AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Shottenkirk
(755 W Hickman Road)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: Shottenkirk, requests approval of a site plan to allow the
construction of additions to their building, totaling approximately 11,000
square feet in area. A trash enclosure/tire storage is proposed to the northeast
of the building. Removal and replacement of existing pavement within the
areas adjacent to the building is also proposed.
The applicant has provided elevations for the proposed building additions on
the site, which meets the intent of the architectural guidelines within the Site
Plan Ordinance.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed this project at the January 12, 2021 Commission Meeting and
recommended approval subject to remaining staff comments:
Approval of a Site Plan for Shottenkirk Service Addition (755 W Hickman Road)
Senior Planner, Melissa DeBoer introduced the request for approval of a site plan for an addition to the
service department of the Shottenkirk Chevrolet Dealership as submitted by the applicant, Shottenkirk
Partnership, LP. The subject property is generally located north of W. Hickman Road and west of NW
6th Street, containing approximately 0.81 acres.
Mrs. DeBoer advised that the site plan indicates additions totaling approximately 11,000 square feet on
the north, east, and south areas of the current building. A trash enclosure and tire storage area are also
proposed to the northeast of the building. No access changes are proposed or required with this project.
Approximately 26 parking spots have been removed bringing the total number of parking stalls to 403
for the project. Open space requirements have been met and elevations are shown to mimic the current
elevations of the existing building.
At this time staff would recommend approval of the site plan for Shottenkirk Service Addition subject
to any remaining staff comments.
Commissioner Hoifeldt questioned what the north addition use would be. Korey Marsh, a
representative for Snyder and Associates, advised that it is a large vehicle car wash.
Commissioner Hoifeldt moved to approve the site plan for Shottenkirk Service Addition (755 W.
Hickman Road) subject to any remaining staff comments. Commissioner Broderick seconded the
motion. Ayes: Inman, Koshy, Streit, Broderick, Ward, and Hoifeldt. Nays: None. Motion Carries.
I11
STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to
remaining staff comments.
RECOMMENDATION: Approve the resolution subject to remaining staff comments.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Melissa DeBoer, Senior Planner
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2021-
APPROVING THE SITE PLAN FOR SHOTTENKIRK SERVICE ADDITION
(755 W HICKMAN ROAD)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for Shottenkirk Service Addition, subject to remaining staff comments on January
12, 2021; AND,
WHEREAS, the Site Plan for Shottenkirk Service Addition is in general conformance with §160
– Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND,
WHEREAS, the Site Plan for Shottnekirk Service Addition is in general conformance with §161
– Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 18th day of January, 2021 that the Site Plan for Shottenkirk Service Addition is approved
subject to remaining staff comments.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Shottenkirk Service Addition – Site
Plan
PREPARED BY: Melissa DeBoer, AICP – Senior Planner
REPORT DATE: January 6, 2021
MEETING DATE: January 12, 2021
GENERAL INFORMATION
Owner/Applicant: Shottenkirk Partnership, LP
Owner’s Representative:
Korey Marsh, Snyder & Associates
Request: The applicant is requesting approval of a site plan for
a building addition.
Location and Size: Property is generally located north of Hickman Road
and west of NW 6th Street, containing approximately
0.81 acres.
Property Address:
755 W Hickman Road
AREA MAP
ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area.
January 6, 2021
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Shottenkirk Car
Dealership Mixed Use C-1 (Community and Highway Service
Commercial District)
North Shottenkirk Lot Medium Density
Residential
M-1A (Limited Industrial District)
South Kum & Go Gas
Station &
Convenience Store
Mixed Use C-1 (Community and Highway Service
Commercial District)
East Industrial Warehouse Mixed Use M-1A (Limited Industrial District)
West Shottenkirk Parking
Lot / Industrial
Mixed Use C-1 (Community and Highway Service
Commercial District) / M-1A (Limited
Industrial District)
PROJECT DESCRIPTION
The project includes multiple additions to the existing building. The proposed additions will add a total of
approximately 11,000 square feet to the existing building. A 1,765 square foot addition is proposed at the
northwest corner of the existing building, a 7,378 square foot addition is proposed at the northeast corner
and a 1,820 square foot addition is proposed at the southwest corner. A trash enclosure/tire storage is
proposed to the northeast of the building.
The project also includes the removal and replacement of existing pavement within the areas immediately
adjacent to the building.
ACCESS AND PARKING
Existing accesses into this site are provided from both Hickman Road and NW 6th Street. No changes are
proposed to these accesses.
The proposed site plan will remove a total of 26 parking spaces. The site will provide a total of 403 parking
stalls.
SIDEWALKS/TRAILS
No public sidewalks or trails are proposed with this project.
UTILITIES
This site is already serviced with all public utilities.
LANDSCAPING & OPEN SPACE
A minimum of 20% of the site is required to be open space. The total amount of open space proposed is
27.9%. The applicant has provided the required amount of plantings per the landscaping ordinance.
ELEVATIONS
The elevations of the building are proposed to be constructed mostly of brick, architectural metal and glass
panels to match the existing building. The trash enclosure/tire storage will be constructed of split face block.
January 6, 2021
3 of 3
STAFF RECOMMENDATION
The site plan is in general conformance with the Site Plan Or dinance and Comprehensive Plan. Staff
recommends approval of the site plan subject to remaining staff comments.
BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-2020250'120.0903.01C100120.0903.01
C100SHOTTENKIRK SERVICE ADDITIONTITLE SHEETWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_PLAN.dwg LOGAN MYERS, TITLE SHEET, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET
0 250
SITE PLAN
FOR
SHOTTENKIRK SERVICE ADDITION
CITY OF WAUKEE, DALLAS COUNTY, IOWA
INDEX OF SHEETS
C100 TITLE SHEET
C101 PROJECT INFORMATION
C200 DEMOLITION PLAN
C300 DIMENSION & UTILITY PLAN
C400 GRADING & EROSION CONTROL PLAN
C500 PLANTING PLAN
VICINITY MAP
OWNER/DEVELOPER
SHOTTENKIRK PARTNERSHIP, LP
PO BOX 1030
WAUKEE, IA 50263
CONTACT: JEREMY BUTTS
PHONE: (319) 669-6215
PROJECT LOCATION
I hereby certify that this engineering document
was prepared by me or under my direct personal
supervision and that I am a duly licensed
Professional Engineer under the laws of the
State of Iowa.
