HomeMy WebLinkAbout2021-06-07-J01zNN Triumph Park_Change Order 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 7, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 3 to Larson Construction, Co., Inc., for the Triumph Park Project increasing the contract in the amount of $36,117.97. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 to Larson Construction, Co., Inc., is for: Item #1: The cost provided for this change was at the request of the design team and City Staff. After reviewing installation details of the infield materials we met with Iowa Sports Turf and reviewed the new drainage system that was added to the Northwest High School Fields. We are adding in a vertical drain tile along all backstops and dugout faces. With that we eliminated some 6” drainage tile in this area, but it will provide improved drainage throughout. This change in drainage approach addressed the common problem areas that are typically created around the backstop and dugouts of the fields. We believe that this is an investment that will pay itself back quickly in the time it saves in working on these areas during and after rain events. Total: $16,700.00 (12 fields) Item #2: This work was also an adjustment that was asked for by the design team and City Staff. In seeing the installation of the fence posts on Fields 11 and 12, we decided that the fence was too close to the edge of the parking stalls. To provide more protection to those cars, we have replaced the 6’ standard fence with 12’ fencing for about 100’ on each of the fields. As City staff and design team were considering this adjustment we identified two additional locations that we believe would provide additional safety measures for the complex. Field #8 we adjusted the 6’ fence to a 12’ fence for about 90’ to provide added protection to the miracle field seating areas. Field #5 was also adjusted by the same height and distance to further protect the parking lot drop off drive. After visiting a few more complexes staff noticed multiple locations where increasing the fence height add safety, but also allowed additional age groups to play on certain fields. The baseball pod will now be able to facilitate up to 14U baseball games. Total: $19,417.97 The construction contingency for this project is $590,000. The total of change order #1 - #3 is $207,856.19, roughly 1% of the total construction project. With construction so far along on the first and second pod of fields, concession stands and maintenance building the design team believes that we are well over 50% of the exposure to future change orders. City Staff and design team believe that the changes that have been made are a result of careful analysis to make sure the project is done correctly J1NN and avoid future maintenance costs. The quantities and pricing have been discussed, analyzed and agreed upon by the contractor and the design team after several meetings. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Change Order RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 3 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: May 27, 2021 Mr. Matt Jermier, Director Waukee Parks and Recreation Department City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #3 Triumph Park Dear Mr. Jermier: Attached please find Change Order #3 totaling the amount of $36,117.97, for approval and signature by Waukee City Council. Quantities have been reviewed and agreed upon by the contractor, City staff, and Confluence. This Change Order accounts for two separate items: Item #1: (Field Drainage Tile) $16,700.00 The cost provided for this change was at the request of the