HomeMy WebLinkAbout2016-03-07-Resolutions 16-067_Fee Schedule FY2016-2017THE CITY OF WAUKEE,IOWA
RESOLUTION 16-067
ADOPTING THK CITY OF WAUKKE FY2016-2017 FEE SCHEDULE
IN THE NAME AND BY THE A UTHORITY OF THE CITY OF 8'A UKEE,IO8'A
WHEREAS,the City of Waukee,Iowa is a duly organized municipality within Dallas
County;AND,
WHEREAS,as part of the budget review and adoption process,a Fee Schedule for
services provided by the City of Waukee has been submitted to the City Council for
consideration and approval;AND,
WHEREAS,the FY2016-2017 Fee Schedule is attached hereto as Exhibit A.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in
session this 7"day of March,2016,that the City of Waukee FY2016-2017 fee schedule
is hereby approved and shall be immediately in effect unless otherwise noted in the fee
schedule.
Rick Peters n,Mayor Pro Tem
Attest:
Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Shane Blanchard
Brian Harrison
Shelly Hughes
Larry R.Lyon
Rick Peterson
AYE
X
X
X
NAY ABSENT ABSTAIN
X
X
City of Waukee Fee Schedule FY2016-2017
as adopted by Waukee City Council on 03/07/2016 by Resolution ¹16-067
ADMINISTRATIVE SERVICES/FINANCE
Examination and Cop in of Public Records*
Photocopies
Electronic media**
Routinel re ared or bound re orts
$0.25 per page (black &white)
$0.50 per page (color)
$5.00 per CD (data files)
$5.00 per DVD (audio/video)
$10.00 per USB drive
$10.00 per GIS file
Actual cost s to roduce
Hourly rate for clerical time needed for the reproduction of
photocopies
Actual cost(s)of employee time if time
involved exceeds fifteen (15)minutes
Hourly rate for professional staff time needed to produce or
review documents
Actual cost(s)of employee time if time
involved exceeds fifteen (15)minutes
*Reference policy adopted by Waukee City Council on 08/20/2012 by Resolution ¹12-187
**All open records requests that are responded to by electronic media shall be done so that the document(s)
may not be altered
Block Part Permit
Bond requirement
$100.00,refundable after barricades
are picked up by Public Works
Noise Permit
License fee $25.00
Peddler,Solicitor Permit
Application fee (per applicant)
License fee (per group)
Bond requirement (per group)
$5.00
$10.00 per day or any part thereof;
$50.00 per week
$100.00 cash or money order,
refundable 30 days after expiration of
license
Fireworks Permit
License fee
Deposit requirement
$10.00
$200.00,refundable upon the clean
up,by applicant,of any debris and in
the sole discretion of the City
*Insurance requirements specified in Waukee Municipal Code 6622 1(2)
Page 1 of 12
City of Waukee Fee Schedule FY2016-2017
Commercial Garba e Hauler Permit
License fee $10.00 per license
Insurance requirements specified in VVaukee Municipal Code $213.5
Collection Fees
NSF fee
income Offset Pro ram administration fee
$30.00
$7.00
Miscellaneous Fees
Rules,regulations,procedures and fees associated with a Retail Cigarette/Tobacco Permit are
governed by Chapter 453A of the Code of iowa
Rules,regulations,procedures and fees associated with a Liquor License are governed by Chapter
123 of the Code of Iowa.
Page 2 of 12
PARKS AND RECREATION
City of Waukee Fee Schedule FY2016-2017
Su ar Creek Municipal Golf Course
Season Passes
Weekda Senior (A e 55+,Monday-Thursda,Frida AM
Sin le Adult (Monday-Sunda )
Couples/Corporate (2 people from same residence or
workplace)
Famil (3 or more from same residence)
Junior A e 18 and under
Cart Passes
Sin le
Cou le/Cor orate 2 eo le
2014 Dail Rates
Weekda (Monda -Thursda,Frida AM)
Weekend (Frida PM-Sunda )
Junior (A e 18 and under,Monda -Thursda,Frida AM)
Senior (A e 55+,Monda -Thursda,Frida AM)
Carts er seat
Ran e Balls
Small (30 balls)
Medium (60 balls)
Lar e (90 Balls)
Frequent Customer Punch Cards
Ten (10)9-hole rounds for the price of nine
Punch card with cart added
Ten(10)lar e ran ebucketsforthe riceofnine
S ecial Event Permits
S ecial Event Permit
$520.00 +tax
$675.00 +tax
$970.00 +tax
$1,175.00 +tax
$340.00 +tax
$395.00 (tax included)
$575.00 (tax included)
9 holes:$16.00
18 holes:$25.00
9 holes;$17.00
18 holes:$28.00
9 holes:$10.00
18 holes:$17.50
9 holes:$10.00
18 holes:$17.50
9 holes:$10.00
18 holes:$14.00
$5.00
$7.00
$9.00
$153.00
$243.00
$81.00
$75.00 (non-refundable)plus shelter
rental fees
Page 3 of 12
Park Shelter Rentals
Centennial Park:
City of Waukee Fee Schedule FY2016-2017
$40.00 per day
Enclosed Shelter House
0 en Air Shelter
Rid e Pointe Park Pavilion:
Full Da
Full Da de osit re uirement
Windfield Park:
Shelter
$25.00 per day
$65.00
$150.00
$25.00 per day
Weekend shelter rentals can be reserved six months in advance from the reservation date.Weekday shelter
rentals can also be reserved in advance,however reservations are not accepted until after March 1st for the
months of March —July and after August 1st for the months of August —February.
