WHEREAS,on May 18,2015,the Waukee City Council approved an Agreement for
Engineering Services with McClure Engineering Company related to the Bluestem Lift Station
No.14 Improvement Project (Resolution ¹15-156);AND,
WHEREAS,the City proposes an Amendment to the Engineering Services Agreement for
construction administration,record drawings,and other meetings;AND,
WHEREAS,the engineering services amendment,attached hereto as Exhibit A,has been
reviewed and approved by the Waukee City Attorney.
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee that the
Amendment No.1 to an Agreement for Engineering Services with McClure Engineering
Company [Bluestem Lift Station No.14 Improvement Project]is hereby approved.
Passed by the City Council of the City of Waukee,Iowa,and approved the 2"day of May,2016.
Attest:
tlliam F.card,Mayor
Rebecca D.Schuett,City Clerk
ROLL CALL VOTE
Shane Blanchard
Brian Harrison
Shelly Hughes
Larry R.Lyon
Rick Peterson
AYK
X
X
X
X
NAY ABSENT ABSTAIN
X
AMENDMENT NO.1
TO THE
AGREEMENT FOR ENGINEERING SERVICES
WASTEWATER SYSTEM IMPROVEMENTS
WAUKEE BLUESTEM LIFT STATION ¹14 IMPROVEMENTS
WAUKEE,IOWA
TNIEAIIIENDMENT d Ih ~ld I I ,2016
and shall amend the AGREEIVIENT dated the 18"day of May,2015,by and be ween McClure
Engineering Company,of Cllve,lowe (herein referred to as "ENGINEER")and the City of Weukee,
lowe (hereinafter referred to as "OWNER"),for the proposed Wastewater System Improvements project.
It is the intent of the OWNER to revise the previous AGREENIENT to include fees for
Construction Administration Record Drawin s and Other Meetin s for the Bluestem Lift Station ¹14
Improvements Project.
This AMENDMENT authorizes the ENGINEER and establishes fees for the phases stated above.
The Project Scope and Estimated Cost are based on the contract awarded by the City Council on March
17,2016.Bid Tabulation is included in Exhibit 'B'.
Attachment 3 Schedule of Fees:
Bluestem Lift Station ¹14 Improvements
H D.Construction Administration ...„.„...
E.Construction Staking ......................,.
F.Resident Project Representative,...,
H J.Record Drawings..........,......,....,.......
H O.Other Meetings..
LS —Lump Sum
Ts M —Time and Material
NTE —Not to Exceed
NIC —Not Included
.....T8 M (NTE)
.....LS
.......T&M
.......LS
T&M
$34 900 00
3 Nl C
$NIC
$2 600.00
$TBD
The revised Hourly Rate Schedule is included in Exhibit 'A'and attached to this AMENDMENT to
be used for work performed on a Time and Material basis.
Payment to the ENGINEER shall be made on a monthly basis,within 30 days of invoice for work
completed to date.Past due amounts owed shall accrue interest at L5%per month from the 30e day.If
the OWNER fails to make monthly payments due the ENGINEER,the ENGINEER may,after giving (7)
days written notice to the OWNER,suspend services under this AMENDIVIENT,
This AIVIENDIVIENT is subject to all the Terms and Conditions attached to the previous
AGREEMENT dated the 18w of May,2015.
This AMENDMENT represents the entire and integrated ANIENDMENT between the OWNER
and the ENGINEER and supersedes all prior negotiations,representations,either written or oral.This
AMENDMENT may be amended only by written instrument signed by both the OWNER and the
ENGINEER.
Exhibit 'A'Houri Rate Schedule
Exhibits Included
Not
Included
Exhibit 'B'
Exhibit 'C'
Exhibit 'D'
Prelimina Pro'ect Sco e
Owner's Res onsibilities
Duties,Res onsibllities and Limitations of Authont of the Resident Pro'ect Re resentative
SPECIAL INSTRUCTIONS.'
IN WITNESS WHEREOF,the parties hereto have made and executed this AMENDMENT as of
the day and year first above written.
OWNER:CITY OF WAUKEE,IOWA ENGINEER:MCCLURE EN
OLIVE,IOWA
ING COMPANY
By;
ilham F.Peard
By:
Daric .Anderson,P.E.
Title:Ma or Title:Water Team Leader
MCCLURE ENGINEERING COMPANY
STANDARD TERMS AND CONDITIONS
complete his Work.
INFORMATION PROVIDED BY OTHERS:The Engineer shell be enbtled to
rely upon lhe accuracy and completeness of dale provided by the Owner and
shall not assume liability Ior such data.The Engineer does not practice law,
insurance or frnancing,therefore,the Owner shall furnish ag legal,accounting
and rnsurance counseling services as may be necessary to protect themsefves al
any time during the project owner shall hold Eagineer harmless from damages
that may ense as a result of inaccurawes of Info/matron or data supplied by
Owner or others to Engineer.
