HomeMy WebLinkAbout2020-04-06-J09 KinderCare - Site Plan AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: April 6, 2020
AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Kindercare
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: Samantha Coponen, EIG14T, requests approval of a site
plan to allow for the construction of a 11,900 square feet, single-story,
daycare building for a Kindercare. The site plan identifies outdoor play areas
enclosed with a fence on both the south and east sides of the building. The
main access to the site will be located off of SE Kettlestone Blvd.
The applicant has provided elevations for the proposed building on the site,
which meets the intent of the architectural guidelines within the Site Plan
Ordinance and the Kettlestone Design Guidelines.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed this project at the March 24, 2020 Commission Meeting and
recommended approval subject to remaining staff comments:
Approval of a Site Plan for Lot 2, Ashworth South Plat 2 – Kindercare (1155 SE Kettlestone
Boulevard)
Senior Planner, Melissa DeBoer, introduced the request for approval of a site plan as submitted by the
applicant, Samantha Coponen, EIG14T, for a daycare. The property is generally located north of SE
Kettlestone Boulevard and east of Grand Prairie Parkway, containing approximately 1.49 acres.
Mrs. DeBoer explained that the site plan identified a single story daycare building for a KinderCare.
The building is proposed to be 11,990 square feet in area. The main entrance will be located on the
west side, and fenced play areas are identified on the east and south sides of the building. A trash
enclosure is identified on the northwest corner of the building. Access is provided from the private
street to the north and SE Kettlestone Blvd from the south. Utilities are available to the site and
Stormwater detention will be collected in a regional storm water retention basin on the west side of
Grand Prairie Parkway.
All parking, landscape, open space, and lighting meet ordinance requirements and the Kettlestone
Design Guidelines. Staff would recommend approval subject to any remaining staff comments.
Commissioner Streit made a note that this is a great location for a daycare.
Commissioner Broderick moved to approve the site plan for lot 2 of Ashworth South Plat 2 (1155 SE
Kettlestone Boulevard) subject to any remaining staff comments. Commissioner Streit Seconded the
J9
motion. Ayes: Conley, Broderick, Ward, Streit, Hoifeldt, Koshy, and Inman. Nays: None. Motion
Carries.
STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Melissa DeBoer, Senior Planner
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2020-
APPROVING THE SITE PLAN FOR KINDERCARE (1155 SE KETTLESTONE
BOULEVARD)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for Kindercare, subject to remaining staff comments on March 24, 2020;
AND,
WHEREAS, the Site Plan for Kindercare is in general conformance with §160 – Site and
Building Development Standards Ordinance of the Waukee Municipal Code; AND,
WHEREAS, the Site Plan for Kindercare is in general conformance with §161 – Landscaping
and Open Space Ordinance of the Waukee Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 6th day of April, 2020 that the Site Plan for Kindercare is approved.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Lot 2, Ashworth South Plat 2
(Kindercare) – Site Plan
PREPARED BY: Melissa DeBoer, AICP – Senior Planner
REPORT DATE: March 16, 2020
MEETING DATE: March 24, 2020
GENERAL INFORMATION
Owner: AP GPP, L.C.
Applicant: Samantha Coponen, EIG14T
Request: The applicant is requesting approval of a site plan for
a daycare.
Location and Size: Property is generally located north of SE Kettlestone
Blvd and east of Grand Prairie Parkway, containing
approximately 1.49 acres.
Property Address: 1155 SE Kettlestone Blvd
AREA MAP
ABOVE: Aerial of Property identifying the proposed plat (outlined in BLUE).
March 17, 2020
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant –
Undeveloped Regional Commercial K-RR (Kettlestone Retail Regional District)
North Vacant –
Undeveloped Regional Commercial K-RR (Kettlestone Retail Regional District)
South Gas Station Regional Commercial K-RR (Kettlestone Retail Regional District)
East Vacant –
Undeveloped
Regional Commercial K-RR (Kettlestone Retail Regional District)
West Vacant –
Undeveloped
Regional Commercial K-RR (Kettlestone Retail Regional District)
PROJECT DESCRIPTION
The project includes the construction of a single-story, daycare building for a Kindercare. The building is
proposed to be approximately 11,990 square feet in area. The main entrance to the building is located on the
west side. The site plan identifies outdoor play areas located on both the east and south sides of the building.
The play areas are enclosed with a 5-foot tall, black, chain link fence.
A trash enclosure is proposed at the northwest corner of the proposed building and a monument sign is
shown at the southeast corner of the site.
ACCESS AND PARKING
There will be one access into the site from the private street to the north. There will be several access points
from the surrounding public streets into the private development with future construction. The main access at
this time will be from the south off of SE Kettlestone Blvd.
A total of 44 parking spaces are required for this facility. The total amount of parking proposed is 44 spaces
including 2 accessible stalls. The site plan also identifies 3 bicycle parking spaces. The proposed site plan meets
the parking requirements of the ordinance.
SIDEWALKS/TRAILS
Five foot wide sidewalks will be installed along all of the surrounding private and public streets. Sidewalks are
proposed interior to the site, surrounding all sides of the building.
UTILITIES
This site will be serviced with all public utilities. Storm water detention will be collected in area intakes
throughout the site and collected in a regional storm water retention basin on the west side of Grand Prairie
Parkway.
March 17, 2020
3 of 3
LANDSCAPING & OPEN SPACE
A minimum of 15% of the project area is required to be open space. The total amount of open space
proposed is 37%. The landscape plan meets the requirements of the Landscape and Open Space Ordinance
and the Kettlestone Design Guidelines.
ELEVATIONS
The elevations of the building are proposed to be constructed of brick, stone, cement board siding, and a
metal roof.
MISCELLANEOUS:
The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the
lighting requirements of the Site Plan Ordinance and the Kettlestone Design Guidelines.
COMPREHENSIVE PLAN
The comprehensive plan classifies the subject property as Regional Commercial. The Regional Commercial
classification provides a variety of uses that would serve the broader regional market.
STAFF RECOMMENDATION
The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff
recommends approval of the site plan for Lot 2, Ashworth South Plat 2 – Kindercare subject to remaining staff
comments.
0
SCALE IN FEET
250 500
PROJECT LOCATION
N
S
W ELOCATION MAP
1.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT
ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL
(WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS),
DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS
ISSUED BY THE ARCHITECT/ENGINEER.
2.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE
GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND
COMPLETE COORDINATION OF ALL WORK.
3.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
5.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF
DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN
CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN
INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH THE WORK.
6.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED,
INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TO
MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN
MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.
7.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO
AVOID GALVANIC CORROSION.
8.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR
GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE
KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THE
CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE
UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY
ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN.
9.THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR UTILITY LOCATIONS,
MINIMUM 2 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION (1-800-292-8989).
PROJECT GENERAL NOTES
ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT SPECIFICATIONS, THE CITY OF
WAUKEE STANDARD SPECIFICATIONS AND THE STATEWIDE URBAN DESIGN AND
SPECIFICATIONS (SUDAS), 2019 EDITION, UNLESS DIRECTED OTHERWISE.
HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUM
OF 1983 (NAD83), ZONE 8, ON THE IOWA REGIONAL COORDINATE SYSTEM, IN U.S. SURVEY
FEET. ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD 88). RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND
VERTICAL COORDINATES FOR THIS PROJECT.
THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN OCTOBER 2019
BY ISG.
SPECIFICATIONS REFERENCE
PROJECT DATUM
TOPOGRAPHIC SURVEY
LEGEND
EXISTING
CITY LIMITS
ACCESS CONTROL
SECTION LINE
QUARTER SECTION LINE
RIGHT OF WAY LINE
PROPERTY / LOTLINE
EASEMENT LINE
CULVERT
WATER EDGEW
WET WETLAND BOUNDARY
WETLAND / MARSH
FENCE LINEXXXX
STORM SEWER
SANITARY SEWER
>SANITARY SEWER FORCEMAIN<II
CONTOUR (MAJOR)
CONTOUR (MINOR)
DECIDUOUS TREE
CONIFEROUS TREE
TREE LINE
MANHOLE/STRUCTURE
CATCH BASIN
HYDRANT
CURB STOP
VALVE
UTILITY PEDESTAL / CABINET
POWER POLE
990
989
PROPOSED
CULVERT
STORM SEWER
SANITARY SEWER
>WATERII
OVERHEAD ELECTRICOE
UNDERGROUND ELECTRICUE
UNDERGROUND TVUTV
GASG
CONTOUR
MANHOLE
CATCH BASIN
HYDRANT
VALVE
EASEMENT
RIGHT OF WAY
>>>>>>>>STORM SEWER (PIPE WIDTH)
1015
LOT LINE
SANITARY SEWER (PIPE WIDTH)
SE KETTLES
T
O
N
E
B
V
L
D
UTILITY PROVIDERS
COMPANY CONTACT INFO
WATER CITY OF WAUKEE
TIM ROYER
515-978-7920
SANITARY CITY OF WAUKEE
TIM ROYER
515-978-7920
GAS CITY OF WAUKEE
515-978-7920
ELECTRIC MIDAMERICAN ENERGY
515-252-6632
TELEPHONE CENTURYLINK
720-578-8090
WATER
UT
I
UNDERGROUND TELEPHONE
OVERHEAD ELECTRICOE
UNDERGROUND ELECTRICUE
UNDERGROUND TVUTV
GASG
OVERHEAD UTILITYOHL
UNDERGROUND UTILITY
FBO UNDERGROUND FIBER OPTIC
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C100
COVER SHEET
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
C100 COVER SHEET
---- ---- C100
KINDERCAREWAUKEE
PROJECT ADDRESS / LOCATION:
1155 SE KETTLESTONE BVLD
LEGAL DESCRIPTION:
LOT 2 OF ASHWORTH SOUTH PLAT 2
WAUKEE, IOWA
CIVIL SHEET SET
Sheet Number Sheet Title
C100 COVER SHEET
C101 GENERAL SITE NOTES
C300 DEMO PLAN
C400 SITE PLAN
C500 SITE UTILITY PLAN
C600 GRADING PLAN
C700 PLANTING PLAN
C701 RESTORATION PLAN
C702 PLANTING SCHEDULE, NOTES, & DETAILS
C800 PHOTOMETRIC PLAN
C810 SITE DETAILS
C811 SITE DETAILS
C812 SITE DETAILS
C813 SITE DETAILS
C814 SITE DETAILS
C815 SITE DETAILS
C820 FIRE TRUCK ACCESS AND HYDRANT COVERAGE PLAN
C900 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN
C902 EROSION & SEDIMENT CONTROL DETAILS
INTE
R
S
T
A
T
E
8
0GRAND PRAIRIE PKWYSE ASHWORTH RD
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
PROJECT MANAGER:
ISG - RYAN ANDERSON
7900 INTERNATIONAL DRIVE, SUITE 550
MINNEAPOLIS, MN 55425
PHONE: 952-426-0699 APPLICANT:
SAMANTHA COPONEN
3221 W. BIG BEAVER ROAD, SUITE 111
TROY, MI 48084
PHONE: 248-817-1691
PROPERTY OWNER:
AP GPP, L.C.
5000 WESTOWN PKWY, SUITE 400
WEST DES MOINES, IA 50266
CONSTRUCTION SCHEDULE:
SPRING 2020 - START OF CONSTRUCTION
SPRING-SUMMER 2020 - SITE CONSTRUCTION
FALL 2020 - CONSTRUCTION COMPLETION
C200 EXISTING CONDITIONS
C901 EROSION & SEDIMENT CONTROL NOTES
AE1-100a
AE1-300a
AE2-001a
FIRST FLOOR PLAN
ROOF PLAN
EXTERIOR ELEVATIONS
FINISH BOARD
SITE SUMMARY
ZONING:K-RR
SITE/LOT AREA:65,312 SQ. FT / 1.49 AC.
IMPERVIOUS AREA:41,152.5 SQ. FT / 0.94 AC. (63%)
GREENSPACE
PROVIDED:24,159.5 SQ. FT / 0.55 AC. (37%) (MINIMUM 15%)
FLOOR AREA RATIO:0.18 (MAXIMUM 0.35)
BIKE PARKING:3 RACKS
EMPLOYEES 10
STUDENTS 130
SQUARE FOOTAGE:11,990 GROSS SF
CONSTRUCTION
TYPE:VB
BUILDING HEIGHT:27 FT
SIGN REQUIREMENTS
MAXIMUM HEIGHT:15'-0"
MONUMENT SIGN
AREA:60 SQ. FT
SETBACK:15'-0"
TOTAL WALL SIGN
AREA:310 SQ. FT (1 SF PER 1 LF OF BUILDING FRONTAGE)
WALL SIGN LETTER
HEIGHT:6'-0"
PARKING REQUIREMENTS (WAUKEE CODE)
TYPE UNIT / AREA STALLS REQUIRED STALLS PROVIDED
CHILD CARE CENTER
1 SPACE PER 6
CHILDREN (130
CHILDREN)
22
44*
1 SPACE PER
VAN/BUS (0
VAN/BUS)
0
1 QUEUE SPACE
PER 6 CHILDREN
(130 CHILDREN)
22
MINIMUM ACCESSIBLE
STALLS 26-50 STALLS 2 2
TOTAL:44 44* (2 ADA )
SETBACKS
PARKING BUILDING PROVIDED
BUILDING
NORTH YARD 10'0'50'
EAST YARD 5'0'32'-7"
SOUTH YARD 5'0'46'-10"
WEST YARD 5'0'77'-2"
* NOTE: 4 ON-STREET PARKING STALLS ARE PROVIDED ON VERMILLION COURT
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C101
GENERAL SITE
NOTES
C101 GENERAL SITE NOTES
---- ---- C101
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
1.ALL WORK SHALL BE IN ACCORDANCE WITH OSHA CODES AND STANDARDS. NOTHING INDICATED ON THE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM
COMPLYING WITH ANY APPROPRIATE SAFETY REGULATIONS.
2.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS. WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE
PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA,
MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT / ENGINEER.
3.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL
EXTENT AND COMPLETE COORDINATION OF ALL WORK.
4.ALL PROPERTY PINS SHALL BE PROTECTED FROM GRADING OR OTHER OPERATIONS. ANY PINS DISTURBED SHALL BE RESET AT THE CONTRACTOR'S EXPANSE.
5.THE WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND CURRENT EDITION OF THE STATEWIDE URBAN DESIGN AND SPECIFICATIONS
(SUDAS) SHALL APPLY TO CONSTRUCTION WORK ON THE PROJECT. A FULL IOWA SUDAS SPECIFICATIONS MANUAL CAN BE FOUND ONLINE FOR FREE AT
WWW.IOWASUDAS.COM.
