Loading...
HomeMy WebLinkAbout2014-06-02-Resolutions 14-142_Gas Main Blanket BidsTHE CITY OF WAUKEE,IOWA RESOLUTION 14-142 APPROVING GAS MAIN BLANKET BID PRICING FROM INFRASOURCE AND Q3 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas County; AND, WHEREAS,the City contracts with certain companies for gas main installation,steel gas pipe replacement,large service line installation and repair during the construction phase of new subdivisions in the City;AND, WHEREAS,Waukee Public Works requested blanket bids from InfraSource and Q3 for such services;AND, WHEREAS,using the blanket bids,the Waukee Public Works Department computes the lower bidder for each individual City project and contracts with the low bidder for the work to be completed. NOW THEREFORE BE IT RESOLVED that the blanket bids from InfraSource and Q3, attached hereto as Exhibits A and B,should be and the same is hereby approved. Passed by the City Council of the City of Waukee,Iowa,and approved this the 2nd day of June, 2014. Attest: CWAMIt:lJ~Rebecca D.Schuett,City Clerk ROLL CALL VOTE Shane Blanchard Brian Harrison Casey L.Harvey Shelly Hughes Rick Peterson AYE X X NAY ABSENT ABSTAIN X X X Exhibit A Q3 $3.46 $696.63 $3.62 $977.34 $3.33 $680.85 sn9.95 $5.44 $5.06 $5.43 Jn$tall1 .5 oc171t Anode and Bell Hole ..each Install.1,5 or1?~i\nodeln Exlstln Bell Hole ..each Install reststauon and Bell Hole ..each $447.55 $33.11 Extra De th er 12"Increment 0.93 $513.77 Install Test Station In Exlstin Bell Hole ..each EqulpmenIR~\as l'l~Ye1l2Ton Pick I)One Ton 2.Ton numo Truck Foreman Truck with Tools Fuser Truck with Tools Backhoe ..Rubber TIred oatkhoeWnJ\Braaker Backhole with Tamper Excavator 160 John Deere or eoulvalent ideboom Tractor -Rubber Tired $202.all $1.50$0:30---' $3.17 $L.11 $0.36 56.33 $5.07 $20.69 boUbloTlnlO $154.26 $134.93 $123.00s $126.70 $129.54 $94.2.4 $170.64 orin E!l~.!e.men!2"or I,ess,__-:---.,...--,_._-:--:-__ .g machine,Am.Auger 100/120 (large}or equivalent rencher Walk Behind $18.03 $68.95 g machlne,0-24/40 (mediumjVermeeror equivalent gmachlne,D-71i'(smaIlIVermeer or equivalent teer $284.29 $106.08 $18.56 rnent Traller $6.90 $7.96 $6.90==~=~~~~~__~~~~~~j_~--:t.$100.78·=·"·-· Pipe Stralghtner $23.87 Geoerator $3.71 Water Pump $3.71 ~l!.!!!6 Jack Tamper $3,71 AIr Comoressor with Tools $7,96 CITY OF WAUKEE BLANKET BID PRICING EXHIBIT B -InfraSource MAIN PRICE 2"PLS TRENCH (3D"MIN.)$4.23 ~~N91-I(?9"MIN.)$5.50 RENCH (3D"MIN.)$9.85 8"PLS TRENCH (30"MIN.)$13.44 2"STEEL TRENCH (3D"MIN.)$12.00 4"STEEL TRENCH (3D"MIN.)$15.00 6"STEEL TRENCH (3D"MIN.)$19.13 TOTAL $79.15 BORE (DIRECTIONAL)PRICE 1/2"(PER FOOT)$11.59 1"PLS (PER FOOT)$11.59 2"PLS (PER FOOT)11.59 4"PLS (PER FOOT)16.23 6"PLS (PER FOOT)$28:98l 8 "PLS (PER FOOT)$,...,...rvrv,,~.