ADDITIONAL SERVICES:As an Additional Service in connection with changes
in Ihe scope of Ihe Engineer'4 work by the Owner,the Engineer shall prepare
Drawings,Specifications and other documentation arid data,evaluate
Contractor's proposal and provide any other services made necessary by such
Change Orders and Construction Change Directivea The Engineer wig be
erniqed to additional compensation to coordinate such changes and schedules
shall be adiusted accordingly
NERSHIP AND E D CUMENTS/Ag reports,plans,specificaticns,
field data and other documents wntten and/or electronic,prepared by Engineer
in doing work on the project,shall remain the property of the Engineer.The
documents prepared by ihe Engrneer for thrs Pro/ect are for use solely with
respect to this project The Engineer'6 Drawings,Specifications or other
documents shall not be used by the Owner on other projects or for additions to
Ihis Proiect,excepl by agreement in wnting and with appropnate con/pen sation
to ihe Engineer.
OPINI S F PROBABLE COST:Itis recognized that neither the Engineer
nor the Owner has control over the cost of labor,matenals or equipment,over
the Contractor's methods of determining bid prices,or over competitrve bidding,
market or negotiating conditions Accordingly,the Engineer cannot and does
nol warrant or represent that brds or negotiated prices will not vary from any
estimate of costs or evalualion prepared or agreed to by the Engineer.
~DI PIITE ILEELL~TI N:Claims,dwpules or other matters,involving a value
fess than $200,000.00,in question between the part/as to this Agreement arisirlg
out of or relatirlg lo this Agreement or breach thereof shall be subject to
mediation unless each of the parties mutually agrees otherwise.No mediation
ansing out of or relating to this Agreement shalt indude,by consotidation,joinder
or in any other manner,an addrtional person or entity not a party lo this
Agreement,except by wntten consent contaming a specific reference lo Ibis
Agreement signed by the Owner,Engineer,and any other person or entity
sought lo be joined.In no event sha5 the demand for mediaaon be made after
the date when the institution of legal or equitable proceedings based upon such
claim would be barred by the applicable statute of limitations.The award
rendered ln the mediation shall bs non-binding.
TEfEMINATION;This Agreement may be terminated by either party upon nol
less than seven days writterl notice should Ihe other party fail substantially to
perform in accordance with the terms of the Agreement through no fault of the
party initialing tha termination.This Agreement may be terminated by the Owner
upon not less than seven days'written notice to the Engineer ln the event the
project is permanentty abandoned.
Failure of Iha Owner to make payments to the Engineer in accordance with Ihe
Agreement shall be considered substantial ncn-performance and cause for
term/nation.If the Owner fails to make payment when due fhe Engineer for
servwes,the Engineer may,upon seven days'wngen noses to the Owner,
suspend performance of services under this Agreement Unless paymenl in full
is received by the Engineer within seven days of the dale oi the notice,the
suspensron shall take eltect without further noses In the event of a suspension
of services,the Engineer shall have nc liability to the Owner for delay or
damage caused the Owner because of such suspension of services.
UNDERGROUND UTILITIES:Information for location ol'underground ublilies
may come from the Owner,third parties,and/or research performed by the
Engineer or its subcontractors Unfortunately,Ihe information the Engineer
must rely on from venous ublrties and other records may be inaccurate or
incomplete Therefore,the Owner agrees to indemnify and hold harmless the
Engineer for eg claims,losses.costs and damages arisrng oui of the location of
underground uiiities prov/dad by the Engineer under this Agreemenl
SHOp DRAwING REvlEw:if,as pan of this Agreement Engineer reviews
Contractor submittais,such as shop dravnngs,product data,samples and other
data,as required by Engineer,these reviews and approvals shag be only for the
limrtad purpose of checking (or conformance wrlh the design concept and the
information expressed In the coniract documents This review shall not include
review of the accuracy or completeness of details,such as quantities,
dimenwons,weights or gauges,fabrication processes,canstruction means or
methods,coordination of the work with other trades or construction safety
precautions,a5 of which are the sole responsibility of the Contractor Engineer
shall not be responsrble for any deviations from the contract documents not
brought to the ahenlion of Engineer in writing by the contractor Engineer shall
not be required to review partial submissrons or those for which submissions of
correlated items have not been received
CONSTRUC ION OB ERVATI Nt lf,as part of this Agreement,Engineer is
providing construction observation services,Engineer shalt visit the project et
appropnate intervals d wing construction to become generally familiar with the
progress and quality of the Contractor's work and Io determine if ths work is
proceeding in general accordance with the Contract Documents.Unless
otherwise speciTied in this Agreement,the Owner has not retained ihe Engineer
to make detailed inspections or to provide exhaustive or continuous proiect
review and observation services.Engineer does not guarantee the performance
of,and shag have no responsrbilily for,the acts or omissions of any contractor,
subcontractor,supplier or any other entity furnishing materials or pedorming any
work on tne proiect
HAZARDOUS MATERIALS —INDEMNIFICATION:The Engineer is not in the
business of making environmental site assessmanis for purposes of determining
the presence of any toxic,hazardous or other environmental damaging
substances The purpose of this provision 0 to be certain that the Owner is
aware of the potential lie bikty if toxic,hazardous or environmental damaging
substances are found on or under the property Engineer makes no
representations regardtng an environmental site assessment,relies upon Owner
to have fully investigated the need and/or scope of such assessment and
assumes no res ponsibihly for the determinaticn to make an envrronmental sile
assessment on ihe sub/ect properly.
