Loading...
HomeMy WebLinkAbout2020-12-07-J08 Redwood at Waukee Hickman Road_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 7, 2020 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Redwood at Waukee Hickman Road FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Redwood Acquisition, LLC, requests approval of a site plan to allow the construction of a townhome residential development. The project involves the construction of nineteen (19) single story, townhome buildings for a total of 100 townhome units. Each building will have four to six units per building. The individual units will range in size from approximately 1,700 square feet to 2,100 square feet. All units will have a two car attached garage. The units are intended to be renter occupied. In addition to the townhome buildings, there will be a building that houses the leasing office, maintenance office and model unit. Trash will be handled with individual trash and recycling bins for each unit. A mail kiosk is provided near the leasing office. The applicant has provided elevations for the proposed building on the site, which meets the intent of the architectural guidelines within the Site Plan Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the February 11, 2020 Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Redwood at Waukee Hickman Road Senior Planner, Melissa DeBoer, introduced the request made by the applicant Redwood Acquisition, LLC, to approve a site plan for a townhome residential development. The subject property is generally located north of Hickman Road and east of T Avenue, containing approximately 18.98 acres. the property was rezoned from A-1, Agricultural District to R-4, Row Dwelling &Townhome Dwelling District in March of 2019. Mrs. DeBoer advised that the site plan indicates the construction of 19 townhome buildings for a total of 100 units. The units will range in size from 1700 to 2100 square feet, and are anticipated as rental units. In addition, the site plan indicates the construction of another building to house the leasing office, maintenance office, and a model unit. Two monument signs are proposed at the north side of the site off of NW 17th Street, a mail kiosk is located near the leasing office, and all garbage and J8 recycling will be provided individually for the units. Elevations indicate this product will be similar to previous developments done by the same applicant. Mrs. DeBoer explained that there will be two access points off of NW 17th Street into the development. NW 17th Street is a public street and will be maintained by the city, however all other streets internal to the site are privately owned and maintained by the property owner. Utilities will be extended from NW 17th Street and will be privately owned and maintained by the property owner. Stormwater detention is accommodated by a wet bottom detention basin. The basin will be privately owned and maintained. All parking, landscaping and open space, and lighting plans are in accordance with the standards within the City Code. At this time staff recommends approval subject to any remaining staff comments.  Commissioner Hoifeldt questioned where the other development of like product was. Mrs. DeBoer advised is was located west of NE Alice’s Road and just south of NE Douglas Parkway.  Commissioner Broderick questioned if the units were the same size. Mrs. DeBoer advised that the sizes do vary between center units and end units.  Commissioner Hoifeldt questioned if the units had basements. Mrs. DeBoer advised that the units did not have basements. Commissioner Hoifeldt questioned if there was a need to provide tornado shelters if there were not basements. Mrs. DeBoer advised there’s no Code provision to require a shelter.  Commissioner Koshy questioned the lack of street lighting. Representative of the applicant, Nikki Neal with Civil Design Advantage, advised that the housing lights were not run by the occupants rather all hosing lights were timed to provide necessary lighting for the area.  Commissioner Hoifeldt clarified that NW 17th Street would have street lighting. Mrs. DeBoer advised that was correct.  Senior City Planner, Andy Kass, advised the commission that the project is coming to the table early, there is still infrastructure that needs to be supplied.  Commissioner Broderick questioned why the basin was so large. Mrs. DeBoer clarified that this detention basin would act as a regional detention pond for the James Pointe area.  