HomeMy WebLinkAbout2021-07-06-J01T Library Stormwater Improvements_Change Order 7AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: June 21, 2021
AGENDA ITEM:Consideration of approval of Change Order No. 7 to Elder Corporation
for the Waukee Public Library Stormwater Improvements increasing the
contract amount by $6,800.00.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 7 is for replacement of the planter
drainage board within the existing raised planter integral to the building.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order increases the contract price in the amount of $6,800.00.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Change Order No. 7
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
J1T
Project# 4185870
June 25, 2021
TO: Rudy Koester
City of Waukee
805 University Ave
Waukee IA, 50263
RE: Change Order #7
Waukee Public Library Stormwater Improvements
SH Project Number 4185870
Mr. Koester,
Please find attached Change Order #7 for the Waukee Public Library Stormwater Improvements. The
change order includes the following items:
• Landscape Planting Bed – Drainage Board Replacement
The original drainage board on the walls of the existing planting bed integral to the building was
discovered to be inadequately draining water from the planting soils. Replacement of the drainage
board will result in improved drainage away from the walls of the library building.
We have reviewed the change order items and unit prices, both are line with anticipated amounts. If
City staff concurs with this change, we recommend the City of Waukee approve this change order in the
amount of $6,800.00 to the construction contract for the Waukee Public Library Stormwater
Improvements with Elder Corporation of Pleasant Hill, IA.
Sincerely,
Shive-Hattery, Inc.
Nathan Hardisty, PE
Project Manager
Enc. Change Order #7
City of Waukee
230 W Hickman Road
Waukee, IA 50263 Distribution:
Owner __X__
Engineer __X__
Contractor __X__
Contractor:
5088 East University Ave
Pleasant Hill, IA 50327 $2,162,580.00 May 4, 2020
CO-7.1 LS $6,800.00 1 $6,800.00
$6,800.00
$2,162,580.00
$45,833.40
$2,208,413.40
$6,800.00
$2,215,213.40
2.43%
0 Days
June 1, 2021
Date:
Approved By:
City of Waukee
Signature:
Name:
Title:
Date:
Recommended By:
Shive-Hattery
Signature:
Name: Nathan T. Hardisty, PE
Title: Project ManagerTitle:
Date:
Waukee Public Library Stormwater
Improvements
4185870
Net Change by previously authorized Change Orders
The Contract Sum prior to This Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
Description
THE CONTRACT IS CHANGED AS FOLLOWS:
Change Order Item CO-7.1 is to add replacement of the drainage board within the existing raised planter integral to the building. Existing drainage board will be
removed and new drainage board will be installed. Granular material will be removed, salvaged, and reinstalled with new filter fabric installed over the granular
material. PVC piping through the planter wall will be cleaned.
Item Value Adjustment
CHANGE ORDER SUMMARY
Quantity AdjustmentUnit Price
Contractor:
Elder Corporation
Elder Corporation
Signature:
Name:
Planter Drainage Board
CHANGE ORDER
Aggregate Change Order as a percent of Original Contract
The date of Final Completion as of the date of this Change Order therefore is
NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER
Project Title
S-H Project File Number
Orig. Contract Amount & Date
Change Order Number
Date
7
The Contract Time will be changed by
TOTAL
The Original Contract Sum was
Unit
June 14, 2021
\\sh.shive-hattery.com\data\Projects\DM\4185870\Construction\Library\CASupport\Change Orders\CO #7\Waukee Public Library Stormwater Improvements Change Order #7.xlsx