Fees
Rules,regulations,procedures and fees associated with a Retail Cigarette/Tobacco Permit are
governed by Chapter 453A of the Code of lowe.
Rules,regulations,procedures and fees associated with a Liquor License are governed by Chapter
123 of the Code of iowa.
Sh%KNQ)LC~
Su ar Creek Municipal Golf Course
Season Passes
Weekda Senior (A e 55+,Monda -Thursda,Frida AM)$520.00+tax
Sin le Adult (Monda -Sunda )
Couples/Corporate (2 people from same residence or
workplace)
Famil 3 or more from same residence)
Junior A e18 and under
Cart Passes
Sin le
Cou le/Corporate 2 eople)
Dail Rates
Weekda (Monda -Thursda,Frida AM
Weekend Frida PM-Sunda
Junior (A e 18 and under,Monda -Thursda,Frida AM)
Senior A e 55+,Monda -Thursda,Frida AM
Carts (per seat
Ran e Balls
Small (30 balls)
Medium 60 balls)
Lar e 90 Balls)
Fre uent Customer Punch Cards
Ten 10)9-hole rounds for the price of nine
Punch card with cart added
Ten (10)lar e ran e buckets for the rice of nine
$675.00 +tax
$970.00 +tax
$1,175.00 +tax
$340.00 +tax
$395.00 tax included)
$575.00 (tax included)
9 holes:$16.00
18 holes:$25.00
9 holes:$17.00
18 holes:$28.00
9 holes:$10.00
18 holes:$17.50
9 holes:$1 .00
18 holes:$17.50
9 holes:$10.00
18 holes:$14.00
$5.00
$7.00
$9.00
$153.00
$243.00
$81.00
S ecial Event Permits
S ecial Event Permit
$75.00 (non-refundable)plus shelter
rental fees
Page 2 of 11
Park Shelter Rentals
Centennial Park:
Enclosed Shelter House
0 en Air Shelter
City of Waukee Fee Sched ule 2018
$40.00 per day
$25.00 per day
Rid e Pointe Park Pavilion:
Full Da
Full Da deposit re uirement
Windfield Park:
Shelter
$65.00
$150.00
$25.00 per day
Weekend shelter rentals can be reserved six months in advance from the reservation date.Weekday shelter
rentals can also be reserved in advance,however reservations are not accepted until after March 1st for the
months of March —July and after August 1st for the months of August —February.
Waukee Communi Center Rentals
Half Da 0 tion1 (10:00 a.m.-3.00 .m.
Half Da 0 tion 2 5:00 .m.-10:00 .m.
Full Da Option 8:00 a.m.-10:00 p.m.
Meetin Option
De osit
$80.00 lus de osit
$80.00 lus de osit
$180.00 lus deposit
$25.00 er hour
$150.00
Additional set-up time may be requested for a fee of $25.00 per hour.
Audio/visual equipment can be rented for an additional $50.00
Non-profit groups will be allowed to reserve the Waukee Community Center for free,two dates each month,
Monday through Thursday.Any usage outside the Monday through Thursday timeline will be subject to rental
rates.To be considered a non-profit group of Waukee,the organization must be a 501(c)(3)corporation duly
formed and existing pursuant to the State of iowa which maintains its principal place of business in the City of
Waukee,Iowa,or if a group is a Waukee senior group (members age 62 or older)consisting of no less than 20
members who are residents of the City of Waukee
Centennial Park Baseball/Softball Field Rentals
No field pre aration
One field,includin one dra in of field
Two fields,includin one dra in of fields
Three fields,includin one dra in of fields
Field Li hts
Field Chalked
Field Dra
De osit re uirement
$25.00 per field per hour
$85.00 per day
$160.00 per field per day
$245.00 per field per day
$35.00 er field erda
$15 00 er field chalked
$15.00 er field dra ed
$50.00 for one field*
$100.00 for two fields*
$150 for three fields*
*Cancellstions require notice of 10 business days.Refunds will be issued by check or will be credited back onto
the credit card used to reserve the facility A $5.00 nonrefundable handling fee will be deducted from the refund.
If ball field reservations are cancelled in the event of rain,all attempts will be made to reschedule.