6.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT / ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING
INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
7.THE WORK TO BE ACCOMPLISHED FOR THE CONSTRUCTION OF THIS PROJECT WILL OCCUR ON OWNER'S PROPERTY. THE CONTRACTOR SHOULD CONFINE
OPERATIONS, PEOPLE, AND EQUIPMENT TO THE OWNER'S PROPERTY.
8.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT TO BE INCORPORATED IN THE
WORK INVOLVED IN THE PROJECT (UNSUITABLE EXCAVATION, WASTE PIPE, ETC.).
9.PUBLIC UTILITY FIXTURES ARE EXISTING WITHIN THE CONSTRUCTION AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OWNERS OF THESE
UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION. THE CONTRACTOR SHALL AFFORD ACCESS TO THESE FACILITIES FOR ANY NECESSARY
MODIFICATION OF SERVICES. NO ADDITIONAL COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH
WORK.
10.CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING AND PREPARING AREAS DISTURBED BY CONTRACTOR'S OPERATIONS FOR SEEDING. ALL DEBRIS GREATER
THAN GOLF BALL SIZE SHALL BE REMOVED AND AREA SHALL BE RAKED SMOOTH. CONTRACTOR SHALL NOT DISTURB AREAS OUTSIDE OF THE OWNER'S
PROPERTY DURING OPERATIONS AND SHALL MAKE A REASONABLE EFFORT TO NOT DISTURB AREAS GREATER THEN NECESSARY DURING CONSTRUCTION.
AREAS OF NONGERMINATION WILL BE RESEEDED AND REFERTILIZED BY THE CONTRACTOR. COST IS TO BE CONSIDERED INCIDENTAL.
11.IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY TRAFFIC CONTROL SIGNS, DEVICES, ETC., AND TO PLACE, MAINTAIN, AND REMOVE
SAME AS CONSTRUCTION COMMENCES AND IS COMPLETED IN ACCORDANCE WITH THE CURRENT EDITION OF THE IOWA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES FOR STREETS & HIGHWAYS. FAILURE TO COMPLY WITH THIS PORTION OF THE SPECIFICATIONS WILL RESULT IN SUSPENSION OF WORK
UNTIL. THE SITUATION IS CORRECTED. A REDUCTION IN THE LUMP SUM TO BE PAID WILL BE MADE FOR EXCESSIVE NONCOMPLIANCE WITH REQUIRED TRAFFIC
CONTROL. NO WORK SHALL COMMENCE IN ANY GIVEN AREA UNTIL ALL APPROPRIATE TRAFFIC CONTROL IS IN PLACE.
12.THE CONTRACTOR SHALL NOT DISTURB GRASSED AREAS AND TREES OUTSIDE THE CONSTRUCTION LIMITS. TREES AND BUSHES SHALL BE RETAINED AS POSSIBLE.
THE CONTRACTOR WILL NOT BE PERMITTED TO PARK SERVICE VEHICLES AND EQUIPMENT OR USE THESE AREAS FOR STORAGE OF MATERIALS. STORAGE,
PARKING AND SERVICE AREA(S) WILL BE SUBJECT TO APPROVAL OF THE ENGINEER.
13.ALL EXISTING TREES AND BUSHES SHALL BE MAINTAINED AND PROTECTED UNLESS NOTED OTHERWISE. AREAS OF HAND FORMING MAY BE REQUIRED TO
PROTECT TRESS.
14.THE CONSTRUCTION OPERATIONS ARE TO TAKE PLACE IN A RESIDENTIAL AREA. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENTS INCLUDED
IN THE SPECIFICATIONS IN REGARD TO POSITIVE DUST CONTROL DURING ALL OPERATIONS TO INCLUDE REMOVAL, CLEAN UP, ETC.
15.CONTRACTOR SHALL PROVIDE BARRICADES AND SIGNS IDENTIFYING VEHICLES AND OBSTACLES IN THE DRIVEN ROADWAYS.
16.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS, NOTIFY ARCHITECT / ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRED INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
17.EXISTING STORM SEWERS, SANITARY SEWERS, AND WATER MAINS ARE LOCATED BASED ON CITY RECORDS AND ACTUAL LOCATIONS MAY VARY GREATLY FROM
THAT SHOWN. THE LOCATIONS AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND
COMPLETE TO THE BEST OF THE KNOWLEDGE OF ISG. NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND
ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM PLAN.
18.CONTRACTOR SHALL REPLACE AND REPAIR ALL EXISTING STORM SEWERS THAT ARE ENCOUNTERED DURING CONSTRUCTION IN ACCORDANCE WITH THE
SPECIFICATION. CONTRACTOR SHALL USE 2000D RCP WITH FLEXIBLE O-RING GASKET JOINTS, PLACE PIPES SO JOINTS ARE NOT DIRECTLY OVER WATER MAIN,
AND RECONNECT TO EXISTING STORM SEWER WITH REINFORCED FERNCO COUPLING.
19.PROPOSED WATER DISTRIBUTION LINE SHALL BE INSTALLED WITH A MINIMUM OF FIVE AND ONE-HALF (5.5') OF COVER. IN LOCATIONS WITH A SEPARATION
DISTANCE OF LESS THAN TEN FEET (10') FROM SANITARY SEWER OR STORM SEWER, THE SANITARY SEWER OR STORM SEWER SHALL BE INSTALLED EIGHTEEN
INCHES (18") BELOW THE BOTTOM OF THE WATER MAIN AND SHALL BE PLACED IN A SEPARATE TRENCH AT A MINIMUM HORIZONTAL SEPARATION OF THREE
FEET PER SUDAS SPECIFICATIONS.
20.AT ALL SANITARY SEWER AND WATER MAIN CROSSOVER, MAINTAIN A MINIMUM OF 18" SEPARATION BETWEEN BOTTOM OF WATER MAIN AND TOP OF
SEWER. PLACE ONE FULL LENGTH OF WATER PIPE, LOCATED SO BOTH JOINTS ARE AS FAR AS POSSIBLE FROM SEWER. USE LOW PERMEABILITY SOIL FOR
BACKFILL WITHIN 10' OF CROSSOVER.
21.THRUST BLOCKS SHALL BE POURED CONCRETE, INSTALLED BEHIND ALL BENDS, TEES AND DEAD ENDS IN ACCORDANCE WITH SPECIFICATIONS.
22.GRANULAR BEDDING IS REQUIRED FOR ANY TYPE OF PIPE USED AND SHALL BE AS SPECIFIED.
23.A NEAT VERTICAL EDGE WILL BE REQUIRED FOR ALL JOINTS BETWEEN THE NEW PAVEMENT SURFACE AND EXISTING PAVING AS SHOWN IN THE PLANS. SAW
CUTTING OR OTHER TECHNIQUES MAY BE USED TO PROVIDE THIS EDGE. COST OF THE SAW CUT IS TO BE CONSIDERED INCIDENTAL. ADDITIONAL REMOVAL
AND REPLACEMENT DUE TO THE CONTRACTOR'S OPERATION WILL BE MEASURED SEPARATELY BUT WILL BE THE CONTRACTOR'S RESPONSIBILITY.
24.ANY DEWATERING NECESSARY FOR CONSTRUCTION SHALL BE CONSIDERED INCIDENTAL TO INDIVIDUAL CONSTRUCTION ITEM. PLEASE REFER TO SUBSURFACE
EXPLORATION REPORT FOR ANTICIPATED SITE CONDITIONS. REPORT IS FOR INFORMATIONAL PURPOSES ONLY AND DOES NOT GUARANTEE CONDITIONS TO BE
EXPERIENCED.
25.THE CONTRACTOR SHALL INSPECT AND VERIFY SOIL CONDITIONS AS NECESSARY IN ORDER TO DETERMINE THE TYPE OF CONSTRUCTION TO EMPLOY. NATURAL
AND/OR MANMADE OBSTRUCTIONS MAY BE ENCOUNTERED IN THE SOIL. THESE CONTRACT DOCUMENTS DO NOT WARRANT THE NATURE OR CONDITIONS OF
THE SOILS, AND DO NOT WARRANT THAT NATURAL OR MANMADE OBSTRUCTIONS WILL NOT BE ENCOUNTERED, NOR GUARANTEE THE EXTENT TO WHICH
ROCKS, BOULDERS, OR OTHER OBSTRUCTIONS, REGARDLESS OF SIZE, MAY BE ENCOUNTERED DURING BORING OPERATIONS. THE CONTRACTOR SHALL NOT BE
ENTITLED TO ADDITIONAL COMPENSATION FOR ANY NATURAL OR MANMADE OBSTRUCTIONS ENCOUNTERED DURING TRENCHLESS CONSTRUCTION.
26.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE
SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT /
ENGINEER BEFORE PROCEEDING WITH THE WORK.
27.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED, AND CONDITIONED ACCORDING
TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK.
28.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
29.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF ISG. NO
WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OF VARIATIONS FROM PLAN.
30.THIS SITE WILL HAVE SAWCUTTING AND/OR CONCRETE GRINDING, SO PROTECTION OF STORM SEWERS AND DRAINAGE WAYS WILL NEED TO BE PROTECTED
FROM SLURRY FROM THE CONCRETE OPERATION TO DISCHARGE OFFSITE.
31.THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO EXCAVATION / CONSTRUCTIONS (1-800-292-8989).
32.ANY PROPOSED CHANGES TO THE PLAN SET SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
33.THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL IN WRITING BY THE CITY OF
WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
34.ALL UTILITIES ARE TO BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARDS.
35.ALL UTILITIES ARE TO BE TESTED TO CITY OF WAUKEE STANDARDS, AND THE CITY IS TO WITNESS ALL TESTING.
36.COORDINATE ALL TIE-INS TO EXISTING UTILITIES WITH CITY OF WAUKEE PUBLIC WORKS DEPARTMENT.
37.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ROAD SHALL COMPLY WITH
THE REQUIREMENTS OF SECTION 503.2 AND SHALL EXTEND TO WITHIN 100-FEET OF THE EXTERIOR WALLS OF THE BUILDING AS MEASURED BY AN APPROVED
ROUTE AROUND THE EXTERIOR OF THE BUILDING.
38.CONTRACTOR TO SCHEDULE A PRECONSTRUCTION MEETING AT LEAST ONE WEEK PRIOR TO COMMENCING CONSTRUCTION.
39.CONTRACTOR IS REQUIRED TO NOTIFY THE CITY OF WAUKEE ENGINEERING DEPARTMENT OF ANY PLANNED WEEKEND OR HOLIDAY WORK AT LEAST 48 HOURS
PRIOR TO PLANNED WORK.
40.CITY OF WAUKEE WILL NOT BE RESPONSIBLE FOR CONCRETE PLACED OVER PUBLIC WATER MAIN AND SANITARY SEWER MAIN.
CONSTRUCTION NOTES
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
FUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>175LOT 2
SE KETTL
E
S
T
O
N
E
B
L
V
D
Sanitary & Storm Sewer Easement
Per Book 2017, Page 13000
Storm Sewer Eas
e
m
e
n
t
Per Book 2017, P
a
g
e
2
0
6
0
7
HH >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>Water Main EasementPer Book 2017, Page 2060535
20Private Storm Sewer EasementPer Book 2017, Page 20607Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
20
50
175.00Private Ingress/Egress EasementPer Book 2017, Page 8784Private Ingress/Egress EasementPer Book 2017, Page 8784Sanitary Sewer EasementPer Book 2017, Page 20606(R/W Width Varie
s
)
20
EX STM MH
R=1022.93
I E=1018.53 15" CONC
I N=1018.48 18" CONC
EX STM MH
R=1025.02
I S=1017.28
I W=1016.96
EX CB
T/C=1024.50
I=1020.34
EX CB
T/C=1024.44
I W=1019.49
EX SAN MH
R=1022.77
I=993.47
EX SAN MH
R=1022.93
I N=1011.08
DROP STRUCTURE>>>EXISTING 8" SANITARYEXISTING 8" WATERMAIN15" STORM SEWER
EXISTING 15" SANITARY
EXISTING 15" SANITARY
EXISTING 15" SANITARY
15" STORM SEW
E
R18" STORM SEWER18" STORM SEWER
10
1022.91
mon chiseled x
11
1023.38
mon chiseled x
100
1022.91
HH
EX STM MH
R=1022.93
I E=1018.53 15" CONC
I N=1018.48 18" CONC
EX STM MH
R=1025.02
I S=1017.28
I W=1016.96
EX CB
T/C=1024.50
I=1020.34
EX CB
T/C=1024.44
I W=1019.49
EX SAN MH
R=1022.77
I=993.47
EX SAN MH
R=1022.93
I N=1011.08
DROP STRUCTURE 10251024102610271
0
2
8
1020 10251021 1022102310241026102710
2
5
102210221022
10
2
3
1
0
2
4
1
0
2
6
1
0
2
71025
10231
0
2
4
23545 C2-EXISTING
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C200
EXISTING
CONDITIONS
C200 EXISTING CONDITIONS
---- ---- C200
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>HH >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>EX STM MH
R=1025.02
I S=1017.28
I W=1016.96
EX CB
T/C=1024.50
I=1020.34
EX CB
T/C=1024.44
I W=1019.49
EX SAN MH
R=1022.77
I=993.47EX SAN MH
R=1022.93
I N=1011.08
DROP STRUCTURE>>>EXISTING 8" SANITARYEXISTING 8" WATERMAIN15" STORM SEWER
EXISTING 15" SANITARY
EXISTING 15" SANITARY
EXISTING 15" SANITARY
15" STORM SEWE
R18" STORM SEWER18" STORM SEWER
EX STM MH
R=1022.93
I E=1018.53 15" CONC
I N=1018.48 18" CONC
I OPENING = 1021.6
SE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURT10251024102610271
0
2
8
1020 10251021 1022102310241026102710
2
5
102210221022
10
2
3
1
0
2
4
1
0
2
6
1
0
2
71025
10231
0
2
4
23545 C2-EXISTING
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C300
DEMO PLAN
C300 DEMO PLAN
---- ---- C300
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
SAWCUT AND REMOVE CONCRETE CURB
PROTECT EXISTING STORM SEWER MANHOLE
PROTECT EXISTING STORM SEWER INTAKE
REMOVE EXISTING BLOWOFF HYDRANT AND
PROTECT EXISTING 6" WATER SERVICE STUB
REMOVAL LEGEND
SYMBOL DESCRIPTION
REMOVE CONCRETE
PAVEMENT
CONTRACTOR SHALL VERIFY EXISTING PAVEMENT SECTION
AND NOTIFY ENGINEER OF ANY DISCREPANCIES.