Commissioner Hoifeldt questioned if the top corner of the pond abut the Trail. Ms. Neal advised that there is a decent amount of space between the trail and the actual bank of the pond. Commissioner Koshy moved to approve a site plan for Redwood Waukee at Hickman Road subject to any remaining comments. Commissioner Inman seconded the motion. Ayes: Broderick, Ward, Koshy, Hoifeldt, and Inman. Nays: None. Motion Carries. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2020- APPROVING THE SITE PLAN FOR REDWOOD AT WAUKEE HICKMAN ROAD IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Redwood at Waukee Hickman Road, subject to remaining staff comments on February 11, 2020; AND, WHEREAS, the Site Plan for Redwood at Waukee Hickman Road is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Redwood at Waukee Hickman Road is in general conformance with §161 – Landscape and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 7th day of December, 2020 that the Site Plan for Redwood at Waukee Hickman Road is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Redwood at Waukee Hickman Road – Site Plan PREPARED BY: Melissa DeBoer, AICP, Senior Planner REPORT DATE: February 6, 2020 MEETING DATE: February 11, 2020 GENERAL INFORMATION Applicant: Redwood Acquisition, LLC Owner: Waukee Land Investment, LLC Owner’s Representative: Keith Weggen, Civil Design Advantage, LLC Request: The applicant is requesting approval of a site plan for a townhome residential development. Location and Size: Property is generally located north of Hickman Road and east of T Avenue, containing approximately 18.98-acres. AREA MAP ABOVE: Aerial of subject property (outlined in YELLOW) in relation to the surrounding area. February 7, 2020 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Single Family Residential & Medium Density Residential R-4 (Row Dwelling & Townhome Dwelling District) North Vacant – Undeveloped Single Family Residential A-1 (Agricultural District) South Vacant – Undeveloped Medium Density Residential & Mixed Use M-1 (Light Industrial District) East Vacant – Undeveloped Medium Density Residential & Light Industrial Office M-1 (Light Industrial District) West Vacant – Undeveloped Medium Density Residential A-1 (Agricultural District) HISTORY The subject property is located north of Hickman Road and east of T Avenue. The property is part of the James Pointe development. This property was rezoned from A-1, Agricultural District, to R-4, Row Dwelling & Townhome Dwelling District, in March 2019. PROJECT DESCRIPTION The project involves the construction of nineteen (19) single story, townhome buildings for a total of 100 townhome units. Each building will have four to six units per building. The individual units will range in size from approximately 1,700 square feet to 2,100 square feet. All units will have a two car attached garage. The units will be renter occupied. In addition to the townhome buildings, another building is proposed to house the leasing office, maintenance office and model unit. Two monument signs are proposed along NW 17th Street. One sign will be located at the north entrance on the west side of NW 17th Street and the other sign will be located at the south entrance on the east side of NW 17th Street. Individual trash and recycling bins will be provided to each unit for curbside trash collection. No trash enclosures have been indicated on the site plan. A mail kiosk is provided near the leasing office for the entire townhome development. ACCESS AND PARKING Two access points will be provided to each side of the proposed townhome development on either side of NW 17th Street. One access point is provided on both sides of NW 17th Street at the north end of the proposed development and one access point is provided at the south end of the development on either side of NW 17th Street. All streets within the development will be privately owned and maintained by the owner of the property. NW 17th Street will be a public street. A total of 220 parking spaces are required for this development – 2 spaces per unit and 1 visitor space per every 5 units. The site plan indicates that a total of 433 parking spaces are provided for the overall site – 200 garage spaces, 200 driveway spaces and 33 standard parking spaces. February 7, 2020 3 of 3 SIDEWALKS/TRAILS A five-foot wide sidewalk will be installed on the west side of NW 17th Street and a ten-foot wide trail will be installed on the east side