Eric D. Cannon, P.E.Date
License Number P18954
My License Renewal Date is December 31, 2021
Pages or sheets covered by this seal:
ERIC D.
CANNON
P18954DPROFELNSEICEIONALENGINEER
AIOW
SS
HICKMAN RDN 10TH STREET6TH STREET
BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-2020N/A120.0903.01C101120.0903.01
C101SHOTTENKIRK SERVICE ADDITIONPROJECT INFORMATIONWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_PLAN.dwg LOGAN MYERS, PROJECT INFO, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)GENERAL NOTES
FEATURES
Spot Elevation
Contour Elevation
Fence (Barbed, Field, Hog)
Fence (Chain Link)
Fence (Wood)
Fence (Silt)
Tree Line
Tree Stump
Deciduous Tree \\ Shrub
Coniferous Tree \\ Shrub
Communication
Overhead Communication
Fiber Optic
Underground Electric
Overhead Electric
Gas Main with Size
High Pressure Gas Main with Size
Water Main with Size
Sanitary Sewer with Size
Duct Bank
Test Hole Location for SUE w/ID
(*) Denotes the survey quality service level for utilities
Sanitary Manhole
Storm Sewer with Size
Storm Manhole
Single Storm Sewer Intake
Double Storm Sewer Intake
Fire Hydrant
Fire Hydrant on Building
Water Main Valve
Water Service Valve
Well
Utility Pole
Guy Anchor
Utility Pole with Light
Utility Pole with Transformer
Street Light
Yard Light
Electric Box
Electric Transformer
Traffic Sign
Communication Pedestal
Communication Manhole
Communication Handhole
Fiber Optic Manhole
Fiber Optic Handhole
Gas Valve
Gas Manhole
Gas Apparatus
Fence Post or Guard Post
Underground Storage Tank
Above Ground Storage Tank
Sign
Satellite Dish
Mailbox
Sprinkler Head
Irrigation Control Valve
LEGEND
EXISTING PROPOSED
93.0x
60
12" RCP
UTILITY WARNING
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR
RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR
SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE
UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED
EXCEPT WHERE NOTED AS QUALITY LEVEL A.
A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY
PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT
LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR
MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE
UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD SPECIFICATIONS
FOR PUBLIC IMPROVEMENTS, 2020 STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) AND THE SOILS REPORTS
PREPARED BY OTHERS.
C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF
STRUCTURE.
D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS
SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE
CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED LANE CLOSURE.
E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO
NOTIFY THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR
HOLIDAY WORK.
F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT
TO 95% MAXIMUM DENSITY.
G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS
SHALL GOVERN.
H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY
ON THE AS-BUILT DOCUMENTS.
I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE
TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND
FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION.
CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE
SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF WAUKEE STANDARDS.
J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE
PROJECT TO AN APPROVED OFF-SITE WASTE SITE.
K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH GRADES TO
MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL.
L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER),
UNLESS OTHERWISE NOTED.
M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND
SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT.
N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE
WORK.
O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY.
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE
TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A
COSESCO PERMIT IS REQUIRED FOR THIS PROJECT.
P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH
UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION.
Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER
SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING
GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN
TO THE STORM SEWER IS AT LEAST TEN FEET.
R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO
CONSTRUCTION ACTIVITIES BEGINNING.
S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING PEDESTRIAN
FACILITIES.
T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF
WAUKEE DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION.
U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED
APPROVAL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE
SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF
WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED.
W. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT
BETWEEN SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS
SHALL BE SEALED.
X. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT
GRADES FOR DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL
PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS.
Y. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS
FOR PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING.
Z. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY
FROM CONCRETE OPERATIONS TO DISCHARGE OFFSITE.
AA. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT AND
CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TIE-INS.
BB. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE 4-INCH STORZ FITTINGS.
CC. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO CONSTRUCTION.
DD. PRIOR TO ANY LANE CLOSURE THE CONTRACTOR IS RESPONSIBLE FOR HAVING A DIGITAL MESSAGE BOARD NOTIFYING
DRIVERS OF LANE CLOSURES AT LEAST ONE WEEK PRIOR TO ANY CLOSURE. CONTRACTOR IS TO COORDINATE ANY LANE/ROAD
CLOSURES WITH THE CITY OF WAUKEE.
EE. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED FOR EVERY FACILITY, BUILDING, OR PORTION OF A
BUILDING AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE
REQUIREMENTS OF SECTION 503.2 AND THIS SECTION SHALL EXTEND TO WITHIN 100 FEET OF ALL PORTIONS OF THE EXTERIOR
WALLS OF THE FIRST STORY OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE
BUILDING OR FACILITY.
FF. ALL SIGNAGE REQUIRES A SEPARATE PERMIT FROM THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
POLLUTION PREVENTION NOTES
A.POLLUTION PREVENTION AND EROSION PROTECTION
1.CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL
POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE,
THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN
WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY
STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT SITE AND ALL
OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF
PERFORMANCE.
2.DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER
HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM
DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE
ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE
NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH
COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED NOT,
REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO THE
CONTRACTOR.
B.STORM WATER DISCHARGE PERMIT
1.THIS PROJECT IS UNDER 1.0 ACRE AND DOES NOT REQUIRE COVERAGE UNDER THE NPDES
GENERAL PERMIT NO. 2 FOR STORM WATER DISCHARGES ASSOCIATED WITH
CONSTRUCTION ACTIVITIES FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL
PROTECTION AGENCY (EPA). THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE
RESPONSIBLE FOR COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE
NPDES GENERAL PERMIT NO. 2 AS SPECIFIED IN THE CONTRACT DOCUMENTS.
2.ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT
NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, DISCHARGE
AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS,
SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED TO ANY JURISDICTIONAL
AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH THE NPDES PERMIT REQUIREMENTS
IS A VIOLATION OF THE CLEAN WATER ACT AND THE CODE OF IOWA.
3.A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL
STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY EROSION
CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST
BE RETAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE
CONTRACTOR SHALL RETAIN A RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS
TO THE OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF
DISCONTINUATION.
C.POLLUTION PREVENTION PLAN
1.THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN
ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE SWPPP
FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION
PLAN MADE DURING CONSTRUCTION.
2.THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES (BMP)
FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S AND
EROSION CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION ACTIVITIES
ARE THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT.
ADDITIONAL BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED.
3.THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT
CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE.