Page 3 of 11
gEQE '
Administrative Fees
City of Waukee Fee Schedule 2018
Zonin Chan e Requests
Certificate of Occupanc /Zonin Compliance Letter
Prelimina Plat
Final Plat
Bounda Retracement Surve
Plat of Surve
Site Plan
$300.00
$150.00
$250.00
$250.00
$40.00
$150.00
$250.00
Construction Plans
Board of Ad'ustment -residential
Board of Ad'ustment -all others
Board of A eels -residential
Board of A eels -all others
Construction Inspection
Development Review-Consultin En ineer
Develo ment Review-Le al
Development Recordin Fees
$500.00 (an additional $140.00 will be
charged for each additional submittal
following two full reviews by staff)
$100.00
$150.00
$100.00
$150.00
$75 00 er hour
All cost incurred will be billed to the
applicant
All cost incurred will be billed to the
applicant
All cost incurred will be billed to the
applicant
Building Fees
Building Permit fees with the exception of the job types specified below shall be calculated based
upon the followin valuation cnteria:
Total Valuation
$1.00 to $500
$501 to $2,000
Fee
$15.00
$15.00 for the first $500 plus $2.00 for
each additional $100 or fraction
thereof,to and including $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $1,000,000
$1,000,001 and up
$45.00 for the first $2,000 plus $8.00
for each additional $1,000 or fraction
thereof,to and including $25,000
$229.00 for the first $25,000 plus
$7.00 for each additional $1,000 or
fraction thereof,to and including
$50,000
$404.00 for the first $50,000 plus
$5.00 for each additional $1,000 or
fraction thereof,to and including
$100,000
$654.00 for the first $100,000 plus
$3.00 for each additional $1,000 or
fraction thereof,to and including
$1,000,000
3,54 ort e irst 1,000,pus
$2.50 for each additional $1,000 or
fraction thereof
Page 4 of 11
City of Waukee Fee Sched ule 2018
Accesso Buildin s (121 to 719 square feet $50.00
Accesso Buildin s (over 720 square feet
Accesso Structures exce t decks
Accesso Structures decks)
$90.00
$20.00
$80.00
Swimmin Pools includin fence,electrical and lumbin )$150.00
Swimming Pools Above-Ground (including fence,electrical
and plumin )
Temporary Structures (including tents,canopies,membrane
structures and similar structures)
Minor Structural Repair or Alteration
Temporary Uses
A ricultural Sales
Building Si ns
Monument Si ns
Si n Remodel
Tem ora Si ns
Mechanical Permit
Electrical Permit
Plumbin Permit
$50.00
$75.00
$75.00
$75.00
$50.00
$50.00
$85.00
$20.00
$20.00
$75.00
$75.00
$75.00
Demolition Permit
Sidewalk/Approach Re lacement
Ener Code Inspection
Ener Code Review/Ins ection
Buildin Permit Re-Issuance/Transfer Fee
Inspections outside of normal business
Residential Rental Ins actions
Multi-famil Develo ment
Condominiums individual owner)
Condominiums (sin le buildin owner
Duplex
Sin le Famil Home
Townhouse (individual owner)
Townhouse (single building owner)
Failure to Re ister initial or renewal
Re-ins ection first re-ins ection free
Com laint Ins ection
Board of Appeals A lication
$50.00 -minor $100.00
-ma'or (bldg/utiiit removal)
$50.00
$350.00 per unit
$500.00 per unit
$100.00
$75.00 er hour
$50.00 per structure plus
$15.00 per dwelling unit
$50.00 er dwellin unit
$50.00 per structure plus
$15.00 per dwelling unit
$50.00 per structure plus
$15.00 per dwelling unit
$50.00 erdwellin unit
$50.00 per dwellin unit
50.00 per structure plus
$15 00 per dwelling unit
$150.00
$50.00 er hour 1 hour minimum
$150.00 includes first re-ins ection
$100.00
Code Compliance
Mowin Non-Compliant Pro erties
Shovelin Non-Compliant Sidewalks
$90 00 er hour one hour minimum)
$90.00 er hour (one hour minimum)
Page 5 of 11
Miscellaneous
Zonin Ordinance
Zonin Ma s/Street Ma s
City of Waukee Fee Schedule 2018
$25.00
$5.00
Com rehensive Plan/Master Plans
An document/map above su lied on CD/flash drive
$25.00
$5.00
flRErD 'E '
Ambulance Service
BLS transports
ALS transports
ALS "2"transports
Mileage
Treat and release
Hazardous Materials Response*
Heavy Response Apparatus with 4 personnel (engine,ladder,
heavy rescue,grader,backhoe,dump truck,endloader,
sweeper,sewer jet,etc.)
Light Response Apparatus with 2 personnel (tanker,brush
truck,ambulance,staff car,pick-up truck,generator,
compressor,related power equipment,etc.)
Extra response personnel (per person)
Expended materials (foam,containment booms,sand,
absorbent,etc.)
Equipment repair and/or cleaning (personal protective
equipment,hose,nozzles,apparatus,etc.)
