Loading...
HomeMy WebLinkAbout2021-06-21-H04B Douglas Pkwy Extension_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 21, 2021 AGENDA ITEM:Consideration of approval of a resolution awarding contract [Douglas Parkway Extension Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The project is to extend Douglas Parkway from NE Badger Lane to N Warrior Lane and add a turn lane on Warrior Lane to Hickman Road, located north of Hickman Road in the City of Waukee Iowa. The construction consists of approximately 450 square yards (SY) of pavement removal, 4,220 SY of 9” Reinforced P.C.C., 4,000 SY of subgrade preparation, 4,850 SY of modified subbase, 1,100 SY of sidewalk and trail pavement, 1 sanitary sewer manhole, 200 LF of 15-inch storm sewer, 200 LF of 36-inch storm sewer, drainage structures, miscellaneous grading, site restoration, survey, traffic control, and other associated work. The City received bids on June 8, 2021 with four (4) contractors submitting bids. Absolute Concrete Construction, Inc. of Slater, IA, submitted the low bid in the amount of $919,069.00 which is approximately 33% under the engineer’s estimate of $1,377,532.00. This project is included in the approved FY 2022 Capital Improvements Plan approved by City Council in March 2021 with a total project budget of $1,865,000. This project has a completion date of May 27, 2022. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $919,069.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommends awarding the project to Absolute Concrete Construction, Inc. in the amount of $919,069.00. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Bid Tab III. Resolution PREPARED BY:Beth Richardson REVIEWED BY: Rudy Koester RK H4B RESOLUTION 2021- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE DOUGLAS PARKWAY EXTENSION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the Douglas Parkway Extension, described in the plans and specifications heretofore adopted by this Council on June 21, 2021, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Absolute Concrete Construction, Inc., of Slater, IA Amount of bid: $919,069.00 Portion of project: All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 21st day of June, 2021. Mayor ATTEST: City Clerk June 8, 2021 City of Waukee Becky Schuett, City Clerk 230 W. Hickman Road Waukee, IA 50263 RE: Douglas Parkway Extension Recommendation of Award Project No.: A13.122515 Dear Becky Schuett: At 2:00 pm on June 8, 2021 bids were received for the Douglas Parkway Extension project. The Engineer’s Estimate for the base bid of the project was $1,377,532.00. Four bids were received, all bidders were responsive, and bids for base bid are summarized as follows: Bidder Amount Absolute Concrete Construction, Inc $919,069.00 Elder Corporation $1,063,586.01 Concrete Technologies Inc $1,086,805.50 Alliance Construction Group LLC $1,141,575.35 The bid