CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: June 21, 2021
AGENDA ITEM:Consideration of approval of a resolution approving concurrence with
Clive City Council award of contract
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: The Cities of Clive, Waukee and Urbandale have
jointly agreed to undertake an HMA overlay project on portions of Warrior Lane and Meredith
Drive north of Hickman Road and west of Alice’s Road during the 2021 construction season.
With portions of the project to be completed in all three cities, a 28E Agreement has been
prepared to identify preliminary costs for each jurisdiction.
The City of Clive received bids for the proposed scope of work on June 17th with Des Moines
Asphalt & Paving submitting the low bid of $972,888.50. As the lead agency for the project, the
City of Clive is set to award a contract to Des Moines Asphalt & Paving for that amount at their
June 24th City Council meeting.
At this time, the City of Clive would request that the City of Waukee consider and accept the bids
at their June 21st City Council meeting. The project timeline includes a late start date of
September 7, 2021 and a completion date of October 29, 2021. We look forward to continue
working with you on the successful completion of this project.
This project is included in the approved FY 2022 Capital Improvements Plan approved by City
Council in March 2021 with a total project budget of $750,000.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The City of Waukee portion
for the project, including the construction costs per bid and estimated engineering fees, is
approximately $480,000.00.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT: Staff recommends concurrence with Clive City Council
award of contract to Des Moines Asphalt & Paving of Ankeny, IA in the amount of $972,888.50.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Letter of Recommendation
II. Bid Tab
III. Resolution
PREPARED BY:Beth Richardson
REVIEWED BY: Rudy Koester RK
H6B
RESOLUTION 2021-
RESOLUTION CONSENTING TO THE CITY OF CLIVE’S
MAKING AWARD OF CONSTRUCTION CONTRACT FOR
THE MEREDITH DRIVE/WARRIOR LANE HMA OVERLAY
PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE
OF IOWA:
Section 1.That the City of Waukee consents to the following bid for the construction of
certain public improvements described in general as the Meredith Drive/Warrior Lane HMA
Overlay Project, described in the plans and specifications heretofore adopted by this Council on
June 21, 2021, being accepted by the City of Clive, the same being the lowest responsive,
responsible bid received for such work, as follows:
Contractor: Des Moines Asphalt & Paving of Ankeny, IA
Amount of bid: $972,888.50
Portion of project: All construction work
Section 2.That Clerk is hereby directed to notify the City of Clive that the City of Waukee
consents to the City of Clive’s execution of the contract with the contractor for the construction of
the public improvements, such contract not to be binding on the City until approved by this
Council.
PASSED AND APPROVED this 21st day of June, 2021.
Mayor
ATTEST:
City Clerk
June 18, 2021
City of Waukee
Attn: Rudy Koester
805 University Avenue
Waukee, IA 50263
Re: Meredith Drive/Warrior Lane HMA Overlay Project
Dear Rudy:
The Cities of Clive, Waukee and Urbandale have jointly agreed to undertake an
HMA overlay project on portions of Warrior Lane and Meredith Drive north of
Hickman Road and west of Alice’s Road during the 2021 construction season. With
portions of the project to be completed in all three cities, a 28E Agreement has
been prepared to identify preliminary costs for each jurisdiction.
The City of Clive received bids for the proposed scope of work on June 17th with
Des Moines Asphalt submitting the low bid of $972,888.50. As the lead agency for
the project, the City of Clive is set to award a contract to Des Moines Asphalt for
that amount at their June 24th City Council meeting. At this time, the City of Clive
would request that the City of Waukee consider and accept the bids at their June
21st City Council meeting.
The project timeline includes a late start date of September 7, 2021 and a
completion date of October 29, 2021. We look forward to continue working with
you on the successful completion of this project. Thank you.
Sincerely,
THE CITY OF CLIVE
Jim Hagelie, P.E.
