HomeMy WebLinkAbout2020-04-06-I06B ADA Sidewalk Curb Ramp Construction_Award ContractAGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: April 6, 2020
AGENDA ITEM:Consideration of approval of a resolution awarding contract [ADA
Sidewalk Curb Ramp Construction Along U.S. Highway 6 Project]
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at Waukee City Hall
on February 31, 2020 at 2:00 p.m. Three (3) bids were received with the
apparent low bid from JT Concrete, Inc., of West Des Moines, IA, in the
amount of $133,473.80.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:$133,473.80
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT: The bids were significantly higher than the engineer’s
estimate of $100,282.05. It is believed this is in part due to the uncertain
times facing our country today as well as the size of the project and its
proximity to the busy Hickman Road corridor. With the cost sharing
between the City of Waukee and the Iowa Department of Transportation
the project remains within budget. City staff recommends awarding
contract to JT Concrete, Inc., of West Des Moines, IA, in the amount of
$133,473.80.
RECOMMENDATION: Approve the resolution
ATTACHMENTS: I. Proposed resolution
II. HR Green letter of recommendation
III. Bid tabulation
PREPARED BY: Becky Schuett/Sara Kappos
REVIEWED BY:Sara Kappos SKK
I6B
RESOLUTION 2020-
RESOLUTION MAKING AWARD OF CONSTRUCTION
CONTRACT FOR THE 2020 ADA SIDEWALK
IMPROVEMENTS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE
OF IOWA:
Section 1.That the following bid for the construction of certain public improvements
described in general as the 2020 ADA Sidewalk Improvements, described in the plans and
specifications heretofore adopted by this Council on April 6, 2020, be and is hereby accepted, the
same being the lowest responsive, responsible bid received for such work, as follows:
Contractor: JT Concrete, Inc., of West Des Moines, IA
Amount of bid: $133,473.80
Portion of project: All construction work
Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the
contractor for the construction of the public improvements, such contract not to be binding on the
City until approved by this Council.
PASSED AND APPROVED this 6th day of April, 2020.
Mayor
ATTEST:
City Clerk
J:\2019\190149\Design\Bid\Ltr-040220-Waukee_2020-ADA-Sidewalk_Award.docx
April 2, 2020
Waukee Mayor and City Council
City of Waukee, City hall
230 West Hickman Road
Waukee, IA 50263
Re: Award of Contract
2020 ADA Sidewalk Improvements Project
IDOT Project No.: NHSN-006-3(73--2R-25
HR Green Project No.: 190149
Dear Mayor and Councilmembers:
Bids were received and opened for this project at 2:00 PM on Tuesday, March 31, 2020. The
following three bids were received:
JT Concrete, Inc. $133,473.80
Henricksen Contracting, LLC $145,093.68
TK Concrete, Inc. $159,760.00, determined to be incomplete
TK Concrete, Inc.’s bid was determined to be incomplete and non-responsive because the
required Form 730007wd 07-97 Targeted Small Business (TSB) Pre-Bid Contact Information
was not included with the Proposal Form.
JT Concrete, Inc.’s proposal for $133,473.80 is determined to be the lowest responsible and
responsive bid, and it recommended the City Council award the contract to JT Concrete, Inc.
Sincerely,
HR GREEN, INC.
David J. Bovee, P.E.