4.THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE
GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S
UNLESS INFEASIBLE OR NOT APPLICABLE:
a.UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN
DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND
SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE
SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL
COMPACTION.
b.INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT
BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS
DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING
OPERATIONS.
c.PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND
LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT
ANY TIME.
d.MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN
WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT
REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL
DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY.
e.INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL
ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR DAYS. RECORD THE
FINDINGS OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A
COPY SUBMITTED WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION.
REVISE THE SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 7 DAYS.
f.PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON
ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS,
SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY
ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR
FUTURE PREVENTION.
g.INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL
MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL
GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS
RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS
STORM SEWERS ARE INSTALLED.
h.RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON
ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER
IMPROVEMENTS ARE LOCATED.
i.STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX,
PERMANENT SEED MIX, SOD, OR PAVEMENT IMMEDIATELY AS SOON AS POSSIBLE UPON
COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES
IMMEDIATELY AFTER CONSTRUCTION ACTIVITY IS FINALLY COMPLETED OR
TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WHICH WILL NOT RESUME
FOR A PERIOD EXCEEDING 14 CALENDAR DAYS.
j.COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE
SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE
FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY
SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY.
CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT
BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE
POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED ONSITE.
k.REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO
FILING OF THE "NOTICE OF DISCONTINUATION".
BULK REGULATIONS:
LOT AREA = NONE
LOT WIDTH = NONE
FRONT YARD= 30 FEET
REAR YARD = 30 FEET
SIDE YARD = NO MINIMUM, EXCEPT WHEN ADJACENT WHEN ADJACENT TO ANY R
DISTRICT, THE MINIMUM SIDE YARD SETBACK SHALL BE 30 FEET.
MAXIMUM HEIGHT = NO MINIMUM EXCEPT WHEN ADJACENT TO AN R-1,R-2 OR R-4
DISTRICT, THE MAXIMUM SHALL BE 2 STORIES OR 40 FEET
1 STORY OR 14 FEET FOR ACCESSORY BUILDINGS.
MINIMUM OPEN SPACE = 20%
PROPERTY DESCRIPTION
SHOTTENKIRK WAUKEE PLAT 1 LOT 1
CONTROL POINTS
SNYDER & ASSOCIATES DALLAS COUNTY LOCAL COORDINATE SYSTEM
NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET
CP50 N=73857.75 E=144641.04 Z=1029.04
CUT "X" IN CURB 12' SOUTH OF CURB INTAKE & 125' SOUTHEAST OF
BUILDING, SOUTHEAST CORNER OF SITE.
CP51 N=74179.79 E=144676.48 Z=1026.19
CUT "X" IN GUTTER 15' NORTHEAST OF MANHOLE & 150' NORTHEAST
OF BUILDING, NORTHEAST CORNER OF SITE.
CP52 N=74167.29 E=144504.12 Z=1030.62
CUT "X" IN CURB AT EAST END OF CONCRETE ISLAND 45' NORTH OF
TRASH ENCLOSURE, NORTHEAST SIDE OF SITE.
CP53 N=74235.99 E=144298.79 Z=1029.61
CUT "X" IN CURB 3' EAST OF LIGHT POLE & 150' NORTHWEST OF
BUILDING, NORTHWEST OF SITE.
CP54 N=74048.16 E=144289.90 Z=1030.93
CUT "X" IN CURB 3' SOUTHEAST OF FENCE CORNER & 77' WEST OF
BUILDING, WEST SIDE OF SITE.
CP55 N=73857.74 E=144266.97 Z=1030.15
CUT "X" IN CURB 15' NORTH OF LIGHT POLE 130' SOUTHWEST OF
BUILDING, SOUTHWEST CORNER OF SITE.
CP56 N=73794.62 E=144468.41 Z=1031.25
CUT "X" IN CURB AT NORTH END OF CONCRETE ISLAND & 130' SOUTH
OF BUILDING, SOUTH OF SITE.
BENCHMARKS
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
IARTN DERIVED - US SURVEY FEET
BM500 N=73890.07 E=144575.73 ELEV=1029.04
NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE
SOUTH END OF ISLAND AT THE SOUTHEAST CORNER OF BUILDING.