PAVEMENT REMOVALS SHALL INCLUDE FULL DEPTH
SAWCUT & SECTION REMOVAL.
REMOVAL OF CURB SHALL BE DONE WITH GRINDING
XXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXX13 7
13
7 XXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
PROPOSED ACCESS EASEMENT 175LOT 2
Sanitary & Storm Sewer Easement
Per Book 2017, Page 13000
Storm Sewer Eas
e
m
e
n
t
Per Book 2017, P
a
g
e
2
0
6
0
7
HH Water Main EasementPer Book 2017, Page 2060535
20Private Storm Sewer EasementPer Book 2017, Page 20607Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
20
50
Private Ingress/Egress EasementPer Book 2017, Page 8784Private Ingress/Egress EasementPer Book 2017, Page 8784Sanitary Sewer EasementPer Book 2017, Page 2060620
SE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURT142.27'152.97'23545 C3-SITE
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C400
SITE PLAN
C400 SITE PLAN
---- ---- C400
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
PLAYGROUND TABLE
TYPE OF PLAY AREA AREA
INFANT 1,800 SF
TODDLER 3,925 SF
VARSITY 3,049 SF
TOTAL AREA 8,774 SF
5' BLACK CHAIN LINK FENCE (SEE C13 SITE DETAILS)(PERIMETER)
4' BLACK CHAIN LINK FENCE, TYP.
(SEE C813 SITE DETAILS)
PLAY AREA SECTION
(SEE C815 SITE DETAILS)
TURN DOWN CONCRETE WALK
(SEE C813 SITE DETAILS)
PEDESTRIAN RAMP (SEE
C812 SITE DETAILS)
ADA BOLLARD AND SIGNAGE, TYP.
OF 3 (SEE C812 SITE DETAILS)
CHAIN LINK FENCE GATE
(SEE C813 SITE DETAILS)
PLAY STRUCTURE AREA (SEE C814 SITE DETAILS)
PLAY STRUCTURE AREA
(SEE C814 SITE DETAILS)
CHAIN LINK FENCE GATE
(SEE C813 SITE DETAILS)
PLAY AREA SECTION (SEE
C815 SITE DETAILS)
PLAY STRUCTURE AREA
(SEE C814 SITE DETAILS)
PLAY AREA SECTION (SEE
C815 SITE DETAILS)
SHADE STRUCTURE, TYP. (SEE C815 SITE DETAILS)
TRASH ENCLOSURE
(SEE C815 SITE DETAILS)
SAND AND WATER PLAY STRUCTURE (SEE C814 SITE DETAILS)
HEAVY DUTY CONCRETE PAVEMENT WITH INTEGRAL
CURB AND GUTTER (6"), TYP (SEE C813 SITE DETAILS)
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARAPLAY AREA SECTION
(SEE C815 SITE DETAILS)41'31.33'31'28.33'
23'17'8'8'8'17'17'9'9'17'
R15'
R3'
R3'
R3'
24'
R3'
R15'
6'
MONUMENT SIGN
R3'
R3'
R1'
(3) BIKE RACK LANDSCAPE FORMS
(SEE C812 SITE DETAILS)
78.87'168.22'71.22'6'PEDESTRIAN RAMP CROSSING
SHADE STRUCTURE, TYP. (SEE C815 SITE DETAILS)
SHADE STRUCTURE, TYP.
(SEE C815 SITE DETAILS
R5'5'26'R5'
CONCRETE WALK
(SEE C813 SITE DETAILS)
PAVEMENT LEGEND
SYMBOL DESCRIPTION
STANDARD CONCRETE PAVEMENT WITH
INTEGRAL CURB AND GUTTER (5")
TURNDOWN CONCRETE
SIDEWALK (4")
CONCRETE SIDEWALK (4")
SYNTHETIC TURF
HEAVY DUTY CONCRETE PAVEMENT
WITH INTEGRAL CURB AND GUTTER (6")
STANDARD CONCRETE PAVEMENT WITH
INTEGRAL CURB AND GUTTER (5"), TYP
(SEE C813 SITE DETAILS)
29'26'26'58'5'20'70'
R15'
R3'
R15'
R3'
R1'
6'5'10'12'17'
SITE SUMMARY
ZONING:K-RR
SITE/LOT AREA:65,312 SQ. FT / 1.49 AC.
IMPERVIOUS AREA:41,152.5 SQ. FT / 0.94 AC. (63%)
GREENSPACE
PROVIDED:24,159.5 SQ. FT / 0.55 AC. (37%) (MINIMUM 15%)
FLOOR AREA RATIO:0.18 (MAXIMUM 0.35)
BIKE PARKING:3 RACKS
EMPLOYEES 10
STUDENTS 130
SQUARE FOOTAGE:11,990 GROSS SF
CONSTRUCTION
TYPE:VB
BUILDING HEIGHT:27 FT
SIGN REQUIREMENTS
MAXIMUM HEIGHT:15'-0"
MONUMENT SIGN
AREA:60 SQ. FT
SETBACK:15'-0"
TOTAL WALL SIGN
AREA:310 SQ. FT (1 SF PER 1 LF OF BUILDING FRONTAGE)
WALL SIGN LETTER
HEIGHT:6'-0"
PARKING REQUIREMENTS (WAUKEE CODE)
TYPE UNIT / AREA STALLS REQUIRED STALLS PROVIDED
CHILD CARE CENTER
1 SPACE PER 6
CHILDREN (130
CHILDREN)
22
44*
1 SPACE PER
VAN/BUS (0
VAN/BUS)
0
1 QUEUE SPACE
PER 6 CHILDREN
(130 CHILDREN)
22
MINIMUM ACCESSIBLE
STALLS 26-50 STALLS 2 2
TOTAL:44 44* (2 ADA )
SETBACKS
PARKING BUILDING PROVIDED
BUILDING
NORTH YARD 10'0'50'
EAST YARD 5'0'32'-7"
SOUTH YARD 5'0'46'-10"
WEST YARD 5'0'77'-2"
* NOTE: 4 ON-STREET PARKING STALLS ARE PROVIDED ON VERMILLION COURT
XXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGUTUTUE UEPROPOSED ACCESS EASEMENT
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>175Sanitary & Storm Sewer Easement
Per Book 2017, Page 13000
Storm Sewer Eas
e
m
e
n
t
Per Book 2017, P
a
g
e
2
0
6
0
7
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>Water Main EasementPer Book 2017, Page 2060535
20Private Storm Sewer EasementPer Book 2017, Page 20607Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
20
50
Private Ingress/Egress EasementPer Book 2017, Page 8784Private Ingress/Egress EasementPer Book 2017, Page 8784Sanitary Sewer EasementPer Book 2017, Page 2060620
EX STM MH
R=1025.02
I S=1017.28
I W=1016.96
EX CB
T/C=1024.50
I=1020.34
EX CB
T/C=1024.44
I W=1019.49
EX SAN MH
R=1022.77
I=993.47EX SAN MH
R=1022.93
I N=1011.08
DROP STRUCTURE>>>EXISTING 8" SANITARYEXISTING 8" WATERMAIN15" STORM SEWER
EXISTING 15" SANITARY
EXISTING 15" SANITARY
EXISTING 15" SANITARY
15" STORM SEWE
R18" STORM SEWER18" STORM SEWER
EX STM MH
R=1022.93
I E=1018.53 15" CONC
I N=1018.48 18" CONC
I OPENING = 1021.6
SE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURT>>>>>>>>>>A-2
R=1025.84
I=1018.33
A-1
R=1024.71
I=1017.36
P-1 (12
"
)
P-2 (12")
CO-2
R=1025.30
I=1015.43
CO-1
R=1025.15
I=1014.48
SP-2 (6")SP-1 (6")EXP-1 (18")>>>IIIIIIEXP-2 (18")>>>>>>>>>>>>>>>>>>>>>>>>>>>>A-3
R=1024.16
I=1019.72
P-3 (12")
A-4
R=1024.30
I=1021.20
SANITARY SEWER STRUCTURE SCHEDULE
STRUCTURE
NO.
CO-1
CO-2
STRUCTURE
TYPE
CLEANOUT
CLEANOUT
STRUCTURE
SIZE (In)
6 Ø
6 Ø
STRUCTURE
MATERIAL
PVC
PVC
CASTING
SOLID
SOLID
TOP OF CASTING
ELEVATION
1025.15
1025.30
INVERT
ELEVATION
1014.48
1015.43
PIPE
NO.
SP-1
EX-SP1
SANITARY SEWER PIPE SCHEDULE
PIPE
NO.
SP-1
SP-2
DRAIN
FROM
CO-2
INLET
ELEVATION
1015.43
1016.00
DRAIN
TO
CO-1
CO-2
OUTLET
ELEVATION
1014.48
1015.43
PIPE
SIZE
6"
6"
MATERIAL
PVC
PVC
PIPE
CLASS
SDR-26
SDR-26
PIPE
GRADE
2.00%
2.00%
PIPE
LENGTH (FT)
47
29BUILDING
STORM DRAIN SCHEDULE
STRUCTURE
NO.
A-1
A-2
A-3
A-4
STRUCTURE
TYPE
SW-501
SW-401
SW-512
SW-512
STRUCTURE
SIZE (In)
36 x 24
48 Ø
40 x 40
40 x 40
STRUCTURE
MATERIAL
RC
RC
RC
RC
CASTING
SW-603 TYPE R
SW-602 TYPE E
SW-604 TYPE 3A
SW-604 TYPE 3A
* TOP OF CASTING
ELEVATION
1024.71
1025.84
1024.16
1024.30
INVERT
ELEVATION
1017.36
1018.33
1019.72
1021.20
OUTLET
PIPE
EXP-1
P-1
P-2
P-3
STORM DRAIN PIPE SCHEDULE
PIPE
NO.
P-1
P-2
P-3
DRAIN
FROM
A-2
A-3
A-4
INLET
ELEVATION
1018.33
1019.72
1021.20
DRAIN
TO
A-1
A-2
A-3
OUTLET
ELEVATION
1017.50
1018.43
1019.82
PIPE
SIZE (IN)
12
12
12
MATERIAL
HDPE
HDPE
HDPE
PIPE
CLASS
HDPE
HDPE
HDPE
PIPE
GRADE
1.50%
1.50%
1.50%
PIPE
LENGTH (FT)
55
86
92
23545 C3-SITE
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C500
SITE UTILITY PLAN
C500 SITE UTILITY PLAN
---- ---- C500
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
6" SANITARY SERVICE TO 5' FROM THE
BUILDING, CONNECTION INTO THE
BUILDING BY MECHANICAL CONTRACTOR
I=1016.0
GAS, ELECTRIC AND PHONE
SERVICE TO 5' FROM THE
BUILDING,CONNECTION INTO
THE BUILDING BY
MECHANICAL CONTRACTOR
6" PVC WATER SERVICE
6" PVC ROOF DRAIN, TYP. (SEE
ARCH)
6" PVC ROOF DRAIN, TYP. (SEE
ARCH)
6" PVC ROOF DRAIN,
TYP. (SEE ARCH)
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
* TOP OF CASTING ELEVATION ON CURB STYLE CATCH BASINS SIGNIFIES TOP BACK OF CURB ELEVATION
UTILITY LEGEND
EXISTING PROPOSED
STORM DRAIN
SANITARY SEWER
SANITARY SEWER FORCEMAIN
WATER MAIN
GAS
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND TELEPHONE
UNDERGROUND TV
OVERHEAD UTILITY
UNDERGROUND UTILITY
FIBER OPTIC
NOTES:
1.) CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES.
2.) ALL UTILITIES THAT ARE TO BE CONSTRUCTED TO 5' OUTSIDE OF BUILDING ARE TO BE CONNECTED
TO BUILDING BY MECHANICAL CONTRACTOR.
3.) ENSURE 18" VERTICAL SEPARATION BETWEEN ALL PROPOSED & EXISTING WATER, STORM &
SANITARY UTILITIES.
4.) WATER SERVICE MUST HAVE 5.5 FT MINIMUM COVER.
5.) GAS SERVICE AND METER TO BE INSTALLED AND SET BY THE CITY OF WAUKEE.
>>>>
>><II<IIIIG G
OE OE
UE UE
UT UT
UTV
OHL
FBO
SANITARY CLEANOUT
(CONNECT SANITARY SERVICE TO EXISTING SANITARY SEWER
STUB, CONTRACTOR TO VERIFY SIZE, DEPTH, AND LOCATION)
I=1014.48
CRITICAL CROSSING
6" STORM SEWER
BOTTOM=1018.5
6" WATER SERVICE
TOP=1016.5
CRITICAL CROSSING
6" STORM SEWER
BOTTOM=1021.5
6" WATER SERVICE
TOP=1018.00
FDC LOCATION
CONNECT TO EXISTING WATER SERVICE AND REMOVE
EXISTING BLOW OFF HYDRANT
( CONTRACTOR TO VERIFY SIZE, DEPTH, AND LOCATION)
PROPOSED 10 FT PUE LINE
FIRE RISER ROOM
LOCATION
GAS METER LOCATION
WATER SERVICE LOCATION, SPLIT
2" AND 6" TO 5' FROM THE BUILDING
IRRIGATION METER PIT
LOCATION
CONNECT TO EXISTING
STORM SEWER
PROPOSED MANHOLE
ADJUSTMENT
PROPOSED FIRE HYDRANT
IIIIIIIIIIIIIII
IIIIISE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTXXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
PROPOSED ACCESS EASEMENT 10251025102
5 1025 102510231024 1026 1026 1026102610261
0
2
6
1
0
2
7
-2.1%-1.5%
-
1
.
2%
-1.8%-1.3%-3.4%
-0.5%-1.6%-2.1%-0.5%-0.6%-3.5%1024.771
0
2
3
.
9
0 1025.781025.911025.911025.581025.911025.911025.911025.221025.381025.651025.701024.80
EOF 102
5
.
3
21024.631025.681025.31
1025.5
0
EOF
1024.021024.2010
2
4
.
8
0
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1026.01025.911025.311025.371025.671025.611025.8210
2
5
.
8
4
-4.0%1023.641
0
2
3
.
6
11025.401025.911025.871025.971025.911024.451025.801025.781025.231025.181025.521
0
2
5
.
7
71025.421025.67
1025.911025.281025.141024.911025.02-3.5%-3.5%
-0.6%-1.2%-3.0%1025.771025.291025.2
91025.10102
4
.
4
01025 10251025102110221023 10
2
3
10
2
310241024
1
0
2
4
102410
2
4 1024102410261
0
2
6
10261
0
2
7
1
0
2
71027 1
0
2
8
1025
1025
102
5
102
51025 1
0
2
510251025
10241024102410241026
10261026
1
0
2
4
.