~u 1"STEEL (PER FOOT)$ 2"STEEL (PER FOOT)$ ~OT)$ (PER FOOT)$3 STEEK (PER FOOT) ~ 5 242.61 SERVICES PRICE 1/2"PLS (PER FOOT)$7.53 1"PLS (PER FOOT)$7.53 2"PLS (PER FOOT)$8.69 4"PLS (PER FOOT)$I«<<<< 6"PLS (PER FOOT)$ 1"STEEL (PER FOOT) ~2"STEEL (PER FOOT)1 . 4"STEEL (PER FOQD $20.16 6"STEEL (PER FOOT)$28.00 TOTAL $137.75 CITY OF WAUKEE BLANKET BID PRICING HOTTlE IN PRICE 1/2"PLS $232.00 1"PLS $232.00 2"PLS $290.00 4"PLS a.6"PLS 8"PLS 1"STEEL $522.00_....... 2"STEEL $690.00 4"STEEL $910.00 6"STEEL $1,450.00 8"STEEL $1,739.00 TOTAL $8,453.00 MISC.PRICE HAND DIG (pER FT.)$28.98 SOD REMOVAL &REPLACEMENT (EXISTING)$3.48 SOD REPLACEfv1e:NT(NEW)$4.06 ASPHALT &REMOVAL &REPLACEMENT $17,39 CONCRETE REMOVAL &REPLACEMENT $20.29 SPREADING STONE $52.16 SILT FENCE $9.85 ROCK SHIELD (PER FT.)$ ANODE 1 LB.INSTALLED $ ANODE 5 LB.INSTALLED $34.78 ANODE 17 LB.INSTALLED $40.57 TEST STATION INSTALLED $173.88 LINE MARKERS INSTALLED $86.94 MATTING (PER FT.)$17.39 ISEEDING (PER FT.)$0.93 I EXTRA DEPT.DITCH (PER 12")$1.74 TOTAL $533.01 FROST CHARGES PRICE 6"TO 12"TRENCH $2.12 13"TO 18"TRENCH $4.22 19"TO 24"TRENCH $5.87 6"TO 12"BELLHOLE 12/1TO 18/1BELLHOLE $126.56 18/1TO 24/1 BELLHOLE $201.60 TOTAL $394.13 CITY OF WAUKEE BLANKET BID PRICING WELDING PRICE WELDER RATE (PER HOUR)$83.02 WELDER HELPER(PER HOUR)$65.72 WELDER RIG (PER HOUR) ~ TOTAL $ LABOR RATES PRICE SUPERVISOR (PER HOUR)'I'vv ....v FOREMAN (PER HOUR)$85.30 FUSER (PER HOUR)$68.19 HELPER (PER HOUR)$65.72 LABORER (PER HOUR)$49.50 OPERATOR (PER HOUR)$68.13 PIPE FITTER (PER HOUR)$83.02 TRENCH DRIVER (PER HOUR)$68.13 TOTAL $588.27 EQUIPMENT RATE HOURLY RATE PICK UP 1/2 TON $25.00 PICK UP 1 TON $28.00 2 TON DUMP TRUCK WITH TOOLS ..........~~~·O9 FOREMAN TRUCK WITH TOOLS $25.00 FUSER TURCK WITH TOOLS $25.00 BACKHOE (RUBI3E:R.TIRI::)$40.00 BACKHOE WITH BREAKER $45.00 BACKHOE WITH TAMPER $45.00 EXCAVATOR $77.00 MINI EXCAVATOR $41.40 SIDEBOOM TRACTOR $65.00 TRENCHER WALK BEHIND $31.05 TRENCHER WHEEL $98.33 BORING EQUIPMENT 2"MISSILE $20.70 BORING EQUIPMENT 3-4"MISSILE $25.88 BORE RIG SMALL $310.50 SKID STEER $20.70 PIPE TRAILER STICK $10.35 PIPE TRAILER COIL $5.18 VACUUM EXCAVATOR $46.58 PIPE STRAIGHTNER $10.35."',- GENERATOR $5.18 WATER PUMP $10.35 JUMPING JACK TAMPER 1~ AIR COMPRESSOR WITH TOOLS TOTAL $ CITY OF WAUKEE BLANKET BID PRICING STOPPING EQUIPMENT PRICE 1"STEEL STOP LOW PRESSURE $56.00 1"STEEL STOP HIGH PRESSURE N/A 2"STEEL STOP LOW PRESSURE $84.00 2"STEEL STOP HIGH PRESSURE N/A 4"STEEL STOP LOW PRESSURE $100.80 4"STEEL STOP HIGH PRESSURE N/A 6"STEEL STOP LOW PRESSURE N/A 6"STEEL STOP HIGH PRESSURE N/A 8"STEEL STOP HIGH PRESSURE N/A 2"PLASTIC SQUEEZE -OFF 4"PLASTIC SQUEEZE -OFF 6"PLASTIC SQUEEZE -OFF $11.20 8"PLASTIC SQUEEZE -OFF 1/2"-1"SQUEEZE -OFF $5.60 TOTAL $316.60 BY-PASS PRICE 1"PLS PY-PASS TBD 2"PLS BY-PASS TBD 4"PLS BY-PASS TBD 6"PLS BY-PASS TBD 1"STEEL BY-PASS TBD 2"STEEL BY-PASS TBD 4"STEEL BY-PASS TBD 16'STEEL BY-PASS TBD 8"STEEL BY-PASS TOi~- GRAND TOTAL $11,991.52