Loading...
HomeMy WebLinkAbout2021-01-18-I11 Shottenkirk Service Addition - Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 18, 2021 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Shottenkirk (755 W Hickman Road) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Shottenkirk, requests approval of a site plan to allow the construction of additions to their building, totaling approximately 11,000 square feet in area. A trash enclosure/tire storage is proposed to the northeast of the building. Removal and replacement of existing pavement within the areas adjacent to the building is also proposed. The applicant has provided elevations for the proposed building additions on the site, which meets the intent of the architectural guidelines within the Site Plan Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the January 12, 2021 Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Shottenkirk Service Addition (755 W Hickman Road) Senior Planner, Melissa DeBoer introduced the request for approval of a site plan for an addition to the service department of the Shottenkirk Chevrolet Dealership as submitted by the applicant, Shottenkirk Partnership, LP. The subject property is generally located north of W. Hickman Road and west of NW 6th Street, containing approximately 0.81 acres. Mrs. DeBoer advised that the site plan indicates additions totaling approximately 11,000 square feet on the north, east, and south areas of the current building. A trash enclosure and tire storage area are also proposed to the northeast of the building. No access changes are proposed or required with this project. Approximately 26 parking spots have been removed bringing the total number of parking stalls to 403 for the project. Open space requirements have been met and elevations are shown to mimic the current elevations of the existing building. At this time staff would recommend approval of the site plan for Shottenkirk Service Addition subject to any remaining staff comments.  Commissioner Hoifeldt questioned what the north addition use would be. Korey Marsh, a representative for Snyder and Associates, advised that it is a large vehicle car wash. Commissioner Hoifeldt moved to approve the site plan for Shottenkirk Service Addition (755 W. Hickman Road) subject to any remaining staff comments. Commissioner Broderick seconded the motion. Ayes: Inman, Koshy, Streit, Broderick, Ward, and Hoifeldt. Nays: None. Motion Carries. I11 STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2021- APPROVING THE SITE PLAN FOR SHOTTENKIRK SERVICE ADDITION (755 W HICKMAN ROAD) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Shottenkirk Service Addition, subject to remaining staff comments on January 12, 2021; AND, WHEREAS, the Site Plan for Shottenkirk Service Addition is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Shottnekirk Service Addition is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 18th day of January, 2021 that the Site Plan for Shottenkirk Service Addition is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Shottenkirk Service Addition – Site Plan PREPARED BY: Melissa DeBoer, AICP – Senior Planner REPORT DATE: January 6, 2021 MEETING DATE: January 12, 2021 GENERAL INFORMATION Owner/Applicant: Shottenkirk Partnership, LP Owner’s Representative: Korey Marsh, Snyder & Associates Request: The applicant is requesting approval of a site plan for a building addition. Location and Size: Property is generally located north of Hickman Road and west of NW 6th Street, containing approximately 0.81 acres. Property Address: 755 W Hickman Road AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. January 6, 2021 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Shottenkirk Car Dealership Mixed Use C-1 (Community and Highway Service Commercial District) North Shottenkirk Lot Medium Density Residential M-1A (Limited Industrial District) South Kum & Go Gas Station & Convenience Store Mixed Use C-1 (Community and Highway Service Commercial District) East Industrial Warehouse Mixed Use M-1A (Limited Industrial District) West Shottenkirk Parking Lot / Industrial Mixed Use C-1 (Community and Highway Service Commercial District) / M-1A (Limited Industrial District) PROJECT DESCRIPTION The project includes multiple additions to the existing building. The proposed additions will add a total of approximately 11,000 square feet to the existing building. A 1,765 square foot addition is proposed at the northwest corner of the existing building, a 7,378 square foot addition is proposed at the northeast corner and a 1,820 square foot addition is proposed at the southwest corner. A trash