4
1MATCH 1025.26MATCH1024.77M
A
T
C
H 1025.06M
A
T
C
H
1025.68-1.5%-3.5%-0.6%-0.3%
1024.42
100 YR.1024.31100 YR.1024.711025.841
0
2
6
.
0
0
1026.001026.001025.951025.951025.951025.951025.981025.911025.911025.981025.951025.951025.991025.991025.971
0
2
5
.
6
9
1025.911025.911025.911025.911026.001026.001
0
2
6
.
0
01026.001
0
2
6
.
0
0
1026.0010
2
6
.
0
0
1026.001026.00102
6
.
0
01026.001026.001026.001026.001026.001
0
2
6
.
0
0
1024.831027.951024.221022.431022.3
1
EOF
1
0
2
2
.
2
6 1024.321024.26 1024.291024.341024.39 1024.571024.611024.211
0
2
4
.
2
61024.161024.431025.99-4.1%-5.6%-15.7%-4.9%
-9.9%
-5.2%1025.781025.781
0
2
5
.
6
31024.761024.811024.371
0
2
4
.
3
2 1025.891025.601025.361025.29-1.4%-6.2%-3.6%-4.2%-3.9%-4.0%
-12.
1
%
-1.0%
-13.9
%-10.2%-2.8%-1.5%1026.001
0
2
5
.
7
0
1025.001024.08
-1.1%-1.5%-3.9%
-19.7%-16.0%-8.2%-4.6%-3.8%-4.0%-1.4%1026.171026.09-1.0%-1.0%-1.3%-0.8%1025.551
0
2
5
.
5
1 -4.0%1024.45100 YR.>>>>>>>>>>>>>>1
0
2
5
.
3
71025.37102
5
.
9
1
1025.611025.671
0
2
5
.
9
11025.911025.841025.841025.611025.61-4.0%-1.5%-0.0%-4.0%-1.5%-0.0%-0.0%1025.711025.591025.691025.69-1.7%
-1.6%
-1.7%0.0%0.0%0.0%0.3%0.3%0.3%1025.911025.911025.91>>>>>>>>>>>>>>>>>>>>>>>>>IIII
I
I
1
0
2
3
.
8
6
102
4
.
2
0
102
4
.
2
5
1
0
2
3
.
1
71023.14M
A
T
C
H1023.641023.671
0
2
4
.
0
5 1023.72-0.5%-2.9%-3.0%1023.14100 YR.1024.321
0
2
4
.
2
7
10
2
4
.
2
6
1
0
2
4
.
2
1
1024.46 1024.551024.791024.72 1024.971024.901
0
2
4
.
4
0
1024.80
1
0
2
3
.
0
1
1022.96-1.1%-4.0%-1.0%
-1.0%-1.1%-1.2%-1.1%-1.1%-4.7%-9.3%-7.9%Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
XXXXXXXX1027.051027.28
1027.371027.131027.171027.031027.221027.221027.15-1.5%
-1.1%
-4.0%-4.0%-2.0%-1.0%-4.0%-3.6%-4.1%10
2
7
.
3
5 1027.401027.3
0 1027.351026.961027.231
0
2
7
.
0
91027.0110
2
7
.
4
4 1027.701027.3210
2
7
.
3
7 1027.421027.371027.231027.161027.23
1026.92 1027.141027.0410
2
6
.
9
6
1027.081027.08-1.0%-1.0%-1.2%-0
.
6
%
1027.10
10
2
7
.
6
51027.441026.89
1027.571
0
2
7
.
1
11027.711027.261027.291027.081026.98-4.0%-1.0%-1.0%-1.1%
-1.4%-1.4%-1.0%
-4.0%-1.0%-1.0%-4.0%-1.0%-4.0%-1.0%-1.0%23545 C4-GRADE
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C600
GRADING PLAN
C600 GRADING PLAN
---- ---- C600
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
INSET A
SCALE 1"=10'
INSET A
INSET B
SCALE 1"=10'
INSET B
GRADING LEGEND
EXISTING CONTOUR (MINOR INTERVAL)
EXISTING CONTOUR (MAJOR INTERVAL)
PROPOSED CONTOUR (MINOR INTERVAL)
PROPOSED CONTOUR (MAJOR INTERVAL)
PROPOSED SPOT ELEVATION
PROPOSED TOP BACK OF CURB SPOT ELEVATION
SURFACE GRADE / DIRECTION
GENERAL GRADING NOTES
PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD
DOWNS ARE NOT INCLUDED.
101
100
101
100
XXX.XXXXX.XX-X.X%
INSET C
SCALE 1"=10'
INSET C
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>
SE KETTLEST
O
N
E
B
V
L
D
FUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTXXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGUTUTUE UEPROPOSED ACCESS EASEMENT
AG - (1)
RA - (4)
PS - (4)
CR - (8)
MP - (3)
PL - (2)
SR - (6)
PL - (2)
MP - (3)
PL - (1)
PL - (3)
MP - (5)
CR - (8)
SR - (3)
SP - (12)
(2) - PK
RA - (8)
(8) SS
(6) PS
(1) AG
(5) RA
(5) RA
(1) AG
(6) PS
(4) BK
(10) PL
(3) QW
(5) BF
(1) QW
(2) AC(1) QW
(3) OS
(2) GI
(3) GI
(6) SR
(10) PC
(9) BK
(9) SP
(6) PL
23545 C5-LAND
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
RAB
RAB
DPP
19-23545
--/--/--
C700
PLANTING PLAN
C700 PLANTING PLAN
---- ---- C700
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
LANDSCAPE REQUIREMENTS
AS REQUIRED IN WAUKEE, IOWA ZONING CODE
KETTLESTONE RETAIL REGIONAL DISTRICT (K-RR), KETTLESTONE PLAZA DISTRICT, ASHWORTH PROPERTIES
LOCATION TYPE REQUIRED REQUIRED PROVIDED
ENTIRE SITE OPEN SPACE KETTLESTONE PLAZA DISTRICT - 20% OPEN SPACE
ASHWORTH PROPERTIES QUALIFIES FOR 5% REDUCTION
SITE AREA = 65,312 SF X 15% =
9,797 SF 24,159 SF
ENTIRE SITE OPEN SPACE LANDSCAPE
REQUIREMENT
FOR EVERY 1000 SF OF REQUIRED OPEN SPACE:
1.5 OVERSTORY TREES, 0.5 UNDERSTORY TREES, 2 SHRUBS
MINIMUM 50% MUST BE OVERSTORY SHADE TREES
MINIMUM 25% MUST BE EVERGREEN TREES
9,797 SF / 1000 = 9.8 MULTIPLIER
1.5 X 9.8 = 11 OVERSTORY TREES
.5 X 9.8 = 5 UNDERSTORY TREES
2 X 9.8 = 20 SHRUBS
8 MUST BE OVERSTORY SHADE TREES
4 MUST BE EVERGREEN TREES
12 OVERSTORY TREES
5 UNDERSTORY TREES
48 SHRUBS
8 ARE OVERSTORY SHADE TREES
4 ARE EVERGREEN TREES
ENTIRE SITE RESTORATION
REQUIREMENTS 161.02 (6) ALL DISTURBED LAND SHALL BE RESTORED WITH SOD SOD IS SPECIFIED SOD IS SPECIFIED
BUILDING PERIMETER FOUNDATION PLANTING
REQUIREMENTS
FOUNDATION PLANTINGS ARE REQUIRED AT THE BASE OF ALL BUILDINGS.
ALL FOUNDATION PLANTINGS ARE IN ADDITION TO REQUIRED OPEN
SPACE PLANTINGS.
FOUNDATION PLANTINGS REQUIRED AT
BUILDING
50 SHRUBS PROVIDED AS FOUNDATION
PLANTINGS
OFF-STREET PARKING
AREA
ISLAND/PENINSULA
LANDSCAPE
REQUIREMENTS
EVERY PARKING LOT ISLAND MINIMUM 1 OVERSTORY TREE AND SHALL BE
COVERED WITH PLANT MATERIALS, LAWN, OR MULCHES.
1 OVERSTORY TREE PER LANDSCAPE ISLAND
WITH PLANT MATERIALS, LAWN, OR MULCH
REFER TO PLAN, LANDSCAPE ISLANDS HAVE
BEEN LANDSCAPED PER CODE WHEN
APPLICABLE
SERVICE AREA SERVICE AREA
SCREENING
LANDSCAPE SHOULD BE ADDED AROUND TRASH ENCLOSURES AND
TRANSFORMERS TO SOFTEN VISUAL IMPACT.
LANDSCAPE SCREENING AROUND TRASH
ENCLOSURE AND TRANSFORMERS
LANDSCAPE SCREENING AROUND TRASH
ENCLOSURE AND TRANSFORMER PROVIDED
SETBACK BETWEEN
PARKING AND PUBLIC
ROW
BUFFER REQUIREMENT
SETBACK BETWEEN PARKING AREA AND PUBLIC ROW SHALL BE
LANDSCAPED WITH 2 OVERSTORY DECIDUOUS TREES AND 8 SHRUBS PER
50 LF OF FRONTAGE. THIS REQUIREMENT IS IN ADDITION TO REQUIRED
OPEN SPACE TREES.
59 LF SETBACK / 50 = 1.18 MULTIPLIER
2 X 1.18 = 3 OVERSTORY DECIDUOUS TREE
8 X 1.18 = 10 SHRUBS
TREE REQUIREMENT FULFILLED WITH
STREET TREE REQUIREMENT
10 SHRUBS PROVIDED
COLLECTOR ROAD ROW STREET TREE
REQUIREMENT
PROPERTIES THAT HAVE FRONTAGE ALONG PUBLIC STREET ROW THAT
ARE CLASSIFIED AS COLLECTOR SHALL PLANT 1 TREE FOR EVERY 40 LF
OF FRONTAGE EXCLUSIVE OF DRIVEWAYS. STREET TREES MAY BE
COUNTED TOWARDS SATISFACTION OF TREE PLANTING REQUIREMENT
FOR ANY ADJOINING OFF-STREET PARKING AREA.
200 LF FRONTAGE / 40 =
5 OVERSTORY DECIDUOUS TREES 5 OVERSTORY DECIDUOUS TREES
EVERGREEN TREE QTY COMMON / BOTANICAL NAME SIZE ROOT
AC 2 White Fir
Abies concolor
6` HT MIN B & B
PK 2 Korean Pine
Pinus koraiensis
6` HT MIN B & B
OVERSTORY TREE QTY COMMON / BOTANICAL NAME SIZE ROOT
AG 3 Autumn Gold Ginkgo
Ginkgo biloba `Autumn Gold`
8` HT MIN B & B
GI 5 Skyline Thornless Honey Locust
Gleditsia triacanthos inermis `Skycole` TM
12` HT MIN B & B
OS 3 Ironwood
Ostrya virginiana
8` HT MIN B & B
QW 5 Regal Prince Oak
Quercus x warei `Long` TM
8` HT MIN B & B
UNDERSTORY TREE QTY COMMON / BOTANICAL NAME SIZE ROOT
BF 5 Dakota Pinnacle Asian White Birch
Betula platyphylla `Fargo` TM
6` HT MIN B & B
GRASSES QTY COMMON / BOTANICAL NAME SIZE ROOT
MP 11 Flame Grass
Miscanthus sinensis `Purpurescens`
24" HT MIN CONT
PS 16 Switch Grass
Panicum virgatum `Shenandoah`
24" HT MIN CONT
SP 21 Prairie Dropseed
Sporobolus heterolepis
12" HT MIN CONT
SHRUBS QTY COMMON / BOTANICAL NAME SIZE ROOT
BK 13 Green Mountain Pyramid Boxwood
Buxus x `Green Mountain`
24" HT MIN CONT
CR 16 Arctic Fire Dogwood
Cornus stolonifera `Arctic Fire`
24" HT MIN CONT
PC 10 Columnar Mugo Pine
Pinus mugo `Columnaris`
48" HT MIN CONT
PL 24 Lemon Candy Dwarf Ninebark
Physocarpus opulifolius `Podaras 3` TM
24" HT MIN CONT
RA 22 Gro-Low Fragrant Sumac
Rhus aromatica `Gro Low`
24" HT MIN CONT
SR 15 Sem Ash Leaf Spirea
Sorbaria sorbifolia `Sem`
24" HT MIN CONT
SS 8 Little Princess Japanese Spirea
Spiraea japonica `Little Princess`
24" HT MIN CONT
PLANT SCHEDULE
SITE BOUNDARY, TYP.
SITE BOUNDARY, TYP.
MONUMENT SIGN
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>>>>
SE KETTLEST
O
N
E
B
V
L
D
FUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTXXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGUTUTUE UEPROPOSED ACCESS EASEMENT
1
1
1
1
1
23545 C5-LAND
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
RAB
RAB
DPP
19-23545
--/--/--
C701
RESTORATION
PLAN
C701 RESTORATION PLAN
---- ---- C701
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
SYMBOL DESCRIPTION QTY DETAIL
STEEL EDGING 185 lf1
REFERENCE NOTES SCHEDULE
3" CLEAN EGG STONE MULCH 2,064 sf
-
BLUEGRASS TURF SOD 13,843 sf
-
GROUNDCOVER SCHEDULE
TEMPORARY EROSION CONTROL
& STABILIZATION NOTE
TEMPORARY STABILIZATION MEASURES, INCLUDING
SEDIMENT CONTROL FENCE, INLET PROTECTION, ETC.
MUST BE MAINTAINED UNTIL FINAL SODDING AND
STABILIZATION MEASURES ARE IN PLACE AND
APPROVED BY THE OWNER'S REPRESENTATIVE.
RESTORATION NOTE:
ALL AREAS DISTURBED BY UTILITY INSTALLATION
AND CONSTRUCTION SHALL BE SODDED AS
SPECIFIED.
SITE BOUNDARY, TYP.
MONUMENT SIGN
SITE BOUNDARY, TYP.
23545 C5-LAND
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
RAB
RAB
DPP
19-23545
--/--/--
C702
PLANTING
SCHEDULE,
NOTES, & DETAILS
C702 PLANTING SCHEDULE, NOTES, & DETAILS
---- ---- C702
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
1.COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES,
FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (FENCE,
FOOTINGS, TREE ROOTBALLS, ETC.). CONTRACTOR SHALL REPORT ANY
DISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK.
2.SAVE AND PROTECT ALL EXISTING TREES NOT NOTED TO BE REMOVED.
3.REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT
GROWTH FROM PLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING
MIX.
4.LAWN AREAS SHALL HAVE 8 INCHES MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL
BE COMPACTED TO 85% MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT.