~PA IEE 7:Amounts unpaid 30 days alter invoice date shall bear interest from
the date paymenl is dua at a rate of 1,5%per month compounded and shall
rnclude costs for attorney fees and other collection fees related to collecting fees
for service.
LIMITATION OF LIABILITY;The Engineeds liability shall be limited to
$1,000,000 00 or as spewficaiiy agreed to by separate agreement.
WAIVERS:The Owner and the Engineer waive ag rights against each other
and against the contractors,consultants,agents and employees of the other for
damages,but only to the extent covered by property insurance du/ing
construckon.The Owner and Engineer each shall require similar waivers from
their contractors,consultants and agents.
ASSIGNMENT:The Owner and Engineer,respecuvely,bind themselves,their
partners,successors,assigns and legal representaives to the other party to this
Agreement and to the partners,successors,assigns and legal representatives of
such other party with respect to ag covenants of this Agreement.Neither Owner
ncr Eng /neer shall assign this Agreemenl
without ihe wnlten consent of the other
In the event of termination not the fault of the Engineer,Ihe Engineer shall be
compensated for services performed prior to termination and ag termination
expenses.Termination expenses are in addrtion to compensation for Basic snd
Addiliona/Servrces,and include expenses which are directly attribulabte lo
termination.
CONTRACTOR MA7TERS;The Engineer has no contral over the Contractor's
means,methods,schedule,costs,quality control,workmanship,on-site storm
water runoff/erosion control,or project safety measures.For this reason,the
Engineer shall not be responsible for or assume liability for the same
GOVERNING LAW:Unless otherwise provided,the Agreement shall be
governed by the law of the pnncipsl place ot business of Ihe Engirleer.
COMPLETE AGREEMENT:This Agreement represents the enure and
integrated agreement between the Owner and Engineer and supersedes ag
pnor negotiations,representations or agreements,either wntten or oral.This
Agreement may be amended only by wntten instrument signed by boih Owner
and Engineer.Nothing contained in this Agreement shall create a contractual
relationship with or a cause of action in favor of a third party against either Ihe
Owner or Engineer.
Effectrve 11/01/06
(Supersedes 2/15/05)
N;\PROJECTSIWAK 221402/ICLERIADMINIAGREEMENTIAMENDMENT NO IiWAUKEE SLUESTEM-AMENDMENTI NO RPR.DOCK
4/22/2016/9'46 47 AM
III
Iver C L U R E
EXHIBIT 'A'
McCLURE ENGINEERING COMPANY
HOURLY RATE SCHEDULE
(Effective through December 31,2016)
PERSONNEL HOURLY RATE
Administrative.
Staff Engineer...
Project Engineer
Senior Project Engineer
Project Manager ..
Principal..
Senior Principal ..
Senior Engineering Technician..
Engineering Technician (ET).
Registered Land Surveyor...
Landscape Architect..
On-Site Representative (OSR)...
Senior On-Site Representative (OSR)
Crew Chief (CC)...,........
Crew Member (CM)..
Survey Crew...
Survey Crew with Scanner..
Intern Crew Member.
,...$65.00
......$100,00
.....$125.00
.......$175.00
.......$155.00
......$200.00
.......$225.00
......$120.00
,....$90.00
...,..$155.00
........$120.00
.........$85.00
.....$120.00
.........$90.00
........$75.00
...,....$200.00
........$260.00
.....$60.00
MISCELLANEOUS EXPENSES
Survey Vehicle Mileage.
Automobile Mileage
Plans ...
Vellums......
Out-of-Pocket Expenses (Meals,Hotels,etc.).......
Large Format Color Prints..
$0 70/Mile
........$0.540/M il e
........$0.15/Sq.Ft.
........$0.55/Sq.Ft.