enclosure/tire storage is proposed to the northeast of the building. The project also includes the removal and replacement of existing pavement within the areas immediately adjacent to the building. ACCESS AND PARKING Existing accesses into this site are provided from both Hickman Road and NW 6th Street. No changes are proposed to these accesses. The proposed site plan will remove a total of 26 parking spaces. The site will provide a total of 403 parking stalls. SIDEWALKS/TRAILS No public sidewalks or trails are proposed with this project. UTILITIES This site is already serviced with all public utilities. LANDSCAPING & OPEN SPACE A minimum of 20% of the site is required to be open space. The total amount of open space proposed is 27.9%. The applicant has provided the required amount of plantings per the landscaping ordinance. ELEVATIONS The elevations of the building are proposed to be constructed mostly of brick, architectural metal and glass panels to match the existing building. The trash enclosure/tire storage will be constructed of split face block. January 6, 2021 3 of 3 STAFF RECOMMENDATION The site plan is in general conformance with the Site Plan Or dinance and Comprehensive Plan. Staff recommends approval of the site plan subject to remaining staff comments. BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-2020250'120.0903.01C100120.0903.01 C100SHOTTENKIRK SERVICE ADDITIONTITLE SHEETWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_PLAN.dwg LOGAN MYERS, TITLE SHEET, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET 0 250 SITE PLAN FOR SHOTTENKIRK SERVICE ADDITION CITY OF WAUKEE, DALLAS COUNTY, IOWA INDEX OF SHEETS C100 TITLE SHEET C101 PROJECT INFORMATION C200 DEMOLITION PLAN C300 DIMENSION & UTILITY PLAN C400 GRADING & EROSION CONTROL PLAN C500 PLANTING PLAN VICINITY MAP OWNER/DEVELOPER SHOTTENKIRK PARTNERSHIP, LP PO BOX 1030 WAUKEE, IA 50263 CONTACT: JEREMY BUTTS PHONE: (319) 669-6215 PROJECT LOCATION I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Eric D. Cannon, P.E.Date License Number P18954 My License Renewal Date is December 31, 2021 Pages or sheets covered by this seal: ERIC D. CANNON P18954DPROFELNSEICEIONALENGINEER AIOW SS HICKMAN RDN 10TH STREET6TH STREET BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-2020N/A120.0903.01C101120.0903.01 C101SHOTTENKIRK SERVICE ADDITIONPROJECT INFORMATIONWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_PLAN.dwg LOGAN MYERS, PROJECT INFO, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)GENERAL NOTES FEATURES Spot Elevation Contour Elevation Fence (Barbed, Field, Hog) Fence (Chain Link) Fence (Wood) Fence (Silt) Tree Line Tree Stump Deciduous Tree \\ Shrub Coniferous Tree \\ Shrub Communication Overhead Communication Fiber Optic Underground Electric Overhead Electric Gas Main with Size High Pressure Gas Main with Size Water Main with Size Sanitary Sewer with Size Duct Bank Test Hole Location for SUE w/ID (*) Denotes the survey quality service level for utilities Sanitary Manhole Storm Sewer with Size Storm Manhole Single Storm Sewer Intake Double Storm Sewer Intake Fire Hydrant Fire Hydrant on Building Water Main Valve Water Service Valve Well Utility Pole Guy Anchor Utility Pole with Light Utility Pole with Transformer Street Light Yard Light Electric Box Electric Transformer Traffic Sign Communication Pedestal Communication Manhole Communication Handhole Fiber Optic Manhole Fiber Optic Handhole Gas Valve Gas Manhole Gas Apparatus Fence Post or Guard Post Underground Storage Tank Above Ground Storage Tank Sign Satellite Dish Mailbox Sprinkler Head Irrigation Control Valve LEGEND EXISTING PROPOSED 93.0x 60 12" RCP UTILITY WARNING THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED EXCEPT WHERE NOTED AS QUALITY LEVEL A. A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE. B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, 2020 STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) AND THE SOILS REPORTS PREPARED BY OTHERS. C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE. D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED LANE CLOSURE. E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO NOTIFY THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR HOLIDAY WORK. F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% MAXIMUM DENSITY. G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY ON THE AS-BUILT DOCUMENTS. I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF WAUKEE STANDARDS. J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE PROJECT TO AN APPROVED OFF-SITE WASTE SITE. K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH GRADES TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED. M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK. O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A COSESCO PERMIT IS REQUIRED FOR THIS PROJECT. P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN TO THE STORM SEWER IS AT LEAST TEN FEET. R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO CONSTRUCTION ACTIVITIES BEGINNING. S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING PEDESTRIAN FACILITIES. T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION. U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED. W. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT BETWEEN SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS SHALL BE SEALED. X. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT GRADES FOR DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS. Y. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING. Z. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY FROM CONCRETE OPERATIONS TO DISCHARGE OFFSITE. AA. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT AND CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TIE-INS. BB. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE 4-INCH STORZ FITTINGS. CC. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO CONSTRUCTION. DD. PRIOR TO ANY LANE CLOSURE THE CONTRACTOR IS RESPONSIBLE FOR HAVING A DIGITAL MESSAGE BOARD NOTIFYING DRIVERS OF LANE CLOSURES AT LEAST ONE WEEK PRIOR TO ANY CLOSURE. CONTRACTOR IS TO COORDINATE ANY LANE/ROAD CLOSURES WITH THE CITY OF WAUKEE. EE. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED FOR EVERY FACILITY, BUILDING, OR PORTION OF A BUILDING AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 AND THIS SECTION SHALL EXTEND TO WITHIN 100 FEET OF ALL PORTIONS OF THE EXTERIOR WALLS OF THE FIRST STORY OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING OR FACILITY. FF. ALL SIGNAGE REQUIRES A SEPARATE PERMIT FROM THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. POLLUTION PREVENTION NOTES A.POLLUTION PREVENTION AND EROSION PROTECTION 1.CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE, THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. 2.DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. B.STORM WATER DISCHARGE PERMIT 1.THIS PROJECT IS UNDER 1.0 ACRE AND DOES NOT REQUIRE COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. 2 AS SPECIFIED IN THE CONTRACT DOCUMENTS. 2.ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS, SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED TO ANY JURISDICTIONAL AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND THE CODE OF IOWA. 3.A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY EROSION CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST BE RETAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS TO THE OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF DISCONTINUATION. C.POLLUTION PREVENTION PLAN 1.THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION PLAN MADE DURING CONSTRUCTION. 2.THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES (BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED. 3.THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE. 4.THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: a.UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL COMPACTION. b.INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS. c.PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT ANY TIME. d.MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY. e.INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR DAYS. RECORD THE FINDINGS OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A COPY SUBMITTED WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION. REVISE THE SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 7 DAYS. f.PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR FUTURE PREVENTION. g.INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS STORM SEWERS ARE INSTALLED. h.RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER IMPROVEMENTS ARE LOCATED. i.STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT SEED MIX, SOD, OR PAVEMENT IMMEDIATELY AS SOON AS POSSIBLE UPON COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES IMMEDIATELY AFTER CONSTRUCTION ACTIVITY IS FINALLY COMPLETED OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WHICH WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. j.COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED ONSITE. k.REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO FILING OF THE "NOTICE OF DISCONTINUATION". BULK REGULATIONS: LOT AREA = NONE LOT WIDTH = NONE FRONT