5.REFER TO PLANTING DETAILS PLAN FOR AMENDED SOIL DEPTH IN PLANTING BEDS
AND SURROUNDING TREES.
6.FIELD STAKE PLANTINGS ACCORDING TO PLAN. OWNER'S REPRESENTATIVE SHALL
APPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE
RIGHT TO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION.
7.ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS
INDICATED IN THE PLANT SCHEDULE.
8.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE
PLANTING PLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING
PLAN SHALL GOVERN.
9.OWNER RESERVES THE RIGHT TO REVISE QUANTITIES TO SUIT BUDGET
LIMITATIONS. CONTRACTOR'S UNIT BID PRICES SHALL PREVAIL FOR ANY CHANGES
IN QUANTITIES.
10.ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS
OF EQUIVALENT OVERALL FORM, HEIGHT, BRANCHING HABIT, FLOWER, LEAF,
COLOR, FRUIT AND CULTURE, AND ONLY AFTER WRITTEN APPROVAL FROM THE
WAUKEE DEVELOPMENT SERVICES DEPARTMENT, OWNER'S REPRESENTATIVE,
AND OWNER.
11.ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERY
STOCK (A.N.S.I.), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OF
NURSERYMEN, WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE
SPECIES LISTED MAY BE USED IF THE STOCK CONFORMS TO A.N.S.I.
12.ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN A LIVE AND HEALTHY
GROWING CONDITION FOR ONE FULL GROWING SEASON (ONE YEAR) AFTER FINAL
PROJECT ACCEPTANCE OR SHALL BE REPLACED FREE OF CHARGE WITH THE
SAME GRADE AND SPECIES. ALL TREES SHALL HAVE A STRONG CENTRAL LEADER.
13.CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO OPERATIONS. ANY
AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION
AT NO ADDITIONAL COST TO THE OWNER.
14.PLANTING BED EDGING - USE 1/8" x 4" STEEL EDGING IN ALL AREAS WHERE
PLANTING BED MEETS LAWN AREAS OR WHERE INDICATED. USE 12" STEEL SPIKES
AS INSTRUCTED BY MANUFACTURER.
15.PROVIDE ROCK MULCH, 3-INCH EGG STONE WITH LANDSCAPE FABRIC, IN ALL
PLANTING BEDS TO A 3-INCH MINIMUM DEPTH.
16.PROVIDE SHREDDED HARDWOOD MULCH CIRCLE, WITHOUT LANDSCAPE FABRIC,
TO A 4-FOOT DIAMETER AROUND ALL TREES OUTSIDE PLANTING BEDS.
17.SOD SECTIONS SHALL BE STAKED IN PLACE WITH BIODEGRADABLE SOD STAKES
WHEN SLOPE IS STEEPER THAN 5:1 OR WHEN CONDITIONS REQUIRE.
18.ALL PLANTS AND TURF TO BE IRRIGATED WITH A PERMANENT, UNDERGROUND
IRRIGATION SYSTEM.
19.INDICATED QUANTITIES ARE ESTIMATES AND SHOULD BE CONFIRMED BY THE
CONTRACTOR/BIDDER.
GENERAL PLANTING NOTES
DECIDUOUS TREE PLANTING DETAIL
SCALE: 1" = 1'-0"
TOP OF ROOTBALL TO BE SET ABOVE GRADE 3"
CUT AND REMOVE AT MINIMUM THE TOP HALF OF
WIRE BASKETS, BURLAP AND/OR TWINE AND
REMOVE FROM THE PLANTING PIT. AVOID CUTTING
OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED
OR BROKEN DURING PLANTING SHOULD BE CUT
CLEAN AT 90 DEGREES
BACKFILL PLANTING PIT PER TREE PLANTING
SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE
SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED
TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL
EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE
DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM
TWICE THE DIAMETER OF THE ROOTBALL
PLACE ROOTBALL ON UNDISTURBED SOIL AND
ENSURE TRUNK OF TREES IS PLUMB
MULCH PER PLANS AND NOTES. DO NOT PLACE
MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN.
3" RING AROUND CROWN
ROOTBALL DIA
2X ROOTBALL DIA
DEPTH OF
ROOTBALL
NEVER CUT PRIMARY LEADER
PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS
AND BRANCHES IMMEDIATELY AFTER PLANTING -
ALL PRUNING CUTS CLEAN AT 90 DEGREES
*NOTE: DO NOT
STAKE TREES
UNLESS INDICATED.
FINISH GRADE
TIE NYLON STRAPPING AROUND TRUNK AS SHOWN
1/2" WIDE NYLON STRAPPING - COLOR TO BE
APPROVED BY LANDSCAPE ARCHITECT
ORANGE CAUTION
MARKERS
#4 REBAR, 18" LONG -
DRIVE TOP STAKE
BELOW GRADE
STAKING DIAGRAM
SHRUB PLANTING DETAIL
SCALE: 1" = 1'-0"
3" LAYER OF MULCH, PER PLANS & NOTES
BACKFILL PLANTING PIT PER SHRUB PLANTING
SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE
SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED
TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL
EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE
DEPTH OF THE ROOTBALL / CONTAINER MINUS 3" AND
A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL
/ CONTAINER - TILL ALL PLANTING BEDS TO A
MINIMUM DEPTH OF 6" THROUGHT
PLACE ROOTBALL ON UNDISTURBED SOIL AND
ENSURE PLANT IS PLUMB
ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF
THE CROWN OF THE PLANT IS SLIGHTLY ABOVE
FINISH GRADE 3"
ROOTBALL DIA
2X ROOTBALL DIA
DEPTH OF
ROOTBALL
FINISH GRADE
CUT AND REMOVE AT MINIMUM THE TOP HALF OF
WIRE BASKETS, BURLAP AND/OR TWINE, OR ENTIRE
CONTAINER, AND REMOVE FROM THE PLANTING PIT,
SCARIFY ROOTS FOR ALL CONTAINERIZED PLANTS 5
GALLONS FOR SMALLER
CONTAINER DIA
2X CONTAINER DIA
PLAN
PERENNIAL PLANTING DETAIL
SCALE: 1" = 1'-0"
EDGE OF PLANTING BED - PER PLANS &
NOTES
PLANT UNDER DRIP LINE OF LIMBED UP
SHRUBS AND TREES
STAGGER SPACING WHERE POSSIBLE
EDGE OF STRUCTURE OR PAVING
PLANT PERIMETER AT SPECIFIED SPACING
FINISH GRADE
UNLESS OTHERWISE NOTED, PLANT UP TO
EXISTING DRIP LINE OF ADJACENT SHRUBS
SECTION
3" LAYER OF MULCH PER MATERIALS SCHEDULE, OR
AS NOTED ON PLAN
TILL ALL PLANT BEDS TO A MINIMUM DEPTH OF 6" AND
BACKFILL PER SPECIFICATIONS, WHEN PROVIDED - IN
AREAS WITH HEAVY CLAY OR ROCKY SOILS AMEND
WITH AMENDED PLANTING SOIL FROM A LOCAL
SOURCE
ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF
THE CROWN OF THE PLANT IS SLIGHTLY ABOVE
FINISH GRADE 3"
CUT AND REMOVE THE ENTIRE CONTAINER AND
SCARIFY, AS NECESSARY, ROOTS FOR ALL
CONTAINERIZED PLANTS 5 GALLONS FOR SMALLERBED EDGE PER PLANS
PLACE ROOTBALL ON UNDISTURBED SOIL AND
ENSURE PLANT IS PLUMB
LANDSCAPE EDGING DETAIL
SCALE: 1" = 1'-0"
MULCH - PER PLANS & NOTES
PLANTING BED - SOIL PREPARATION PER PLANS
& NOTES
LAWN OR GROUND COVER
FINISH GRADE
LANDSCAPE EDGING AND STAKING - PER PLANS
& NOTES
SUBGRADE - PER PLANS & NOTES
CONIFER / EVERGREEN TREE PLANTING DETAIL
SCALE: 1" = 1'-0"
TIE NYLON STRAP AROUND TRUNK AS SHOWN
CUT AND REMOVE AT MINIMUM THE TOP HALF OF
WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE
FROM THE PLANTING PIT. AVOID CUTTING OR
SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR
BROKEN DURING PLANTING SHOULD BE CUT CLEAN
AT 90 DEGREES
BACKFILL PLANTING PIT PER TREE PLANTING
SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE
SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED
TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL
EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE
DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM
TWICE THE DIAMETER OF THE ROOTBALL
MULCH PER PLANS AND NOTES.
DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK,
LEAVE A MIN. 3" RING AROUND CROWN
ROOTBALL DIA
1.5 X ROOTBALL DIA
DEPTH OF
ROOTBALL
NEVER CUT PRIMARY LEADER
PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS
AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL
PRUNING CUTS CLEAN AT 90 DEGREES
TREES 8'+TREES 6'-8'
TOP OF ROOTBALL TO BE SET ABOVE GRADE 3"
1/2" WIDE NYLON STRAPPING - COLOR TO BE
APPROVED BY LANDSCAPE ARCHITECT
*NOTE: DO NOT
STAKE TREES
UNLESS INDICATED.
STAKING DIAGRAM,
NO STAKING TREES
UNDER 6'
IIIIIIIIIIIIIII
IIIIISE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTXXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGUTUTUE UEPROPOSED ACCESS EASEMENT
AA
AA
AA
AA
X
X
0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.8 1.0 1.0 0.9 0.7 0.6 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0
0.0 0.0 0.0 0.1 0.2 0.3 0.6 1.1 1.5 1.5 1.2 1.0 0.8 0.7 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0
0.0 0.0 0.0 0.1 0.2 0.5 0.9 1.5 2.1 2.1 1.8 1.4 1.2 0.9 0.7 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0
0.0 0.0 0.0 0.1 0.4 0.8 1.3 2.2 2.8 2.9 2.5 2.0 1.5 1.1 0.8 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0
0.0 0.0 0.0 0.1 0.5 1.3 2.5 3.7 3.5 3.5 3.1 2.5 1.8 1.3 1.0 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.4 1.4 3.3 5.4 4.0 3.7 3.4 2.9 2.2 1.6 1.1 0.8 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.5 1.4 3.8 7.3 4.6 3.7 3.7 3.2 2.4 1.7 1.2 0.8 0.6 0.4 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.5 3.4 6.0 4.6 4.1 3.8 3.2 2.4 1.8 1.2 0.9 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.5 1.5 3.0 4.7 4.6 4.5 3.9 3.2 2.4 1.8 0.9 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.5 1.2 2.0 3.4 4.4 4.5 3.9 3.2 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.4 1.0 1.8 3.2 4.4 4.5 4.0 3.2 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.6 1.3 2.3 3.8 4.6 4.7 4.1 3.4 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.5 3.3 5.3 4.8 4.7 4.2 3.5 2.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.5 3.7 6.9 5.0 4.4 4.3 3.7 3.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.5 3.7 7.3 5.1 4.4 4.3 3.7 3.1 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.4 3.3 5.6 4.9 4.7 4.3 3.6 2.9 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.6 1.4 2.5 4.0 4.6 4.9 4.2 3.5 3.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.5 1.0 1.8 3.2 4.5 4.7 4.2 3.5 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.2 0.5 1.1 1.9 3.3 4.5 4.8 4.2 3.5 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.5 1.4 2.8 4.5 4.7 4.9 4.3 3.7 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.4 3.2 6.0 5.0 4.6 4.3 3.9 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.3 3.5 7.7 5.3 4.3 4.4 4.0 3.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.3 3.2 6.2 5.0 4.4 4.3 3.8 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.4 1.4 2.8 4.7 4.6 4.7 4.2 3.5 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.1 0.1 0.5 1.1 1.8 3.2 4.2 4.6 4.0 3.3 2.7 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.4 0.8 1.5 2.8 4.2 4.4 3.9 3.2 2.7 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.4 1.0 1.8 3.1 4.2 4.5 4.0 3.2 2.7 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.3 1.2 2.6 4.7 4.6 4.5 4.0 3.4 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.3 1.1 2.7 6.0 5.0 4.0 3.9 3.5 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.3 1.0 2.7 7.1 5.2 3.7 3.7 3.4 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.2 1.0 2.5 5.1 4.3 3.7 3.5 3.0 2.4 1.6 1.0 0.7 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.3 1.0 2.0 3.3 3.4 3.5 3.1 2.6 2.0 1.4 1.0 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.2 0.6 1.0 1.7 2.4 2.8 2.5 2.0 1.6 1.2 0.9 0.7 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.2 0.3 0.6 1.2 1.9 2.0 1.8 1.5 1.2 0.9 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.8 1.3 1.4 1.3 1.0 0.8 0.7 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.5 0.8 1.0 0.9 0.7 0.6 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.6 0.7 0.6 0.5 0.4 0.4 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
23545 C6-LIGHTING
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
SMG
ARA/RJA
RJA/ART
19-23545
--/--/--
C800
PHOTOMETRIC
PLAN
C800 PHOTOMETRIC PLAN
---- ---- C800
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
FOOTCANDLE LEGEND
MANUFACTURER/MODEL NUMBER
LIGHT FIXTURE SCHEDULE
STYLETYPE LAMPS REMARKS
Provide light fixtures as shown on Fixture Schedule. Substitutions shall have prior approval by the Project Engineer before bid date. Being
listed as an acceptable Manufacturer in no way relieves the Contractors obligation to provide all equipment and features in accordance
with these specifications.
AA
(1) ALT4-P35-180L-4K-FGL-NFO
(1) #PTRS20-61120
HEAD(S)
SITE POLE SINGLE HEAD
POLE 20'-0" POLE
(1) 213W LED
KIM LIGHTING /
LIGHT POLE DETAIL
N.T.S.1
x EXISTING
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C810
SITE DETAILS
C810 SITE DETAILS
---- ---- C810
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
7030.206
CURB RAMPS OUTSIDE OF
INTERSECTION RADIUS
SUDAS Standard Specifications
W
W
m in .Detectable Warning
1
Key
3
Turning Space
3
1
2
4'-0" min.
3
4
4'-0"
4
4
4'-0"
min.
PERPENDICULAR CURB RAMP
(For Class A Sidewalk)
PARALLEL CURB RAMP
(For Class A Sidewalk)
Curb Ramp
1
W
2
3
4'-0"
2
2
PERPENDICULAR AND PARALLEL CURB RAMP
(For Class B or C Sidewalk)
2
Perpendicular Curb Ramp: Target
running slope of 6.25% with maximum
running slope of 8.3%. Match pedestrian
street crossing cross slope at back of
curb. At mid-block crossings, cross
slope may exceed 2.0% to match
roadway grade.
