HomeMy WebLinkAbout2021-05-17-Resolution 2021-201_Set Public Hearing Date, Douglas Pkwy ExtensionRESOLUTION 2021-201
RESOLUTION ORDERING CONSTRUCTION OF THE
DOUGLAS PARKWAY EXTENSION, AND FIXING A DATE
FOR HEARING THEREON AND TAKING OF BIDS
THEREFOR
WHEREAS, it is deemed advisable and necessary to construct certain public improvements
described in general as the Douglas Parkway Extension; and
WHEREAS, the City has caused to be prepared plans, specifications and form of contract,
together with estimate of cost, which are now on file in the office of the City Clerk for public
inspection, for the construction of the public improvements; and
WHEREAS, the plans, specifications and form of contract are deemed suitable for the
making of the public improvements; and
WHEREAS, final grades have been established by ordinance, consistent with the plans for
all street improvements included in the proposed construction; and
WHEREAS, before the plans, specifications, form of contract and estimate of cost may be
adopted, and a contract for the construction of the public improvements is entered into, it is
necessary, pursuant to Chapter 26, Code of Iowa, to hold a public hearing and to advertise for bids:
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
WAUKEE, STATE OF IOWA:
Section 1. That it is hereby determined that it is necessary and advisable to construct certain
public improvements described in general as the Douglas Parkway Extension, in the manner set
forth in the plans and specifications and form of contract, above referred to, the cost thereof to be
paid in accordance with the provisions as set out in the posted Notice to Bidders and published
Notice of Public Hearing; the public improvements being more generally described as follows:
The project is to extend Douglas Parkway from NE Badger Lane to N Warrior Lane
anal add a turn lane on Warrior Lane to Hickman Road, located north of Hickman
Road in the City of Waukee Iowa. The construction consists of approximately 450
square yards (SY) of pavement removal, 4220 SY of 9" Reinforced P.C.C., 4000
SY of subgrade preparation, 4850 SY of modified subbase, 1100 SY of sidewalk
and trail pavement, 1 sanitary sewer manhole, 200 LF of 15-inch storm sewer, 200
LF of 36-inch storm sewer, drainage structures, miscellaneous grading, site
restoration, survey, traffic control, and other associated work.
Section 2. That the amount of the bid security to accompany each bid shall be in an amount
which shall conform to the provisions of the notice to bidders approved as a part of the
specifications.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a
notice to bidders once in a relevant contractor plan room service with statewide circulation and a
relevant construction lead generating service with statewide circulation and on an internet site
sponsored by either the City or a statewide association that represents the City. Posting shall be
not less than thirteen clear days nor more than forty-five days prior to June 8, 2021, which is hereby
fixed as the date for receiving bids. The bids are to be filed prior to 2:00 P.M., on such date.
The City Council hereby delegates to the City Administrator or his designee the duty of
receiving, opening and tabulating bids for construction of the Project. Bids shall be received and
opened as provided in the public notice and the results of the bids shall be considered at the meeting
of this Council on June 21, 2021, at 5:30 P.M.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish
notice of hearing once in a legal newspaper, printed wholly in the English language, published at
least once weekly and having general circulation in this City. Publication shall be not less than
four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public
hearing on the plans, specifications, form of contract and estimate of costs for the project, the
hearing to be at 5:30 P.M. on June 21, 2021.
PASSED AND APPROVED this 17th day of May, 2021.
Mayor
ATTEST:
t��(o
City Clerk
RESULTS OF VOTE:
AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
X
R. Charles Bottenberg
X
Chris Crone
X
Larry R. Lyon
X
Ben Sinclair
X