design team and the owner. In reviewing installation details of the infield materials we met with the contractor and reviewed the new drainage system that was added to the Waukee fields during their project. We are adding in a vertical drain tile along all backstops and dugout faces. With that we eliminated some 6” drainage tile in this area, but it will provide improved drainage throughout. This change in drainage approach addressed the problem areas that are typically created around the backstop and dugouts of the fields. We believe that this is an investment that will pay itself back quicky in the time it saves in working on these areas after rain events. Item #2: (Fence Height Adjustment) $19,417.97 This work was also an adjustment that was asked for by the design team. In seeing the installation of the fence posts on Fields 11 and 12, we decided that the fence was too close to the edge of the parking stalls. To provide more protection to those cars, we have replaced the 6’ standard fence with 12’ fencing for about 100’ on each of the fields. In concert with reviewing this field we re-visited the concept of doing something similar to fields #5 and #8 as they have similar issues. On field #8 we adjusted the 6’ fence to a 12’ fence for about 90’ to provide added protection to the miracle field seating areas. Field #5 was also adjusted by the same height and distance to further protect the parking lot drop off drive. Confluence recommends approval of CO with payment as indicated. If there are any questions, please let me know. Respectfully, Confluence City of Waukee ___________ ____________________________________ Matthew O. Carlile, PLA, ASLA. LEED AP Tim Moerman Principal City Administrator 525 17TH STREET DES MOINES, IA 50309 RE: Triumph Park Scope of work to be done: Cost Summary: Subcontractors 15,670.00$ Supplier -$ LCCI -$ Sub-Total 15,670.00$ 2.5% OH&P (Subcontractors)391.75$ 5% OH&P (LCCI/Suppliers)-$ 0.75% Bond 120.46$ TOTAL 16,182.21$ Respectfully, Jeff Mertz Larson Construction Co., Inc. Per Proposed changes to revise 2" and 6" drain tile per the attached drawings at the eight practice field and the twelve paying fields. Independence, Iowa 50644 PO Box 112 Phone 319.334.7061 www.larsonconst.com May 6, 2021 Change Order Request #013r1 COMMERCIAL AND INDUSTRIAL GENERAL CONTRACTORS ITEM #Company Description Quantity Unit Labor Material Bid Form Unit Cost Lump Sum TOTAL 1 Iowa Sports Turf Revision to drain tile and grade 1 ls 15,670.00$ 15,670.00$ 2 Elder Corporation Adjustment of final grade 1 ls 0.00$ 0.00$ 3 ls -$ -$ 4 ls -$ -$ 5 ls -$ -$ 6 ls -$ -$ 7 ls -$ -$ 8 ls -$ -$ 9 ls -$ -$ 10 ls -$ -$ 11 ls -$ -$ 12 ls -$ -$ 13 ls -$ -$ 14 ls -$ -$ 15 ls -$ -$ 15,670.00$ Change Order Request #013r1 - Subcontractors TOTAL Line Total $15,670.00 Subtotal $15,670.00 $0.00 0.00% Sales Tax $- Total $15,670.00 Thank you for your business! One Line Drive, Des Moines, IA 50309 Phone: 515.202.5120 Fax: 515.243.5152 caseys@iowasportsturf.com All these changes result in an add If you have any questions concerning this quote, contact Casey Scheidel. Special Notes and Instructions Above information is not an invoice and only a price for the services/goods described above. Quote is valid for 30 days. Please confirm your acceptance of this quote by signing this document Signature Print Name Date Practice Fields- Remove 2" Add 6" collector Softball- Remove 6"- 1,168 LF Add 6"- 456 LF Add 1"x6"- 2,744 LF Description Baseball- Remove 6"- 892 LF Add 6"-232 LF Add 1"x6"- 1,848 LF Quote May 6, 2021 Customer:Quote/Project Description Larson Construction Triumph Park Drainage Change 525 