Waukee Communit Center Rentals
Half Da 0 tion 1 10:00 a.m.-3:00 .m.
Half Da Option 2 (5:00 p.m.-10:00 p.m.)
Full Da 0 tion (8:00 a.m.-10:00 p m.)
Meetin 0 tion
Deposit
$80.00 lus de osit
$80.00 plus de osit
$180.00 lus deposit
$25.00 er hour
$150.00
Additional set-up time may be requested for a fee of $25 00 per hour.
Audio/visual equipment can be rented for an additional $50.00
Non-profit groups will be allowed to reserve the Waukee Community Center for free,two dates each month,
Monday through Thursday.Any usage outside the Monday through Thursday timeline will be subiect to rental
rates.To be considered a non-profit group of Waukee,the organization must be a 501(c)(3)corporation duly
formed and existing pursuant to the State of iowa which maintains its prinmpal place of business in the City of
Waukee,iowa,or if a group is a Waukee senior group (members age 62 or older)consisting of no less than 20
members who are residents of the City of Waukee
Centennial Park Baseball/Softball Field Rentals
No field preparation
One field,includin one dra in of field
Two fields,includin one dra in of fields
Three fields,includin one dra in of fields
Field Li hts
Field Chalked
Field Dra
De osit re uirement
$20.00 per field per hour
$65.00 per day
$140.00 per field per day
$225.00 per field per day
$30.00 per field per da
$10.00 per field chalked
$10.00 per field dra ed
$50.00 for one field*
$100.00 for two fields*
$150 for three fields*
*Cancellations require notice of 10 business days Refunds will be issued by check or will be credited back onto
the credit card used to reserve the faaiity.A $5.00 nonrefundabie handling fee will be deducted from the refund
If ball field reservations are cancelled in the event of rain,all attempts will be made to reschedule.
Page 4 of 12
City of Waukee Fee Schedule FY2016-2017
DEVELOPINENT SERVICES
Administrative Fees
Zonin Chan e Requests
Certificate of Occupanc /Zonin Compliance Letter
Prelimina Plat
Final Plat
Auditor's Plat
Plat of Surve
Site Plan
$300.00
$150.00
$250.00
$250.00
$30.00
$150.00
$250.00
Construction Plans
Board of Ad'ustment -residential
Board of Ad'ustment -all others
Board of Appeals -residential
Board of A peals -all others
Construction Ins ection
Develo ment Review -Consulting En ineer
Develo ment Review -Le al
Develo ment Recordin Fees
$500.00 (an additional $140.00 will be
charged for each additional submittal
followin two full reviews by staff)
$75.00
$150.00
$75.00
$150.00
$75.00 per hour
All cost incurred will be billed to the
apphcant
All cost incurred will be billed to the
applicant
All cost incurred will be billed to the
applicant
Building Fees
Building Permit fees with the exception of the job types specified below shall be calculated based
u on the followin valuation criteria:
Total Valuation
$1.00 to $500
$501 to $2,000
Fee
$15.00
$15.00 for the first $500 plus $2.00 for
each additional $100 or fraction
thereof,to and includin $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $1,000,000
$1,000,001 and up
$45.00 for the first $2,000 plus $8.00
for each additional $1,000 or fraction
thereof,to and including $25,000
$229.00 for the first $25,000 plus
$7.00 for each additional $1,000 or
fraction thereof,to and including
$50,000
$404.00 for the first $50,000 plus
$5.00 for each additional $1,000 or
fraction thereof,to and including
$100,000
$654.00 for the first $100,000 plus
$3.00 for each additional $1,000 or
fraction thereof,to and including
$1,000,000
3,354 for the first 1,000,000 plus
$2.50 for each additional $1,000 or
fraction thereof
Page 5 of 12
City of Waukee Fee Schedule FY2016-2017
Accesso Buildin s (121 to 719 square feet)
Accesso Buildin s over 720 s uare feet)
Accesso Structures except decks
Accesso Structures (decks
Swimmin Pools includin fence,electrical and plumbin
Swimming Pools Above-Ground (including fence,electrical
and pluming)
Temporary Structures (including tents,canopies,membrane
structures and similar structures)
Agricultural Sales
Buildin Si ns
Monument Si ns
Si n Remodel
Tempora Si ns
Mechanical Permit