YARD= 30 FEET REAR YARD = 30 FEET SIDE YARD = NO MINIMUM, EXCEPT WHEN ADJACENT WHEN ADJACENT TO ANY R DISTRICT, THE MINIMUM SIDE YARD SETBACK SHALL BE 30 FEET. MAXIMUM HEIGHT = NO MINIMUM EXCEPT WHEN ADJACENT TO AN R-1,R-2 OR R-4 DISTRICT, THE MAXIMUM SHALL BE 2 STORIES OR 40 FEET 1 STORY OR 14 FEET FOR ACCESSORY BUILDINGS. MINIMUM OPEN SPACE = 20% PROPERTY DESCRIPTION SHOTTENKIRK WAUKEE PLAT 1 LOT 1 CONTROL POINTS SNYDER & ASSOCIATES DALLAS COUNTY LOCAL COORDINATE SYSTEM NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET CP50 N=73857.75 E=144641.04 Z=1029.04 CUT "X" IN CURB 12' SOUTH OF CURB INTAKE & 125' SOUTHEAST OF BUILDING, SOUTHEAST CORNER OF SITE. CP51 N=74179.79 E=144676.48 Z=1026.19 CUT "X" IN GUTTER 15' NORTHEAST OF MANHOLE & 150' NORTHEAST OF BUILDING, NORTHEAST CORNER OF SITE. CP52 N=74167.29 E=144504.12 Z=1030.62 CUT "X" IN CURB AT EAST END OF CONCRETE ISLAND 45' NORTH OF TRASH ENCLOSURE, NORTHEAST SIDE OF SITE. CP53 N=74235.99 E=144298.79 Z=1029.61 CUT "X" IN CURB 3' EAST OF LIGHT POLE & 150' NORTHWEST OF BUILDING, NORTHWEST OF SITE. CP54 N=74048.16 E=144289.90 Z=1030.93 CUT "X" IN CURB 3' SOUTHEAST OF FENCE CORNER & 77' WEST OF BUILDING, WEST SIDE OF SITE. CP55 N=73857.74 E=144266.97 Z=1030.15 CUT "X" IN CURB 15' NORTH OF LIGHT POLE 130' SOUTHWEST OF BUILDING, SOUTHWEST CORNER OF SITE. CP56 N=73794.62 E=144468.41 Z=1031.25 CUT "X" IN CURB AT NORTH END OF CONCRETE ISLAND & 130' SOUTH OF BUILDING, SOUTH OF SITE. BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=73890.07 E=144575.73 ELEV=1029.04 NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE SOUTH END OF ISLAND AT THE SOUTHEAST CORNER OF BUILDING. BM501 N=74100.92 E=144349.83 ELEV=1032.67 NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE WEST END OF ISLAND AT THE NORTHWEST CORNER OF BUILDING. UTILITY CONTACT INFORMATION UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552006176. W1-WATER MAIN CITY OF WAUKEE S1-SANITARY SEWER TIM ROYER G1-GAS MAIN 515-987-4363 troyer@waukee.org UE1-UNDERGROUND ELECTRIC MIDAMERICAN ENERGY JAMIE NEER 515-252-6972 MECDSMDesignLocates@midamerican.com CO1-COMMUNICATION CENTURYLINK TOM STURMER 303-453-9927 thomas.sturmer@centurylink.com FO1-FIBER OPTIC UNITE PRIVATE NETWORKS, LLC JOE KILZER 816-425-3556 upngis@upnfiber.com FO2-FIBER OPTIC CONSOLIDATED COMMUNICATIONS JUSTIN GREV 507-386-3606 justin.grev@consolidated.com CLEAR PER MAP XENIA RURAL WATER DISTRICT LAIRD VAN DEE 515-676-2117 lvandee@xeniawater.org NO RESPONSE MI-FIBER JACK JONES 515-897-9192 jack@grm.net NO RESPONSE MEDIACOM COMMUNICATIONS CORP PAUL MAY 515-246-2252 pmay@mediacomcc.com ZONING C-1: COMMUNITY AND HIGHWAY SERVICE COMMERCIAL DISTRICT IMPERVIOUS AREA 5,730 SF OF ADDITIONAL IMPERVIOUS SURFACE TOTAL AREA OF DISTURBANCE 0.81 AC GENERAL USE NEW & PRE-OWNED AUTOMOTIVE SALES & SERVICE PROPERTY ADDRESS 755 W. HICKMAN RD WAUKEE, IA 50263 PARKING REQUIREMENTS EXISTING PARKING: 429 STALLS EXISTING PROPOSED PARKING: 403 STALLS PROVIDED OPEN SPACE 20% OPEN SPACE REQUIRED 331,125 SF X 20% = 66,225 SF OPEN SPACE REQUIRED OPEN SPACE PROVIDED: 92,307 SF PROVIDED 92,307 SF / 331,125 SF = 27.88% 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 40' Public Sanitary Sewer Easement (Bk2008 Pg3729) 32' Existing Public Ingress/ Egress Easement (Bk2008 Pg3733) 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 55' Existing Private Surface Water Flowage & Detention Easement (Bk2008 Pg3727) 15' Existing Storm Sewer Easement (Bk 2008 Pg3728) 40' Existing Sanitary Sewer Easement (Bk2008 Pg3729) 10' Existing Underground Electric Line Easement (Bk2008 Pg10090) 30' Existing Ingress/ Egress Easement (Bk2015 Pg7030) Existing Building Rim=1028.80 Inv=1012.12 10" PVC N Inv=1012.33 10" PVC W Rim=1028.94 Intake=1028.18 F.L.=1021.87 30" RCP E F.L.=1021.98 30" RCP N F.L.=1022.20 24" RCP W F.L.=1023.01 12" RCP S F.E.S.=1023.37 30" RCP S Rim=1028.78 Intake=1027.96 F.L.=1022.49 30" RCP N&S Rim=1028.52 Inv=1011.79 10" PVC N&S Inv=1012.50 Unknown Pipe W Inv=1019.31 6" PVC W Rim=1028.83 Intake=1028.02 F.L.=1022.91 30" RCP N&S F.L.=1023.94 15" CPP W Rim=1027.92 Inv=1011.27 10" PVC E Inv=1011.39 10" PVC S Rim=1030.24 F.L.=1024.33 18" RCP E F.L.=1024.44 (2)8" CMP W Rim=1029.78 F.L.=1024.02 24" RCP N F.L.=1024.02 18" RCP W F.L.=1024.33 12" RCP S Rim=1030.79 F.L.=1025.07 12" RCP N&SW Intake=1029.61 F.L.=1025.31 12" RCP NE F.L.=1025.46 12" RCP W Intake=1029.61 F.L.=1024.98 18" RCP E F.L.=1025.51 15" RCP W Rim=1030.62 Inv=1013.18 10" PVC E&W Rim=1029.77 F.L.=1023.25 24" RCP E F.L.=1023.25 18" RCP W F.L.=1023.65 12" RCP S Intake=1029.27 F.L.=1023.89 12" RCP N Intake=1029.35 F.L.=1024.69 18" RCP NE F.L.