HomeMy WebLinkAbout2015-05-18-Resolutions 15-158_Fee Schedule FY2015-2016THE CITY OF WAUKEE,IOWA
RESOLUTION 15-158
ADOPTING THE CITY OF WAUKEE FY2015-2016 FEE SCHEDULE
IN THE NAME AND BY THEA UTHORITY OF THE CITY OF 8'A UKEE,ION'A
WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas
County;AND,
WHEREAS,as part of the budget review and adoption process,a Fee Schedule for
services provided by the City of Waukee has been submitted to the City Council for
consideration and approval;AND,
WHEREAS,the FY2015-2016 Fee Schedule is attached hereto as Exhibit A.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in
session this 18 day of May,2015,that the City of Waukee FY2015-2016 fee schedule
is hereby approved and shall be immediately in effect.
illi .card,Mayor
Attest:
Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Shane Blanchard
Brian Harrison
Casey L.Harvey
Shelly Hughes
Rick Peterson
AYE
X
X
X
X
X
NAY ABSENT ABSTAIN
City of Waukee Fee Schedule FY2015-2016
as adopted by Waukee City Council on 05/18/2015 by Resolution ¹1 5-158
ADMINISTRATIVE SERVICES/FINANCE
Examination and Co in of Public Records'
Photocopies
Electronic media**
Routinel re ared or bound re orts
$0.25 per page (black 8 white)
$0.50 per page (color
$5.00 per CD (data files)
$5.00 per DVD (audio/video)
$10.00 per USB drive
$10.00 er GIS file
Actual cost s to roduce
Hourly rate for clerical time needed for the reproduction of
photocopies
Actual cost(s)of employee time if time
involved exceeds fifteen (15)minutes
Hourly rate for professional staff time needed to produce or
review documents
Actual cost(s)of employee time if time
involved exceeds fifteen (15 minutes
*Reference policy adopted by Wsukee City Council on 08/20/2012 by Resolution ¹12-187
**All open records requests that are responded to by electronic media shall be done so that the document(s)
may nct be altered.
Block Pa Permit
Bond re uirement
$100.00,refundable after barricades
are picked up b Public Works
Noise Permit
License fee $25.00
Peddler,Solicitor Permit
Application fee er applicant)
License fee (per group)
Bond requirement (per group)
$5.00
$10.00 per day or any part thereof;
$50.00 per week
$100.00 cash or money order,
refundable 30 days after expiration of
license
Fireworks Permit
License fee
Deposit requirement
$10.00
$200.00,refundable upon the clean
up,by applicant,of any debris and in
the sole discretion of the Cit
insurance requirements specified in Wsukee Municipal Code 8622.1(2)
Page 1 of 12
City of Waukee Fee Schedule FY2015-2016
Commercial Garba e Hauler Permit
License fee $10.00 er license
*Insurance requirements specified in Waukae Municipal Code $213.5
Collection Fees
NSF fee
Income Offset Pro ram administration fee
$30.00
$7.00
Miscellaneous Fees
Rules,regulations,procedures and fees associated with a Retail Cigarette/Tobacco Permit are
governed by Chapter 453A of the Code of iowa.
Rules,regulations,procedures and fees associated with a Liquor License are governed by Chapter
123 of the Code of lowe.
Page 2 of 12
PARKS AND RECREATION
City of Waukee Fee Schedule FY2015-2016
Su ar Creek Munici al Golf Course
Season Passes
Weekda Senior (A e 55+,Monde -Thursda,Frida AM
Sin le Adult Monda -Sunda )
Couples/Corporate (2 people from same residence or
workplace)
Famil (3 or more from same residence
Junior A e 18 and under
Cart Passes
Sin le
Cou le/Cor orate 2 eo le
2014 Dail Rates
Weekda Monde -Thursda,Frida AM
Weekend (Frida PM-Sunda
Junior A e 18 and under,Monda -Thursda,Frida AM
Senior (A e 55+,Monde -Thursda,Frida AM)
Carts er seat
Ran e Balls
Small (30 balls)
Medium 60 balls)
Lar e (90 Balls
Fre uent Customer Punch Cards
Ten 10)9-hole rounds for the rice of nine
Punch card with cart added
Ten 10 lar e ran ebucketsforthe riceofnine
$520.00 +tax
$675.00 +tax
$970.00+tax
$1,175.00 +tax
$340.00+tax
$395.00 tax included
$575.00 (tax included)
9 holes:$16.00
1 8 holes:$25.00
9 holes:$17.00
18 holes:$28.00
9 holes;$10.00
18 holes:$17.50
9 holes:$10.00
18 holes:$17.50
9 holes:$10.00
18 holes:$14.00
$5.00
$7.00
$9.00
$153.00
$243.00
$81.00
S ecial Event Permits
S ecial Event Permit
$75.00 (non-refundable)plus shelter
rental fees
Page 3 of 12
City of Waukee Fee Schedule FY2015-2016
Park Shelter Rentals
Centennial Park:
$40.00 per day
Enclosed Shelter House
$25.00 per day0enAirShelter
Rid e Pointe Park Pavilion:
$65.00
Full Da
Full Da de osit re uirement $150.00
Weekend shelter rentals can be reserved six months in advance from the reservation date.Weekday shelter
rentals can also be reserved in advance;however reservations are not accepted until after March 1st for the
months of March —July and after August 1st for the months of August —February
Waukee Communi Center Rentals
Half Da 0 tion1 10:00 a.m.-3:00 .m
Half Da 0 tion 2 5:00 .m.-10:00 .m.
