CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: May 3, 2021
AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Jiffy Lube
(130 W. Hickman Road)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: Terraform Companies, requests approval of a site plan for
a 3,000 square foot building for a Jiffy Lube. The proposed building includes
four service garage spaces for oil changes. A trash enclosure is provided to the
south of the building and a monument sign is proposed at the northwest corner
of the site along Hickman Road.
The applicant has provided elevations for the proposed building on the site,
which meets the intent of the architectural guidelines within the Site Plan
Ordinance.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed this project at the April 27, 2021 Commission Meeting and recommended
approval subject to remaining staff comments:
Approval of a Site Plan for Jiffy Lube (130 W. Hickman Road)
Senior City Planner, Melissa DeBoer, introduced the request for approval of a site plan for a
commercial development as submitted by the applicant, Terraform Companies. The subject property is
generally located south of W Hickman road and west of Warrior Lane, containing approximately 1.00
acre.
Mrs. DeBoer advised that the site plan identified the construction of a single story 3,000
square foot building to be used as a drive-through oil change shop for Jiffy Lube. The proposed
building includes a total of four service garage spaces. A trash enclosure is identified to the south of
the building and a monument sign is proposed at the northwest corner of the site. Access to the site is
provided from the surrounding properties through the use of blanket access agreement and shared
ingress/egress easements. A total of 20 parking spaces are identified and 8 queuing spaces. The
existing sidewalk along Laurel Street are proposed to be torn out and replaced during the utility
extensions for the site. All landscape, open space, and lighting requirements have been met at this
time.
Staff would recommend approval of the site plan for Jiffy Lube subject to remaining staff
comments.
J2
Commissioner Ward moved to approve the Site Plan for Jiffy Lube (130 W. Hickman Road)
subject to remaining staff comments. Commissioner Inman seconded the motion. Ayes: Streit, Koshy,
Inman, Conley, Ward, and Hoifeldt. Nays: None. Motion Carries.
STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to
remaining staff comments.
RECOMMENDATION: Approve the resolution subject to remaining staff comments.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Melissa DeBoer, Senior Planner
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2021-
APPROVING THE SITE PLAN FOR JIFFY LUBE
(130 W. HICKMAN ROAD)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for Jiffy Lube, subject to remaining staff comments on April 27, 2021; AND,
WHEREAS, the Site Plan for Jiffy Lube is in general conformance with §160 – Site and
Building Development Standards Ordinance of the Waukee Municipal Code; AND,
WHEREAS, the Site Plan for Jiffy Lube is in general conformance with §161 – Landscaping
and Open Space Ordinance of the Waukee Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 3rd day of May, 2021 that the Site Plan for Jiffy Lube is approved subject to remaining staff
comments.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Jiffy Lube – Site Plan PREPARED BY: Melissa DeBoer, AICP – Senior Planner
REPORT DATE: April 23, 2021
MEETING DATE: April 27, 2021
GENERAL INFORMATION
Applicant: Terraform Companies
Owner:
Waukee Properties Partnership
Project Manager: Erin Ollendike, P.E. – Civil Design Advantage, LLC
Request: The applicant is requesting approval of a site plan
for a drive-through oil change shop for a Jiffy Lube.
Location and Size: Property is located south of W Hickman Road and
west of Warrior Lane, containing approximately
1.00 acre.
Property Address: 130 W. Hickman Road
AREA MAP
ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area.
April 23, 2021
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant – Undeveloped Mixed Use C-1 (Community & Highway
Service Commercial District)
North Undeveloped – Currently in
process of constructing a Hy-
Vee Fast & Fresh
Mixed Use C-1 (Community & Highway
Service Commercial District)
South Single Family Residential Single Family Residential R-2 (One and Two Family
Residential District)
East Multi-Tenant Commercial Mixed Use C-1 (Community & Highway
Service Commercial District)
West Commercial – Sherwin
Williams
Mixed Use C-1 (Community & Highway
Service Commercial District)
PROJECT DESCRIPTION
The project involves the construction of a building that is proposed to be approximately 3,000 square feet in
area. The proposed building includes four service garage spaces for oil changes. The customer will enter the
garage on the south side and exit on the north side. A trash enclosure is shown to the south of the building
and a monument sign is proposed at the northwest corner of the site along Hickman Road.
ACCESS AND PARKING
There are several accesses into this site from the surrounding properties. A blanket access agreement and
shared ingress/egress easements are in place to allow access to and from adjace nt sites.
A total of 7 parking spaces and 8 queuing spaces are required for this site and they are providing a total of 20
parking spaces, including 4 service bays, and 8 queuing spaces. The proposed site plan meets the parking
requirements of the ordinance.
SIDEWALKS/TRAILS
A five-foot wide sidewalk already exists on the south side of the site along Laurel Street. Portions of this
sidewalk will be removed and replaced with the utility connections for this site.
UTILITIES
All utilities will be provided to this site. Sanitary sewer and gas services are provided off of Laurel Street.
Water service will be provided off of the existing water main to the north of the proposed building.
Storm water detention will be provided with the shared detention basin located on the property to the east.
LANDSCAPING & OPEN SPACE
A minimum of 20% of the project area is required to be open space. The total amount of open space
proposed is 42%. The applicant has provided the required amount of plantings per the landscaping ordinance.