Parallel Curb Ramp: Target cross slope
of 1.5% with a maximum cross slope of
2.0%. The length of the parallel ramp
is not required to exceed 15 feet,
regardless of resulting slope. Do not
exceed 8.3% slope for parallel ramps
shorter than 15 feet.
Turning Space: Target slope of 1.5%,
with a maximum slope perpendicular to
the travel directions of 2.0%. At
mid-block crossings, cross slope of
landing may exceed 2.0% to match
roadway grade. Minimum 4 feet by
4 feet.
Flare (10:1 max.) required if ramp is
contiguous with sidewalk.
Right-
of-
w
a
y
min.
5'-0"
5'-0"
5'-0"
5 feet by
5 feet.
55 &0-'(7$,/6
'$7('(6&5,37,21 %<
352-(&7
7,7/(
6+((7
5(9,6,21 6&+('8/(
352-(&7 12.
),/( 1$0(
'(6,*1(' %<
25,*,1$/ ,668( '$7(
'5$:1 %<
&/,(17 352-(&7 12.
5(9,(:(' %<
:,7+287 35,25 :5,77(1 &216(17.
,1&. $1' 0$< 127 %( 86(' &23,(' 25 '83/,&$7('
7+,6 '2&80(17 ,6 7+( 3523(57< 2) , 6 *5283
'$7('(6&5,37,21 %<
,668( 6&+('8/(
-
$5$
$5$5-$
5-$$57
-55
------
C811
SITE DETAILS
& 6,7( '(7$,/6
---- ---- &
,$:$8.((
LOT 2
ASHWORTH
SOUTH PLAT 2
&/,(17 5(9,(: 6(7 $5$
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION&,7< 68%0,77$/ $5$
&,7< 68%0,77$/ $5$
050 &,7< 68%0,77$/ $5$
00 &,7< 68%0,77$/ $5$
7030.205
GENERAL SIDEWALK AND
CURB RAMP DETAILS
SUDAS Standard Specifications
DETECTABLE WARNING LOCATION AT RAILROAD CROSSING
TYPICAL SECTION - CURB RAMP
Slope Varie
s
4
3
PERPENDICULAR CROSSINGSKEWED CROSSING
6 6
Pavement
12"
(length varies)(if required)
6.25% (targe
t
)
8.3% (max.)
1 2
LC of Roadway
Detectable warning
Sidewalk
1
6" min.
Edge of Pavement
5
2
3
5
4
6
Key
Turning Space
See Detail A
5
Curb Ramp
Standard Sidewalk
5% max.
Cross Slope
(4'-0"x4'-0" min.)
24" Wide (min.)
Detectable Warning
Possible Crossing Arm
(location varies)
Back of Curb
DETAIL A
Gutterline
Level
Line
12" expansion joint or KT-2
or BT-3 joint when specified.
When a KT or BT joint is
installed at the back of curb,
provide 12" expansion joint at
front or back of the turning space.
12" (max.)
4" min.
6" min.
18"
Provide a minimum 2 foot width of
detectable warning surfaces in the
direction of pedestrian travel across
the full width of the curb ramp or
turning space, exclusive of curbs or
flares.
Provide a minimum of 6 inches of
concrete below the detectable warning
panel.
Minimum 4 feet by 4 feet. Target cross
slope of 1.5% with a maximum cross
slope of 2.0%.
If normal sidewalk elevation cannot be
achieved with the perpendicular ramp
between the street and landing due to
limited ramp length, provide a parallel
ramp to make up the elevation
difference between the landing and the
standard sidewalk.
The length of the parallel ramp is not
required to exceed 15 feet, regardless
of the resulting slope. Do not exceed
8.3% slope for parallel ramps shorter
than 15 feet.
If crossing gate conflicts with
location of detectable warning or if
pedestrian crossing gate is provided,
place detectable warning panel in
advance of the crossing gate.
Locate front edge of detectable warning
panel 12 to 15 feet from centerline of
nearest rail. Orient truncated domes
parallel to the direction of pedestrian
travel.
Parallel Curb RampTurning SpacePerpendicular Curb Ramp
5 feet by 5 feet.
PV-102
PCC CURB DETAILS
FIGURE 7010.102 STANDARD ROAD PLAN
BEAM CURB*
*For short replacement sections,
match existing curb profile
DRIVEWAY DROP CURB
FORM
GRADE
ELEV.
15
8''
12"
6"2" R
Slope as
per plans
Slope as
per plans
6" SLOPED CURB 4" SLOPED CURB
12"
4"
4"2" R
18"
6"
41
2''11
2''
1" R
6"
41
2''11
2''
6"
1" R
FORM
GRADE
ELEV.
Slope as
per plans
71
2''
41
2''
6"
6" STANDARD CURB
R 3"
DROP CURB
AT SIDEWALK
1
2'' (max.)
Back of Curb
Level
Line
Gutterline 2'-6" (or as specified)
FORM
GRADE
ELEV.
Slope as
per plans
Proposed
Pavement
1
2
3
1
8
1
2 3
CURB AND GUTTER UNIT
Varies
71
2''
FORM
GRADE
ELEV.
1 1
2'' to 3''
(as specified)
For joint details, see PV-101.
6" Standard Curb, 6" Sloped Curb, or 4"
Sloped Curb as specified.
" if Proposed Pavement is HMA. No
elevation difference if Proposed
Pavement is PCC.
'BT' , 'KT', or 'L' joint if Proposed
Pavement is PCC. 'B' joint if Proposed
Pavement is HMA.
See Detail A
DETAIL A
FORM
GRADE
ELEV.
R 3"
Slope as
per plans
Slope as
per plans
PV-102
PCC CURB DETAILS
FIGURE 7010.102 STANDARD ROAD PLAN
4''
Sloped
6"
Sloped
Any
Curb
No Curb
6''
Standard
6''
Sloped
6''
Standard
4''
Sloped5'-0"
Transition
5'-0" Transiti
o
n
5'-0"
Transition
5'-0"
Transition
CURB RUNOUT
FOR ALL CURBS
CURB TRANSITION
FROM 6" SLOPED TO 4" SLOPED CURB TRANSITION
FROM 6" STANDARD TO 4" SLOPED
CURB TRANSITION
FROM 6" STANDARD TO 6" SLOPED
4
15' Normal
15' Normal 4
Curb and Gutter
Curb and Gutter'C''C''C''C'Proposed Pavement
JOINTING DIAGRAM FOR
CURB AND GUTTER UNIT'C''C'4
If proposed pavement is PCC, match
joint spacing for proposed pavement.
Place 'E' joints in curb and gutter
section where expansion joints are to
be placed in proposed pavement.
SW-512
CIRCULAR AREA INTAKE
FIGURE 6010.512 STANDARD ROAD PLAN
1'-0" min.
SW-604 Type 3, 4, or 5 Casting
Inlet Elevation
Class 3 RCP Risers
Square Edge
Base
4''4''
6'' min.
6'' min.
Location Station
Depth
12'' min.
D1
1
18''
24''
24''
30''
30''
36''
12''
15''
18''
21''
24''
27''
1
2
2
TYPICAL SECTION
CASE 1
INTAKE SIZE - CASE 1
Precast (shown) or cast-in-place base:
Precast: 6 inch thick concrete with #6 welded
wire mesh on 4 inch centers (WWF 4'' x 4'').
Center mesh vertically within base.
Cast-in-place: 8 inch thick non-reinforced concrete.
12 inch minimum riser height above all pipes.
Outlet Pipe
Diameter,
D1
Minimum Riser
Diameter,
D2
Riser
Diameter, D2
(varies)
Concrete
Fillet
SW-604
CASTINGS FOR AREA INTAKES
FIGURE 6010.604 STANDARD ROAD PLAN
Hole Optional Hole Optional
33"
FlowFlow
TYPE 3A TYPE 3B
TYPE 4A TYPE 4B TYPE 4C TYPE 4D
TYPE 4
TYPE 3 TYPE 5
2" max.
2" max.
2" max.
1" min.
2" min.
1" min.
2" max.
1" min.
2" min.
1" min.
1" min.1" min.
For Placement on 30'' RCP
(Light Duty)
3
4" min.
197
8" ± 1
8"
11
2" min.
257
8" ± 1
4"
3
4" min.
3
4" min.
11
2" min.
321
4" ± 1
4"381
4" ± 1
4"
201
8" ± 1
8"
23" ± 1
8"
21
8"
83
4"67
8" min.
10" max.
67
8" min.
10" max.
197
8" ± 1
8"257
8" ± 3
8"
For Placement on 18" RCP For Placement on 24" RCP For Placement on 36" RCP
(Light Duty)
For Placement on 24" to 30" RCP
For Placement on 18" RCP For Placement on 24" RCP
1"
-NTS
BIKE RACK
48"1'-0"24"60"36"12" CONCRETE BASE
F&I: HANDICAPPED PARKING SIGN WHICH
MEETS A.D.A. & STATE OF IOWA
REQUIREMENTS.
2" Ø GALVANIZED STEEL POST
CONCRETE FILLED
6" STEEL GUARD POST
24"Ø x 4'-0" DEEP
CONC. PLUG
HANDICAPPED SIGN
POST W/BOLLARD
NTS
7030.210
DETECTABLE WARNING
PLACEMENT
SUDAS Standard Specifications
PARALLEL RAMPS
PERPENDICULAR RAMPS
1
2
Detectable Warning
Key
Turning Space
Curb Ramp
2'-0" min.
2'-0" min.
2'-0" min.
2'-0" min.
2'-0" min.
2'-0" min.
2
Grade Break
Grade Break
Grade Break
1
1
1
2
When detectable warning is located on
curb ramp surface, orient domes in the
direction of pedestrian travel.
When the distance between the grade
break and the back of curb is less than
5 feet, place detectable warning
surface at the bottom of the curb ramp.
Where one corner of the curb ramp is
more than 5 feet from the back of curb,
construct curb ramp as a parallel curb
ramp. Move grade break back as
required to place detectable warning on
turning space at the back of curb.
Provide a minimum 2 foot width of detectable
warning surfaces in the direction of pedestrian
travel across the full width of the curb ramp or
turning space, exclusive of curbs or flares.
Grade Break
SD400NTS
VERTICAL RAIN LEADER
4" PERIMETER DRAIN
HORIZONTAL ROOF DRAIN,
SIZE VARIES.
6" PVC LEADER
45° FITTING
6" PVC REDUCER
4" DOWNSPOUTBUILDING LINE
FINISH FLOOR
(SEE PLANS)
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C812
SITE DETAILS
C812 SITE DETAILS
---- ---- C812
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
(5'-0"x5'-0" PLQ.)
CONCRETE SLAB (MIN 4000 PSI)
AGGREGATE BASE
IOWA DOT 14
COMPACTED SUBGRADE
(12" MINIMUM)
GRADE DROP LID
TOP
BOTTOM
EXTENSION
BASE
CAP TO BE SET 12"
BELOW GRADE.
BOX TO BE SET WITH
12" OF ADJUSTMENT.
RESILIANT WEDGE VALVE
CONFORMING TO AWWA
C-509-80 STANDARDS
GATE VALVE,
BOX SCREW TYPE THREE PIECE,
51 4" SHAFT SIZE G BOX,
7'6" EXTENDED,
#6 STANDARD BASE
GATE VALVE ADAPTOR
ALL GATE VALVES SHALL
BE IN ACCORDANCE WITH
CITY OF
STANDARDS
GATE VALVE
ADAPTER
1-1/2" WASHED ROCK
(INCIDENTAL)
MEGALUG
CONC BLOCKING
WATERMAIN PIPE BEDDING
(SEE DETAIL)
NOTES:
INSTALL TOP NUT EXTENDER TO 7' DEPTH ON ALL VALVES WITH OVER-DEPTH
TYPICAL
GATE VALVE & BOX INSTALLATION
NTS WM200
WAUKEE
CONCRETE PAVEMENT W/
INTEGRAL CURB & GUTTER
NTS
CONCRETE CURB & GUTTER
(REFER TO DETAILS FOR DIMENSIONS)
CONCRETE SLAB (MIN 4000 PSI)
AGGREGATE BASE
4"6"COMPACTED SUBGRADE
CONCRETE SIDEWALK
NTS
VARIES
6"6"SEE DETAIL2 - #4 CONT BARS
AGGREGATE BASE AS
CURB FOUNDATION
#4 BARS @ 16" OC EXTEND TO
OPPOSITE EDGE OF CONC WALK
12" SAND BASE
CONCRETE (MIN 4000 PSI)
TURN DOWN
CONCRETE SIDEWALK
NTS ST170
TOP PAVEMENT
TOP CONCRETE WALK
TURN DOWN
CONCRETE WALK
TURN DOWN WALK TRANSITION
N.T.S.
EDGE OF SIDEWALK
* DIRECTION OF DETAIL MAY BE MIRRORED
TURN DOWN WALK W/
PAVEMENT TRANSITION
CONCRETE SLAB (MIN 4000 PSI)
AGGREGATE BASE
5"4"COMPACTED SUBGRADE
CONCRETE PAVEMENT
NTS
STANDARD
CONCRETE SLAB (MIN 4000 PSI)
AGGREGATE BASE
6"6"COMPACTED SUBGRADE
CONCRETE PAVEMENT
NTS
HEAVY DUTY
4' ON END POST4' OR 5'4' ON AIR DRIVEN LINE POST12"Ø
ON END
POST
CONCRETE
FOOTING
GRADE
WIRE SIZED PER
MANUFACTURES
RECOMMENDATION
STRETCHER BAR
TERMINAL POST 3" OD SCHEDULE 40 PIPE, GATE
POST 4" OD SCHEDULE 40 PIPE, LINE POST 2" OD
SCHEDULE 40 PIPE
BLACK VINYL COATED
#9 GAUGE CHAIN LINK
FABRIC WITH 2" MESH
TOP RAIL SIZED PER
MANUFACTURERS
RECOMMENDATION
AIR DRIVEN LINE POST SPACING PER
MANUFACTURERS REQUIREMENTS (TYP)
4' OR 5' CHAIN LINK FENCE
NTS LD204
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C813
SITE DETAILS
C813 SITE DETAILS
---- ---- C813
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
6-23 MONTHS
STRUCTURE
·NO FALL ZONE REQUIREMENT
·NO UNDERCUT REQUIRED
PLAYGROUND STRUCTURE
INSTALLATION INFORMATION
SAND AND WATER PLAY STRUCTURE
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
---
--
--
19-23545
--/--/--
C814
SITE DETAILS
C814 SITE DETAILS
---- ---- C814
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
SHADE STRUCTURE
N.T.S.