Electrical Permit
Plumbin Permit
$50.00
$85.00
$20.00
$80.00
$150.00
$50.00
$75.00
$50.00
$50.00
$75.00
$20.00
$20.00
$65.00
$65.00
$65.00
Demolition Permit
Sidewalk/Approach Re lacement
Ener Code ins ection
Ener Code Review/Ins ection
Buildin Permit Re-Issuance/Transfer Fee
Ins ections outside of normal business
$50.00 -minor
$100.00 —major (bid /utility removal)
$50.00
$350.00 per unit
$500.00 er unit
$100.00
$75 00 er hour
Code Com liance
Mowin Non-Com liant Properties
Shoveling Non-Compliant Sidewalks
Miscellaneous
Zonin Ordinance
Zonin Ma s/Street Maps
Comprehensive Plan/Master Plans
An document/map above su plied on CD/flash dnve
$90.00 per hour one hour minimum)
$90.00 per hour (one hour minimum)
$25.00
$5.00
$25.00
$5.00
Page 6 of 12
FIRE DEPARTMENT/EMS
City of Waukee Fee Schedule FY2016-2017
Ambulance Service
BLS/ASL transports
ALS "2"transports
Mileage
Treat and release
$600.00 per patient transported
$800.00 per patient transported
$12.00 per loaded mile per patient
transported
$150.00 per call
Hazardous Materials Response*
Heavy Response Apparatus with 4 personnel (engine,ladder,
heavy rescue,grader,backhoe,dump truck,endloader,
sweeper,sewer jet,etc.)
Light Response Apparatus with 2 personnel (tanker,brush
truck,ambulance,staff car,pick-up truck,generator,
compressor,related power equipment,etc.)
Extra response personnel (per person)
Expended materials (foam,containment booms,sand,
absorbent,etc.)
Equipment repair and/or cleaning (personal protective
equipment,hose,nozzles,apparatus,etc.)
Damaged equipment and/or property (may include injury to,
destruction of,or loss of natural resources,etc.)
Other (contracted services,contracted equipment,evacuation
of people,etc.
$285.33 per hour
$228.27 per hour
$22.85 per hour
Replacement cost,including shipping
Cost (parts plus labor),including
shipping
Replacement and/or repair cost,
including shipping
Billed as used
Minimum of one (1)hour,and billed in 15 minute increments beyond the first hour
Inspections*
Initial inspection
First reinspection (performed within 30 days of initial
inspection)
Second reinspection (performed within 2 weeks of first
reinspection)
Third reinspection (performed within 2 weeks of second
reinspection)
Fourth reinspection (performed within 2 weeks of third
reinspection)
no char e
no char e
$100.00
$300.00
$600.00
Fifth reinspection and each reinspection thereafter (performed
within 2 weeks of fourth and subsequent reinspections)$1,000.00 per reinspection
*Occupancy permit reinspections to be scheduled with an agreed upon date.A written work order secured by
the occupant and/or building owner and presented to the inspector with an agreed upon completion date to
correct Fire Code violations will serve in place of the next reinspection fee.If the work order is not complted by
the agreed upon date,the corresponding reinspection fee will be charged and another reinspection scheduled
Page 7 of 12
POLICE DEPARTMENT
City of Waukee Fee Schedule FY2016-2017
Pet Licensin and Animal Control
S a ed or neutered do or cat
Non-spa ed or neutered do or cat
$15 00 er license
$25.00 per hcense
A copy of recent rabies vaccination is required for a pet hcense to be issued.Licenses are valid from January 1
through December 31 and must be renewed annually.
Page 8 of 12
UTILITY BILLING
City of Waukee Fee Schedule FY2016-2017
Gas reconnection fee
Portable irri ation meter
Shut off notice/tag fee
Water reconnection fee
Late fees
$50.00
$100.00
$25.00
$25 00
1/D/
Page 9 of 12
City of Waukee Fee Schedule FY2016-2017
PUBLIC WORKS DEPARTMENT
Equipment Rates Per Hour*
Dum truck
Sewer 'et
Vac trailer
Sewer TV unit
Street swee er
Wheel loader
Backhoe
Excavator
Motor radar
Skid loader
Bucket truck
Variable messa e board
Picku (3/4 ton)
Trencher (walk behind
Trencher (wheel)
Borin /Missile
Gas construction/service truck
$80.00
$222.00
$180.00
$180.00
$115.00
$126.00
$81.00
$81.00
$158.00
$41.00
$77.00
$36.00
$38.00
$31.05
$98.33
$20.70
$38.00
*One hour minimum charge Additional equipment fees may be charged based on Iowa Department
of Transportation.