Full Da 0 tion 8:00 a.m.-10:00 .m.
Meetin 0 tion
De osit
$80.00 lus de osit
$80.00 lus de osit
$180,00 lus de osit
$25.00 er hour
$150.00
Additional set-up time may be requested for a fee of $25.00 per hour.
Audio/visual equipment can be rented for an additional $50 00
Non-profit groups will be allowed to reserve the Waukee Community Center for free,two dates each month,
Monday through Thursday.Any usage outside the Monday through Thursday timeline will be subject to rental
rates.To be considered a non-profit group of Waukee,the organization must be a 501(c)(3)corporation duly
formed and existing pursuant to the State of iowa which maintains its principal place of business in the City of
Waukee,iowa,or if a group is a Waukee senior group (members age 62 or older)consisting of no less than 20
members who are residents of the City of Waukee.
Centennial Park Baseba)l/Softball Field Rentals
No field re aration
One field,includin one dra in of field
Two fields,includin one dra in of fields
Three fields,includin one dra in of fields
Field Li hts
Field Chalked
Field Dra
De osit re uirement
$20.00 per field per hour
$65.00 per day
$140.00 per field er day
$225.00 er field per da
$30.00 er field er da
$10.00 per field chalked
$10.00 er field dra ed
$50.00 for one field*
$100.00 for two fields*
$150 for three fields*
*Cancellations require notice of 10 business days.Refunds will be issued by check or will be credited back onto
the credit card used to reserve the faality.A $5 00 nonrefundable handling fee will be deducted from the refund.
If ball field reservations are cancelled in the event of rain,all attempts will be made to reschedule.
Page 4 of 12
City of Waukee Fee Schedule FY2016-2016
D EVE LOP$/IENT SERVICES
Administrative Fees
Zonin Chan e Re uests
Certificate of Occu anc /Zonin Com liance Letter
Prelimina Plat
Final Plat
Auditor's Plat
Plat of Surve
Site Plan
$300.00
$150.00
$250.00
$250.00
$30.00
$150.00
$250.00
Construction Plans
Board of Ad'ustment -residential
Board of Ad'ustment -all others
Board of A eals -residential
Board of A eals -all others
Construction Ins ection
Develo ment Review -Consultin En ineer
Develo ment Review -Le al
Develo ment Recordin Fees
$500.00 (an additional $140.00 will be
charged for each additional submittal
followin two full reviews b staff)
$75.00
$150.00
$75.00
$150.00
$75.00 er hour
All cost incurred will be billed to the
applicant
All cost incurred will be billed to the
applicant
All cost incurred will be billed to the
applicant
Building Fees
Building Permit fees with the exception of the job types specified below shall be calculated based
u on the followin valuation criteria:
Total Valuation
$1.00 to $500
$501 to $2,000
Fee
$15.00
$15.00 for the first $500 plus $2.00 for
each additional $100 or fraction
thereof,to and including $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $1,000,000
$1,000,001 and up
$45.00 for the first $2,000 plus $8.00
for each additional $1,000 or fraction
thereof,to and including $25,000
$229.00 for the first $25,000 plus
$7.00 for each additional $1,000 or
fraction thereof,to and including
$50,000
$404.00 for the first $50,000 plus
$5.00 for each additional $1,000 or
fraction thereof,to and including
$100,000
$654.00 for the first $100,000 plus
$3.00 for each additional $1,000 or
fraction thereof,to and including
$1,000,000
3,354 ort e irst 1,000,000 plus
$2.50 for each additional $1,000 or
fraction thereof
Page 5 of 12
City of Waukee Fee Schedule FY2015-2016
Accesso Buildin s 121 to 719 s uare feet)
Accesso Buildin s(over720s uarefeet
Accesso Structures exce t decks)
Accesso Structures (decks
Swimmin Pools includin fence,electrical and lumbin )
Swimming Pools Above-Ground (including fence,electrical
and plumin )
Temporary Structures (including tents,canopies,membrane
structures and similar structures)
Agricultural Sales
Buildin Si ns
Monument Si ns
Si n Remodel
Tem ora Si ns
Mechanical Permit
Electrical Permit
Plumbin Permit
$50.00
$85.00
$20.00
