HomeMy WebLinkAbout2014-06-02-Resolutions 14-142_Gas Main Blanket BidsTHE CITY OF WAUKEE,IOWA
RESOLUTION 14-142
APPROVING GAS MAIN BLANKET BID PRICING FROM INFRASOURCE AND Q3
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA
WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas County;
AND,
WHEREAS,the City contracts with certain companies for gas main installation,steel gas pipe
replacement,large service line installation and repair during the construction phase of new
subdivisions in the City;AND,
WHEREAS,Waukee Public Works requested blanket bids from InfraSource and Q3 for such
services;AND,
WHEREAS,using the blanket bids,the Waukee Public Works Department computes the lower
bidder for each individual City project and contracts with the low bidder for the work to be
completed.
NOW THEREFORE BE IT RESOLVED that the blanket bids from InfraSource and Q3,
attached hereto as Exhibits A and B,should be and the same is hereby approved.
Passed by the City Council of the City of Waukee,Iowa,and approved this the 2nd day of June,
2014.
Attest:
CWAMIt:lJ~Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Shane Blanchard
Brian Harrison
Casey L.Harvey
Shelly Hughes
Rick Peterson
AYE
X
X
NAY ABSENT ABSTAIN
X
X
X
Exhibit A Q3
$3.46
$696.63
$3.62
$977.34
$3.33
$680.85
sn9.95
$5.44
$5.06
$5.43
Jn$tall1 .5 oc171t Anode and Bell Hole ..each
Install.1,5 or1?~i\nodeln Exlstln Bell Hole ..each
Install reststauon and Bell Hole ..each
$447.55
$33.11
Extra De th er 12"Increment 0.93
$513.77
Install Test Station In Exlstin Bell Hole ..each
EqulpmenIR~\as
l'l~Ye1l2Ton
Pick I)One Ton
2.Ton numo Truck
Foreman Truck with Tools
Fuser Truck with Tools
Backhoe ..Rubber TIred
oatkhoeWnJ\Braaker
Backhole with Tamper
Excavator 160 John Deere or eoulvalent
ideboom Tractor -Rubber Tired
$202.all
$1.50$0:30---'
$3.17
$L.11
$0.36
56.33
$5.07
$20.69
boUbloTlnlO
$154.26
$134.93
$123.00s
$126.70
$129.54
$94.2.4
$170.64
orin E!l~.!e.men!2"or I,ess,__-:---.,...--,_._-:--:-__
.g machine,Am.Auger 100/120 (large}or equivalent
rencher Walk Behind $18.03
$68.95
g machlne,0-24/40 (mediumjVermeeror equivalent
gmachlne,D-71i'(smaIlIVermeer or equivalent
teer
$284.29
$106.08
$18.56
rnent Traller $6.90
$7.96
$6.90==~=~~~~~__~~~~~~j_~--:t.$100.78·=·"·-·
Pipe Stralghtner $23.87
Geoerator $3.71
Water Pump $3.71
~l!.!!!6 Jack Tamper $3,71
AIr Comoressor with Tools $7,96
CITY OF WAUKEE
BLANKET BID PRICING
EXHIBIT B -InfraSource
MAIN PRICE
2"PLS TRENCH (3D"MIN.)$4.23
~~N91-I(?9"MIN.)$5.50
RENCH (3D"MIN.)$9.85
8"PLS TRENCH (30"MIN.)$13.44
2"STEEL TRENCH (3D"MIN.)$12.00
4"STEEL TRENCH (3D"MIN.)$15.00
6"STEEL TRENCH (3D"MIN.)$19.13
TOTAL $79.15
BORE (DIRECTIONAL)PRICE
1/2"(PER FOOT)$11.59
1"PLS (PER FOOT)$11.59
2"PLS (PER FOOT)11.59
4"PLS (PER FOOT)16.23
6"PLS (PER FOOT)$28:98l
8 "PLS (PER FOOT)$,...,...rvrv,,~.~u
1"STEEL (PER FOOT)$
2"STEEL (PER FOOT)$
~OT)$
(PER FOOT)$3
STEEK (PER FOOT)
~
5
242.61
SERVICES PRICE
1/2"PLS (PER FOOT)$7.53
1"PLS (PER FOOT)$7.53
2"PLS (PER FOOT)$8.69
4"PLS (PER FOOT)$I«<<<<
6"PLS (PER FOOT)$
1"STEEL (PER FOOT)
~2"STEEL (PER FOOT)1 .
4"STEEL (PER FOQD $20.16
6"STEEL (PER FOOT)$28.00
TOTAL $137.75
CITY OF WAUKEE
BLANKET BID PRICING
HOTTlE IN PRICE
1/2"PLS $232.00
1"PLS $232.00
2"PLS $290.00
4"PLS a.6"PLS
8"PLS
1"STEEL $522.00_.......