BM501 N=74100.92 E=144349.83 ELEV=1032.67
NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE
WEST END OF ISLAND AT THE NORTHWEST CORNER OF BUILDING.
UTILITY CONTACT INFORMATION
UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM
THE IOWA ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552006176.
W1-WATER MAIN CITY OF WAUKEE
S1-SANITARY SEWER TIM ROYER
G1-GAS MAIN 515-987-4363
troyer@waukee.org
UE1-UNDERGROUND ELECTRIC MIDAMERICAN ENERGY
JAMIE NEER
515-252-6972
MECDSMDesignLocates@midamerican.com
CO1-COMMUNICATION CENTURYLINK
TOM STURMER
303-453-9927
thomas.sturmer@centurylink.com
FO1-FIBER OPTIC UNITE PRIVATE NETWORKS, LLC
JOE KILZER
816-425-3556
upngis@upnfiber.com
FO2-FIBER OPTIC CONSOLIDATED COMMUNICATIONS
JUSTIN GREV
507-386-3606
justin.grev@consolidated.com
CLEAR PER MAP XENIA RURAL WATER DISTRICT
LAIRD VAN DEE
515-676-2117
lvandee@xeniawater.org
NO RESPONSE MI-FIBER
JACK JONES
515-897-9192
jack@grm.net
NO RESPONSE MEDIACOM COMMUNICATIONS CORP
PAUL MAY
515-246-2252
pmay@mediacomcc.com
ZONING
C-1: COMMUNITY AND HIGHWAY SERVICE COMMERCIAL DISTRICT
IMPERVIOUS AREA
5,730 SF OF ADDITIONAL IMPERVIOUS SURFACE
TOTAL AREA OF DISTURBANCE
0.81 AC
GENERAL USE
NEW & PRE-OWNED AUTOMOTIVE SALES & SERVICE
PROPERTY ADDRESS
755 W. HICKMAN RD
WAUKEE, IA 50263
PARKING REQUIREMENTS
EXISTING PARKING: 429 STALLS EXISTING
PROPOSED PARKING: 403 STALLS PROVIDED
OPEN SPACE
20% OPEN SPACE REQUIRED
331,125 SF X 20% = 66,225 SF OPEN SPACE REQUIRED
OPEN SPACE PROVIDED: 92,307 SF PROVIDED
92,307 SF / 331,125 SF = 27.88%
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
40' Public Sanitary
Sewer Easement
(Bk2008 Pg3729)
32' Existing Public Ingress/
Egress Easement
(Bk2008 Pg3733)
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
55' Existing Private
Surface Water Flowage &
Detention Easement
(Bk2008 Pg3727)
15' Existing Storm
Sewer Easement
(Bk 2008 Pg3728)
40' Existing Sanitary
Sewer Easement
(Bk2008 Pg3729)
10' Existing Underground
Electric Line Easement
(Bk2008 Pg10090)
30' Existing Ingress/
Egress Easement
(Bk2015 Pg7030)
Existing
Building
Rim=1028.80
Inv=1012.12 10" PVC N
Inv=1012.33 10" PVC W
Rim=1028.94
Intake=1028.18
F.L.=1021.87 30" RCP E
F.L.=1021.98 30" RCP N
F.L.=1022.20 24" RCP W
F.L.=1023.01 12" RCP S
F.E.S.=1023.37
30" RCP S
Rim=1028.78
Intake=1027.96
F.L.=1022.49 30" RCP N&S
Rim=1028.52
Inv=1011.79 10" PVC N&S
Inv=1012.50 Unknown Pipe W
Inv=1019.31 6" PVC W
Rim=1028.83
Intake=1028.02
F.L.=1022.91 30"
RCP N&S
F.L.=1023.94 15"
CPP W
Rim=1027.92
Inv=1011.27 10" PVC E
Inv=1011.39 10" PVC S
Rim=1030.24
F.L.=1024.33 18" RCP E
F.L.=1024.44 (2)8" CMP W
Rim=1029.78
F.L.=1024.02 24" RCP N
F.L.=1024.02 18" RCP W
F.L.=1024.33 12" RCP S
Rim=1030.79
F.L.=1025.07 12" RCP N&SW
Intake=1029.61
F.L.=1025.31 12" RCP NE
F.L.=1025.46 12" RCP W
Intake=1029.61
F.L.=1024.98 18" RCP E
F.L.=1025.51 15" RCP W
Rim=1030.62
Inv=1013.18 10" PVC E&W
Rim=1029.77
F.L.=1023.25 24" RCP E
F.L.=1023.25 18" RCP W
F.L.=1023.65 12" RCP S
Intake=1029.27
F.L.=1023.89 12" RCP N
Intake=1029.35
F.L.=1024.69 18" RCP NE
F.L.=1024.69 12" RCP SW
Rim=1029.83
F.L.=1024.30 18" RCP E&SW
F.L.=1024.30 18" RCP W
Trash
TYP
2C
2H
2F 2E 2I
2I
2G
2G
1D
2M
2D
2D
2N
2L
2B
2B
2B
2B
2J
2K
2D
2O
2A
1A2A
1A
1A
1B
2O
1A
1C
2A
2A
2A2A
1A
1A
1A
1B
2A
1B 1B
1B
1A
1B
1A
2O
1D
1A
2C
1B
2I
2I
2G
1B
2I
1A
1B
1B
2P
2O
EASEMENT TO
BE VACATED BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C200120.0903.01
C200SHOTTENKIRK SERVICE ADDITIONDEMOLITION PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_DEMO.dwg LOGAN MYERS, DEMO PLAN, 2020/12/21, 2:48 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET
0 20
DEMOLITION PLAN NOTES
1.EXISTING FEATURES, PROTECT THE FOLLOWING:
A.PAVEMENT TO REMAIN.
B.EXISTING UTILITIES. COORDINATE ANY RELOCATIONS OR ADJUSTMENTS
WITH UTILITY SERVICE PROVIDER AS NECESSARY.
C.EXISTING BUILDING
D.EXISTING TREE.
E.EXISTING GAS METER.
2.DEMOLITION, REMOVE THE FOLLOWING:
A.FULL DEPTH SAWCUT AND REMOVE EXISTING PAVEMENT TO NEAREST JOINT.
B.REMOVE WATER PIPE TO LIMITS SHOWN.
C.REMOVE STORM SEWER INTAKES.
D.RELOCATE UNDERGROUND ELECTRIC. COORDINATE NEW LOCATION WITH
OWNER AND UTILITY SERVICE PROVIDER.
E.REMOVE TRASH ENCLOSURE.
F.REMOVE AND RELOCATE TRANSFORMER. COORDINATE WITH OWNER AND
UTILITY PROVIDER
G.REMOVE & RELOCATE LIGHT POLE. COORDINATE WITH OWNER AND UTILITY
PROVIDER.
H.REMOVE BUILDING TO LIMITS SHOWN.
I.REMOVE TREES & SHRUBS.
J.REMOVE & RELOCATE FIRE HYDRANT.
K.REMOVE WATER VALVE.
L.REMOVE & RELOCATE WATER FDC.
M.REMOVE SAND OIL SEPARATOR.
N.REMOVE SANITARY SEWER PIPE AND CLEANOUT.
O.REMOVE BOLLARDS.
P.REMOVE & RELOCATE POST INDICATOR VALVE.