Damaged equipment and/or property (may include injury to
destruction of,or loss of natural resources,etc.)
Other (contracted services,contracted equipment,evacuation
of people,etc.)
$600.00 per patient transported
$700.00 per patient transported
$900.00 per patient transported
$13.00 per loaded mile per patient
transported
$150.00 per call
$295.70 per hour
$236.56 per hour
$23.68 per hour
Replacement cost,including shipping
Cost (parts plus labor),including
shipping
Replacement and/or repair cost,
includin shipping
Billed as used
Minimum of one (1)hour,and billed in 15 minute increments beyond the first hour.
Inspections*
Initial inspection
First reinspection (performed within 30 days of initial
inspection)
Second reinspection (performed within 2 weeks of first
reinspection)
Third reinspection (performed within 2 weeks of second
reinspection)
Fourth reinspection (performed within 2 weeks of third
reinspection)
no char e
no char e
$100.00
$300.00
$600.00
Fifth reinspection and each reinspection thereafter (performed
within 2 weeks of fourth and subsequent reinspections)$1,000.00 per reinspection
*Occupancy permit remspections to be scheduled with an agreed upon date.A written work order secured by the
occupant and/or building owner and presented to the inspector with an agreed upon completion date to correct
Fire Code violations will serve in place of the next reinspection faa.If the work order is not compltad by the agreed
upon date,the corresponding reinspection fae will be charged and another reinspection scheduled.
Page 6 of 11
City of Waukee Fee Schedule 2018
,POLICE'
Administration
Off-dut police officer
Fin er rintin services
$60.00 er hour with 2-hour minimum
$10.00 per card
Pet Licensin and Animal Control
Spa ed or neutered do or cat
Non-spa ed or neutered do or cat
Re lacement ta
License renewal late fee assessed as of Ma 1,2017
$15.00 per license
$25.00 per license
$5.00 per license
$10.00 er license
A copy of recent rabies vaconation is required for a pet license to be issued.Licenses are valid from January 1
through December 31 and must be renewed annually.
'QTILtl~LrI„'
Gas service de osit
Water service de osit
Gas service de osit renters
Water service de osit renters
Gas service de osit mobile home court resident
Gas reconnection fee
Water reconnection fee
Snowbird*as reconnection fee
Snowbird*water reconnection fee
Portable irri ation meter
Shut off notice/ta fee
Late fees
$50.00
$50.00
$100.00
$100.00
$100.00
$50.00
$50.00
$25.00
$12.50
$100.00
$25.00
1 '/~%
*Snowbird is defined as a homeowner who leaves a home vacant for
a minimum of three consecutive months and informs Utihty Billing in
advance of the vacancy.Snowbirds who are regular garbage
customers can suspend service during the vacancy penod,however,
they are required to continue paying the $3.00/month solid waste
landfill fee.
Page 7 of 11
PUBS(
City of Waukee Fee Sched ule 2018
Equipment Rates Per Hours
Dump truck
Sewer 'et
Vac trailer
Sewer TV unit
Street swee er
Wheel loader
Backhoe
Excavator
Motor radar
Skid loader
Bucket truck
Variable messa e board
Pickup (3/4 ton)
Trencher walk behind)
Trencher (wheel)
Borin /Missile
Gas construction/service truck
$80.00
$222.00
$180.00
$180.00
$115.00
$126.00
$81.00
$65.00
$158.00
$41.00
$77.00
$36.00
$38.00
$31.05
$98.33
$20.70
$38.00
*One hour minimum charge.Additional equipment fees may be charged based on iowa Department of
Transportation.