Engineering Services Administrator
Public Works
2123 NW 111th ST
Clive, IA 50325
(515)223-6231
(515)223-6013 Fax
www.cityofclive.com
ITEM DESCRIPTIONQUANTITY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE1 SUBGRADE PREPARATION28286SY 6.00$ 169,716.00$ 1.50$ 42,429.00$ 1.25$ 35,357.50$ 1.30$ 36,771.80$ 2 SUBGRADE TREATMENT, 6% CEMENT570TON 300.00$ 171,000.00$ 216.00$ 123,120.00$ 216.00$ 123,120.00$ 216.00$ 123,120.00$ 3 REMOVAL OF KNOWN PIPE CULVERT, CMP, 18"42LF 50.00$ 2,100.00$ 36.00$ 1,512.00$ 36.00$ 1,512.00$ 37.00$ 1,554.00$ 4 REMOVAL OF KNOWN PIPE CULVERT, CMP, 24"72LF 50.00$ 3,600.00$ 39.00$ 2,808.00$ 39.00$ 2,808.00$ 40.00$ 2,880.00$ 5 REMOVAL OF KNOWN PIPE CULVERT, CMP, 30"40LF 50.00$ 2,000.00$ 38.00$ 1,520.00$ 38.00$ 1,520.00$ 39.00$ 1,560.00$ 6 REMOVAL OF KNOWN PIPE CULVERT, CMP, 36"44LF 50.00$ 2,200.00$ 37.00$ 1,628.00$ 37.00$ 1,628.00$ 38.00$ 1,672.00$ 7 PIPE CULVERT, TRENCHED, RCP, 21"32LF 200.00$ 6,400.00$ 116.00$ 3,712.00$ 116.00$ 3,712.00$ 120.00$ 3,840.00$ 8 PIPE CULVERT, TRENCHED, RCP ARCH PIPE, 36" DIA. EQUIVALENT32LF 300.00$ 9,600.00$ 232.00$ 7,424.00$ 232.00$ 7,424.00$ 240.00$ 7,680.00$ 9 PIPE CULVERT, TRENCHED, RCP, 36"70LF 300.00$ 21,000.00$ 170.00$ 11,900.00$ 170.00$ 11,900.00$ 175.00$ 12,250.00$ 10 PIPE APRON, RCP, 21"2EA 3,500.00$ 7,000.00$ 2,900.00$ 5,800.00$ 2,900.00$ 5,800.00$ 3,000.00$ 6,000.00$ 11 PIPE APRON, RCP ARCH PIPE, 36" DIA. EQUIVALENT2EA 4,000.00$ 8,000.00$ 4,900.00$ 9,800.00$ 4,900.00$ 9,800.00$ 5,100.00$ 10,200.00$ 12 PIPE APRON, RCP, 36"4EA 4,000.00$ 16,000.00$ 4,600.00$ 18,400.00$ 4,600.00$ 18,400.00$ 4,800.00$ 19,200.00$ 13 HMA PAVEMENT, STANDARD TRAFFIC, BASE COURSE, 3/4" MIX4705TON 90.00$ 423,450.00$ 60.00$ 282,300.00$ 65.00$ 305,825.00$ 64.50$ 303,472.50$ 14 HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, 1/2" MIX2390TON 90.00$ 215,100.00$ 62.00$ 148,180.00$ 67.00$ 160,130.00$ 67.00$ 160,130.00$ 15 HMA PAVEMENT, STANDARD TRAFFIC, SURFACE COURSE, 1/2", NO SPEC. REQ.2390TON 90.00$ 215,100.00$ 65.50$ 156,545.00$ 69.00$ 164,910.00$ 70.00$ 167,300.00$ 16 HMA PAVEMENT SAMPLES AND TESTING1LS 5,000.00$ 5,000.00$ 1,610.00$ 1,610.00$ 750.00$ 750.00$ 516.00$ 516.00$ 17 DRIVEWAY, GRANULAR, CLASS