=1024.69 12" RCP SW Rim=1029.83 F.L.=1024.30 18" RCP E&SW F.L.=1024.30 18" RCP W Trash TYP 2C 2H 2F 2E 2I 2I 2G 2G 1D 2M 2D 2D 2N 2L 2B 2B 2B 2B 2J 2K 2D 2O 2A 1A2A 1A 1A 1B 2O 1A 1C 2A 2A 2A2A 1A 1A 1A 1B 2A 1B 1B 1B 1A 1B 1A 2O 1D 1A 2C 1B 2I 2I 2G 1B 2I 1A 1B 1B 2P 2O EASEMENT TO BE VACATED BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C200120.0903.01 C200SHOTTENKIRK SERVICE ADDITIONDEMOLITION PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_DEMO.dwg LOGAN MYERS, DEMO PLAN, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET 0 20 DEMOLITION PLAN NOTES 1.EXISTING FEATURES, PROTECT THE FOLLOWING: A.PAVEMENT TO REMAIN. B.EXISTING UTILITIES. COORDINATE ANY RELOCATIONS OR ADJUSTMENTS WITH UTILITY SERVICE PROVIDER AS NECESSARY. C.EXISTING BUILDING D.EXISTING TREE. E.EXISTING GAS METER. 2.DEMOLITION, REMOVE THE FOLLOWING: A.FULL DEPTH SAWCUT AND REMOVE EXISTING PAVEMENT TO NEAREST JOINT. B.REMOVE WATER PIPE TO LIMITS SHOWN. C.REMOVE STORM SEWER INTAKES. D.RELOCATE UNDERGROUND ELECTRIC. COORDINATE NEW LOCATION WITH OWNER AND UTILITY SERVICE PROVIDER. E.REMOVE TRASH ENCLOSURE. F.REMOVE AND RELOCATE TRANSFORMER. COORDINATE WITH OWNER AND UTILITY PROVIDER G.REMOVE & RELOCATE LIGHT POLE. COORDINATE WITH OWNER AND UTILITY PROVIDER. H.REMOVE BUILDING TO LIMITS SHOWN. I.REMOVE TREES & SHRUBS. J.REMOVE & RELOCATE FIRE HYDRANT. K.REMOVE WATER VALVE. L.REMOVE & RELOCATE WATER FDC. M.REMOVE SAND OIL SEPARATOR. N.REMOVE SANITARY SEWER PIPE AND CLEANOUT. O.REMOVE BOLLARDS. P.REMOVE & RELOCATE POST INDICATOR VALVE. REMOVAL LEGEND PAVEMENT REMOVAL BUILDING DEMOLITION T 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 40' Public Sanitary Sewer Easement (Bk2008 Pg3729) 32' Existing Public Ingress/ Egress Easement (Bk2008 Pg3733) 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 55' Existing Private Surface Water Flowage & Detention Easement (Bk2008 Pg3727) 15' Existing Storm Sewer Easement (Bk 2008 Pg3728) 40' Existing Sanitary Sewer Easement (Bk2008 Pg3729) 10' Existing Underground Electric Line Easement (Bk2008 Pg10090) 30' Existing Ingress/ Egress Easement (Bk2015 Pg7030) BM500 BM501 50 51 52 54 55 Existing Building F.F.E.=1031.58 Rim=1028.80 Inv=1012.12 10" PVC N Inv=1012.33 10" PVC W Rim=1028.94 Intake=1028.18 F.L.=1021.87 30" RCP E F.L.=1021.98 30" RCP N F.L.=1022.20 24" RCP W F.L.=1023.01 12" RCP S F.E.S.=1023.37 30" RCP S Rim=1028.78 Intake=1027.96 F.L.=1022.49 30" RCP N&S Rim=1028.52 Inv=1011.79 10" PVC N&S Inv=1012.50 Unknown Pipe W Inv=1019.31 6" PVC W Rim=1028.83 Intake=1028.02 F.L.=1022.91 30" RCP N&S F.L.=1023.94 15" CPP W Rim=1027.92 Inv=1011.27 10" PVC E Inv=1011.39 10" PVC S Rim=1030.24 F.L.=1024.33 18" RCP E F.L.=1024.44 (2)8" CMP W Rim=1029.78 F.L.=1024.02 24" RCP N F.L.=1024.02 18" RCP W F.L.=1024.33 12" RCP S Rim=1030.79 F.L.=1025.07 12" RCP N&SW Intake=1029.61 F.L.=1025.31 12" RCP NE F.L.=1025.46 12" RCP W Intake=1029.61 F.L.=1024.98 18" RCP E F.L.=1025.51 15" RCP W Rim=1030.62 Inv=1013.18 10" PVC E&W Rim=1029.77 F.L.=1023.25 24" RCP E F.L.=1023.25 18" RCP W F.L.=1023.65 12" RCP S Intake=1029.27 F.L.=1023.89 12" RCP N Intake=1029.35 F.L.=1024.69 18" RCP NE F.L.=1024.69 12" RCP SW Rim=1029.83 F.L.=1024.30 18" RCP E&SW F.L.=1024.30 18" RCP W F.F.E.=1031.56 F.F.E.=1031.58 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.60 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.64 F.F.E.=1031.50 F.F.E.=1031.54 F.F.E.=1031.55 F.F.E.=1031.57 F.F.E.=1031.54 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.54 F.F.E.=1031.60 F.F.E.=1031.56 F.F.E.=1031.60 F.F.E.=1031.58 F.F.E.=1031.61 F.F.E.=1031.59 F.F.E.=1031.57 R6.0' 7.0' TYP 18.0'9.0'TYP6.0' 18LF OF 15"ST @ 0.5% ST-1, SW-501 T/C=1028.70 INV=1022.68 ST-1A, SW-401 RIM=1028.72 INV=1022.59(E) INV=1022.49(N) INV=1022.49(S) ADJUST RIM TO GRADE RIM=1029.68 ST-2A, SW-401 RIM=1028.80 INV=1023.01(E) INV=1022.91(N) INV=1022.91(S) INV=1023.94(W) ST-2, SW-501 T/C=1028.30 INV=1023.13 (W) 24LF OF 15"ST @ 0.5%R3.0 'R2.0 ' R3.0'R30.5'R5.0 ' R4.5'R3.0'R15.6'R15.3'R15.0'R3 . 0 ' R1.0'R14.9'R6 . 0 ' R3.0' R5.0'R1 5 . 0 ' R44. 0 ' R6.0'R3.0'R3 . 