Labor Fees (includes Park &Rec Labor fees)
Labor Operations/S eciaiist
Administrative
Overtime rate
After-hour call in
Holida after hour call-in*
De artment Supervisors
Assistant Public Works Director
Department Director
$46.48 per hour regular rate (1 hour
minimum);
$69.72 per hour overtime rate (1 hour
minimum)
$45.47 er hour 1 hour minimum
$68.21 er hour
$76.62 per hour 1 hour minimum
$127.70 per hour 1 hour minimum)
$51.08 per hour regular rate;
$76.62 per hour overtime rate*
$67.00 overtime NIA
$80.00 overtime NIA
*Holidays as designated m the City of Waukee Personnel Manual
Custom Mailbox Reimbursement
Pursuant to Ci of Waukee Snow &ice Removal Polic $150.00
Hydrant Meter Deposit
5/8"&3/4"meter
1"meter
2"meter
3"meter
Non-refundable aministrative fee
$410.00
$509.00
$2,204.00
$3,717.00
$125.00
Meter Accuracy Test
Test $100.00
Page 8 of 11
City of Waukee Fee Schedule 2018
Water Meters and Appurtenances Fee*
3/4"meter IP EARL
1"IPEARL arri ation meter
1"IPEARL domestic meter
1"meter IPEARL Dual Port Wired EP
1 1/2"meter corn ound with strainer &tla kit
1-1/2"meter turbo with strainer &fla kit
2"meter turbo with strainer &fla kit
2"meter corn ound with strainer &fla kit
3"meter corn ound with strainer &fla kit
3"meter turbo with strainer &fla kit
4"meter corn ound with strainer &fla kit
4"meter turbo with strainer &fla kit
6"meter compound with strainer &fla kit
6"meter turbo with strainer 8 fla kit
Breakin seal/tarn erin w/meter
$365.00
$275.00
$438.00
$468.00
$1,795.00
$1,274.00
$1,500.00
$2,096.00
$2,436.00
$1,715.00
$4,074.00
$3,178.00
$6,866.00
$5,566.00
$250.00
*Water meter equipment pricing subiect to change without notice.
Samples and Flushings
Bacteriolo ical Sample
Water used for flushin
$150.00
$8.62 per 1,000
*New mains that fail initial bacteriological test may be assessed sampling and flushing costs
Oversize/Overweight Permits
Sin le Trip
Round Tri
Annual Oversize
$0.00
$0.00
$0.00
Equipment Services
Parts
Shop time
Mechanics time
Costof arts lus15%
$30.00 er hour 1 hour minimum)
$45.00 er hour
Page 9 of 11
Signage*
8"Street Blades:
24"Length
30"Length
36"Length
42"Length
City of Waukee Fee Schedule 2018
$57.05
$65.39
$82.29
$86.38
54"Length
72"Length
Sto si n,30 X 30 R1-1 and hardware
$117.89
$136.52
$119.83
Stop si n,30 X 30 R1-1 with post and street blades/hardware
No Parkin with teles ar post
No Parkin banded on li ht post
25 MPH banded to li ht pole
25 MPH on tels ar ost
Street Blade with telespar ost
Nine-dot delineators with ost and hardware
Teles are Post/Hardware
No outlet on post
No outlet banded on li ht pole
*All other signs billed at cost plus labor/installation
Gas Charges
Gas meter accurac test:
Residential
Lar e Volume
Gas meter fees -commercial:
2"Flan ed 150¹Meter Set -8C
2"Flan ed 150¹Meter Set -15C
2"Flan ed150¹Meter Set-1.5M
2"Flan ed150¹Meter Set-2M
2"Flan ed 150¹Meter Set -3M
3"Flan ed150¹Meter Set-5M
3"Flan ed150¹Meter Set-7M
4"Flanged 150¹Meter Set -11M
Construction cost of 1"service line -ion side
Construction cost of 1"service line -short side
Construction cost of 2"service line -lon side
Construction cost of 2"service line -short side
Construction cost of 4"service line -ion side
Construction cost of 4"service line -short side
Multiple Meter Commercial Headers
Stormwater Fees
COSESCO -Individual lot
COSESCO-All other GP¹2
$96.59 plus street blade cost
$88.09
$46.13
$51.24
$88.93
$55.76 lus street blade cost
$45.22
$70.94
$121.78
$73.50
$105.00
$240.00
$6,200.00
$6,200.00
$6,200.00
$6,500.00
$6,600.00
$7,500.00
$8,200.00
$10,500.00
Time and Material +15%
Time and Material +15%
Time and Material +15%
Time and Material +15%
Time and Matenal +15%
Time and Material +15%
Time and Material +15%
$250.00/one time fee
$250.00/one time fee
GIS Fees
Electronic media $41.95 er hour
Page 10 of11
City of Waukee Fee Schedule 2018
Engineering Fees
En ineerin inspection fees
Third art ins ection fees
Lar e format rints reater than 11 X 17"
$75.00 er hour
Char ed as billed
$25.00
Miscellaneous Fees
Ri ht of wa /utilit ermit fee $25.00
Rebates
Furnace (92%efficienc or reater)
Water heater (30,40,&50 allons
D er,stove,as fire lace
$75.00 (30-79,000 btu per hour);
$1 50.00 (80,000+btu per hour)
$50.00
$25.00
Programmable thermostat (maximum rebate of installed cost)
Rain barrel
Rain arden/bioretention cell reimbursement
$30.00
$50.00 maximum for purchase of 50
gallon or larger barrel
Up to $1,000 00 —50%cost share for
materials &hired labor
Page 11 of 11