SHADE STRUCTURE
MAINTENANCE INFORMATION
SHADE STRUCTURE
INSTALLATION INFORMATION
PLAY AREA SECTION
(N.T.S.)
TURF (BY OTHERS)
TURF (BY OTHERS)
COMPACTED SUBGRADE
NOTES:
1. CONTRACTOR TO INSTALL CONCRETE SLAB AND STONE IN LOCATIONS SHOWN ON THE PLAN.
2. ALL TURF AND PAD IS BY OTHERS.
3. THE COMPACTED STONE BELOW THE TURF AREA IS BY OTHERS. CONTRACTOR TO PREPARE
SUBGRADE TO BOTTOM OF STONE ELEVATION.
1-1/2" PAD (BY OTHERS)
4" COMPACTED STONE
4" CONCRETE
1-1/2"
3" COMPACTED STONE
(BY OTHERS)
1-1/2"
23545 C0-DETAILS
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C815
SITE DETAILS
C815 SITE DETAILS
---- ---- C815
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
XXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXX13 7
13
7 XXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
GGUTUTUE UEPROPOSED ACCESS EASEMENT
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>175LOT 2
Sanitary & Storm Sewer Easement
Per Book 2017, Page 13000
Storm Sewer Eas
e
m
e
n
t
Per Book 2017, P
a
g
e
2
0
6
0
7
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>Water Main EasementPer Book 2017, Page 2060535
20Private Storm Sewer EasementPer Book 2017, Page 20607Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
20
50
Private Ingress/Egress EasementPer Book 2017, Page 8784Private Ingress/Egress EasementPer Book 2017, Page 8784Sanitary Sewer EasementPer Book 2017, Page 2060620
>>>
SE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTIIIIII 1010
1015
1020
1025
1030
1035
IIIIII23545 C3-SITE
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C820
FIRE TRUCK
ACCESS AND
HYDRANT
COVERAGE MAP
C820 FIRE TRUCK ACCESS AND HYDRANT COVERAGE MAP
---- ---- C820
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
0
SCALE IN FEET
20 40
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
HYDRANT COVERAGE LEGEND
EXISTING HYDRANT
PROPOSED HYDRANT
R150'
R150'
PROPOSED FIRE HYDRANT
EXISTING HYDRANT
FDC LOCATION
100 FT FDC HYDRANT RADIUS
EXISTING HYDRANT
XXX X X X X X X
X
X XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX X
SINGLE STORY BUILDING
DAY CARE FACILITY
11,990 SF
FFE = 1126.0
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>GGUTUTUE UEPROPOSED ACCESS EASEMENT
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>175LOT 2
Sanitary & Storm Sewer Easement
Per Book 2017, Page 13000
Storm Sewer Eas
e
m
e
n
t
Per Book 2017, P
a
g
e
2
0
6
0
7
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>IIIIIIIIIIIIIII
IIIII>>>>>>>>>>>>>>>>>>>>Water Main EasementPer Book 2017, Page 2060535
20Private Storm Sewer EasementPer Book 2017, Page 20607Private Ingress/Egress Easement
Per Book 2017, Page 20608
151520
20
50
Private Ingress/Egress EasementPer Book 2017, Page 8784Private Ingress/Egress EasementPer Book 2017, Page 8784Sanitary Sewer EasementPer Book 2017, Page 2060620
>>>
SE KETTLEST
O
N
E
B
V
L
D
10' PARKING SETBA
C
K5' PARKING SETBACK10' PARKING SETBACK
10' PARKING SETBACKFUTURE SE KE
T
T
L
E
S
T
O
N
E
B
V
L
D
R
O
A
D
W
A
Y VERMILLION COURTPCPCPCPCPCPCPCPCPCPCPCPCPCPC
PC
PC
PC
PC
PC
PC PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC1025
1025
1025102510251025102510251023 10
24 1026102610261
0
2
6
102
7
10241026
1
0
2
7
102510251025102110
2
1
102210231
0
2
3 102310
2
3
10
2
310241
0
2
4
1
0
2
4 10241024102
6
102610271
0
2
7102510241026 10271
0
2
8
23545 C1-SWPPP
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C900
TEMPORARY
EROSION AND
SEDIMENT
CONTROL PLAN
C900 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN
---- ---- C900
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
0
SCALE IN FEET
20 40
EROSION CONTROL LEGEND
SYMBOL ITEM
NO.DESCRIPTION UNITS QUANTITY
PERIMETER CONTROL LF 925
2573.502 EXISTING STORM DRAIN INLET
PROTECTION EACH 3
2573.502 PROPOSED STORM DRAIN
INLET PROTECTION EACH 3
2573.501 STABILIZED CONSTRUCTION
EXIT EACH 1
CONCRETE WASHOUT AREA EA 1
EXISTING DRAINAGE ARROW
PROPOSED DRAINAGE ARROW
EXISTING CONTOUR (MINOR
INTERVAL)
EXISTING CONTOUR (MAJOR
INTERVAL)
PROPOSED CONTOUR (MINOR
INTERVAL)
PROPOSED CONTOUR (MAJOR
INTERVAL)
PERIMETER CONTROL CAN BE SILT FENCE, SEDIMENT CONTROL LOG, OR WOOD MULCH.
QUANTITIES ARE FOR INFORMATIONAL PURPOSES TO MEET THE REQUIREMENTS OF THE
CONSTRUCTION STORMWATER PERMIT. NO GUARANTEE IS MADE TO THE ACTUAL QUANTITIES
REQUIRED.
THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET.
SEE SITE RESTORATION PLAN FOR FINAL TURF ESTABLISHMENT
NOTE #1: SWPPP COVERAGE INCLUDES ELECTRIC, GAS, TELEPHONE, AND CABLE INSTALLATION. EACH
COMPANY OR THEIR SUBCONTRACTOR IS RESPONSIBLE TO FOLLOW THE REQUIREMENTS OF THIS
SWPPP INCLUDING PROVIDING THEIR OWN RESTORATION IF INSTALLATION OCCURS AFTER PRIMARY
INSTALLATION OF SEEDING/SODDING/MULCHING DURING CONSTRUCTION OF EACH UTILITY.
NOTE #2: SUDAS TYPE 4 SEED MIX TO BE USED FOR ALL TEMPORARY STABILIZATION (SUDAS 9010) SOD
TO BE USED FOR ALL PERMANENT STABILIZATION (SUDAS 9020) (ESTIMATED QUANTITY = 13,294 SF.)
NOTE #3: REMOVE ALL DEBRIS AND MUD SETTLED INTO ROW AT THE END OF EACH WORK DAY AND
PRIOR TO A RAIN EVENT.
NOTE #4: THE ULTIMATE DISCHARGE LOCATION FOR THE SITE IS SUGAR CREEK.
NOTE #5: THE STABILIZED CONSTRUCTION EXIT SHALL EXTEND TO A PAVED SURFACE AT ALL TIMES.
NOTE #6: WORK SHALL BE CONFINED TO THE LIMITS OF THIS PROPERTY EXCEPT FOR THE SIDEWALK
ALONG SE KETTLESTONE BVLD DIRECTLY SOUTH OF THE SOUTH PROPERTY LINE OF THE SITE.
PC
101
100
101
100
EXISTING PROPERTY LINE, TYP.
EXISTING CONTOUR, TYP.
PERIMETER CONTROL OUTLINES
PROJECT DISTURBANCE LIMITS
AREA= 1.22 AC.
STAGING/MATERIALS/
WASTE LOCATION
23545 C1-SWPPP
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C901
EROSION &
SEDIMENT
CONTROL NOTES
C901 EROSION & SEDIMENT CONTROL NOTES
---- ---- C901
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
ACTIVITY SCHEDULE
Install all BMP's needed and associated with the
Grading Phase such as stabilized construction
entrances, silt basins, riser pipes, outlet pipes silt
traps, silt fence, diversions, terraces, temporary
berms, and etcetera.
Prior to any stripping of existing vegetation or
grading.
Proceed with stripping of existing vegetation and
grading in accordance with the grading plan,
while disturbing no more than necessary.
After Installing all BMP's needed and associated with
the Grading Phase. Furthermore, INSPECTOR
approval must be obtained before the start of any
stripping of existing vegetation or grading.
Proceed with infrastructure installation.
Infrastructure installation must occur prior to any
building construction.
Implement the installation of Temporary Seeding,
Permanent Seeding, and/or Mulching.
Proceed with removal of BMP's.
BMP's may not be removed until each impacted
drainage basin has been fully developed. Full
development shall mean installation of pavement,
buildings, and utilities, landscaping, and fully
established permanent seeding. Furthermore,
INSPECTOR approval must be obtained before the
removal of any BMP's.
CONSTRUCTION ACTIVITIES & SCHEDULING
CONSTRUCTION ACTIVITY NOTES:
EROSION PREVENTION:
Construction of silt fence and all other erosion control measures shall be complete before other
construction activity occurs.
Use phased construction wherever practical and establish turf as soon as possible to minimize
sediment transport.
Turf establishment or temporary seeding or mulching of all exposed soil not being actively worked
should be immediately initiated once earth disturbing activities have ceased.
Temporary cover during construction is incidental.
Pipe outlets must be provided with temporary or permanent energy dissipation within 24 hours after
connection to a surface water.
SEDIMENT CONTROL PRACTICES:
Construction of silt fence and all other erosion control measures shall be complete prior to land
disturbing activities occur.
Inlet erosion protection shall be installed and maintained until turf has been established.
The contractor shall be responsible to control erosion from leaving the construction zone. All
eroded material that leaves the construction zone shall be collected by the contractor and returned
to the site at the contractor's expense.
All streets must be swept at the end of each working day and prior to a rain event.
Silt fence or other effective erosion control measures must be installed around the perimeter of any
soil stockpiles, including temporary stockpiles. Stockpiles cannot be placed in surface waters,
including storm water conveyances such as curb and gutter systems, or conduits and ditches.
Perimeter control shall be installed along the back of curb immediately following curb installation at
all locations with positive drainage to parking lot and/or streets, and shall remain until stabilization is
achieved. This shall be accomplished through the use of silt fence, biorolls, Rock logs, or other
methods approved by the Engineer.
CONSTRUCTION ACTIVITY NOTES:
DEWATERING AND BASIN DRAINING:
Dewater sediment-laden water to sedimentation basins if possible, or use other BMP's to
prevent erosion and remove sediment when discharging to surface waters. Use
appropriate energy dissipation measures on all discharges.
Dewatering practices cannot cause nuisance conditions, erosion or in receiving channels or
inundation of wetlands resulting in adverse impacts.
POLLUTION PREVENTION:
All solid waste collected from the construction site must be disposed in accordance with all
applicable regulations.
All hazardous materials (oil, gasoline, fuel, paint, etc) must be properly stored to prevent
spills, leaks or other discharge, storage areas shall provide secondary containment and a
hazardous materials spill kit. Storage and disposal of hazardous waste must be in
compliance with all applicable regulations.
Equipment maintenance areas must be limited to a defined area of the site. All runoff
containing any hazardous material must be properly collected and disposed. No engine
degreasing shall be allowed on site.
The contractor is responsible for monitoring air pollution and ensuring it does not exceed
levels set by local, state, or federal regulations. This includes dust created by work being
performed on the site. Air pollution and dust control correction is considered incidental to
the unit bid prices for which work is being performed. Additional dust control measures
may be required by the Engineer.
Concrete washout onsite: All liquid waste generated by concrete washout operations
must be contained in a leak-proof containment facility or impermeable liner. The liquid
waste must not contact the ground, and there must not be runoff from the concrete
washout operations or areas. A sign must be installed adjacent to each washout facility to
inform concrete equipment operators to utilize the proper facilities. Protect storm sewers
and drainage ways from allowing concrete slurry from concrete operations to discharge
offsite.
INSPECTION AND MAINTENANCE:
The Permittees must routinely inspect the construction site once every seven (7) days
during active construction.
All inspections performed during construction must be recorded and records retained with
the SWPPP.
Contractor is responsible for keeping a record of all rainfall information & erosion control
maintenance until final establishment of turf.
All silt fences must be repaired, replaced, or supplemented when they become
nonfunctional or the sediment reaches 12 of the height of the fence.
Erosion control, and other BMP's must be replaced, repaired, or supplemented when they
reach 50% design load.
FINAL STABILIZATION:
The Permittees must ensure final stabilization of the site. The Permittees must submit a
notice of termination within 30 days after final stabilization is complete or control has been
passed to another owner.
All temporary erosion control measures and BMP's must be removed as part of the final
site stabilization.
The storm water permit further defines final stabilization and its requirements.
MAINTENANCE SCHEDULE
The following Maintenance Schedule has been provided. The INSPECTOR must perform
the inspections. The OPERATOR/CONTRACTOR must perform all needed maintenance.
Furthermore, all erosion control feature requiring maintenance may not be listed below. The
OPERATOR/CONTRACTOR and INSPECTOR must perform their respective duties on all
BMP's that are not listed below as well.
1.Construction Entrance - The entrance shall be maintained in a condition which
will prevent tracking or flow of sediment onto public rights-of-way. This may
require periodic top dressing with additional stone or the washing and
reworking of existing stone as conditions demand and repair and/or cleanout of
any structures used to trap sediment. All materials spilled, dropped, washed, or
materials dropped, washed or tracked onto roadways will not be permitted
under any circumstances.
2.Wattles - The maintenance measures are as follows: (2.1) wattles shall be
inspected weekly; (2.2) close attention shall be paid to the repair of damaged
bales, end runs and undercutting beneath bales; (2.3) necessary repairs to
barriers or replacement of wattles shall be accomplished promptly; (2.4)
sediment deposits shall be removed after each rainfall, they must be removed
when the level of deposition reaches approximately one-half the height of the
wattle; and (2.5) any sediment deposits remaining in place after the wattle is no
longer required shall be dressed to conform to the existing grade, prepared and
seeded.
3.Silt Fence - The maintenance measures are as follows; (3.1) silt fences shall
be inspected weekly, any required repairs shall be made immediately; (3.2)
close attention shall be paid to the repair of damaged silt fence resulting from
end runs and undercutting; (3.3) should the fabric on a silt fence decompose or
become ineffective prior to the end of the expected usable life and the barrier is
still necessary, the fabric shall be replaced promptly; (3.4) sediment deposits
must be removed when the level of deposition reaches approximately one-half
the height of the barrier; and (3.5) any sediment deposits remaining in place
after the silt fence is no longer required shall be dressed to conform to the
existing grade, prepared and seeded.
4.Storm Drain Inlet Protection - The maintenance measures are as follows: (4.1)
structures shall be inspected weekly and repairs made as necessary and (4.2)
structures shall be removed and the area stabilized when the remaining
drainage area has been properly stabilized.
