HomeMy WebLinkAbout2014-03-17-Resolutions 14-078_Fee Schedule FY2014-2015 - AmendmentTHE CITY OF WAUKEE,IOWA
RESOLUTION 14-078
ADOPTING THE REVISED CITY OF WAUKEE FY2014-2015 FEE
SCHEDULE
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA
WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas
County;AND,
WHEREAS,as part of the budget review and adoption process,a Fee Schedule for
services provided by the City of Waulcee was approved by the Waulcee City Council on
March 3,2014 (Resolution #14-053);AND,
WHEREAS,certain fees have been added to the fee schedule since initial approval by
the Waukee City Council;AND,
WHEREAS,the revised FY2014-20l5 Fee Schedule is attached hereto as Exhibit A.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in
session this 17th day of March,2014,that the revised City of Waukee FY2014-2015 fee
schedule is hereby approved and shall be immediately in effect.
Attest:
~t'2J~-Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Shane Blanchard
Brian Harrison
Casey L.Harvey
Shelly Hughes
Rick Peterson
AYE
X
X
X
NAY ABSENT ABSTAIN
X
X
City of Waukee Fee Schedule FY2014-2015
as adopted by Waukee City Council on 03/17/2014 by Re,,0ILlti~jJft'14Jj"7$··•••
Examination and Copying of Public Records'
$0.25 per page (black &white)
Photocooies $0.50 per page (color)
$5.00 per CD (data files)
$5.00 per DVD (audio/video).$10.00 per USB drive
Electronic media"$10.00 per GIS file
Routinelv prepared or bound reports Actual cost(s)to produce
Actual cost(s)of employee time if
Hourly rate for clerical time needed for the reproduction of time involved exceeds fifteen (15)
photocopies minutes
Actual cost(s)of employee time if
Hourly rate for professional staff time needed to produce or time involved exceeds fifteen (15)
review documents minutes
,Reference policy adopted by Waukee City Council on 08/20/2012 by Resolution #12-187
,.All open records requests that are responded to by electronic media shall be done so that the document(s)
may not be altered.
Block Partv Permit
Bond requirement
$100.00,refundable after barricades
are picked up by Public Works
Noise Permit
License fee (residential zoning district,City parks)$50.00
License fee (all other zoning districts)$100.00
$100.00,refundable 30 days after
Bond requirement expiration of license
Peddler Solicitor Permit,
Application fee (per applicant)$5.00
$10.00 per day or any part thereof;
License fee (per group)$50.00 per week
$100.00 cash or money order,
refundable 30 days after expiration of
Bond requirement (per group)license
Fireworks Permit
License fee $10.00
$200.00,refundable upon the clean
up,by applicant,of any debris and in
Deposit requirement the sole discretion of the City
•Insurance requirements specified in Waukee Municipal Code §622.1 (2)
Page 1 of 12
City of Waukee Fee Schedule FY2014-2015
I::.Li"'c:::en"s"'e::.-f"'e:::e:...-I,,$.:..1 O:::."'O:::O..!:p:::e::.r.:,:li::.ce"'n.:,:s:::e:...-_
Commercial Garbage Hauler Permit
•Insurance requirements specified in Waukee Municipal Code §213.5
Collection Fees
NSF fee $30.00
Income Offset Program administration fee $7.00
Miscellaneous Fees
Rules,regulations,procedures and fees associated with a Retail Cigarette/Tobacco Permit are
governed by Chapter 453A of the Code of Iowa.
Rules,regulations,procedures and fees associated with a Liquor License are governed by Chapter
123 of the Code of Iowa.
Page 2 of 12
City of Waukee Fee Schedule FY2014-2015
Sugar Creek Municipal Golf Course
Season Passes
Weekday Senior (Age 55+,Monday-Thursdav,Fridav AM)$520.00 +tax
Single Adult (Monday-Sunday)$675.00 +tax
Couples/Corporate (2 people from same residence or
workplace)$970.00 +tax
Familv (3 or more from same residence)$1,175.00 +tax
Junior (Age 18 and under)$340.00 +tax
Cart Passes
Sinole I $395.00 (tax included)
Couple/Corporate (2 people)$575.00 (tax included)
2014 DaiIV Rates
9 holes:$16.00
Weekdav (Monday-Thursday,Fridav AM)18 holes:$25.00
9 holes:$17.00
Weekend (Friday PM-Sunday)18 holes:$28.00
9 holes:$10.00
Junior (Age 18 and under,Mondav-Thursday,Fridav AM)18 holes:$17.50
9 holes:$10.00
Senior (Age 55+,Mondav-Thursday,Friday AM)18 holes:$17.50
9 holes:$10.00
Carts (per seat)18 holes:$14.00
Range Balls
Small (30 balls)$5.00
Medium (60 balls)$7.00
Large (90 Balls)$9.00
Freauent Customer Punch Cards
Ten (10)9-hole rounds for the price of nine $153.00
Punch card with cart added $243.00
Ten (10)large range buckets for the price of nine $81.00
Page 3 of 12
City of Waukee Fee Schedule FY2014·2015
Park Shelter Rentals
Centennial Park:
$40.00 per day
Enclosed Shelter House
$25.00 per day
Open Air Shelter
Ridge Pointe Park Pavilion:
$65.00
Full Dav
Full Day deposit requirement $150.00
Weekend shelter rentals can be reserved six months in advance from the reservation date.Weekday shelter
rentals can also be reserved in advance;however reservations are not accepted until after March 1st for the
months of March -July and after August 1st for the months of August -February.