$80.00
$150.00
$50.00
$75.00
$50.00
$50.00
$75.00
$20.00
$20.00
$65.00
$65.00
$65.00
Demolition Permit
Sidewalk/Ap roach Re lacement
Ener Code Inspection
Ener Code Review/Ins ection
Buildin Permit Re-Issuance/Transfer Fee
Ins ections outside of normal business
$50.00 -minor
$100.00 -ma'or (bid /utility removal)
$50.00
$350.00 er unit
$500.00 er unit
$100.00
$75.00 er hour
Code Com liance
Mowin Non-Compliant Pro erties
Shovelin Non-Com liant Sidewalks
$90.00 er hour one hour minimum
$90.00 per hour (one hour minimum
Miscellaneous
Zonin Ordinance
Zonin Ma s/Street Maps
Com rehensive Plan/Master Plans
An document/ma above su lied on CD/flash drive
$25.00
$5.00
$25.00
$5.00
Page 6 of 12
FIRE DEPARTMENT/EMS
City of Waukee Fee Schedule FY2015-2016
Ambulance Service
BLS/ASL trans orts
ALS "2"transports
Mileage
Treat and release
$600.00 per patient transported
$800.00 er atient transported
$12.00 per loaded mile per patient
trans orted
$150.00 per call
Hazardous Materials Res onse*
Heavy Response Apparatus with 4 personnel (engine,ladder,
heavy rescue,grader,backhoe,dump truck,endloader,
sweeper,sewer 'et,etc.)$284.76 er hour
Light Response Apparatus with 2 personnel (tanker,brush
truck,ambulance,staff car,pick-up truck,generator,
corn ressor,related power equipment,etc.)
Extra response ersonnel er erson)
Expended materials (foam,containment booms,sand,
absorbent,etc.)
Equipment repair and/or cleaning (personal protective
equipment,hose,nozzles,apparatus,etc.)
Damaged equipment and/or property (may include injury to,
destruction of,or loss of natural resources,etc.)
$227.81 per hour
$22.80 er hour
Replacement cost,includin shi in
Cost (parts plus labor),including
shipping
Replacement and/or repair cost,
includin shippin
Other (contracted services,contracted equipment,evacuation
of people,etc.Billed as used
*Minimum of one (1)hour,and billed in 15 minute increments beyond the first hour.
Inspections*
Initial inspection
First reinspection (performed within 30 days of initial
inspection)
Second reinspection (performed within 2 weeks of first
reinspection)
Third reinspection (performed within 2 weeks of second
reinspection)
Fourth reinspection (performed within 2 weeks of third
reinspection)
no char e
no char e
$100.00
$300.00
$600.00
Fifth reinspection and each reinspection thereafter (performed
within 2 weeks of fourth and subsequent reinspections)$1,000.00 per reinspection
*Occupancy permit reinspections to be scheduled with an agreed upon date.Awritten work order secured by
the occupant and/or building owner and presented to the inspector with an agreed upon completion date to
correct Fire Code violations will serve in place of the next reinspection fee.If the work order is not complted by
the agreed upon date,the corresponding reinspection fee will be charged and another reinspection scheduled.
Page 7 of 12
POUCE DEPARTMENT
City of Waukee Fee Schedule FY2015-2016
Pet Licensin and Animal Control
S a ed or neutered do or cat
Non-s a ed or neutered do or cat
$2.50 er license
$5.00 erlicense
A copy of recent rabies vaccination is required for a pet license to be issued.Licenses are valid from July 1
through June 30 and must be renewed annually.
Page 8 of 12
UTILITY BILLING
City of Waukee Fee Schedule FY2016-2016
Gas reconnection fee
Portable irri ation meter
Shut off notice/ta fee
Water reconnection fee
Late fees
$50.00
$100.00
$25.00
$25.00
1 '/2%
Page 9 of 12
City of Waukee Fee Schedule FY2015-2016
PUBLIC WORKS DEPARTMENT
Equipment Rates Per Hour*
Dum truck
Sewer 'et
Vac trailer
Sewer TV unit
Street swee er
Wheel loader
Backhoe
Excavator
Motor rader
Skid loader
Bucket truck
Variable messa e board
Picku 3/4 ton
Trencher walk behind
Trencher(wheel)
Borin /Missile
Gas construction/service truck
$80.00
$222.00
$180.00
$180.00
$115.00
$126.00
$81.00
$81.00
$158.00
$41.00
$77.00
$36.00
$38.00
$31.05
$98.33
$20.70
$38.00
*One hour minimum charge.Additional equipment fees may be charged based on iowa Department
of Transportation.