ELEVATIONS
The elevations of the building are proposed to be constructed primarily of stone, EIFS, overhead doors and
storefront glazing. The trash enclosure is proposed to be constructed of split faced concrete block.
April 23, 2021
3 of 3
MISCELLANEOUS
The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the
lighting requirements of the Site Plan Ordinance.
STAFF RECOMMENDATION
Staff recommends approval of the site plan for Jiffy Lube subject to remaining staff comments.
3405 SE CROSSROADS DR. SUITE G, GRIMES, IOWA 50111PH: (515) 369-4400 Fax: (515) 369-4410CIVIL DESIGN ADVANTAGEUTILITY WARNINGCONSTRUCTION SCHEDULEDEVELOPMENT SUMMARYSUBMITTAL DATESPROJECT SITE ADDRESSSURVEYORZONINGOWNER INDEX OF SHEETSVICINITY MAPGENERAL LEGENDENGINEERLEGAL DESCRIPTIONDATE OF SURVEYllllllBENCHMARKSwww.iowaonecall.com1-800-292-8989ONE CALLIOWAONE CALLKnow what'sbefore you dig.below.CallSITE PLAN FOR:WAUKEE, IOWASITEPRELIMINARYJIFFY LUBE - WAUKEE Jiffy LubeJiffy LubeAPPLICANTNOTESIMPERVIOUS AREA
S89°58'46"E 116.80'S00°05'58"W 372.30'N89°49'58"W 116.63'N00°04'22"E 372.00'
CIVIL DESIGN ADVANTAGE2011.667ENGINEER: EKO EI: GH
REVISIONS DATE
WAUKEE, IOWA FIRST SUBMITTAL 02/02/2021
PHONE: (515) 369-4400 FAX: (515) 369-4410
3405 S.E. CROSSROADS DRIVE, SUITE G
GRIMES, IOWA 50111JIFFY LUBE
SECOND SUBMITTAL 03/09/2021
THIRD SUBMITTAL 04/06/2021PAVEMENT THICKNESSSIGN LEGENDVANACCESSIBLETRAFFIC CONTROL NOTESGENERAL NOTESDIMENSION PLAN2.0INTEGRAL 6" STANDARD CURB12" SUBGRADE PREPARATIONACCESSIBLE PARKING SIGN ON POST
CIVIL DESIGN ADVANTAGE2011.667ENGINEER: EKO EI: GH
REVISIONS DATE
WAUKEE, IOWA FIRST SUBMITTAL 02/02/2021
PHONE: (515) 369-4400 FAX: (515) 369-4410
3405 S.E. CROSSROADS DRIVE, SUITE G
GRIMES, IOWA 50111JIFFY LUBE
SECOND SUBMITTAL 03/09/2021
THIRD SUBMITTAL 04/06/2021DETAILED GRADING PLANGRADING NOTESAREA OF DISTURBANCE = 0.73 ACGRADING PLAN3.0GRADING PLAN
Rl llll l l l l l l l l l l l l
l
llllllllllllll
llllllllllllllllllll l l l l l l l l l l l l l l l
l
l
l
lllllllllllll
llllllDA #10.73 AC(TOTAL AREA)CIVIL DESIGN ADVANTAGE2011.667ENGINEER: EKO EI: GH
REVISIONS DATE
WAUKEE, IOWA FIRST SUBMITTAL 02/02/2021
PHONE: (515) 369-4400 FAX: (515) 369-4410
3405 S.E. CROSSROADS DRIVE, SUITE G
GRIMES, IOWA 50111JIFFY LUBE
SECOND SUBMITTAL 03/09/2021
THIRD SUBMITTAL 04/06/2021EROSION AND SEDIMENT CONTROL PLAN4.0RllllSWPPP LEGENDDISCHARGE POINT SUMMARYSTABILIZATION QUANTITIESNOTES:EROSION AND SEDIMENT CONTROL PLANJIFFY LUBEJIFFY LUBEVICINITY MAPSITE
CIVIL DESIGN ADVANTAGE2011.667ENGINEER: EKO EI: GH
REVISIONS DATE
WAUKEE, IOWA FIRST SUBMITTAL 02/02/2021
PHONE: (515) 369-4400 FAX: (515) 369-4410
3405 S.E. CROSSROADS DRIVE, SUITE G
GRIMES, IOWA 50111JIFFY LUBE
SECOND SUBMITTAL 03/09/2021
THIRD SUBMITTAL 04/06/2021UTILITY NOTESSW-203 SANITARY CLEANOUTUTILITY PLAN5.0DOWNSPOUT CONNECTION WITH TEE
PLANT SCHEDULECIVIL DESIGN ADVANTAGE2011.667ENGINEER: EKO EI: GH
REVISIONS DATE
WAUKEE, IOWA FIRST SUBMITTAL 02/02/2021
PHONE: (515) 369-4400 FAX: (515) 369-4410
3405 S.E. CROSSROADS DRIVE, SUITE G
GRIMES, IOWA 50111JIFFY LUBE
SECOND SUBMITTAL 03/09/2021
THIRD SUBMITTAL 04/06/2021
LANDSCAPE PLAN6.0LANDSCAPE NOTESOPEN SPACE REQUIREMENTSMINIMUM PLANTING REQUIREMENTS25' BUFFER REQUIREMENTS (SOUTH)