Waukee Community Center Rentals
Half Day Option 1 (10:00 a.m.-3:00 p.m.)$80.00 plus deposit
Half Day Option 2 (5:00 p.m.-10:00 p.m.)$80.00 plus deposit80
Full Day Option (8:00 a.m.-10:00 p.m.)$180.00 plus deposit
Meeting Option $25.00 per hour
Deposit $150.00
Additional set-up time may be requested for a fee of $25.00 per hour.
Audio/visual equipment can be rented for an additional $50.00
Non-profit groups will be allowed to reserve the Waukee Community Center for free,two dates each month,
Monday through Thursday.Any usage outside the Monday through Thursday timeline will be subject to rental
rates.To be considered a non-profit group of Waukee,the organization must be a 501 (c)(3)corporation duly
formed and existing pursuant to the State of Iowa which maintains its principal place of business in the City of
Waukee,Iowa,or if a group is a Waukee senior group (members age 62 or older)consisting of no less than 20
members who are residents of the City of Waukee.
Centennial Park Baseball/Softball Field Rentals
No field preparation $20.00 per field per hour
One field,including one dragging of field $65.00 per day
Two fields,including one dragging of fields $140.00 per field per day
Three fields,including one dragging of fields $225.00 per field per day
Field Lights $30.00 per field per day
Field Chalked $10.00 per field chalked
Field Drag $10.00 per field dragged
$50.00 for one field*
$100.00 for two fields*
Deposit requirement $150 for three fields*
*Refunds may be issued for reservations only when cancellations are made 10 days prior to date of
reservation.If ball field reservations are cancelled in the event of rain,all attempts will be made to reschedule.
Page 4 of 12
City of Waukee Fee Schedule FY2014·2015
Administrative Fees
Zoning Change Renuests $300.00
Certificate of Occupancy/Zoning Comoliance Letter $150.00
Preliminary Plat $250.00
Final Plat $250.00
Auditor's Plat $30.00
Plat of Survey $150.00
Site Plan $250.00
$500.00 (an additional $140.00 will be
charged for each additional submittal
Construction Plans following two full reviews by staff)
Board of Adfustment -residential $75.00
Board of Adjustment -all others $150.00
Board of Appeals -residential $75.00
Board of Apoeals -all others $150.00
Construction Inspection $75.00 per hour
All cost incurred will be billed to the
Develooment Review -Consulting Engineer applicant
All cost incurred will be billed to the
Development Review -Legal applicant
All cost incurred will be billed to the
Development Recording Fees applicant
Building Fees
Building Permit fees with the exception of the job types specified below shall be calculated based
upon the following valuation criteria'
Total Valuation Fee
$1.00 to $500 $15.00
$15.00 for the first $500 plus $2.00
for each additional $100 or fraction
$501 to $2,000 thereof,to and including $2,000
$45.00 for the first $2,000 plus $8.00
for each additional $1,000 or fraction
$2,001 to $25,000 thereof,to and including $25,000
$229.00 for the first $25,000 plus
$7.00 for each additional $1,000 or
fraction thereof,to and including
$25,001 to $50,000 $50,000
$404.00 for the first $50,000 plus
$5.00 for each additional $1,000 or
fraction thereof,to and including
$50,001 to $100,000 $100,000
$654.00 for the first $100,000 plus
$3.00 for each additional $1,000 or
fraction thereof,to and including
$100,001 to $1,000,000 $1,000,000
1$3,354 for the first $1,000,000 plus
$2.50 for each additional $1,000 or
$1,000,001 and up fraction thereof
Page 5 of 12
City of Waukee Fee Schedule FY2014-2015
Accessorv Buildings (121 to 719 square feet)$50.00
Accessory Buildings (over 720 sauare feet)$85.00
Accessorv Structures (except decks)$20.00
Accessorv Structures (decks)$80.00
Swimming Pools (including fence,electrical and plumb ina)$150.00
Swimming Pools Above-Ground (including fence,electrical
and pluming)$50.00
Temporary Structures (including tents,canopies,membrane
structures and similar structures)$75.00
Agricultural Sales $50.00
Building Signs $50.00
