HomeMy WebLinkAbout2021-05-17-I01O Alices Rd-170th St Transmission Line Relocation Phase 2_Award QuoteAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 17, 2021 AGENDA ITEM:Consideration of approval of resolution awarding quote [Alice’s Road/170th Street Transmission Line Relocation Phase 2 Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: This project includes the furnishing of all labor, equipment, and non-owner supplied materials for the construction of the 170th Street Transmission Line Relocation project described as follows: Natural gas pipeline in-service lowering of approximately 1,700 feet of 8-inch epoxy coated steel gas pipeline including, surface restoration and miscellaneous associated work, including cleanup. Quotes were received on Monday, May 10, 2021 with two quotes received, NPL of Lakeville, MN in the amount of $129,583.00 and Infrasource of Lenexa, KS utilizing the current T&E rates included in the contract with the City of Waukee. NPL was the apparent low quote. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $129,583.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommend approval of the resolution awarding quote [Alice’s Road/170th Street Transmission Line Relocation Phase 2 Project] to NPL Lakeville, MN. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Quotes II. Resolution III. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Tim Royer I1O THE CITY OF WAUKEE, IOWA RESOLUTION 2021- AWARDING QUOTE FOR 170TH STREET TRANSMISSION LINE RELOCATION PHASE 2 PROJECT IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA BE IT RESOLVED BY THE CITY COUNCIL OF WAUKEE, IOWA: That the following quote for certain public improvements described in general as 170th Street Transmission Line Relocation Phase 2 Project and described in the Request for Quotes that was provided to vendors be and is hereby accepted, the same being the lowest responsible quote received for such work, as follows: Contractor: NPL of Lakeville, MN Amount of quote: $129,583.00 PASSED AND APPROVED this 17th day of May, 2021. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair Utility Safety & Design, Inc. 28847 US Highway 136 Unionville, MO 63565 P (660) 947-3316 F (660) 552-4602 SHELBYVILLE, KENTUCKY PO Box 727 Shelbyville, KY 40066 Office/Fax (502) 513-5127 BELLEVILLE, ILLINOIS 9 Executive Woods Court, Suite 1 Belleville, IL 62226-2016 P (618) 277-1520 F (618) 277-1586 OLNEY, ILLINOIS 1927 Miller Drive Olney, IL 62450 P (618) 392-5502 F (618) 392-2261 May 11, 2021 Mr. Tim Royer, Assistant Dir. of Public Works City of Waukee 805 University Avenue Waukee, IA 50263 troyer@waukee.org RE: 170th Street Transmission Line Relocation Phase 2 Dear Mr. Royer, USDI has reviewed the quotes from two contractors for the above referenced project. The apparent low quote is NPL of Lakeville, MN. Their quote amount was $129,583.00. Today, I spoke with Mr. Theis at NPL and explained to him that his exceptions for traffic control and water pumps must be included with the cost and proposed scope of work. He was agreeable to include the cost of traffic control and water pumps in their proposed quote without modification. I do have previous experience working with NPL on other natural gas pipeline projects. They are a qualified and experienced contractor. At this time, I see no reason to not award the quote to NPL, with the stipulation that there are no exceptions or adders to their quote. Please feel free to contact me anytime if you have any questions or require additional information. Respectfully Submitted, Anthony Everette, P.E. Senior Vice-President Engineering USDI Attach: As noted C:\Users\Becky\Desktop\Gas Main Lowering Quote Tabulation.doc QUOTE TABULATION Alice’s Road Gas Main Lowering Quotes opened: Monday, May 10, 2021 3:00 p.m. Waukee City Hall Present for quote opening: Assistant Public Works Director of Operations Tim Royer City Clerk Becky Schuett Quotes Received: Total Quote 1)NPL $114,885.00 + Lakeview, MN $14,68.000 for optional hydro mulch 2)InfraSource Pursuant to current T&E contract rates Ann Arbor, MI