5.Temporary Seeding - Areas which fail to establish vegetative cover adequate
to prevent rill erosion will be re-seeded as soon as such areas are identified.
6.Permanent Seeding - The maintenance measures are as follows: (10.1) in
general, a stand of vegetation cannot be determined to be fully established until
it has been maintained for one full year after planning; (10.2) new seedlings
shall be supplied with adequate moisture, supply water as needed, especially
late in the season, in abnormally hot or dry conditions, or on adverse sites,
water applications shall be controlled to prevent excessive runoff; (10.3)
inspect all seeded areas for failures and make necessary repairs,
replacements, and reseedings within the planting season, if possible; [10.3.a] if
stand is inadequate for erosion control, over seed and fertilize using half of the
rates originally specified; [10.3.b] if stand is 60% damaged, re-establish
following seedbed and seeding recommendations; [10.3.c] if stand has less
than 40% cover, re-evaluate choice of plant materials and quantities of lime
and fertilizer, the soil must be tested to determine if acidity or nutrient
imbalances are responsible, re-establish the stand following seedbed and
seeding recommendations.
7.Street Cleaning / Sweeping - The maintenance measures are as follows: (13.1)
evaluate access points daily for sediment tracking; (13.2) when tracked or
spilled sediment is found on paved surfaces, it will be removed daily, during
times of heavy track-out, such as during rains, cleaning may be done several
times throughout the day; (13.3) all streets shall be swept at the end of each
working day and prior to a rain event; (13.4) unknown spills or objects will not
be mixed with the sediment; and (13.5) if sediment is mixed with other
pollutants, it will be disposed of properly at an authorized landfill.
Stabilization of disturbed areas must be initiated
immediately whenever any clearing, grading,
excavating, or other earth disturbing activities have
permanently ceased on any portion of the site or
temporarily ceased on any portion of the site and
will not resume for a period exceeding 14 calendar
days.
Stabilization of disturbed areas must be initiated
immediately whenever any clearing, grading,
excavating, or other earth disturbing activities
have permanently ceased on any portion of the
site or temporarily ceased on any portion of the
site and will not resume for a period exceeding 14
calendar days.
23545 C1-SWPPP
DATE DESCRIPTION BY
PROJECT
TITLE
SHEET
REVISION SCHEDULE
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
DATE DESCRIPTION BY
ISSUE SCHEDULE
--
-
ARA
ARA/RJA
RJA/ART
19-23545
--/--/--
C902
EROSION &
SEDIMENT
CONTROL DETAILS
C902 EROSION & SEDIMENT CONTROL DETAILS
---- ---- C902
IAWAUKEE
LOT 2
ASHWORTH
SOUTH PLAT 2
11/22/19 CLIENT REVIEW SET ARA
PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTION11/26/19 CITY SUBMITTAL #1 ARA
12/23/19 CITY SUBMITTAL #2 ARA
02/25/20 CITY SUBMITTAL #3 ARA
03/11/20 CITY SUBMITTAL #4 ARA
STANDARD 2"
OVERFLOW AREA 11 GA GALVANIZED STEEL SUSPENSION SYSTEM
LIFT HANDLES
REPLACEABLE SEDIMENT BAGS WITH
GEOTEXTILE FILTER FABRIC
NOTES:
FOR SPECIFICATIONS AND MAINTENANCE GUIDELINES VISIT
WWW.INLETFILTERS.COM
INSTALLATION:
REMOVE GRATE
DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR
CONCRETE STRUCTURE
REPLACE GRATE
MATERIALS:
FRAMING - 11 GAUGE STEEL; CORROSION RESISTANT
SEDIMENT BAG - WOVEN GEOTEXTILE FABRIC; 2 CUBIC FOOT TYP VOLUME;
STAINLESS STEEL LOCKING BAND SECURING BAG TO FRAME
RECTANGULAR FILTER
INLET PROTECTION
NTS EC211
2'1' MIN3' DEEP10'NATIVE
MATERIAL
5'x10'x3' CONCRETE
WASHOUT AREA
1' DEEP IMPERVIOUS
CLAY LINER
MINIMUM 10-MIL THICK PLASTIC
SHEETING OR APPROVED
EQUAL
NOTES:
CONTRACTOR SHALL INSTALL A SIGN INDICATING THE CONCRETE WASHOUT AREA.
CONTRACTOR SHALL MAINTAIN WASHOUT AREA TO REMOVE MATERIALS BEYOND 75% CAPACITY.
WASHOUT AREA SHALL NOT BE PLACED WITHIN 50' OF STORM DRAINS, OPEN DITCHES OR BODIES OF WATER.
CONTRACTOR SHALL INSPECT WASHOUT AREA AS NECESSARY TO PREVENT LEAKS AND OVER TOPPING.
WASHOUT AREA SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETE.
CONCRETE WASHOUT
NTS EC500
9040.102
FILTER BERM AND FILTER SOCK
SUDAS Standard Specifications
Water Flow
Water Flow
1
1
12"24"Disturbed Area
Direction of Flo
w
2'-0"
Water Flow
(for perimeter control along street)10'-0" max.(for sediment and slope control)
Area to
be Protected
Fill Material
Filter Material
Stakes (typ.)
Construct "J-hook" at each
end on an individual section
of sock or berm.
Place berm or sock
perpendicular to slope.
Stake
Berm shown is typical for slopes flatter than
3:1. For steeper slopes, increase berm size
as directed by the Engineer.
Place berm in uncompacted windrow
perpendicular to the slope at locations
specified in the contract documents.
Filter sock diameter as specified in the
contract documents.
PLAN VIEW OF SLOPE
FILTER BERM
FILTER SOCK
SECTION VIEW AT STREET
TYPICAL PLACEMENT OF BERM OR SOCK200'-0" max. length per section(600'-0" if slope is flatter than 5%) 3' min.
Overlap
9040.120
STABALIZED
CONSTRUCTION ENTRANCE
SUDAS Standard Specifications
1
Le
n
g
t
h
1
1
Thickness as
specified (6" min.).
20'-0"
mi
ni
m
u
m
10'-0"
mi
n.
1 Entrance length: 50 foot minimum
(30 foot for single family residential), or
as specified in the contract documents.
Length of entrance may be increased if
sediment track-out occurs.
FINISH FLOOR
0' -0"
6
AE2-001a
STANDING SEAM METAL
ROOF -M-8
PRE-FINISHED ALUMINUM
TRIM -M-3
PRE-FINISHED
ALUMINUM GUTTER &
DOWN SPOUTS -M-6
BRICK VENEER -M-1a
BRICK VENEER -M-1b
STONE SILL -M-5
27' - 2 5/8"
19' - 9 5/8"
16' - 0 1/2"
26' - 1 1/8"
21' - 1 7/8"
ROOF VENTS -PAINT TO
MATCH ROOF SHINGLES
(TYP)
FINISH FLOOR
0' -0"
STANDING SEAM METAL
ROOF -M-8
PRE-FINISHED ALUMINUM
TRIM -M-3
SIDING -M-4
PRE-FINISHED
ALUMINUM GUTTER &
DOWN SPOUTS -M-6
BRICK VENEER -M-1a
BRICK VENEER -
M-1b
STONE SILL -M-5
14' - 8 3/8"
22' - 9 1/2"
26' - 1 1/8"
14' - 8 3/8"
22' - 9 1/2"
26' - 1 1/8"
27' - 2 5/8"
7
AE2-001a
PROPOSED 100" X 24" SIGN -SIGN TO BE PERMITTED
UNDER SEPARATE SUBMITTAL BY SIGN VENDOR
SYMBOL ITEM MANUFACTURER MODEL COLOR / FINISH REMARKS
M-1a
M-3
M-4
M-5
M-6
M-8
M-9
BRICK
BREAK METAL TRIM
CEMENT BOARD
SIDING
SILLS & COLUMNS
PRE-FIN ALUM
GUTTER
STANDING SEAM
METAL ROOF
SPLIT FACE CMU
EXTERIOR ELEVATION MATERIALS
BRAMPTON BRICK
QUALITY EDGE
JAMES HARDIE
ESCHELON MASONRY
PLY-GEM MASTIC
McELROY METAL
ESCHELON MASONRY
CROSSROADS SERIES
TRULINE EMBOSSED TRIM COIL
5" HORIZONTAL LAP SIDING
CORDOVA STONE
5" K-STYLE SEAMLESS GUTTER
INSTALOC STANDING SEAM
SYSTEM, STYLE -PLANK PROFILE
MESASTONE
JASPER
807 CLAY
COBBLESTONE
LIMESTONE,
GROUNDFACE
PEBBLESTONE CLAY
COPPER PENNY
METALLIC
COUNTY GRAY
NOTE:
-TYPICAL DORMERS M-4 SIDING, PAINT TRIM SW9172 TO MATCH.
-CUPOLA TO BE PAINTED CLAY & DESERT SAND, PAINT SW9117 TO MATCH M-3.
IF BRICK IS NOT READILY
AVAILABLE PROVIDE OPTIONS
FOR OWNER TO APPROVE
IF CMU IS NOT READILY
AVAILABLE PROVIDE OPTIONS
FOR OWNER TO APPROVE
M-10
M-11
M-12
WINDOW FRAME
STOREFRONT
EXTERIOR DOORS
JELD-WEN
-
SHERWIN WILLIAMS
VARIES -REFER TO
WINDOW TYPES
-
-
DESERT SAND
DARK BRONZE
ALUMINUM
PAINT, SW701 HG GRAY SCREEN SEMIGLOSS
M-1b BRICK BRAMPTON BRICK CROSSROADS SERIES PUTNAM
FINISH FLOOR
0' -0"
STANDING SEAM METAL
ROOF -M-8
PRE-FINISHED ALUMINUM
TRIM -M-3
PRE-FINISHED ALUMINUM
GUTTER & DOWN
SPOUTS -M-6
BRICK VENEER -M-1a
STONE SILL &
COLUMN -M-5
27' - 2 5/8"
26' - 1 1/8"
21' - 1 7/8"
16' - 0 1/2"
19' - 9 5/8"
SPANDREL GLASS (5)
BRICK VENEER -M-1b
FINISH FLOOR
0' -0"
STANDING SEAM METAL
ROOF -M-8
PRE-FINISHED ALUMINUM
TRIM -M-3
SIDING -M-4
PRE-FINISHED ALUMINUM
GUTTER & DOWN
SPOUTS -M-6
BRICK
VENEER -M-1a
BRICK VENEER -
M-1b
STONE SILL -M-5
ROOF VENTS -PAINT TO
MATCH ROOF SHINGLES
(TYP)
GRADE LEVEL
FACE
BRICK M-1a
TO MATCH
BUILDING
6" ∅ STEEL
PIPE -CONC.
FILLED
M-5 PRE-CAST
CONCRETE CAP
W/DRIP EDGE AT
BOTH SIDES
FINISH FLOOR
0' -0"
BRICK BELOW CAST
STONE TO GRADE
2 5/8" ± (ONE BRICK)4"2 5/8" ± (ONE BRICK)
2 5/8" ± (ONE BRICK)
8" ± (SOLDIER COURSE)
BEHIND TRIM
1X4 TRIM BOARD ON 1X12
SUB BOARD WITH PRE-
FIN ALUMINUM WRAP
PRE-FIN ALUMINUM
GUTTER
FASCIA BOARD W/
PRE-FINISHED
ALUMINUM WRAP
1' - 4"1' - 4"1' - 4"CAST STONE SILL
TIE GUTTERS INTO
ROOF DRAIN
CONDUCTORS -TYP
CONCEALED FLASHING
1/2" SOLID CELLULAR PVC
SHEET ON SELF-ADHERED
ROOFING UNDERLAYMENT
ON 1/2" APA RATED
SHEATHING ON HORIZONTAL
2X4 WOOD STUDS AT 16" ON
CENTER ON 2X4 WOOD
STUDS AT 16" ON CENTER
ALUMINUM CLAD SILL
W/ DRIP EDGE
1X4 TRIM BOARD PAINTED
9 1/2"2' - 6"9 1/2"2' - 6"WINDOW -TYPE B ON ALL
4 SIDES
1X CORNER BOARD PAINTED
ON 1/2" PACK OUT
1X10 TRIM BOARD PAINTED
1X4 TRIM BOARD PAINTED
1X6 FASCIA TRIM BOARD PAINTED
PREFINISHED METAL STANDING
SEAM ROOFING ON 30LB
ROOFING FELT ON 1/2" APA
RATED SHEATHING ON 2X6
WOOD ROOFING FRAMING AT
16" ON CENTER
12
10
is a member of the IBI Group of companies
DATE:
ISSUE
SHEET TITLE
PROJECT
SCALE:
APPROVED BY:PROJECT MGR:
PROJECT NO:
SHEET NUMBER
CLIENT
COPYRIGHT
ISSUES
This drawing has been prepared solely for the intended use, thus any reproduction
or distribution for any purpose other than authorized by IBI Group is forbidden.
Written dimensions shall have precedence over scaled dimensions. Contractors
shall verify and be responsible for all dimensions and conditions on the job, and IBI
Group shall be informed of any variations from the dimensions and conditions
shown on the drawing. Shop drawings shall be submitted to IBI Group for general
conformance before proceeding with fabrication.
IBI Group - Michigan LLC
NOT FOR CONSTRUCTIONCHECKED BY:DRAWN BY:SCALE CHECKSEAL
3221 W Big Beaver, Suite 111
Troy, MI, 48084
10mm1 inCONSULTANTS
As indicated
B C:\Users\corrinne.greer\Documents\REVIT2018\123046_814KC WakeIA_arch_v18_corrinne.greer.rvtEXTERIOR ELEVATIONS
123046
L.SMIGLIANI
2020-03-06
AE2-001a
KINDERCARE LEARNING
CENTER
L.SMIGLIANI
WAUKEE, IA
C.GREER E.SHELINE
AE2-001a Scale: 1/8" = 1'-0"
1 SOUTH ELEVATION
AE2-001a Scale: 1/8" = 1'-0"
3 EAST ELEVATION
AE2-001a Scale: 1/8" = 1'-0"
4 NORTH ELEVATION
AE2-001a Scale: 1/8" = 1'-0"
2 WEST ELEVATION
AE2-001a Scale: 1/8" = 1'-0"
5 TRASH ENCLOSURE TYP ELEVATION
AE2-001a Scale: 1/2" = 1'-0"
6 ELEVATION DETAIL - QUION
AE2-001a Scale: 1/2" = 1'-0"
7 ELEVATION DETAIL - CUPOLA
No. DESCRIPTION DATE
A SITE PLAN REVIEW 2019-11-08
B SITE PLAN REVISION 2020-03-10