Monument Signs $75.00
Sign Remodel $20.00
Temoorarv Signs $20.00
Mechanical Permit $65.00
Electrical Permit $65.00
Plumbing Permit $65.00
$50.00 -minor
Demolition Permit $100.00 -major (bldg/utility removal)
Sidewalk/Approach Replacement $50.00
Energv Code Insoection $350.00 oer unit
Energy Code Review/Inspection $500.00 per unit
Building Permit Re-lssuancelTransfer Fee $100.00
Insoections outside of normal business $75.00 per hour
Code Compliance
Mowing Non-Compliant Properties $90.00 per hour (one hour minimum)
Shoveling Non-Compliant Sidewalks $90.00 per hour (one hour minimum)
Miscellaneous
Zoning Ordinance $25.00
Zoning Maps/Street Maps $5.00
Comprehensive Plan/Master Plans $25.00
Any document/map above supplied on CDlfiash drive $5.00
Page 6 of 12
City of Waukee Fee Schedule FY2014-2015
Ambulance Service
BLS/ASL transports $600.00 per patient transported
ALS "2"transports $800.00 per patient transported
$12.00 per loaded mile per patient
Mileage transported
Treat and release $150.00 per call
Hazardous Materials Response'
Heavy Response Apparatus with 4 personnel (engine,ladder,
heavy rescue,grader,backhoe,dump truck,end loader,
sweeper,sewer jet,etc.)$280.00 per hour
Light Response Apparatus with 2 personnel (tanker,brush
truck,ambulance,staff car,pick-up truck,generator,
compressor,related power equipment,etc.)$224.00 per hour
Extra response personnel (per person)$22.42 per hour
Expended materials (foam,containment booms,sand,
absorbent,etc.)Replacement cost,including shipping
Equipment repair and/or cleaning (personal protective Cost (parts plus labor),including
equipment,hose,nozzles,apparatus,etc.)shipping
Damaged equipment and/or property (may include injury to,Replacement and/or repair cost,
destruction of,or loss of natural resources,etc.)including shipping
Other (contracted services,contracted equipment,evacuation
of people,etc.)Billed as used
*Minimum of one (1)hour,and billed in 15 minute increments beyond the first hour.
Inspections'
Initial inspection no charge
First reinspection (performed within 30 days of initial
inspection)no charge
Second reinspection (performed within 2 weeks of first
reinspection)$100.00
Third reinspection (performed within 2 weeks of second
reinspection)$300.00
Fourth reinspection (performed within 2 weeks of third
reinspection)$600.00
Fifth reinspection and each reinspection thereafter (performed
within 2 weeks of fourth and subsequent reinspect ions )$1,000.00 per reinspection
*Occupancy permit reinspections to be scheduled with an agreed upon date.A written work order secured by
the occupant and/or building owner and presented to the inspector with an agreed upon completion date to
correct Fire Code violations will serve in place of the next reinspection fee.If the work order is not complted by
the agreed upon date,the corresponding reinspection fee will be charged and another reinspection scheduled.
Page 7 of 12
City of Waukee Fee Schedule FY2014-2015
Pet Licensing and Animal Control
Spayed or neutered dog or cat
Non-spayed or neutered dog or cat
A copy of recent rabies vaccination is required for a pet license to be issued.Licenses are valid from July 1
through June 30 and must be renewed annually.
Page 8 of 12
City of Waukee Fee Schedule FY2014·2015
Utilitv connection fee $50.00
Portable irrigation meter $80.00
Shut off notice/tag fee $25.00
Reconnection fee (regular business hours)$25.00
Late fees 1Y.%
Page 9 of 12
City of Waukee Fee Schedule FY2014-2015
Equipment Rates Per Hour'
Dumo truck $80.00
Seweriet $111.00
Vac trailer $111.00
Sewer TV unit $180.00
Street sweeoer $115.00
Wheel loader $126.00
Backhoe $81.00
Excavator $81.00
Motor grader $158.00
Skid loader $41.00
Bucket truck $77.00
Variable messaae board $36.00
Pickup (3/4 ton)$38.00
Trencher (walk behind)$31.05
Trencher (wheel)$98.33
Boring/Missile $20.70
Gas construction/service truck $22.77
"One hour minimum charge.Additional equipment fees may be charged based on Iowa Department
of Transportation.