received from Absolute Concrete Construction, Inc was 33.28% below the engineers estimate for the project, and was determined to be the lowest responsive, responsible bidder. Bolton & Menk, Inc. has reviewed the bid documents submitted and checked references on this bidder and was satisfied with responses given. Therefore, Bolton & Menk, Inc. recommends award of the Douglas Parkway Extension project to Absolute Concrete Construction, Inc, for the bid amount of $919,069.00 (NINE HUNDRED NINETEEN THOUSAND SIXTY NINE DOLLARS AND ZERO CENTS). The bid tabulation is attached for your use. Feel free to contact me should there be any questions related to this project. Sincerely, Charles Kahlsdorf, P.E., PMP Project Manager BOLTON & MENK, INC. cc: File w/attachment Base Bid Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 CLEARING AND GRUBBING LS 1 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $2,185.00 $2,185.00 $2,000.00 $2,000.00 2 EXCAVATION, CLASS 10 CY 8990 $15.00 $134,850.00 $4.00 $35,960.00 $4.00 $35,960.00 $4.40 $39,556.00 $4.50 $40,455.00 3 SUBGRADE PREPARATION, 12"SY 5271 $4.00 $21,084.00 $2.00 $10,542.00 $2.25 $11,859.75 $2.20 $11,596.20 $2.75 $14,495.25 4 SUBGRADE TREATMENT, FLY ASH OR CEMENT SY 5271 $9.00 $47,439.00 $7.00 $36,897.00 $7.25 $38,214.75 $7.75 $40,850.25 $8.00 $42,168.00 5 SUBBASE, 6", MODIFIED SY 5271 $15.00 $79,065.00 $8.50 $44,803.50 $8.25 $43,485.75 $9.30 $49,020.30 $9.00 $47,439.00 6 SANITARY SEWER SERVICE STUB, PVC, 8"LF 150 $100.00 $15,000.00 $45.00 $6,750.00 $200.00 $30,000.00 $49.25 $7,387.50 $55.00 $8,250.00 7 STORM SEWER, TRENCHED, 15", RCP LF 119 $90.00 $10,710.00 $50.00 $5,950.00 $108.00 $12,852.00 $54.75 $6,515.25 $60.00 $7,140.00 8 STORM SEWER, TRENCHED, 24", RCP LF 190 $100.00 $19,000.00 $68.00 $12,920.00 $99.50 $18,905.00 $74.50 $14,155.00 $75.00 $14,250.00 9 STORM SEWER, TRENCHED, 36", RCP LF 311 $135.00 $41,985.00 $100.00 $31,100.00 $154.50 $48,049.50 $110.00 $34,210.00 $110.00 $34,210.00 10 PIPE APRON, RCP, 36"EA 2 $3,500.00 $7,000.00 $2,250.00 $4,500.00 $4,300.00 $8,600.00 $2,455.00 $4,910.00 $3,000.00 $6,000.00 11 SUBDRAIN, CASE E,TYPE 2, 6"LF 1204 $20.00 $24,080.00 $15.00 $18,060.00 $21.50 $25,886.00 $16.50 $19,866.00 $17.00 $20,468.00 12 SUBDRAIN CLEANOUT, TYPE 1-A, 6"EA 11 $600.00 $6,600.00 $250.00 $2,750.00 $1,100.00 $12,100.00 $275.00 $3,025.00 $250.00 $2,750.00 13 SUBDRAIN OUTLETS AND CONNECTIONS EA 8 $500.00 $4,000.00 $302.00 $2,416.00 $450.00 $3,600.00 $325.00 $2,600.00 $300.00 $2,400.00 14 WATER MAIN, TRENCHED, PVC, 8"LF 162 $200.00 $32,400.00 $45.00 $7,290.00 $45.00 $7,290.00 $49.50 $8,019.00 $55.00 $8,910.00 15 WATER MAIN, TRENCHED, PVC, 12"LF 481 $225.00 $108,225.00 $55.00 $26,455.00 $84.50 $40,644.50 $60.00 $28,860.00 $60.00 $28,860.00 16 WATER MAIN LOWERING/HORIZONTAL ADJUSTMENT, TRENCHED, DIP, 12"EA 2 $7,500.00 $15,000.00 $2,500.00 $5,000.00 $12,000.00 $24,000.00 $2,735.00 $5,470.00 $2,500.00 $5,000.00 17 VALVE, GATE, 8"EA 2 $2,500.00 $5,000.00 $2,000.00 $4,000.00 $1,600.00 $3,200.00 $2,185.00 $4,370.00 $2,000.00 $4,000.00 18 FIRE HYDRANT ASSEMBLY EA 4 $4,500.00 $18,000.00 $5,000.00 $20,000.00 $7,400.00 $29,600.00 $5,465.00 $21,860.00 $5,000.00 $20,000.00 19 FLUSHING DEVICE (BLOWOFF), 8"EA 2 $2,950.00 $5,900.00 $1,000.00 $2,000.00 $1,300.00 $2,600.00 $1,100.00 $2,200.00 $1,000.00 $2,000.00 20 VALVE BOX ADJUSTMENT EA 3 $500.00 $1,500.00 $150.00 $450.00 $260.00 $780.00 $165.00 $495.00 $150.00 $450.00 21 FIRE HYDRANT ASSEMBLY REMOVAL EA 3 $2,000.00 $6,000.00 $1,500.00 $4,500.00 $1,100.00 $3,300.00 $1,640.00 $4,920.00 $1,500.00 $4,500.00 22 STORM MANHOLE, SW-401, 96 IN.EA 1 $5,500.00 $5,500.00 $8,500.00 $8,500.00 $14,000.00 $14,000.00 $9,285.00 $9,285.00 $9,000.00 $9,000.00 23 SANITARY MANHOLE, SW-303, 48 INCH EA 1 $12,000.00 $12,000.00 $2,800.00 $2,800.00 $38,000.00 $38,000.00 $10,160.00 $10,160.00 $10,000.00 $10,000.00 24 INTAKE, SW-501 EA 2 $3,500.00 $7,000.00 $3,000.00 $6,000.00 $2,900.00 $5,800.00 $3,280.00 $6,560.00 $3,000.00 $6,000.00 25 INTAKE, SW-503 EA 2 $5,500.00 $11,000.00 $3,500.00 $7,000.00 $4,800.00 $9,600.00 $3,825.00 $7,650.00 $3,500.00 $7,000.00 26 INTAKE, SW-505 EA 2 $6,000.00 $12,000.00 $3,800.00 $7,600.00 $4,800.00 $9,600.00 $4,155.00 $8,310.00 $4,000.00 $8,000.00 27 INTAKE, SW-506 EA 1 $8,500.00 $8,500.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 $7,100.00 $7,100.00 $7,000.00 $7,000.00 28 INTERNAL DROP CONNECTION EA 2 $2,500.00 $5,000.00 $1,500.00 $3,000.00 $3,500.00 $7,000.00 $1,640.00 $3,280.00 $1,500.00 $3,000.00 29 MANHOLE ADJUSTMENT, MINOR EA 2 $3,500.00 $7,000.00 $400.00 $800.00 $1,900.00 $3,800.00 $440.00 $880.00 $400.00 $800.00 30 CONNECTION TO EXISTING INTAKE EA 1 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $2,600.00 $2,600.00 $1,640.00 $1,640.00 $1,500.00 $1,500.00 31 REMOVE INTAKE STRUCTURE EA 2 $1,200.00 $2,400.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 $1,640.00 $3,280.00 $1,500.00 $3,000.00 32 PAVEMENT, PCC, 9"SY 4304 $85.00 $365,840.00 $69.50 $299,128.00 $73.00 $314,192.00 $94.75 $407,804.00 $97.00 $417,488.00 33 FULL DEPTH CONCRETE MEDIAN SY 184 $85.00 $15,640.00 $125.00 $23,000.00 $130.50 $24,012.00 $155.00 $28,520.00 $130.00 $23,920.00 34 REMOVAL OF SIDEWALK SY 170 $13.00 $2,210.00 $12.50 $2,125.00 $12.50 $2,125.00 $13.75 $2,337.50 $15.00 $2,550.00 35 SIDEWALK, PCC, 4"SY 332 $45.00 $14,940.00 $45.00 $14,940.00 $42.50 $14,110.00 $63.50 $21,082.00 $55.00 $18,260.00 36 SIDEWALK, PCC, 6"SY 755 $60.00 $45,300.00 $45.00 $33,975.00 $44.50 $33,597.50 $63.50 $47,942.50 $57.00 $43,035.00 37 DETECTABLE WARNING SF 252 $55.00 $13,860.00 $50.00 $12,600.00 $52.50 $13,230.00 $44.50 $11,214.00 $55.00 $13,860.00 38 FULL DEPTH PATCHES SY 70 $150.00 $10,500.00 $175.00 $12,250.00 $216.50 $15,155.00 $185.00 $12,950.00 $170.00 $11,900.00 39 PAVEMENT REMOVAL SY 543 $13.00 $7,059.00 $31.00 $16,833.00 $31.00 $16,833.00 $34.00 $18,462.00 $35.00 $19,005.00 40 PAINTED PAVEMENT MARKINGS, DURABLE STA 88.7 $400.00 $35,480.00 $185.00 $16,409.50 $192.00 $17,030.40 $200.00 $17,740.00 $183.00 $16,232.10 41 PAINTED SYMBOLS AND LEGENDS EA 15 $250.00 $3,750.00 $280.00 $4,200.00 $290.00 $4,350.00 $305.00 $4,575.00 $280.00 $4,200.00 42 PAVEMENT MARKINGS REMOVED STA 7.8 $50.00 $390.00 $200.00 $1,560.00 $210.00 $1,638.00 $220.00 $1,716.00 $200.00 $1,560.00 43 SYMBOLS AND LEGENDS REMOVED EA 2 $150.00 $300.00 $150.00 $300.00 $157.50 $315.00 $165.00 $330.00 $150.00 $300.00 44 TYPE A SIGN, SHEET ALUMINUM SF 64 $400.00 $25,600.00 $75.00 $4,800.00 $79.00 $5,056.00 $82.00 $5,248.00 $75.00 $4,800.00 45 TEMPORARY TRAFFIC CONTROL LS 1 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $6,775.00 $6,775.00 $15,000.00 $15,000.00 46 HYDROSEEDING, TYPE 1 URBAN, FERTILIZING, AND MULCHING AC 1.5 $3,500.00 $5,250.00 $4,000.00 $6,000.00 $3,200.00 $4,800.00 $3,280.00 $4,920.00 $3,000.00 $4,500.00 47 HYDROSEEDING, TYPE 2 URBAN, FERTILIZING, AND MULCHING AC 0.75 $3,500.00 $2,625.00 $3,500.00 $2,625.00 $2,900.00 $2,175.00 $3,060.00 $2,295.00 $2,800.00 $2,100.00 48 SWPPP PREPARATION LS 1 $3,500.00 $3,500.00 $1,500.00 $1,500.00 $1,600.00 $1,600.00 $1,640.00 $1,640.00 $1,500.00 $1,500.00 49 SWPPP MANAGEMENT LS 1 $5,000.00 $5,000.00 $3,800.00 $3,800.00 $3,200.00 $3,200.00 $3,275.00 $3,275.00 $3,000.00 $3,000.00 50 CHECK DAM, ROCK TON 15 $90.00 $1,350.00 $100.00 $1,500.00 $110.00 $1,650.00 $120.00 $1,800.00 $110.00 $1,650.00 51 RIP RAP, CLASS 'E'TON 60 $90.00 $5,400.00 $95.00 $5,700.00 $85.50 $5,130.00 $82.00 $4,920.00 $85.00 $5,100.00 52 SILT FENCE, INSTALL, MAINTAIN, AND REMOVAL LF 2600 $3.00 $7,800.00 $1.70 $4,420.00 $1.50 $3,900.00 $1.65 $4,290.00 $1.50 $3,900.00 53 TEMPORARY EROSION CONTROL MULCHING, HYDROMULCHING AC 2.3 $2,000.00 $4,600.00 $1,600.00 $3,680.00 $1,500.00 $3,450.00 $1,530.00 $3,519.00 $1,400.00 $3,220.00 54 INLET PROTECTION DEVICE, INSTALL, MAINTAIN, AND REMOVE EA 23 $300.00 $6,900.00 $160.00 $3,680.00 $157.50 $3,622.50 $165.00 $3,795.00 $150.00 $3,450.00 55 MOBILIZATION LS 1 $91,000.00 $91,000.00 $100,000.00 $100,000.00 $60,987.36 $60,987.36 $97,000.00 $97,000.00 $145,000.00 $145,000.00 56 CONCRETE WASHOUT LS 1 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $1,600.00 $1,600.00 $2,440.00 $2,440.00 $5,000.00 $5,000.00 TOTAL BASE BID $1,377,532.00 $919,069.00 $1,063,586.01 $1,086,805.50 $1,141,575.35 8-Jun-21 H:\WAUKEE_CI_IA\A13122515_Douglas Parkway Extension\6_Plans-Specs\Bid Tab\Bid Tabulation.xlsx City of Waukee Douglas Parkway Extension Waukee, IA TABULATION OF BIDS Elder Corporation Bid Letting Date: Tuesday June 8, 2021 @ 2:00 PM Line No.Description QuantityUnit Concrete Technologies Inc Grimes Alliance Construction Group LLC UrbandaleEngineer's Estimate Absolute Concrete Construction, Inc Slater, IA Des Moines Page 1 of 1