REMOVAL LEGEND
PAVEMENT REMOVAL
BUILDING DEMOLITION
T
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
40' Public Sanitary
Sewer Easement
(Bk2008 Pg3729)
32' Existing Public Ingress/
Egress Easement
(Bk2008 Pg3733)
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
55' Existing Private
Surface Water Flowage &
Detention Easement
(Bk2008 Pg3727)
15' Existing Storm
Sewer Easement
(Bk 2008 Pg3728)
40' Existing Sanitary
Sewer Easement
(Bk2008 Pg3729)
10' Existing Underground
Electric Line Easement
(Bk2008 Pg10090)
30' Existing Ingress/
Egress Easement
(Bk2015 Pg7030)
BM500
BM501
50
51
52
54
55
Existing
Building
F.F.E.=1031.58
Rim=1028.80
Inv=1012.12 10" PVC N
Inv=1012.33 10" PVC W
Rim=1028.94
Intake=1028.18
F.L.=1021.87 30" RCP E
F.L.=1021.98 30" RCP N
F.L.=1022.20 24" RCP W
F.L.=1023.01 12" RCP S
F.E.S.=1023.37
30" RCP S
Rim=1028.78
Intake=1027.96
F.L.=1022.49 30" RCP N&S
Rim=1028.52
Inv=1011.79 10" PVC N&S
Inv=1012.50 Unknown Pipe W
Inv=1019.31 6" PVC W
Rim=1028.83
Intake=1028.02
F.L.=1022.91 30"
RCP N&S
F.L.=1023.94 15"
CPP W
Rim=1027.92
Inv=1011.27 10" PVC E
Inv=1011.39 10" PVC S
Rim=1030.24
F.L.=1024.33 18" RCP E
F.L.=1024.44 (2)8" CMP W
Rim=1029.78
F.L.=1024.02 24" RCP N
F.L.=1024.02 18" RCP W
F.L.=1024.33 12" RCP S
Rim=1030.79
F.L.=1025.07 12" RCP N&SW
Intake=1029.61
F.L.=1025.31 12" RCP NE
F.L.=1025.46 12" RCP W
Intake=1029.61
F.L.=1024.98 18" RCP E
F.L.=1025.51 15" RCP W
Rim=1030.62
Inv=1013.18 10" PVC E&W
Rim=1029.77
F.L.=1023.25 24" RCP E
F.L.=1023.25 18" RCP W
F.L.=1023.65 12" RCP S
Intake=1029.27
F.L.=1023.89 12" RCP N
Intake=1029.35
F.L.=1024.69 18" RCP NE
F.L.=1024.69 12" RCP SW
Rim=1029.83
F.L.=1024.30 18" RCP E&SW
F.L.=1024.30 18" RCP W
F.F.E.=1031.56
F.F.E.=1031.58
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.60
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.64
F.F.E.=1031.50
F.F.E.=1031.54
F.F.E.=1031.55
F.F.E.=1031.57
F.F.E.=1031.54
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.54
F.F.E.=1031.60 F.F.E.=1031.56
F.F.E.=1031.60
F.F.E.=1031.58
F.F.E.=1031.61
F.F.E.=1031.59
F.F.E.=1031.57
R6.0'
7.0'
TYP
18.0'9.0'TYP6.0'
18LF OF 15"ST @ 0.5%
ST-1, SW-501
T/C=1028.70
INV=1022.68
ST-1A, SW-401
RIM=1028.72
INV=1022.59(E)
INV=1022.49(N)
INV=1022.49(S)
ADJUST RIM
TO GRADE
RIM=1029.68
ST-2A, SW-401
RIM=1028.80
INV=1023.01(E)
INV=1022.91(N)
INV=1022.91(S)
INV=1023.94(W)
ST-2, SW-501
T/C=1028.30
INV=1023.13 (W)
24LF OF 15"ST @ 0.5%R3.0
'R2.0
'
R3.0'R30.5'R5.0
'
R4.5'R3.0'R15.6'R15.3'R15.0'R3
.
0
'
R1.0'R14.9'R6
.
0
'
R3.0'
R5.0'R1
5
.
0
'
R44.
0
'
R6.0'R3.0'R3
.
0
'
FFE=1031.60
FFE=1031.60
FFE=1031.60
TYP
2F2E
2C
2B
1B
2G
1A
2C
8 9
2D
2H
1B
5A
2H
5F
5E
5B5A
5C
5D
4B
4A
4C
2F
6G
2F
2A
6C
2D
3A
2C
2E
1B
2D
2D 2B1B
1B
2F
2H
1B
2H2F
2F
2H
2F
1A
1A
1B
6E
8 9
8 9
6G
6D
6D
6D
6D
6D
6D
4.2'
2.0'
29.0'
6D
19.0'3.9'17.1'
2C
6B
6D 29.2'4.8'69.9'11.4'19.4'6D21.3'7.0'7"PCC
4"PCC
6"PCC
7"PCC
6F
6F
PROPOSED BUILDING
ADDITION
PROPOSED BUILDING
ADDITION
PROPOSED BUILDING
ADDITION
150' Proposed Hydrant Coverage1
5
0
'
E
x
i
s
t
i
n
g
H
y
d
r
a
n
t
C
o
v
e
r
a
g
e
150' Existin
g
H
y
d
r
a
n
t
C
o
v
e
r
a
g
e
150' E
xi
s
ti
n
g
H
y
d
r
a
n
t
C
o
v
e
r
a
g
e
FIRE/SPRINKLER ROOM
74.0'99.7'175.0'40.2'163.4'10
10
82.9'21.3'69.2'26.3'26.4'6A
12.0'12.0'28.7'BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C300120.0903.01
C300SHOTTENKIRK SERVICE ADDITIONDIMENSION & UTILITY PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_DIM.dwg LOGAN MYERS, DIMENSION & UTILITY PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET
0 20
DIMENSION PLAN CONSTRUCTION NOTES
1. PROTECT THE FOLLOWING SITE FEATURES:
A. EXISTING UTILITY. VERIFY LOCATION, ELEVATION AND MINIMUM COVER
REQUIREMENTS PRIOR TO CONSTRUCTION.
B. EXISTING PAVEMENT.
C. EXISTING BUILDING.
2. PAVEMENTS, PROVIDE THE FOLLOWING:
A. 6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO
95% STANDARD PROCTOR DENSITY.
B. 7" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO
95% STANDARD PROCTOR DENSITY.
C. 4" MINIMUM DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE
COMPACTED TO 95% STANDARD PROCTOR DENSITY.
D. 6" PCC ROLLED CURB.
E. INTEGRAL CURB AND SIDEWALK.
F. TAPER TO 6" CURB.
G. NO CURB.
H. 6" STANDARD PCC CURB
3. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING:
A. PAINTED PARKING STALL LINE, 4" WIDE, COORDINATE COLOR WITH OWNER..
4. SANITARY SEWER SERVICES. PROVIDE THE FOLLOWING:
A. CONNECT TO EXISTING 6" SANITARY SEWER SERVICE. VERIFY SIZE, LOCATION,
AND ELEVATION PRIOR TO CONSTRUCTION.
B. SAND/OIL SEPARATOR. COORDINATE WITH MECHANICAL PLANS FOR LOCATION
AND ASSOCIATED DETAILS.
C. CONNECT TO BUILDING. COORDINATE SIZE, LOCATION, AND ELEVATION WITH
MECHANICAL PLANS.
5. WATER SERVICE. PROVIDE THE FOLLOWING:
A.8" WATER MAIN.
B.8" X 8" TEE.
C.6" FIRE LINE WITH VALVE. VERIFY LOCATION, SIZE, AND ELEVATION WITH
MECHANICAL PLANS.
D.2.5" DOMESTIC WATER LINE WITH VALVE. VERIFY LOCATION, SIZE, AND ELEVATION
WITH MECHANICAL PLANS.