A CRUSHED STONE85TON 40.00$ 3,400.00$ 35.30$ 3,000.50$ 47.00$ 3,995.00$ 48.50$ 4,122.50$ 18 PAINTED PAVEMENT MARKINGS, DURABLE389STA 100.00$ 38,900.00$ 38.00$ 14,782.00$ 38.00$ 14,782.00$ 39.00$ 15,171.00$ 19 GROOVES CUT FOR PAVEMENT MARKINGS389STA 60.00$ 23,340.00$ 24.00$ 9,336.00$ 24.00$ 9,336.00$ 25.00$ 9,725.00$ 20 TEMPORARY TRAFFIC CONTROL1LS 20,000.00$ 20,000.00$ 8,400.00$ 8,400.00$ 13,000.00$ 13,000.00$ 8,700.00$ 8,700.00$ 21 PORTABLE DYNAMIC MESSAGE SIGNS200CDAY 300.00$ 60,000.00$ 50.00$ 10,000.00$ 51.50$ 10,300.00$ 51.00$ 10,200.00$ 22 FLAGGERS70EACH 800.00$ 56,000.00$ 410.00$ 28,700.00$ 425.87$ 29,810.90$ 425.00$ 29,750.00$ 23 RIP RAP120TON 50.00$ 6,000.00$ 59.00$ 7,080.00$ 59.00$ 7,080.00$ 61.00$ 7,320.00$ 24 SILT FENCE OR SILT FENCE DITCH CHECK240LF 2.00$ 480.00$ 4.25$ 1,020.00$ 4.25$ 1,020.00$ 10.00$ 2,400.00$ 25 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF SEDIMENT240LF 2.00$ 480.00$ 1.00$ 240.00$ 1.00$ 240.00$ 5.00$ 1,200.00$ 26 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF DEVICE240LF 2.00$ 480.00$ 1.00$ 240.00$ 1.00$ 240.00$ 1.00$ 240.00$ 27 CONSTRUCTION SURVEY1LS 10,000.00$ 10,000.00$ 4,500.00$ 4,500.00$ 5,700.00$ 5,700.00$ 15,000.00$ 15,000.00$ 28 MOBILIZATION1LS 80,000.00$ 80,000.00$ 40,000.00$ 40,000.00$ 26,500.00$ 26,500.00$ 35,300.00$ 35,300.00$ 29 GRANULAR SHOULDERS, TYPE B1390TON 40.00$ 55,600.00$ 15.80$ 21,962.00$ 29.00$ 40,310.00$ 37.50$ 52,125.00$ 30 MILLED SHOULDER RUMBLE STRIPS, HMA SURFACE20STA 500.00$ 10,000.00$ 150.00$ 3,000.00$ 150.00$ 3,000.00$ 155.00$ 3,100.00$ 31 MILLED CENTERLINE RUBMLE STRIPS, HMA SURFACE10STA 500.00$ 5,000.00$ 150.00$ 1,500.00$ 150.00$ 1,500.00$ 155.00$ 1,550.00$ 32 ASPHALT EMULSION FOR FOG SEAL (SHOULDER RUMBLE STRIPS)22GAL 50.00$ 1,100.00$ 20.00$ 440.00$ 100.00$ 2,200.00$ 25.00$ 550.00$ TOTAL CONSTRUCTION COST1,648,046.00$ 972,888.50$ 1,023,610.40$ 1,054,599.80$ CostAnkeny, IA10% Bid Bond 10% Bid Bond10% Bid BondDes Moines, IA Engineer's Opinion ofProbable ConstructionGrimes Asphalt and Paving Corp.Des Moines Asphalt & PavingDes Moines, IAInRoads, LLCBIDS RECEIVED: JUNE 17, 2021PROJECT: MEREDITH DRIVE/WARRIOR LANE HMA OVERLAY PROJECTBID TABULATION FORM