HomeMy WebLinkAbout2021-04-19-I01R Library Stormwater Improvements_Change Order 5AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 19, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 5 to Elder Corporation for the Waukee Public Library Stormwater Improvements increasing the contract amount by $8,114.40. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 5 is for erosion control matting placed on the steeper slopes around the pond and along the south entrance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $8,114.40. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 5 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1R Project# 4185870 April 12th, 2021 TO: Rudy Koester City of Waukee 805 University Ave Waukee IA, 50263 RE: Change Order #5 Waukee Public Library Stormwater Improvements SH Project Number 4185870 Mr. Koester, Please find attached Change Order #5 for the Waukee Public Library Stormwater Improvements. The change order includes the following items: · Erosion Control Matting The erosion control matting is to be placed on steep slopes around the perimeter of the pond and on the southern slope of the property. The matting will help protect the seeding that has been installed in these areas. The matting will also help to prevent erosion caused by stormwater. We have reviewed the change order items and unit prices, both are line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $8,114.40 to the construction contract for the Waukee Public Library Stormwater Improvements with Elder Corporation of Pleasant Hill, IA. Sincerely, Shive-Hattery, Inc. Nathan Hardisty, PE Project Manager Enc. Change Order #5 City of Waukee 230 W Hickman Road Waukee, IA 50263 Distribution: Owner __X__ Engineer __X__ Contractor __X__ Contractor: 5088 East University Ave Pleasant Hill, IA 50327 $2,162,580.00 May 4, 2020 CO-5.1 SQ $24.15 336 $8,114.40 $8,114.40 $2,162,580.00 $9,550.00 $2,172,130.00 $8,114.40 $2,180,244.40 0.82% 0 Days June 15, 2021 CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Erosion Control Blanket Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 5 The Contract Time will be changed by TOTAL The Original Contract Sum was Unit April 12, 2021 Contractor: Elder Corporation Elder Corporation Signature: Name: Title: Date: Waukee Public Library Stormwater Improvements 4185870 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description THE CONTRACT IS CHANGED AS FOLLOWS: Change Order Item CO-5.1 is to add an erosion control blanket to the project. The erosion control blanket will be placed in areas with steep slopes, specifically around the pond and the slope on the south side of the driveway. The ersoin control blanket will help reduce the erosion of these slopes and aid in the establishment of the seeding of these areas. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Signature: Name: Nathan T. Hardisty, PE Title: Project Manager 1 of 1P:\Projects\DM\4185870\Construction\Library\CASupport\Change Orders\CO #5\Waukee Public Library Stormwater Improvements Change Order #5.xlsx