Loading...
HomeMy WebLinkAbout2014-09-15-Resolutions 14-255_Library HVAC - Architect AgrTHE CITY OF WAUKEE,IOWA RESOLUTION 14-255 APPROVING AN AGREEMKNT WITH MODUS FOR THK DESIGN OF THK REPAIRS FOR THK HVAC SYSTEM AT THK WAUKEE PUBLIC LIBRARY IN THE NAME AND BY THE A UTHOIUTY OF THE CITY OF WA USE, IONIA WHEREAS,the City of Waukee,Dallas County,State of iowa,is a duly organized Municipal Organization;AND, WHEREAS,the Waukee Public Library has experienced extremely lugh utility costs and unreliable HVAC service as a consequence of inefficient design;AND, WHEREAS,City staff recommends contracting with Modus in order to design necessary repairs to the Waukee Public Library HVAC system;AND, WHEREAS,the Waukee Public Library Board of Trustees has reviewed the proposed agreement, attached hereto as Exhibit A,and finds it satisfactory. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 15"' day of September,2014,that it hereby approves an agreement with Modus for the design of the repairs for the HVAC system at the Waukee Public Library,subject to addressing issues identified by the City Attorney. illiam .P ard,Mayor Attest: Rebecca D.Schuett,City Clerk ROLL CALL VOTE Shane Blanchard Brian Harrison Casey L.Harvey Shelly Hughes Rick Peterson AYE X X X NAY ABSENT ABSTAIN X X September 3,2014 Bill Peard Mayor,City of Waukee 230 W.Hickman Road Waultee,IA 50263 RE:Waukee Library HVAC Updates Dear Bill: I am pleased to offer you this engineering service proposal for the design of an operational Variable Air Volume (VAV)system with local zone thermal control.This proposal includes contract documents,bidding assistance,submittal reviews and on-site meetings with construction personnel as required. Scope of design services includes the following: ~Redesign existing ductwork and diffusers as necessary to rezone system airflow ~Design new Variable Air Volume (VAV)terminal units with electric reheat where needed and associated controls and thermostats ~Replace Air Handling Unit (AHU)Single Zone VAV controls with standard VAV controls ~I-IVAC Controls Evaluate new and existing power requirements Design insulation For exterior ductwork (Alternate) Design supplemental electric heat at perimeter windows (Alternate) This proposal does not include the following services: ~Plumbing design Ligh.ting design ~Fire alarm design ~Low voltage design ~Structural engineering ~Architectural modflciations ~Fees,permit costs or other costs associated with review or applications to governing bodies ~As-built CAD drawing creation Distribution and document reproduction expenses ~Life cycle cost analysis for utility rebates or energy code approval ~Commissioning services 214 EAST FOURTH STREET f235 OSSOJTSL MODUS-ENG.COM WATERLOO,IOWA 5G703 319 1235 0844JFAX 1717 INGERSOLL AVE.STE.111 J 25 I 728O 1 TEL OES MOINES,IOWA 50300 515 1?5 I 7349 f FAX For the above-referenced services,our fee will be lump sum,not to exceed $24,000.The estimated construction budget is approximately $190,000 for a total cost of approximately $214,000. Additional services,as approved and requested,shall be provided at our hourly rates. IvlODUS Errors and Omissions Policy shall be deemed a part of this Agreement. The AIA 8101 (2007)Standard Form of Agreement Between Owner and Architect shall be deemed a part of this letter. Sincerely, Holly M.Sheriff,P.E.,LEED AP hsheriff mod s-en com 515-25 1-7280 If you are in agreement,please sign this letter and return a copy to our office.This will serve as our written contract. GNAT ?I4 EAST EOURTH STREET [235 0650 I TEL MODUS EN8 COM WATERLOO&IOWA 50703 3IQ 1 235 0644 J FAx l717 INGERSOLL AVE.STE.III j 25 I 7280 1 TEL DES MOINES,IOWA 5030Ia SIS l25I 7343/Fm