E.RELOCATED FIRE DEPARTMENT CONNECTION. VERIFY LOCATION WITH
MECHANICAL AND ARCHITECTURAL PLANS.
F.RELOCATED FIRE HYDRANT ASSEMBLY.
6. SITE AMENITIES. PROVIDE THE FOLLOWING:
A.TRASH ENCLOSURE. CONTRACTOR TO COORDINATE CONSTRUCTION DETAILS OF
ENCLOSURE WITH ARCHITECTURAL PLANS.
B.MECHANICAL PAD. CONTRACTOR TO COORDINATE PAD THICKNESS AND SIZE
WITH MECHANICAL PLANS.
C.RETAINING WALL. SEE STRUCTURAL DRAWINGS FOR CONSTRUCTION DETAILS.
D.BOLLARD.
E.TRANSFORMER. COORDINATE LOCATION, SIZE WITH UTILITY PROVIDER AND
OWNER PRIOR TO CONSTRUCTION.
F.LIGHT POLE. IF FEASIBLE, CONTRACTOR TO RELOCATE EXISTING LIGHT POLES IN
CONCRETE BASE.
G.WHEEL STOP.
7. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, AND TELEPHONE
SERVICES WITH UTILITY SERVICES PROVIDER, THE CITY OF WAUKEE, AND THE
OWNER PRIOR TO CONSTRUCTION.
8. SEE STRUCTURAL DRAWINGS FOR BUILDING FOUNDATION, STOOP LOCATION, AND
DETAILED CONSTRUCTION.
9. SEE ARCHITECTURAL DRAWINGS FOR DETAILED BUILDING CONSTRUCTION DETAILS.
10. ROOF DRAIN LOCATIONS. COORDINATE WITH MECHANICAL & ARCHITECTURAL
PLANS FOR EXACT LOCATION PRIOR TO CONSTRUCTION.
FORM
GRADE
ELEV.
SLOPE AS
PER PLANS
2
C300
6-INCH STANDARD CURB
NO SCALE6"4 1
2"
7 1
2"
3
C300
INTEGRAL SIDEWALK AND CURB DETAIL
NO SCALE
2% MAX
3"ADJACENT PAVEMENT
SIDEWALK
12"18"4" MIN1
C300
6-INCH ROLLED CURB
NO SCALE
FORM
GRADE
ELEV.6"SLOPE AS
PER PLANS
1 5
8"
12"
4
C300
BOLLARD DETAIL
NO SCALE 4'-0"6"R3"
R3"
1" RADIUS
SEALED 'E' JOINT
2"R
ROUNDED TOP
(PAINTED)
8'-0"x8" DIA SCHEDULE
40 GALVANIZED PIPE FILLED
WITH CONCRETE. PREP
SURFACE AND PAINT WITH
HIGH PERFORMANCE PAINT.
COLOR AS PER OWNER
SLOPE FINISHED
GRADE TO DRAIN
PROVIDE
INTERNAL
SLEEVE
12" DIA
CONCRETE
FOOTING
PAVEMENT LEGEND
4" PCC SIDEWALK
6" PCC PAVEMENT
7" PCC PAVEMENT
T
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
40' Public Sanitary
Sewer Easement
(Bk2008 Pg3729)
32' Existing Public Ingress/
Egress Easement
(Bk2008 Pg3733)
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
55' Existing Private
Surface Water Flowage &
Detention Easement
(Bk2008 Pg3727)
15' Existing Storm
Sewer Easement
(Bk 2008 Pg3728)
40' Existing Sanitary
Sewer Easement
(Bk2008 Pg3729)
10' Existing Underground
Electric Line Easement
(Bk2008 Pg10090)
30' Existing Ingress/
Egress Easement
(Bk2015 Pg7030)
1030
1030
103010311031103110301
0
3
0
1030
1030
1031 1029102810
2
7
102910291028102710261029102810271026BM500
BM501
50
51
52
54
55
Existing
Building
F.F.E.=1031.58
Rim=1028.80
Inv=1012.12 10" PVC N
Inv=1012.33 10" PVC W
Rim=1028.94
Intake=1028.18
F.L.=1021.87 30" RCP E
F.L.=1021.98 30" RCP N
F.L.=1022.20 24" RCP W
F.L.=1023.01 12" RCP S
F.E.S.=1023.37
30" RCP S
Rim=1028.78
Intake=1027.96
F.L.=1022.49 30" RCP N&S
Rim=1028.52
Inv=1011.79 10" PVC N&S
Inv=1012.50 Unknown Pipe W
Inv=1019.31 6" PVC W
Rim=1028.83
Intake=1028.02
F.L.=1022.91 30"
RCP N&S
F.L.=1023.94 15"
CPP W
Rim=1027.92
Inv=1011.27 10" PVC E
Inv=1011.39 10" PVC S
Rim=1030.24
F.L.=1024.33 18" RCP E
F.L.=1024.44 (2)8" CMP W
Rim=1029.78
F.L.=1024.02 24" RCP N
F.L.=1024.02 18" RCP W
F.L.=1024.33 12" RCP S
Rim=1030.79
F.L.=1025.07 12" RCP N&SW
Intake=1029.61
F.L.=1025.31 12" RCP NE
F.L.=1025.46 12" RCP W
Intake=1029.61
F.L.=1024.98 18" RCP E
F.L.=1025.51 15" RCP W
Rim=1030.62
Inv=1013.18 10" PVC E&W
Rim=1029.77
F.L.=1023.25 24" RCP E
F.L.=1023.25 18" RCP W
F.L.=1023.65 12" RCP S
Intake=1029.27
F.L.=1023.89 12" RCP N
Intake=1029.35
F.L.=1024.69 18" RCP NE
F.L.=1024.69 12" RCP SW
Rim=1029.83
F.L.=1024.30 18" RCP E&SW
F.L.=1024.30 18" RCP W
F.F.E.=1031.56
F.F.E.=1031.58
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.60
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.64
F.F.E.=1031.50
F.F.E.=1031.54
F.F.E.=1031.55
F.F.E.=1031.57
F.F.E.=1031.54
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.54
F.F.E.=1031.60 F.F.E.=1031.56
F.F.E.=1031.60
F.F.E.=1031.58
F.F.E.=1031.61
F.F.E.=1031.59
F.F.E.=1031.57
1031.45 TC
1030.95 G
1030.70
1031.50
1031.40
(1030.78)1031.30 TC
1030.80 G
1030.20
1028.20
1028.52
1031.38
1031.11
1031.51 1030.68
1030.56
1029.94
1029.86
(1027.82 TC
1027.32 G)
1028.18 TC
1027.68 G
(1028.10 TC
1027.60 G)
1031.60
1031.601031.60
1031.26
1031.011030.841030.00
1029.78
1029.87
1029.30
1031.60
1031.60
1027.80
(1029.79)
(1029.79)(1029.
