Loading...
HomeMy WebLinkAbout2020-05-18-I09 NW 10th Street, W Hickman to NW Douglas Pkwy_Change Order 1CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 18, 2020 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Absolute Concrete Construction, Inc. for the NW 10th Street Improvements, W Hickman Road to NW Douglas Parkway increasing the contract price in the amount of $137,723.71. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is for removal of contractor provided handholes from the contract, cement stabilization, geogrid, temporary granular surfacing, traffic signal detector cable upgrade, additional traffic control for detour route signage, time and material for core-out and replacement with suitable backfill. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $137,723.71. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Motion to Approve. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: AGENDA ITEM: I9 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 May 1, 2020 Sara Kappos, P.E. Assistant Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Change Order #1 NW 10th Street Improvements W Hickman Rd to NW Douglas Parkway Dear Ms. Kappos: Attached please find a detailed Change Order for City Council approval on May 18, 2020. Change Description  Item 8.18 Handhole, Type 1, Furnish and Install o Removal of 14 from contract due to private utility companies providing their own handholes  Item CO1.1 Handhole, Type IV, Install Only o Due to UPN and CenturyLink wanting their own handhole.  Item CO1.2 Cement Stabilization o Due to poor soil conditions experienced, in lieu of devoting equipment and crews to maintaining temporary access roads, using 6% Cement treatment of the subgrade.  Item CO1.3 Geogrid o Due to poor soil conditions experienced, in lieu of devoting equipment and crews to maintaining temporary access roads, using geogrid in addition to cement treatment of the subgrade.  Item CO1.4 Temporary Granular Surfacing, Class A Crushed Stone, Excess of Bid Item o With additional rock anticipated establishing a new price that does not include restoration.  Item CO1.5 Traffic Signal Detector Cable Upgrade to Cat6e o Due to potential equip ment changes for advanced detection, cable from cabinet to advanced detection is being upgraded from cat5e cable to give flexibility of future options.  Item CO1.6 Additional Traffic Control for Detour Route Signage o Once planned detour route was in place, it was noticed additional signage should be added to NE Alice’s Road south of Hickman Rd.  Item CO1.7 Time and Material for Core-out and replacement with suitable backfill o A section of gas main trench east of NW 10th Street along the south side of NW Sunrise Drive was not sufficiently compacted by another contractor during the 2019 construction season and created a section of unstable material needing to be addressed. C:\pw_workdir\pw_ie\jcd\d0424140\Ltr-2020-0501-Waukee-NW 10th Street Improvements-Recommend CO#1.docx 5/11/2020 We have reviewed the submitted quotes from Absolute Concrete Construction, Inc. and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $137,723.71 to complete the additional work associated with Change Order #01. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Joshua C. DeBower, P.E. Lead Civil Engineer Encl: Change Order #1 dated 04/30/2020 CHANGE ORDER 01 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:Absolute Concrete Construction, Inc. 1000 West 6th Avenue PO Box 148 $9,845,649.70 November 5, 2019 Slater, Iowa 50244 8.18 EA $1,320.00 -14 ($18,480.00) CO 1.1 EA $3,368.00 14 $47,152.00 CO 1.2 TON $269.50 150 $40,425.00 CO 1.3 SY $2.20 4705 $10,351.00 CO 1.4 TON $24.48 1000 $24,480.00 CO 1.5 LS $385.00 1 $385.00 CO 1.6 LS $2,200.00 1 $2,200.00 CO 1.7 LS $31,210.71 1 $31,210.71 $137,723.71 $9,845,649.70 $0.00 $9,845,649.70 $137,723.71 $9,983,373.41 0 Days Recommended By: Absolute Concrete Construction, Inc. Signature: Name: Logan Petersen Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ ADDITIONAL TRAFFIC CONTROL FOR DETOUR ROUTE SIGNAGE Special TIME AND MATERIAL FOR CORE OUT AND REPLACEMENT WITH SUITABLE BACKFILL ALONG A SECTION OF GAS MAIN SOUTH OF NW SUNRISE DRIVE The Original Contract Sum was Special CEMENT STABILIZATION Special GEOGRID Special TEMPORARY GRANULAR SURFACING, CLASS A CRUSHED STONE, EXCESS OF BID ITEM Special Title: City Administrator Value Adjustment TRAFFIC SIGNAL DETECTOR CABLE UPGRADE TO CAT6E NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was Checked By: Prepared By: The new Contract Sum including this Change Order will be Signature: Name: Joshua C. DeBower, P.E. Date: Name: Tim Moerman 1 Foth Project File Number Orig. Contract Amount & Date Date: The Contract Time will be increased by CHANGE ORDER SUMMARY Item No.Quantity AdjustmentUnit Price THE CONTRACT IS CHANGED AS FOLLOWS: Addition of cement treated subbase and geogrid under temp access roads due to pour soil conditions, addition of Class A crushed stone for quantity over bid amount, switch to Handhole, Install Only for placement of private utility provided equipment, switching of advanced detector cable from CAT5e to CAT6e, additional traffic control for detour route, and time and material to fix an existing trench with unsuitable material. Unit Title: Lead Civil Engineer Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders City of Waukee Special Special Description Special Project Title Waukee Project File Number Item Code April 30, 2020 Change Order Number NW 10th Street Improvements W. Hickman Road to NW Douglas Parkway HANDHOLE, TYPE IV, INSTALL ONLY HANDHOLE, TYPE I, FURNISH AND INSTALL 19W003.00 Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 Date CO#01-2020-0430-NW 10th Street Improvements.xls Change Order 1 Page 1 of 1