0 ' FFE=1031.60 FFE=1031.60 FFE=1031.60 TYP 2F2E 2C 2B 1B 2G 1A 2C 8 9 2D 2H 1B 5A 2H 5F 5E 5B5A 5C 5D 4B 4A 4C 2F 6G 2F 2A 6C 2D 3A 2C 2E 1B 2D 2D 2B1B 1B 2F 2H 1B 2H2F 2F 2H 2F 1A 1A 1B 6E 8 9 8 9 6G 6D 6D 6D 6D 6D 6D 4.2' 2.0' 29.0' 6D 19.0'3.9'17.1' 2C 6B 6D 29.2'4.8'69.9'11.4'19.4'6D21.3'7.0'7"PCC 4"PCC 6"PCC 7"PCC 6F 6F PROPOSED BUILDING ADDITION PROPOSED BUILDING ADDITION PROPOSED BUILDING ADDITION 150' Proposed Hydrant Coverage1 5 0 ' E x i s t i n g H y d r a n t C o v e r a g e 150' Existin g H y d r a n t C o v e r a g e 150' E xi s ti n g H y d r a n t C o v e r a g e FIRE/SPRINKLER ROOM 74.0'99.7'175.0'40.2'163.4'10 10 82.9'21.3'69.2'26.3'26.4'6A 12.0'12.0'28.7'BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C300120.0903.01 C300SHOTTENKIRK SERVICE ADDITIONDIMENSION & UTILITY PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_DIM.dwg LOGAN MYERS, DIMENSION & UTILITY PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET 0 20 DIMENSION PLAN CONSTRUCTION NOTES 1. PROTECT THE FOLLOWING SITE FEATURES: A. EXISTING UTILITY. VERIFY LOCATION, ELEVATION AND MINIMUM COVER REQUIREMENTS PRIOR TO CONSTRUCTION. B. EXISTING PAVEMENT. C. EXISTING BUILDING. 2. PAVEMENTS, PROVIDE THE FOLLOWING: A. 6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. B. 7" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. C. 4" MINIMUM DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. D. 6" PCC ROLLED CURB. E. INTEGRAL CURB AND SIDEWALK. F. TAPER TO 6" CURB. G. NO CURB. H. 6" STANDARD PCC CURB 3. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: A. PAINTED PARKING STALL LINE, 4" WIDE, COORDINATE COLOR WITH OWNER.. 4. SANITARY SEWER SERVICES. PROVIDE THE FOLLOWING: A. CONNECT TO EXISTING 6" SANITARY SEWER SERVICE. VERIFY SIZE, LOCATION, AND ELEVATION PRIOR TO CONSTRUCTION. B. SAND/OIL SEPARATOR. COORDINATE WITH MECHANICAL PLANS FOR LOCATION AND ASSOCIATED DETAILS. C. CONNECT TO BUILDING. COORDINATE SIZE, LOCATION, AND ELEVATION WITH MECHANICAL PLANS. 5. WATER SERVICE. PROVIDE THE FOLLOWING: A.8" WATER MAIN. B.8" X 8" TEE. C.6" FIRE LINE WITH VALVE. VERIFY LOCATION, SIZE, AND ELEVATION WITH MECHANICAL PLANS. D.2.5" DOMESTIC WATER LINE WITH VALVE. VERIFY LOCATION, SIZE, AND ELEVATION WITH MECHANICAL PLANS. E.RELOCATED FIRE DEPARTMENT CONNECTION. VERIFY LOCATION WITH MECHANICAL AND ARCHITECTURAL PLANS. F.RELOCATED FIRE HYDRANT ASSEMBLY. 6. SITE AMENITIES. PROVIDE THE FOLLOWING: A.TRASH ENCLOSURE. CONTRACTOR TO COORDINATE CONSTRUCTION DETAILS OF ENCLOSURE WITH ARCHITECTURAL PLANS. B.MECHANICAL PAD. CONTRACTOR TO COORDINATE PAD THICKNESS AND SIZE WITH MECHANICAL PLANS. C.RETAINING WALL. SEE STRUCTURAL DRAWINGS FOR CONSTRUCTION DETAILS. D.BOLLARD. E.TRANSFORMER. COORDINATE LOCATION, SIZE WITH UTILITY PROVIDER AND OWNER PRIOR TO CONSTRUCTION. F.LIGHT POLE. IF FEASIBLE, CONTRACTOR TO RELOCATE EXISTING LIGHT POLES IN CONCRETE BASE. G.WHEEL STOP. 7. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, AND TELEPHONE SERVICES WITH UTILITY SERVICES PROVIDER, THE CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. 8. SEE STRUCTURAL DRAWINGS FOR BUILDING FOUNDATION, STOOP LOCATION, AND DETAILED CONSTRUCTION. 9. SEE ARCHITECTURAL DRAWINGS FOR DETAILED BUILDING CONSTRUCTION DETAILS. 10. ROOF DRAIN LOCATIONS. COORDINATE WITH MECHANICAL & ARCHITECTURAL PLANS FOR EXACT LOCATION PRIOR TO CONSTRUCTION. FORM GRADE ELEV. SLOPE AS PER PLANS 2 C300 6-INCH STANDARD CURB NO SCALE6"4 1 2" 7 1 2" 3 C300 INTEGRAL SIDEWALK AND CURB DETAIL NO SCALE 2% MAX 3"ADJACENT PAVEMENT SIDEWALK 12"18"4" MIN1 C300 6-INCH ROLLED CURB NO SCALE FORM GRADE ELEV.6"SLOPE AS PER PLANS 1 5 8" 12" 4 C300 BOLLARD DETAIL NO SCALE 4'-0"6"R3" R3" 1" RADIUS SEALED 'E' JOINT 2"R ROUNDED TOP (PAINTED) 8'-0"x8" DIA SCHEDULE 40 GALVANIZED PIPE FILLED WITH CONCRETE. PREP SURFACE AND PAINT WITH HIGH PERFORMANCE PAINT. COLOR AS PER OWNER SLOPE FINISHED GRADE TO DRAIN PROVIDE INTERNAL SLEEVE 12" DIA CONCRETE FOOTING PAVEMENT LEGEND 4" PCC SIDEWALK 6" PCC PAVEMENT 7" PCC PAVEMENT T 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 40' Public Sanitary Sewer Easement (Bk2008 Pg3729) 32' Existing Public Ingress/ Egress Easement (Bk2008 Pg3733) 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 55' Existing Private Surface Water Flowage & Detention Easement (Bk2008 Pg3727) 15' Existing Storm Sewer Easement (Bk 2008 Pg3728) 40' Existing Sanitary Sewer Easement (Bk2008 Pg3729) 10' Existing Underground Electric Line Easement (Bk2008 Pg10090) 30' Existing Ingress/ Egress Easement (Bk2015 Pg7030) 1030 1030 103010311031103110301 0 3 0 1030 1030 1031 1029102810 2 7 102910291028102710261029102810271026BM500 BM501 50 51 52 54 55 Existing Building F.F.E.=1031.58 Rim=1028.80 Inv=1012.12 10" PVC N Inv=1012.33 10" PVC W Rim=1028.94 Intake=1028.18 F.L.=1021.87 30" RCP E F.L.=1021.98 30" RCP N F.L.=1022.20 24" RCP W F.L.=1023.01 12" RCP S F.E.S.=1023.37 30" RCP S Rim=1028.78 Intake=1027.96 F.L.=1022.49 30" RCP N&S Rim=1028.52 Inv=1011.79 10" PVC N&S Inv=1012.50 Unknown Pipe W Inv=1019.31 6" PVC W Rim=1028.83 Intake=1028.02 F.L.=1022.91 30" RCP N&S F.L.=1023.94 15" CPP W Rim=1027.92 Inv=1011.27 10" PVC E Inv=1011.39 10" PVC S Rim=1030.24 F.L.=1024.33 18" RCP E F.L.=1024.44 (2)8" CMP W Rim=1029.78 F.L.=1024.02 24" RCP N F.L.