labor Fees (includes Park &Rec labor fees)
$38.29 per hour regular rate (1 hour
minimum);
$57.44 per hour overtime rate (1 hour
Labor Operations/Specialist minimum)
Administrative $40.89 per hour (1 hour minimum)
Overtime rate $61.34 per hour
After-hour call in $59.70 per hour (1 hour minimum)
Holiday after hour call-in"$74.92 oer hour (1 hour minimum)
$44.48 per hour regular rate;
Department Supervisors $59.70 per hour overtime rate"
Assistant Public Works Director $59.75 overtime N/A
Deoartment Director $72.00 overtime N/A
"Holidays as designated in the City of Waukee Personnel Manual
Custom Mailbox Reimbursement
I.:..P..::u;:.:rs:;u::a~n~t~to::...:::C~itYl...::'o.:..f.:..W~a::u~k",e~e-.::S~n::o~w~&=1c~eo...:.:R",e~m::o~v~a.:..1P~01~ic~y__I,-,$:..:1-=5.::0:..:.0:.:0,--_
Hydrant Meter Deposit
5/8"&3/4"meter $350.00
1"meter $500.00
2"meter $1,380.00
3"meter $2,400.00
Non-refundable aministrative fee $70.00
ITest
Meter Accuracy Test
1$100.00
Page100f12
City of Waukee Fee Schedule FY2014·2015
Water Meters and Appurtenances Fee*
3/4"meter IPEARL $250.00
1"meter I PEARL $250.00
1 1/2"meter compound with strainer &flag kit $1,471.54
1-1/2"meter turbo with strainer &flag kit $1,042.59
2"meter turbo with strainer &flag kit $1,100.09
2"meter comoound with strainer &flag kit $1,716.26
3"meter compound with strainer &flao kit $2,053.90
3"meter turbo with strainer &flag kit $1,442.10
4"meter comoound with strainer &flag kit $3,551.20
4"meter turbo with strainer &flan kit $2,777.25
6"meter comoound with strainer &flag kit $6,074.65
6"meter turbo with strainer &flag kit $4,945.35
Breaking seal/tampering w/meter $250.00
*Water meter equipment pricing subject to change without notice.
Samples and Flushing*
Bacteriological Sample N/A
Water used for flushing $8.62 per 1,000
*New mains that fail initial bacteriological test may be assessed sampling and flushing costs
Oversize/Overweight Permits
Single Trip $0.00
Round Trip $0.00
Annual Oversize $0.00
Equipment Services
Parts Cost of parts plus 15%
Shop time $30.00 per hour (1 hour minimum)
Mechanics time $45.00 per hour
Signage*
Stop sign,30 X 30 R1-1 and hardware $82.99
Stop sign,30 X 30 R1-1 with post and street blades/hardware $144.50
No Parking with telespar post $36.67
No Parking banded on light post $14,70
Nine-dot delineators with post and hardware $45.22
*All other signs billed at cost plus laborlinstallation
Page 11 of 12
City of Waukee Fee Schedule FY2014-2015
Gas Charges
Gas meter accuracvtest:
Residential 1$100.00
Large Volume 1$225.00
Gas meter fees -commercial:
2"Flanged 150#Meter Set -8C $3,843.00
2"Flanged 150#Meter Set -15C $3,872.00
2"Flanged 150#Meter Set -1.5M $3,890.00
2"Flanged 150#Meter Set -2M $3,995.00
2"Flanged 150#Meter Set -3M $4,090.00
3"Flanoed 150#Meter Set -5M $4,570.00
3"Flanged 150#Meter Set -7M $5,253.00
4"Flanged 150#Meter Set -11 M $5,821.00
Construction cost of 2"service line -lone side $2,830.00
Construction cost of 2"service line -short side $1,450.00
Construction cost of 4"service line -long side $5,600.00
Construction cost of 4"service line -short side $2,900.00
$450.00 X number of meter
Multiple Meter Commercial Headers connections
Stormwater Fees
COSESCO -Individual lot $65.0010ne time fee
COSESCO -All other GP#2 $65.00/quarterly
GIS Fees
I.=E"le~c~tr~on~i~c.:cm.:.::e:::d.:.::ia~I-",$~34.:.:..=2.=2..t:p.=e:....r:.::ho~u~r _
Engineering Fees
Engineering inspection fees $75.00 per hour
Third party inspection fees Charged as billed
Large format prints(greater than 11 X 17")$25.00
Miscellaneous Fees
I.:..:R~ig~h.:.:t0~f...::w:..::a2y:..::/u~ti~litLY~p~er.:cm,"it,-,f~ee"----I-,,,$:::25~.~00,,----_
Rebates
$75.00 (30-79,000 btu per hour);
Furnace (92%efficiency or greater)$150.00 (80,000 +btu per hour)
Water heater (30,40,&50 gallons)$50.00
Drver,stove,gas fireplace $25.00
Programmable thermostat (maximum rebate of installed cost)$30.00
$50.00 maximum for purchase of 50
Rain barrel gallon or larger barrel
Up to $1,000.00 -50%cost share for
Rain garden/bioretention cell reimbursement materials &hired labor
Page 12 of 12