Project Manager
Enclosures
cc: file
HR GREEN, INC.BID TABULATION5525 MERLE HAY RD., STE. 2002020 ADA SIDEWALK IMPROVEMENTSJOHNSTON, IOWA 50131WAUKEE, IOWAPH: 515-278-2913IOWA DEPARTMENT OF TRANSPORTATION (DOT)FAX: 515-278-1846PROJECT NO.: NHSN-006-3(73)--2R-25Bid Date: March 31, 2020 - 2:00 P.M.HR Green Project No. 190149UnitQuantityUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalDIVISION 2 - EARTHWORK2.1 TOPSOIL, OFFSITECY 3.3 150.00$ $ 495.00 600.00$ $ 1,980.00 150.00$ $ 495.00 150.00$ $ 495.00 2.2 EXCAVATION, CLASS 10CY 13 100.00$ $ 1,300.00 80.00$ $ 1,040.00 250.00$ $ 3,250.00 100.00$ $ 1,300.00 DIVISION 7 -STREETS & RELATED WORK7.1 CURB AND GUTTER, 2.5 FT, 9 IN.LF 95 55.00$ $ 5,225.00 100.00$ $ 9,500.00 63.60$ $ 6,042.00 75.00$ $ 7,125.00 7.2 REMOVAL OF SIDEWALKSY 84 17.50$ $ 1,470.00 40.00$ $ 3,360.00 31.80$ $ 2,671.20 20.00$ $ 1,680.00 7.3 REMOVAL OF SHARED USE PATHSY 111.3 17.50$ $ 1,947.75 40.00$ $ 4,452.00 31.80$ $ 3,539.34 20.00$ $ 2,226.00 7.4 SHARED USE PATH, PCC, 6 IN.SY 33 95.00$ $ 3,135.00 120.00$ $ 3,960.00 138.00$ $ 4,554.00 100.00$ $ 3,300.00 7.5 SHARED USE PATH, PCC, 7 IN.SY 81.6 115.00$ $ 9,384.00 120.00$ $ 9,792.00 149.00$ $ 12,158.40 100.00$ $ 8,160.00 7.6 SIDEWALK, PCC, 4 IN.SY 45.8 75.00$ $ 3,435.00 120.00$ $ 5,496.00 106.00$ $ 4,854.80 125.00$ $ 5,725.00 7.7 SIDEWALK, PCC, 6 IN.SY 75.7 95.00$ $ 7,191.50 120.00$ $ 9,084.00 117.00$ $ 8,856.90 130.00$ $ 9,841.00 7.8 DETECTABLE WARNING, CAST IRONSF 210 50.00$ $ 10,500.00 55.00$ $ 11,550.00 64.00$ $ 13,440.00 50.00$ $ 10,500.00 7.9 FULL DEPTH PATCHESSY 135 205.00$ $ 27,675.00 135.00$ $ 18,225.00 149.00$ $ 20,115.00 100.00$ $ 13,500.00 7.1 PAVEMENT REMOVALSY 26.4 50.00$ $ 1,320.00 60.00$ $ 1,584.00 60.00$ $ 1,584.00 50.00$ $ 1,320.00 DIVISION 8 -TRAFFIC CONTROL8.1 PAINTED PAVEMENT MARKINGS, DURABLE STA 100.8 85.00$ $ 8,568.00 250.00$ $ 25,200.00 290.00$ $ 29,232.00 325.00$ $ 32,760.00 8.2 PAVEMENT MARKINGS REMOVEDSTA 16.56 180.00$ $ 2,980.80 180.00$ $ 2,980.80 209.00$ $ 3,461.04 300.00$ $ 4,968.00 8.3 TRAFFIC CONTROLLS 1 4,000.00$ $ 4,000.00 5,000.00$ $ 5,000.00 9,000.00$ $ 9,000.00 13,750.00$ $ 13,750.00 DIVISION 9 - SITE WORK AND LANDSCAPING9.1HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 4 (URBAN TEMPORARY EROSION CONTROL MIXTURE)ACRE 0.06 12,500.00$ $ 750.00 15,000.00$ $ 900.00 10,000.00$ $ 600.00 50,000.00$ $ 3,000.00 9.2 SODSQ 26 75.00$ $ 1,950.00 65.00$ $ 1,690.00 150.00$ $ 3,900.00 225.00$ $ 5,850.00 9.3 FILTER SOCK, 6 IN.LF 460 3.00$ $ 1,380.00 4.00$ $ 1,840.00 2.00$ $ 920.00 4.00$ $ 1,840.00 9.4 FILTER SOCK, REMOVALLF 460 1.25$ $ 575.00 4.00$ $ 1,840.00 2.00$ $ 920.00 2.00$ $ 920.00 DIVISION 11 - MISCELLANEOUS11.1 CONSTRUCTION SURVEYLS 1 2,500.00$ $ 2,500.00 6,500.00$ $ 6,500.00 4,500.00$ $ 4,500.00 5,500.00$ $ 5,500.00 11.2 MOBILIZATIONLS 1 3,500.00$ $ 3,500.00 5,000.00$ $ 5,000.00 9,500.00$ $ 9,500.00 24,500.00$ $ 24,500.00 11.3 CONCRETE WASHOUTLS 1 1,000.00$ $ 1,000.00 2,500.00$ $ 2,500.00 1,500.00$ $ 1,500.00 1,500.00$ $ 1,500.00 Total $ 100,282.05 $ 133,473.80 $ 145,093.68 $ 159,760.00 **** Denotes math error on Proposal Form corrected on Bid Tabulation.3/31/2020I hereby certify that this is a true and correct tabulation of bids received March 31, 2020 for 2020 ADA SIDEWALK IMPROVEMENTS, WAUKEE, IOWA - PROJECT NO.: NHSN-006-3(73)--2R-25David J. Bovee, P.E., License No. 15800 DateJT Concrete, Inc.West Des Moines, IAHenriksen Contracting, LLCGrimes, IAEngineer's Opinion of Probable CostTK Concrete, Inc.Pella, IA- 1 -