Labor Fees (includes Park &Rec Labor fees)
Labor 0 erations/S ecialist
Administrative
Overtime rate
After-hour call in
Holida after hour call-in*
De artment Su ervisors
Assistant Public Works Director
De artment Director
$40.91 per hour regular rate (1 hour
minimum);
$61.37 per hour overtime rate (1 hour
minimum
$41.47 er hour 1 hour minimum
$62.21 er hour
$69.56 er hour 1 hour minimum
$115.93 er hour 1 hour minimum)
$46.37 per hour regular rate;
$69.56 per hour overtime rate*
$60.24 overtime N/A
$73.50 overtime N/A
*Holidays as designated in the City of Waukee Personnel Manual
Custom Mailbox Reimbursement
Pursuant to Cit of Waukee Snow &Ice Removal Polic $150.00
Hydrant Meter Deposit
5/8"tt 3/4"meter
1"meter
2"meter
3"meter
Non-refundable aministrative fee
$380.00
500.00
1,380.00
2,400.00
125.00
Meter Accuracy Test
Test $100.00
Page 10 of 12
City of Waukee Fee Schedule FY2015-2016
Water Meters and Appurtenances Fee*
3/4"meter IPEARL
1"meter IPEARL
1 1/2"meter corn ound with strainer &fla kit
1-1/2"meter turbo with strainer &fla kit
2"meter turbo with strainer &fla kit
2"meter compound with strainer &fla kit
3"meter com ound with strainer &fla kit
3"meter turbo with strainer &fig kit
4"meter corn ound with strainer &fla kit
4"meter turbo with strainer &fla kit
6"meter corn ound with strainer &fla kit
6"meter turbo with strainer &fig kit
Breakin seal/tarn erin w/meter
$296.00
$347.00
$1,510.60
$1,137.00
$1,167.50
$1,716.26
$2,117.50
$1,485.00
$3,551.20
$2,777.25
$6,074.65
$4,945.35
$250.00
*Water meter equipment pricing subject to change without notice.
Samples and Flushing"
Bacteriolo ical Sam le
Water used for flushin
$150.00
$8.62 er 1,000
*New mains that fail initial bacteriological test may be assessed sampling and flushing costs
Oversize/Overweight Permits
Sin le Tri
Round Tri
Annual Oversize
$0.00
$0.00
$0.00
Equipment Services
Parts
Sho time
Mechanics time
Cost of arts lus 15%
$30.00 er hour 1 hour minimum)
$45.00 er hour
Signage*
Sto si n,30 X 30 R1-1 and hardware $82.99
Stop si n,30 X 30 R1-1 with ost and street blades/hardware
No Parkin with tales ar ost
No Parkin banded on li ht post
Nine-dot delineators with ost and hardware
*All other signs billed at cost plus labor/installation
$144.50
$36.67
$14.70
$45.22
Page 11 of 12
City of Waukee Fee Schedule FY2015-2016
Gas Charges
Gas meter accurac test:
Residential
Lar e Volume
Gas meter fees -commercial
2"Flan ed 150¹Meter Set -8C
2"Flan ed 150¹Meter Set -15C
2"Flan ed 150¹Meter Set -1.5M
2"Flan ed 150¹Meter Set -2M
2"Flan ed 150¹Meter Set-3M
3"Flan ed 150¹Meter Set-5M
3"Flan ed 150¹Meter Set-7M
4"Flanged 150¹Meter Set -11M
Construction cost of 2"service line -ion side
Construction cost of 2"service line -short side
Construction cost of 4"service line -lon side
Construction cost of 4"service line -short side
Multi le Meter Commercial Headers
$105.00
$240.00
$4,227.00
$4,260.00
$4,280.00
$4,390.00
$,500.00
$5,027.00
$5,778.00
$6,403,00
$3,280.00
$1,552.00
$5,992.30
$3,103.00
$475.00 X number of meter
connections
Stormwater Fees
COSESCO -Individual lot
COSESCO -All other GP¹2
$65.00/one time fee
$65.00/uarterl
GIS Fees
Electronic media $34.22 er hour
Engineering Fees
En ineerin inspection fees
Third art ins ection fees
Lar e format rints reater than 11 X 17"
$75.00 er hour
Char ed as billed
$25.00
Miscellaneous Fees
Ri ht of wa /utilit ermit fee $25.00
Re bates
Furnace (92%efficienc or reater
Water heater (30,40,8 50 allons
D er,stove,as fire lace
$75.00 (30-79,000 btu per hour);
$150.00 (80,000 +btu per hour)
$50.00
$25.00
Pro rammable thermostat (maximum rebate of installed cost)$30.00
Rain barrel
Rain arden/bioretention cell reimbursement
$50.00 maximum for purchase of 50
allon or lar er barrel
Up to $1,000.00 -50%cost share for
materials &hired labor
Page 12 of 12