Loading...
HomeMy WebLinkAbout2021-04-05-J01U Traffic Signal System Enhancements_Pmt Est 2CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 5, 2021 AGENDA ITEM:Consideration of approval of Partial Payment No. 2 to Iowa Signal, Inc. for the Traffic Signal System Enhancement Project in the amount of $159,623.20. FORMAT:Action SYNOPSIS INCLUDING PRO & CON: Iowa Signal, Inc. has requested a partial payment for the Traffic Signal System Enhancement Project in the amount of $159,623.20. Snyder & Associates, Inc. has reviewed the payment estimate and recommends payment. Partial Payment No. 2 is for the period July 1, 2020 to March 1, 2021. Payment is for traffic control, mobilization, advance radar and video detection system equipment installation, and stopline video detection system equipment installation. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $159,623.20 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Partial Payment No. 2 ATTACHMENTS: I. Letter of Recommendation II. Partial Payment Application No. 2 PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: AGENDA ITEM: J1U 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2019\119.0727.01\construction\ltr_2021-03-17_payapp2.docx March 17, 2021 Rudy Koester, P.E. Public Works Director City of Waukee 805 University Ave Waukee, IA 50263 RE: PARTIAL PAYMENT APPLICATION NO. 2 TRAFFIC SIGNAL ENHANCEMENT PROJECT - DETECTION DOT PROJECT NO.: ICAAP-SWAP-8177(624)--SH-25 S&A PROJECT NO.: 119.0727.01 Dear Mr. Koester: Partial payment application #2 is for the installation of most of the detection equipment for the Traffic Signal Enhancement Project that was let through the DOT. We are working through some detection concerns with Iowa Signal and General Traffic (vendor of most equipment). We are working with Iowa Signal to prepare a change order to add video detection at the University Ave & Alice’s Rd/Grand Prairie Pkwy intersection to the project as well. Attached the partial payment application #2 for the project. We recommend payment of $159,623.20 to the contractor, Iowa Signal, Inc. for the project installation so far. This represents 95% of the project withholding retainage. Please contact me should you have any questions regarding this partial pay application. Sincerely, SNYDER & ASSOCIATES, INC. Todd Knox, P.E., PTOE Project Manager Enclosure (if applicable) cc: Wayne Lesley, Iowa Signal PROJECT: Traffic Signal System Enhancement Project IOWA DOT PROJECT NO.: ICAAP-SWAP-8177(624)--SH-25 OWNER: Waukee CONTRACTOR: Iowa Signal, Inc. ADDRESS: 3711 SE Capitol Circle, Grimes, IA 50111 DATE: 3/15/2021 PAYMENT PERIOD: 7/1/2020 to 3/1/2021 1. CONTRACT SUMMARY: Original Contract Amount:543,350.00$ CONTRACT PERIOD: COMPLETION DATE Contract Completion Date: Net Change by Change Order: -$ Contract Amount to Date: 543,350.00$ 2. WORK SUMMARY:Extension by Change Order: 0 Total Work Performed to Date:511,650.00$ Retainage: 3%$15,349.50 Total Earned Less Retainage:$496,300.50 Less Previous Applications for Payment: $336,677.30 AMOUNT DUE THIS APPLICATION:$159,623.20 3. CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with the Work covered by prior Applications for Payment; and (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by the application for Payment are free and clear of all liens, claims, security interests, and encumbrances Iowa Signal, Inc. CONTRACTOR By DATE: 4. ENGINEER'S APPROVAL: Payment of the above AMOUNT DUE THIS APPLICATION is recommended: Snyder & Associates, Inc. ENGINEER By DATE: 5. OWNER'S APPROVAL OWNER By DATE: APPLICATION FOR PARTIAL PAYMENT NO. 1 V:\Projects\2019\119.0727.01\Construction\PayApp02_2021-02-02_RemainingWork.xlsx 3/16/2021 3/17/21 6. DETAILED ESTIMATE OF WORK COMPLETED: ITEM PLAN COST QTY. COST NO. DESCRIPTION QTY. TOTAL TO DATE TOTAL 1. Traffic Control 1 LS 2,500.00$ 2,500.00$ 1 2,500.00$ 2. Mobilization 1 LS 5,000.00$ 5,000.00 1 5,000.00 3. Advance Radar Detection System 7 EACH 17,000.00$ 119,000.00 6 102,000.00 4. Advance Video Detection System 5 EACH 14,700.00$ 73,500.00 4 58,800.00 5. Stopline Video Detection System 14 EACH 24,525.00$ 343,350.00 14 343,350.00 TOTAL ORIGINAL CONTRACT = 543,350.00$ 511,650.00$ CHANGE ORDER SUMMARY: TOTAL CHANGE ORDERS = -$ -$ TOTAL CONTRACT & CHANGE ORDERS $543,350.00 511,650.00$ UNIT UNIT COST COMPLETED WORKCONTRACT ITEMS CO # V:\Projects\2019\119.0727.01\Construction\PayApp02_2021-02-02_RemainingWork.xlsx