9
5)
(10
3
0
.
2
9
)
(1030.27)
(1030.60)(1030.58)
(1030.46)(1030.37)(1030.28)
(1031.08)
(1028.86)
(1029.24)
(1031.00 TC
1030.50 G)
1031.60
1031.34
1031.18
1031.40
1031.40
1031.65 TC
1031.15 G
1030.81 TC
1030.31 G
1030.03 TC
1029.53 G
1030.80
1030.
8
0
1029.29
(1029.20)1031.55 TC1031.05 G1031.55 TC
1031.05 G
1031.55 TC
1031.05 G
1031.60 1031.10(1029.36)
STAGING AREA
(COORDINATE WITH
PROPERTY OWNER)
STABILIZED
CONSTRUCTION
ENTRANCE
●●●●●●●●●●●●●●●●●●SEDIMENT
BASKET
SEDIMENT
BASKET
SILT FENCE
TYP
APPROXIMATE
STOCK PILE
(COORDINATE
SIZE AND LOCATION
WITH OWNER
CONCRETE
WASHOUT 1029.40
1029.87
1030.70 TC
1030.20 G
1029.50 TC
1029.00 G
1029.60 TC
1029.10 G
1029.1
7
TW=1029.00
TW=1029.00
TW=1029.50
TW=1030.00
TW=1030.00
TW=1029.50
1
0
3
0 102910281
0
3
11031
10311029
1031 1030PROPOSED BUILDING
ADDITION
PROPOSED BUILDING
ADDITION
PROPOSED BUILDING
ADDITION
FFE=1031.60
FFE=1031.60
FFE=1031.60
1031.60 1031.60
1031.60
1031.601031.60
1031.60
1030.501031.60 ●●●●●●SILT FENCE
TYP
100YR=1028.47
AREA OF
DISTURBANCE
AREA OF
DISTURBANCE
ULTIMATE DISCHARGE
TO LITTLE WALNUT CREEK
Overflow Elev=1028.70 BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C400120.0903.01
C400SHOTTENKIRK SERVICE ADDITIONGRADING & EROSION CONTROL PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_GRA.dwg LOGAN MYERS, GRADING PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET
0 20
GRADING NOTES
A.UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
INFORMATION AND/ OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE
THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE
UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED.
B.PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT
OCCURS SHALL BE REPAIRED BY THE CONTRACTOR TO THE OWNERS
SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION.
C.PRIOR TO GRADING, THE OWNER/ CONTRACTOR SHALL OBTAIN A GRADING PERMIT.
D.GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER),
UNLESS OTHERWISE NOTED.
E.CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE
SHOWN ON THE PLAN. SILT FENCE AROUND STORM INTAKES SHALL BE MAINTAINED
UNTIL PAVING AND SEEDING/ SODDING ARE COMPLETE.
F. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF ALL
SITE UTILITIES AND IMPROVEMENTS WITH THE ARCHITECTURAL MECHANICAL/
ELECTRICAL/ PLUMBING SYSTEMS INCLUDING ROUTING, CRITICAL DIMENSIONS,
CONNECTIONS, AND INVERT ELEVATIONS.
G.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR
FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES.
H.THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM
NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION
ACTIVITIES.
I.CONTRACTOR TO PROVIDE BELOW GRADE INLET PROTECTION IN ALL STORM SEWER
STRUCTURES.
QUANTITIES
SEEDING AND MULCHING (TYPE 4)0.10 AC
SILT FENCE 325 LF
SEDIMENT BASKETS 2 EA
Post Spacing
(5'-0" max.)
Post Spacing
(5'-0" max.) Variable (20'-0" for a normal 10'-0" wide ditch.)
TYPICAL SILT FENCE DITCH CHECK
Fore
s
l
o
p
e Backslope
1
2" min.
20" min.
ATTACHMENT TO POST
Fabric
Post
Wire or
Cable Ties
Insert 12 inches of fabric a minimum
of 6 inches deep (fabric may be
folded below the ground line).
Reduce post spacing to 5'-0" at water
concentration areas, or as required
to adequately support fence.
1
2 24"
36"
8'-0" Spacing
DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES
1
2
Ground Line Fabric
See plans for spacing.
(Profile View)
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
1
1
'T' Steel
Fence Post
4'-0" min.
Ground line
Fabric
Flow
SILT FENCE
200'-0" max. length per section
(600'-0" if slope is flatter than 5%)
(Plan View)
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
Ground ContoursInstall parallel to
ground contour.
Install "J-hook" at each end of an
individual section of silt fence.
BENCHMARKS
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
IARTN DERIVED - US SURVEY FEET
BM500 N=73890.07 E=144575.73 ELEV=1029.04
NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE
SOUTH END OF ISLAND AT THE SOUTHEAST CORNER OF BUILDING.
BM501 N=74100.92 E=144349.83 ELEV=1032.67
NORTHWEST BURY BOLT ON WATEROUS HYDRANT AT THE
WEST END OF ISLAND AT THE NORTHWEST CORNER OF BUILDING.