=1024.02 18" RCP W F.L.=1024.33 12" RCP S Rim=1030.79 F.L.=1025.07 12" RCP N&SW Intake=1029.61 F.L.=1025.31 12" RCP NE F.L.=1025.46 12" RCP W Intake=1029.61 F.L.=1024.98 18" RCP E F.L.=1025.51 15" RCP W Rim=1030.62 Inv=1013.18 10" PVC E&W Rim=1029.77 F.L.=1023.25 24" RCP E F.L.=1023.25 18" RCP W F.L.=1023.65 12" RCP S Intake=1029.27 F.L.=1023.89 12" RCP N Intake=1029.35 F.L.=1024.69 18" RCP NE F.L.=1024.69 12" RCP SW Rim=1029.83 F.L.=1024.30 18" RCP E&SW F.L.=1024.30 18" RCP W F.F.E.=1031.56 F.F.E.=1031.58 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.60 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.64 F.F.E.=1031.50 F.F.E.=1031.54 F.F.E.=1031.55 F.F.E.=1031.57 F.F.E.=1031.54 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.54 F.F.E.=1031.60 F.F.E.=1031.56 F.F.E.=1031.60 F.F.E.=1031.58 F.F.E.=1031.61 F.F.E.=1031.59 F.F.E.=1031.57 1031.45 TC 1030.95 G 1030.70 1031.50 1031.40 (1030.78)1031.30 TC 1030.80 G 1030.20 1028.20 1028.52 1031.38 1031.11 1031.51 1030.68 1030.56 1029.94 1029.86 (1027.82 TC 1027.32 G) 1028.18 TC 1027.68 G (1028.10 TC 1027.60 G) 1031.60 1031.601031.60 1031.26 1031.011030.841030.00 1029.78 1029.87 1029.30 1031.60 1031.60 1027.80 (1029.79) (1029.79)(1029. 9 5) (10 3 0 . 2 9 ) (1030.27) (1030.60)(1030.58) (1030.46)(1030.37)(1030.28) (1031.08) (1028.86) (1029.24) (1031.00 TC 1030.50 G) 1031.60 1031.34 1031.18 1031.40 1031.40 1031.65 TC 1031.15 G 1030.81 TC 1030.31 G 1030.03 TC 1029.53 G 1030.80 1030. 8 0 1029.29 (1029.20)1031.55 TC1031.05 G1031.55 TC 1031.05 G 1031.55 TC 1031.05 G 1031.60 1031.10(1029.36) STAGING AREA (COORDINATE WITH PROPERTY OWNER) STABILIZED CONSTRUCTION ENTRANCE ●●●●●●●●●●●●●●●●●●SEDIMENT BASKET SEDIMENT BASKET SILT FENCE TYP APPROXIMATE STOCK PILE (COORDINATE SIZE AND LOCATION WITH OWNER CONCRETE WASHOUT 1029.40 1029.87 1030.70 TC 1030.20 G 1029.50 TC 1029.00 G 1029.60 TC 1029.10 G 1029.1 7 TW=1029.00 TW=1029.00 TW=1029.50 TW=1030.00 TW=1030.00 TW=1029.50 1 0 3 0 102910281 0 3 11031 10311029 1031 1030PROPOSED BUILDING ADDITION PROPOSED BUILDING ADDITION PROPOSED BUILDING ADDITION FFE=1031.60 FFE=1031.60 FFE=1031.60 1031.60 1031.60 1031.60 1031.601031.60 1031.60 1030.501031.60 ●●●●●●SILT FENCE TYP 100YR=1028.47 AREA OF DISTURBANCE AREA OF DISTURBANCE ULTIMATE DISCHARGE TO LITTLE WALNUT CREEK Overflow Elev=1028.70 BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C400120.0903.01 C400SHOTTENKIRK SERVICE ADDITIONGRADING & EROSION CONTROL PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_GRA.dwg LOGAN MYERS, GRADING PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET 0 20 GRADING NOTES A.UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/ OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. B.PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE REPAIRED BY THE CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION. C.PRIOR TO GRADING, THE OWNER/ CONTRACTOR SHALL OBTAIN A GRADING PERMIT. D.GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED. E.CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE SHOWN ON THE PLAN. SILT FENCE AROUND STORM INTAKES SHALL BE MAINTAINED UNTIL PAVING AND SEEDING/ SODDING ARE COMPLETE. F. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF ALL SITE UTILITIES AND IMPROVEMENTS WITH THE ARCHITECTURAL MECHANICAL/ ELECTRICAL/ PLUMBING SYSTEMS INCLUDING ROUTING, CRITICAL DIMENSIONS, CONNECTIONS, AND INVERT ELEVATIONS. G.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES. H.THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES. I.CONTRACTOR TO PROVIDE BELOW GRADE INLET PROTECTION IN ALL STORM SEWER STRUCTURES. QUANTITIES SEEDING AND MULCHING (TYPE 4)0.10 AC SILT FENCE 325 LF SEDIMENT BASKETS 2 EA Post Spacing (5'-0" max.) Post Spacing (5'-0" max.) Variable (20'-0" for a normal 10'-0" wide ditch.) TYPICAL SILT FENCE DITCH CHECK Fore s l o p e Backslope 1 2" min. 20" min. ATTACHMENT TO POST Fabric Post Wire or Cable Ties Insert 12 inches of fabric a minimum of 6 inches deep (fabric may be folded below the ground line). Reduce post spacing to 5'-0" at water concentration areas, or as required to adequately support fence. 