Labor Fees (includes Park &Rec Labor fees)
Labor Operations/Specialist
Administrative
Overtime rate
After-hour call in
Holida after hour call-in*
De artment Supervisors
Assistant Public Works Director
De artment Director
$40.91 per hour regular rate (1 hour
minimum);
$61.37 per hour overtime rate (1 hour
minimum)
$41.47 er hour 1 hour minimum
$62.21 per hour
$69.56 per hour 1 hour minimum)
$115.93 per hour (1 hour minimum)
$46.37 per hour regular rate;
$69.56 per hour overtime rate*
$60.24 overtime N/A
$73.50 overtime N/A
*Holidays as designated in the City of Waukee Personnel Manual
Custom Mailbox Reimbursement
Pursuant to Cit of Waukee Snow 8 Ice Removal Polic $150.00
Hydrant Meter Deposit
5/8"&3/4"meter
1"meter
2"meter
3"meter
Non-refundable aministrative fee
$380.00
$500.00
$1,380.00
$2,400.00
$125.00
Meter Accuracy Test
Test $100.00
Page 10 of 12
City of Waukee Pee Schedule FY2016-2017
Water Meters and Appurtenances Fee~
3/4"meter IPEARL
1"meter IPEARL
1 1/2"meter compound with strainer 8 fla kit
1-1/2"meter turbo with strainer &flag kit
2"meter turbo with strainer 8 fla kit
2"meter compound with strainer 8 fla kit
3"meter corn ound with strainer 8 flag kit
3"meter turbo with strainer &fla kit
4"meter compound with strainer &fla kit
4"meter turbo with strainer &fla kit
6"meter compound with strainer &fla kit
6"meter turbo with strainer &fla kit
Breakin seal/tarn erin w/meter
$350.00
$264.25
$1,720.00
$1,221.00
$1,438.00
$2,008.50
$2,334.50
$1,643 25
$3,904.25
$3,045.25
$6,580.00
$5,334.50
$250.00
*Water meter equipment pricing subject to change without notice.
Samples and Flushing*
Bacteriolo ical Sam le
Water used for flushin
$150.00
$8.62 per 1,000
*New mains that fail initial bacteriological test may be assessed sampling and flushing costs
Oversize/Overweight Permits
Sin le Trip
Round Trip
Annual Oversize
$0.00
$0.00
$0.00
Equipment Services
Parts
Shop time
Mechanics time
Cost of arts lus15%
$30.00 per hour 1 hour minimum)
$45.00 er hour
Signage*
Sto si n,30 X 30 R1-1 and hardware $82.99
Stop sign,30 X 30 R1-1 with post and street blades/hardware $144.50
No Parking with teles ar post
No Parkin banded on li ht post
Nine-dot delineators with post and hardware
$36.67
$14.70
$45.22
"All other signs billed at cost plus laborhnstallation
Page11 of12
City of Waukee Fee Schedule FY2016-2017
Gas Charges
Gas meter accurac test:
Residential
Lar e Volume
Gas meter fees -commercial
2"Flan ed 150¹Meter Set -8C
2"Flan ed 150¹Meter Set -15C
2"Flan ed150¹Meter Set-1.5M
2"Flan ed 150¹Meter Set -2M
2"Flan ed 150¹Meter Set -3M
3"Flan ed 150¹Meter Set -5M
3"Flan ed 150¹Meter Set -7M
4"Flanged 150¹Meter Set -11M
Construction cost of 2"service line -lon side
Construction cost of 2"service line -short side
Construction cost of 4"service line -ion side
Construction cost of 4"service line —short side
Multiple Meter Commercial Headers
$105.00
$240.00
$5,600.00
$5,600.00
$5,600.00
$5,700.00
$5,800.00
$7,200.00
$7,800.00
$9,580.00
Time and Material
Time and Material
Time and Material
Time and Material
Time and Material
Stormwater Fees
COSESCO -Individual lot
COSESCO -All other GP¹2
$250.00/one time fee
$250.00/one time fee
6 IS Fees
Electronic media $34.22 per hour
Engineering Fees
Engineerin ins ection fees
Third party inspection fees
Lar e format rints reater than 11 X 17")
$75.00 per hour
Char ed as billed
$25.00
Miscellaneous Fees
Ri ht of wa /utilit ermit fee $25.00
Rebates
Furnace (92%efficienc or reater)
Water heater (30,40,&50 allons
D er,stove,as fire lace
$75.00 (30-79,000 btu per hour);
$150.00 (80,000 +btu per hour)
$50.00
$25.00
Programmable thermostat (maximum rebate of installed cost)$30.00
Rain barrel
Rain arden/bioretention cell reimbursement
$50.00 maximum for purchase of 50
gallon or larger barrel
Up to $1,000.00-50%cost share for
materials &hired labor
Page 12 of 12