T
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
40' Public Sanitary
Sewer Easement
(Bk2008 Pg3729)
32' Existing Public Ingress/
Egress Easement
(Bk2008 Pg3733)
15' Existing Private Storm
Sewer Easement
(Bk2008 Pg3728)
55' Existing Private
Surface Water Flowage &
Detention Easement
(Bk2008 Pg3727)
40' Existing Sanitary
Sewer Easement
(Bk2008 Pg3729)
10' Existing Underground
Electric Line Easement
(Bk2008 Pg10090)
30' Existing Ingress/
Egress Easement
(Bk2015 Pg7030)
1030
1030
103010311031103110301
0
3
0
1031 1029102810
2
7
102910291028102710261029102810271026BM500
BM501
51
52
54
Existing
Building
F.F.E.=1031.58
Rim=1028.80
Inv=1012.12 10" PVC N
Inv=1012.33 10" PVC W
F.E.S.=1023.37
30" RCP S
Rim=1028.78
Intake=1027.96
F.L.=1022.49 30" RCP N&S
Rim=1028.52
Inv=1011.79 10" PVC N&S
Inv=1012.50 Unknown Pipe W
Inv=1019.31 6" PVC W
Rim=1028.83
Intake=1028.02
F.L.=1022.91 30"
RCP N&S
F.L.=1023.94 15"
CPP W
Rim=1027.92
Inv=1011.27 10" PVC E
Inv=1011.39 10" PVC S
Rim=1030.24
F.L.=1024.33 18" RCP E
F.L.=1024.44 (2)8" CMP W
Rim=1029.78
F.L.=1024.02 24" RCP N
F.L.=1024.02 18" RCP W
F.L.=1024.33 12" RCP S
Rim=1030.79
F.L.=1025.07 12" RCP N&SW
Intake=1029.61
F.L.=1025.31 12" RCP NE
F.L.=1025.46 12" RCP W
Rim=1030.62
Inv=1013.18 10" PVC E&W
F.F.E.=1031.56
F.F.E.=1031.58
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.60
F.F.E.=1031.60
F.F.E.=1031.61
F.F.E.=1031.64
F.F.E.=1031.50
F.F.E.=1031.54
F.F.E.=1031.55
F.F.E.=1031.57
F.F.E.=1031.54
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.56
F.F.E.=1031.54
F.F.E.=1031.60 F.F.E.=1031.56
F.F.E.=1031.60
F.F.E.=1031.58
F.F.E.=1031.61
F.F.E.=1031.59
F.F.E.=1031.57
6-SB
5-SB
3-JC 1-AF
3-JC
1-AF
1-AF
4-JC
1030
1030
103010311031103110301
0
3
0
1031 1029102810
2
7
1029102910281027102610291028102710261-AF
G
G
G
G
G
13-JC BYDATEREVISIONMARKScale:Technician:T-R-S:SNYDER & ASSOCIATES, INC. |Checked By:Engineer:Date:1" =Project No:SheetProject No:
Sheet 2727 S.W. SNYDER BLVDANKENY, IOWA 50023515-964-2020 | www.snyder-associates.comEDCLJMKMM11-24-202020'120.0903.01C500120.0903.01
C500SHOTTENKIRK SERVICE ADDITIONPLANTING PLANWAUKEE, IOWAAS PER CITY COMMENTSAS PER CITY COMMENTS 12-08-2012-21-20 LJMLJM 12 28-79-26V:\Projects\2020\120.0903.01\CADD\SP_1200903_LND.dwg LOGAN MYERS, PLANTING PLAN, 2020/12/21, 2:49 PM, ANSI FULL BLEED D (34.00 X 22.00 INCHES)FEET
0 20
PLANT SCHEDULE
QTY KEY BOTANICAL NAME COMMON NAME INSTALL
SIZE COMMENTS
CANOPY TREES
4 AF Acer freemanii 'Jeffersred'AUTUMN BLAZE MAPLE 2" Cal.B&B
EVERGREEN SHRUBS
5'-7' SPREAD
23 JC Juniperus x pfitzeriana 'Sea Green'SEA GREEN JUNIPER 24" Ht.#3 CONT.
(5' O.C.)
DECIDUOUS SHRUBS
3-5' SPREAD
11 SB Spiraea betulifolia 'Tor'TOR SPIREA 18" Ht.#3 CONT.
(3' O.C.)
NO SCALE
DECIDUOUS TREE STAKING DETAIL1
C500NO SCALE
PLANTING PIT DETAILS2
C500
1
1
(AS PER CITY OF WAUKEE SITE PLAN ORDINANCE)
OPEN SPACE AREA REQUIREMENTS:
331,125 S.F. TOTAL LOT AREA x 20%= 66,225 S.F. REQUIRED
92,307 S.F. TOTAL OPEN SPACE PROVIDED (27.88%)
176,977 S.F. OF PARKING AREA SHOWN
176,977 S.F. x 10%= 17,698 S.F. REQ'D INTERIOR PARKING LOT LANDSCAPE AREA
18,623 S.F. INTERIOR PARKING LOT LANDSCAPE AREA PROVIDED
OPEN SPACE PLANTING REQUIREMENTS:
331,125 S.F. TOTAL LOT AREA x 20%= 66,225 S.F. REQUIRED
1 TREE/1,000 S.F. REQ'D OPEN SPACE
·67 TREES REQUIRED
·103 TREES PROVIDED
1 SHRUB/1,000 S.F. REQ'D OPEN SPACE
·67 SHRUBS REQUIRED
·187 SHRUBS PROVIDED
SITE PLAN CHANGES:
---- 4 TREES REMOVED, 4 TREES PROPOSED TO REPLACE
---- 17 SHRUBS REMOVED, 17 SHRUBS PROPOSED TO REPLACE
SCREENING:
4 EVERGREEN SHRUBS PROPOSED TO SCREEN PROPOSED TRANSFORMER
13 EVERGREEN SHRUBS PROPOSED TO SCREEN PROPOSED TRASH ENCLOSURE
PLANTING PLAN GENERAL NOTES
A.UTILITY WARNING:
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR
RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE
SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT
LOCATION INDICATED.
B.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES.
AVOID DAMAGE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO
THE CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE.
COORDINATE AND COOPERATE WITH UTILITY COMPANIES DURING CONSTRUCTION.
C.ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE
"AMERICAN STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION).
D.CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM
DATE OF INSTALLATION.
E. PROVIDE A MIN 3-FOOT PERIMETER RING OF SHREDDED HARDWOOD MULCH AROUND ALL
TREES. PROVIDE VERTICAL CUT NATURAL EDGE TO A DEPTH OF 4-INCHES.
F.SOD ALL AREAS DISTURBED BY CONSTRUCTION, UNLESS DIRECTED BY OWNER OR SHOWN
OTHERWISE ON THE LANDSCAPE PLAN.
G.PROVIDE SHREDDED HARDWOOD MULCH WHERE SHOWN.
PLANTING PLAN REQUIREMENTS
Certified Service
Q U I C K L U B E
AYERS DESIGN GROUPARCHITECTSPhone: (515) 229-3336email: rich@adgarchitect.netAddress: 6876 Harding StreetIndianola, Iowa
AYERS DESIGN GROUPARCHITECTSPhone: (515) 229-3336email: rich@adgarchitect.netAddress: 6876 Harding StreetIndianola, Iowa