2"STEEL $690.00
4"STEEL $910.00
6"STEEL $1,450.00
8"STEEL $1,739.00
TOTAL $8,453.00
MISC.PRICE
HAND DIG (pER FT.)$28.98
SOD REMOVAL &REPLACEMENT (EXISTING)$3.48
SOD REPLACEfv1e:NT(NEW)$4.06
ASPHALT &REMOVAL &REPLACEMENT $17,39
CONCRETE REMOVAL &REPLACEMENT $20.29
SPREADING STONE $52.16
SILT FENCE $9.85
ROCK SHIELD (PER FT.)$
ANODE 1 LB.INSTALLED $
ANODE 5 LB.INSTALLED $34.78
ANODE 17 LB.INSTALLED $40.57
TEST STATION INSTALLED $173.88
LINE MARKERS INSTALLED $86.94
MATTING (PER FT.)$17.39
ISEEDING (PER FT.)$0.93
I EXTRA DEPT.DITCH (PER 12")$1.74
TOTAL $533.01
FROST CHARGES PRICE
6"TO 12"TRENCH $2.12
13"TO 18"TRENCH $4.22
19"TO 24"TRENCH $5.87
6"TO 12"BELLHOLE
12/1TO 18/1BELLHOLE $126.56
18/1TO 24/1 BELLHOLE $201.60
TOTAL $394.13
CITY OF WAUKEE
BLANKET BID PRICING
WELDING PRICE
WELDER RATE (PER HOUR)$83.02
WELDER HELPER(PER HOUR)$65.72
WELDER RIG (PER HOUR)
~
TOTAL $
LABOR RATES PRICE
SUPERVISOR (PER HOUR)'I'vv ....v
FOREMAN (PER HOUR)$85.30
FUSER (PER HOUR)$68.19
HELPER (PER HOUR)$65.72
LABORER (PER HOUR)$49.50
OPERATOR (PER HOUR)$68.13
PIPE FITTER (PER HOUR)$83.02
TRENCH DRIVER (PER HOUR)$68.13
TOTAL $588.27
EQUIPMENT RATE HOURLY RATE
PICK UP 1/2 TON $25.00
PICK UP 1 TON $28.00
2 TON DUMP TRUCK WITH TOOLS ..........~~~·O9
FOREMAN TRUCK WITH TOOLS $25.00
FUSER TURCK WITH TOOLS $25.00
BACKHOE (RUBI3E:R.TIRI::)$40.00
BACKHOE WITH BREAKER $45.00
BACKHOE WITH TAMPER $45.00
EXCAVATOR $77.00
MINI EXCAVATOR $41.40
SIDEBOOM TRACTOR $65.00
TRENCHER WALK BEHIND $31.05
TRENCHER WHEEL $98.33
BORING EQUIPMENT 2"MISSILE $20.70
BORING EQUIPMENT 3-4"MISSILE $25.88
BORE RIG SMALL $310.50
SKID STEER $20.70
PIPE TRAILER STICK $10.35
PIPE TRAILER COIL $5.18
VACUUM EXCAVATOR $46.58
PIPE STRAIGHTNER $10.35."',-
GENERATOR $5.18
WATER PUMP $10.35
JUMPING JACK TAMPER
1~
AIR COMPRESSOR WITH TOOLS
TOTAL $
CITY OF WAUKEE
BLANKET BID PRICING
STOPPING EQUIPMENT PRICE
1"STEEL STOP LOW PRESSURE $56.00
1"STEEL STOP HIGH PRESSURE N/A
2"STEEL STOP LOW PRESSURE $84.00
2"STEEL STOP HIGH PRESSURE N/A
4"STEEL STOP LOW PRESSURE $100.80
4"STEEL STOP HIGH PRESSURE N/A
6"STEEL STOP LOW PRESSURE N/A
6"STEEL STOP HIGH PRESSURE N/A
8"STEEL STOP HIGH PRESSURE N/A
2"PLASTIC SQUEEZE -OFF
4"PLASTIC SQUEEZE -OFF
6"PLASTIC SQUEEZE -OFF $11.20
8"PLASTIC SQUEEZE -OFF
1/2"-1"SQUEEZE -OFF $5.60
TOTAL $316.60
BY-PASS PRICE
1"PLS PY-PASS TBD
2"PLS BY-PASS TBD
4"PLS BY-PASS TBD
6"PLS BY-PASS TBD
1"STEEL BY-PASS TBD
2"STEEL BY-PASS TBD
4"STEEL BY-PASS TBD
16'STEEL BY-PASS TBD
8"STEEL BY-PASS
TOi~-
GRAND TOTAL $11,991.52