17TH STREET DES MOINES, IA 50309 RE: Triumph Park Scope of work to be done: Cost Summary: Subcontractors 18,220.00$ Supplier -$ LCCI -$ Sub-Total 18,220.00$ 5% OH&P (Subcontractors)911.00$ 10% OH&P (LCCI/Suppliers)-$ 1.5% Bond 286.97$ TOTAL 19,417.97$ Respectfully, Jeff Mertz Larson Construction Co., Inc. Per PR #03 Fencing Revisions Independence, Iowa 50644 PO Box 112 Phone 319.334.7061 www.larsonconst.com May 19, 2021 Change Order Request #016 COMMERCIAL AND INDUSTRIAL GENERAL CONTRACTORS ITEM #Company Description Quantity Unit Labor Material Bid Form Unit Cost Lump Sum TOTAL 1 DSM Fence Revisions to poles and fabric 1 ls 18,220.00$ 18,220.00$ 2 ls -$ -$ 3 ls -$ -$ 4 ls -$ -$ 5 ls -$ -$ 6 ls -$ -$ 7 ls -$ -$ 8 ls -$ -$ 9 ls -$ -$ 10 ls -$ -$ 11 ls -$ -$ 12 ls -$ -$ 13 ls -$ -$ 14 ls -$ -$ 15 ls -$ -$ 18,220.00$ Change Order Request #016 - Subcontractors TOTAL thinkconfluence.com PR-03 Scope Revision 1. Removed: 6’ Chain link fence line posts a. Field 5: 10 EA b. Field 8: 10 EA c. Field 11: 11 EA d. Field 12: 11 EA e. TOTAL REMOVED: 42 posts 2. Removed: 6’ Chain link fence fabric a. Field 5: 89.8 LF b. Field 8: 89.8 LF c. Field 11: 98.7 LF d. Field 12: 98.7 LF e. TOTAL REMOVED: 377 LF 3. Demolition: 6’ Chain link fence line post demolition a. Field 11: 11 posts b. Field 12: 11 posts c. TOTAL DEMO: 22 posts DATE: 05-18-2021 PROJECT: Triumph Park PROJECT #: 17393-02 LOCATION: Waukee, Iowa OWNER: City of Waukee Parks and Recreation CONSULTANT: Confluence CONTACT: John Aceto 525 17th Street Des Moines, IA 50309 jaceto@thinkconfluence.com 515-288-4875 This Proposal Request (PR) forms a part of the Contract Documents for the project. The Proposal Request modifies the original bidding documents dated July 23, 2020 with amendments and additions noted below. The contractor shall issue a proposal of adjusted contract sum for the proposed modifications. PR-03 / TRIUMPH PARK / 17393-02 Page 2 of 2 thinkconfluence.com 4. Addition: 12’ Chain link fence posts a. Field 5: 10 EA b. Field 8: 10 EA c. Field 11: 11 EA d. Field 12: 11 EA e. TOTAL ADDITIONAL: 42 EA 5. Addition: 12’ Chain link fence fabric a. Field 5: 89.8 LF b. Field 8: 89.8 LF c. Field 11: 98.7 LF d. Field 12: 98.7 LF e. TOTAL ADDITIONAL: 377 LF Attachments 1. 1 PR-3 – 1 page 2. 2 PR-3 – 1 page 3. 3 PR-3 – 1 page End of PR-03 REF. DWG. CONFLUENCE PROJECT NO: 09XXX SCALE: NOT TO SCALE SHEET L309 01 CONFLUENCE PROJECT NO: 17393-02 DATE: 05-18-2021 PR-03 TRIUMPH PARK WAUKEE, IOWA 1"=30' 1 PR-03 BARRIER FENCING: BASEBALL QUAD1 FIELD 12FIELD 11REMOVE ELEVEN (11) 6'-0"POSTS, REPLACE WITHELEVEN (11) 12'-0" POSTS.REMOVE ELEVEN (11) 6'-0"POSTS, REPLACE WITHELEVEN (11) 12'-0" POSTS.98.7'98.7' REF. DWG. CONFLUENCE PROJECT NO: 09XXX SCALE: NOT TO SCALE SHEET L302 02 CONFLUENCE PROJECT NO: 17393-02 DATE: 05-18-2021 PR-03 TRIUMPH PARK WAUKEE, IOWA 1"=30' 2 PR-3 BARRIER FENCING: SOFTBALL QUAD01FIELD 8FIELD 5MIRACLEFIELDREPLACE TEN (10) POSTSWITH 12'-0" CHAIN LINK89.8'89.8'L305REPLACE TEN (10) POSTSWITH 12'-0" CHAIN LINK 6'-0"6"3'-6" MIN.1'-0"4'-0" MIN.6'-0"12'-0"1'-0"10'-0" MAX.9 GA. CHAINLINK FABRIC4'-0" MIN.12" WIDE PCCMOW STRIPOUTFIELDWINDSCREENPROTECTIVEFENCE CAP,TYP.LINE POST,SPACE 10'-0"MAX.LINE POST CAPBOTTOM RAILTOP RAILTOP RAILTENSION BARBRACE RAILTERMINALDOME CAPTERMINAL POSTFINISH GRADEPROTECTIVE FENCE CAP, TYP.OUTFIELDWINDSCREEN12" WIDE PCC MOW STRIP4'-0"1'-0"4'-0"6' FENCE LINE POST12' FENCE TERMINAL POSTFINISH GRADEREF. DWG. SCALE: NOT TO SCALE SHEET 03 CONFLUENCE PROJECT NO: 17393-02 DATE: 05-18-2021 PR-03 TRIUMPH PARK WAUKEE, IOWAN.T.S3 PR-3ELEVATION: 12' CHAIN LINK FENCE1L508N.T.S3 PR-3ELEVATION: 6' FENCE TO 12' FENCE2