.......At Cost+10%
.....,.....$5.25/Sq,Ft
IllH-
McCLURE'
M.QMccture DnvetAccounttngrruourty Rate Scheduietuouriy Rate Schedule -Through Dec.31,2016.doc
EXHIBIT 'B'
PRELIMINARY PROJECT SCOPE
The Engineer shall conduct the following services marked "Included",for approval by the Owner.
Item
D.Construction Administration
1.Provide general administration of construcbon contract as OWNER'6
representative.
2.Visit sile of construction at appropriate stages of construction to observe the
Contractors work
3.Issue interpretafions and clarifications of contract documents.
4.Review shop drawings.
5.Act as Initial interpreter of the requirements of the contract documents.
6.Review and process Contractors application for paymenl.
7.Attend Construction Progress Meetings.
Included Not Included
00000
1.Estabksh Field Controls
2.Stake Construction Control Points
00
F.Resident Pro ect Re resentative
1.Provide a Resident Project Representative to be on sile dunng construction
(see Exhibit 'D",A Listing of Duties,Responsibifities and Limitations of Authority
of the Resident Pro)act Representative).
1.As-Built Record Drawings (2 Hard Copies &1 Electronic Copy Included)
2.Additional Hard Copies -1 EA@$100.00
3.Additional Electronic Copies -1 EA IE $25.00
000
1.Special meetings with Owner/Staff
2.Public informational Meetings
3.Regulatory Agencies
000
8-1
NnPROJECTstWAK 2214027LCLERNDM/NIAGREEMENT'iAMENOMENT NO 1LWAUKEE BLUEBTEM-AMENDMIENTi NO RPR DOCX
4/22/201S/9'4S 47 AM
Ill~~-
/vtcCLURE
MccltME ENGINEERING camPANT
IECUNVJ I'I'hr 1 5 A
Cl tA JM25
515 ann 222o
.ieoE 4/Cuket+CQ L M,„„„,„„,„„.„„„„,,w whtn52252
Wn .51527272M
lETTINO DATE 0 TIME;Feb ry 29,2014 2500
lETTING LOCATIONEWa k e City HaE,Wa ke,
I'f EM
CERTIFIED CHECK OR BID BOND ~ION tY r Nt
Acknowl dg Add d I (Y o No)
DESCRIPf ION SION UNIT PRICE EXTENSION
Uh5t ho,ValwV h dSo it GUEEITP I 8
Co I fB iid dC ntroh
Snwdb G lo ondA I moacT nforlwilch
4 0th UIRI yl I S Svd R I ria
5 C ti HAM
TOTAL PROJECT LUMP SUM 810 PRICE
Sdklt tat.phd I I tedC holSutlctn andC
OdAlte ale2.1 IGr d 0
SidAII n I 3 ~R LSR IG d 8
SECTION
26 30 10 Sl db P «Sytm
Cum
ShtmreM u%%dct /5 p5'
t E dp'Adfutlm ntf ort
DEECRIPIIO CE MFO/SUPPUER
0
43 25 13 5 b itl NonClo Pu p
SH dm AO 6 4 W/SpPF
I n EMPI AClunmantf+
Fly I
IEEAI I!UFT STATiON VALVE VAULT,AND SANITART UTI
1.08
1.13
1.14
BIN PVCSo ito 5 v TenchW
SINPVCS il 0 Se~,T»hl
64NPVCFo Mwn,l h d
61 PVCFo~M i,T lb c
ITEM 32 STANDBY GENERATOR AND AUTOMATIC TRAN5FER
302 R Sit h lo Sl li no I ill IW IGwbwE E
ITEM ct OTHER IHIUEY PIPING 0 SURFACE RESTORATION
4.03
4.06
4.07
4.15
4.16
4.22
4 23
4 24
4.25
4.26
4.28
4.29
4.30
12.IM ECP Stw 5,Tr~hed
WI Se icePipihw ISINDio el C 0hwfPol
Water Sowice I"pi -I 54NDtamelor C r TCC 8 Trt
W I Sw ice Pi I ~I MIND'm C p Tubin,tn
FCC P wt -SIN TNE tkmov I
PCC P ent ~5 fN Trail
Ci a I dG bbin
Swl R tw h G Ci
Sod din
T Repfa
Sh tR Icosi
0 honed UliliEer,P
U hamdUEIWN.P ndkulo
ITEM 71 SID AL'TERNATE 2 ~FIHAL GRADING ONLY
703 UAo 5 eCI
7.thl QE Fon
ITEM Bt SID ALTERNATE 3.ROUGH 0 FINAl GRADING
8.03 UC nH doSeaR
8.04 5th Fane
'Cw tmdUitP Em rio (UMIPi G n p 5
GWA'AND WAS PREPARED UNDER MY DIRECI
cuwtth J
hAMPMAM
NwmhrnwnhthWMymhVC VW .WdrrMAWJn.edtmmmWJCM
272eyÃte