1 2 24" 36" 8'-0" Spacing DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES 1 2 Ground Line Fabric See plans for spacing. (Profile View) TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES 1 1 'T' Steel Fence Post 4'-0" min. Ground line Fabric Flow SILT FENCE 200'-0" max. length per section (600'-0" if slope is flatter than 5%) (Plan View) TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES Ground ContoursInstall parallel to ground contour. Install "J-hook" at each end of an individual section of silt fence. BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=73890.07 E=144575.73 ELEV=1029.04 NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE SOUTH END OF ISLAND AT THE SOUTHEAST CORNER OF BUILDING. BM501 N=74100.92 E=144349.83 ELEV=1032.67 NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE WEST END OF ISLAND AT THE NORTHWEST CORNER OF BUILDING. T 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 40' Public Sanitary Sewer Easement (Bk2008 Pg3729) 32' Existing Public Ingress/ Egress Easement (Bk2008 Pg3733) 15' Existing Private Storm Sewer Easement (Bk2008 Pg3728) 55' Existing Private Surface Water Flowage & Detention Easement (Bk2008 Pg3727) 40' Existing Sanitary Sewer Easement (Bk2008 Pg3729) 10' Existing Underground Electric Line Easement (Bk2008 Pg10090) 30' Existing Ingress/ Egress Easement (Bk2015 Pg7030) 1030 1030 103010311031103110301 0 3 0 1031 1029102810 2 7 102910291028102710261029102810271026BM500 BM501 51 52 54 Existing Building F.F.E.=1031.58 Rim=1028.80 Inv=1012.12 10" PVC N Inv=1012.33 10" PVC W F.E.S.=1023.37 30" RCP S Rim=1028.78 Intake=1027.96 F.L.=1022.49 30" RCP N&S Rim=1028.52 Inv=1011.79 10" PVC N&S Inv=1012.50 Unknown Pipe W Inv=1019.31 6" PVC W Rim=1028.83 Intake=1028.02 F.L.=1022.91 30" RCP N&S F.L.=1023.94 15" CPP W Rim=1027.92 Inv=1011.27 10" PVC E Inv=1011.39 10" PVC S Rim=1030.24 F.L.=1024.33 18" RCP E F.L.=1024.44 (2)8" CMP W Rim=1029.78 F.L.=1024.02 24" RCP N F.L.=1024.02 18" RCP W F.L.=1024.33 12" RCP S Rim=1030.79 F.L.=1025.07 12" RCP N&SW Intake=1029.61 F.L.=1025.31 12" RCP NE F.L.=1025.46 12" RCP W Rim=1030.62 Inv=1013.18 10" PVC E&W F.F.E.=1031.56 F.F.E.=1031.58 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.60 F.F.E.=1031.60 F.F.E.=1031.61 F.F.E.=1031.64 F.F.E.=1031.50 F.F.E.=1031.54 F.F.E.=1031.55 F.F.E.=1031.57 F.F.E.=1031.54 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.56 F.F.E.=1031.54 F.F.E.=1031.60 F.F.E.=1031.56 F.F.E.=1031.60 F.F.E.=1031.58 F.F.E.=1031.61 F.F.E.=1031.59 F.F.E.=1031.57 6-SB 5-SB 3-JC 1-AF 3-JC 1-AF 1-AF 4-JC 1030 1030 103010311031103110301 0 3 0 1031 1029102810 2 7 1029102910281027102610291028102710261-AF G G G G G 13-JC BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No: Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C500120.0903.01 C500SHOTTENKIRK SERVICE ADDITIONPLANTING PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_LND.dwg LOGAN MYERS, PLANTING PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET 0 20 PLANT SCHEDULE QTY KEY BOTANICAL NAME COMMON NAME INSTALL SIZE COMMENTS CANOPY TREES 4 AF Acer freemanii 'Jeffersred'AUTUMN BLAZE MAPLE 2" Cal.B&B EVERGREEN SHRUBS 5'-7' SPREAD 23 JC Juniperus x pfitzeriana 'Sea Green'SEA GREEN JUNIPER 24" Ht.#3 CONT. (5' O.C.) DECIDUOUS SHRUBS 3-5' SPREAD 11 SB Spiraea betulifolia 'Tor'TOR SPIREA 18" Ht.#3 CONT. (3' O.C.) NO SCALE DECIDUOUS TREE STAKING DETAIL1 C500NO SCALE PLANTING PIT DETAILS2 C500 1 1 (AS PER CITY OF WAUKEE SITE PLAN ORDINANCE) OPEN SPACE AREA REQUIREMENTS: 331,125 S.F. TOTAL LOT AREA x 20%= 66,225 S.F. REQUIRED 92,307 S.F. TOTAL OPEN SPACE PROVIDED (27.88%) 176,977 S.F. OF PARKING AREA SHOWN 176,977 S.F. x 10%= 17,698 S.F. REQ'D INTERIOR PARKING LOT LANDSCAPE AREA 18,623 S.F. INTERIOR PARKING LOT LANDSCAPE AREA PROVIDED OPEN SPACE PLANTING REQUIREMENTS: 331,125 S.F. TOTAL LOT AREA x 20%= 66,225 S.F. REQUIRED 1 TREE/1,000 S.F. REQ'D OPEN SPACE ·67 TREES REQUIRED ·103 TREES PROVIDED 1 SHRUB/1,000 S.F. REQ'D OPEN SPACE ·67 SHRUBS REQUIRED ·187 SHRUBS PROVIDED SITE PLAN CHANGES: ---- 4 TREES REMOVED, 4 TREES PROPOSED TO REPLACE ---- 17 SHRUBS REMOVED, 17 SHRUBS PROPOSED TO REPLACE SCREENING: 4 EVERGREEN SHRUBS PROPOSED TO SCREEN PROPOSED TRANSFORMER 13 EVERGREEN SHRUBS PROPOSED TO SCREEN PROPOSED TRASH ENCLOSURE PLANTING PLAN GENERAL NOTES A.UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. B.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY COMPANIES DURING CONSTRUCTION. C.ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). D.CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF INSTALLATION. E. PROVIDE A MIN 3-FOOT PERIMETER RING OF SHREDDED HARDWOOD MULCH AROUND ALL TREES. PROVIDE VERTICAL CUT NATURAL EDGE TO A DEPTH OF 4-INCHES. F.SOD ALL AREAS DISTURBED BY CONSTRUCTION, UNLESS DIRECTED BY OWNER OR SHOWN OTHERWISE ON THE LANDSCAPE PLAN. G.PROVIDE SHREDDED HARDWOOD MULCH WHERE SHOWN. PLANTING PLAN REQUIREMENTS Certified Service Q U I C K L U B E AYERS DESIGN GROUPARCHITECTSPhone: (515) 229-3336email: rich@adgarchitect.netAddress: 6876 Harding StreetIndianola, Iowa AYERS DESIGN GROUPARCHITECTSPhone: (515) 229-3336email: rich@adgarchitect.netAddress: 6876 Harding StreetIndianola, Iowa