of NW 17th Street. Sidewalks are shown internal to the development, as well, in order to provide pedestrian access across the site. UTILITIES Utilities will be extended from the utilities along NW 17th Street. All utilities within the development will be privately owned and maintained by the property owner. Stormwater detention will be provided with a dry bottom detention basin located along the east side of the site. This detention basin will be privately owned and maintained. LANDSCAPING & OPEN SPACE A minimum of 20% of the site is required to be open space. The total amount of open space proposed is 58%. As part of the landscaping requirements, two (2) trees per unit are required. This site also requires several landscape buffers, a 40-ft landscape buffer along the east and south sides of the site, a 25-ft landscape buffer at the north side of the site, and 25-ft landscape buffers on either side of NW 17th Street. The applicant has provided the required amount of plantings per the Landscape and Open Space Ordinance. ELEVATIONS Four different building types are proposed. The elevations of the buildings are proposed to be constructed of various vinyl siding and trim, stone veneer and asphalt shingles. LIGHTING PLAN General exterior residential house lighting will be provided on the exterior of each unit. A lighting plan has been submitted for review and it is in compliance with the lighting standards from the City Code. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval subject to remaining staff comments. M-R T-CM-S U-PM-S 3 P-E MAIL KIOSK TYPE 10 SN 4 UNITS TYPE 10 SN 6 UNITS TYPE 7 5 UNITS TYPE 7 6 UNITSLOT 29TYPE 10 SN 6 UNITS TYPE 10 SN 5 UNITS TYPE 7 4 UNITS TYPE 2 5 UNITS TYPE 2 5 UNITS TYPE 2 5 UNITS TYPE 7 6 UNITS TYPE 7 6 UNITS TYPE 7 6 UNITS TYPE B SN 6 UNITS TYPE B SN 5 UNITS TYPE B SN 5 UNITS TYPE B SN 6 UNITS MAINTENANCE BUILDING/ LEASING OFFICE TYPE 2 5 UNITS TYPE 7 4 UNITS MODEL UNIT 3 I-V 3 V-S 2 P-G 3 V-S 3 I-V A-R T-C P-G 2 P-G M-S T-C P-G 2 A-R P-G A-R P-G U-P 2 M-S P-A 2 P-G 2 M-R3 P-AA-B A-R 2 P-G 2 M-R T-C P-A P-G P-A 2 P-A A-R P-G U-P P-A B-H P-A B-H A-R 2 P-G 2 P-A M-S 2 Q-P 2 P-A P-G 3 M-S3 P-A 2 A-R2 P-H M-S T-C 2 P-G2 B-H 4 P-A 2 C-M A-R U-P2 M-S2 M-R2 P-HP-G2 B-H A-R A-R B-H B-H 2 T-C M-R 2 M-R2 P-A B-H A-R 2 A-R 2 M-R 2 P-G2 M-R2 P-AP-G 2 B-H Q-P Q-P 2 P-G A-R2 M-S 2 P-A 2 P-H C-M A-R 2 P-A 2 B-H2 M-S M-R A-RP-G U-P2 M-S P-E 2 P-A M-R 2 M-S A-R 2 T-C 3 P-H 3 M-R 2 T-C 4 P-G 2 B-H 2 P-G 2 C-M 3 P-A2 P-G U-P 2 M-S 4 P-E3 P-A 3 P-A 3 A-C 2 T-C2 P-A 2 B-H 4 P-G M-S 2 A-B A-R 5 P-A 2 U-P 4 B-H 2 T-C 5 P-G 3 C-M 3 P-H 3 P-A B-H A-R A-R2 M-S 3 P-G 2 M-R 2 P-A 2 P-H B-H 3 A-R 3 U-P B-H 2 M-S 5 P-G 2 M-R B-H T-CA-B 2 M-R 3 P-A 2 P-G 2 B-H 2 T-CA-R 5 P-G 2 M-R 3 P-A P-G 2 B-H2 M-S A-R B-HM-S 2 P-G 3 M-R 2 A-P M-R 5 P-G 3 C-M 2 T-C 4 P-G 3 A-C 2 P-H 3 M-S P-A 2 A-P 2 U-P P-H 2 P-G 2 M-S A-R 3 C-M M-R 3 P-E STORMWATER MANAGEMENT 3 A-R 3 A-R 3 P-G 4 P-H 3 B-H 4 U-P 3 M-S 2 A-R 2 P-E 3 B-H 4 M-R 2 M-S 2 G-S 3 P-G 2 M-R 2 A-R 2 P-G 2 G-S 2 C-M 3 P-G 3 M-S 2 M-R 3 P-G 4 P-A 2 P-A P-H P-A 2 P-G 2 U-P 2 P-A 2 B-H 2 M-R 3 M-S 3 P-A 3 M-R 2 P-A 2 P-G 2 P-H 5 P-H 2 P-A 2 P-A 2 P-G 3 P-H P-G 2 P-G 2 P-H A-R 3 P-G M-S 3 U-P 2 P-H 3 P-A 3 A-R G-S 2 A-B A-B P-G P-H 2 U-P 5 M-S 4 M-S 5 A-B 3 U-P 2 A-R 4 M-S 3 M-S 2 A-B 4 P-H3 A-R 2 U-P 2 Q-P 2 A-B 3 M-S 2 C-M 2 T-C T-C 3 A-B 2 Q-P Q-P 2 Q-P2 C-M A-RA-R 2 A-B A-CA-C B-H 2 Q-P M-S2 M-SM-S T-C 2 M-R 6 P-A B-H 3 M-S 3 M-R 3 G-S P-E 2 P-E 2 Q-P 2 B-H 2 A-C 2 P-H 3 B-H 3 B-H 2 P-H2 C-M 2 A-R A-B 2 A-B 2 B-H Q-P 2 M-R 2 A-P G-S A-P A-P A-B A-C 2 P-G P-HP-G 2 A-B 2 M-R 2 P-G A-R2 B-HT-C M-SM-S 2 B-H 2 M-R A-RA-R A-R2 A-B 2 P-G 2 P-G 2 P-A G-S G-S A-B G-S M-S A-R A-R 3 Q-P 2 P-H M-S M-S A-P A-P A-P G-S A-P A-B A-B A-C 2 P-A 2 P-G T-C T-C 3 M-S2 P-A 2 A-C 2 P-E A-C 2 M-R 2 A-R M-S M-S A-R Q-PM-S P-G 6 P-A 2 C-M M-S M-S P-H T-C P-G G-S M-R M-R P-G P-G M-S A-B Q-P M-S M-S 16 J-G 16 T-D 30 J-G 9 T-D 20 J-G P-G A-R P-A A-C FOUNTAIN ·MANUF,: OTTERBINE BAREBO ·MODEL: AQUASTAR GIANT FOUNTAIN, 10 HP ·3000K LED UPLIGHT PACKAGE ·SEE DETAIL SHEET L-4 FOUNTAIN ·MANUF,: OTTERBINE BAREBO ·MODEL: AQUASTAR GIANT FOUNTAIN, 10 HP ·3000K LED UPLIGHT PACKAGE ·SEE DETAIL SHEET L-4 LAWN AREA 6' MIN. LAWN AREA 6' MIN. H:\2019\190992\DWG\SHEETS\FINAL\L_190992 - LANDSCAPE-CD.DWG - L-1 - 6/4/2020 12:14:03 PM - RICHARD WASHINGTON NOREVISIONDATESHEET NAME SHEET OF DISCIPLINE LANDSCAPEDRAWN BY:CHECKED BY:DESIGNED BY:RWISSUE DATE:11/26/19ISSUED FOR:PRELIM SET4 PROJECT NO.SCALE:RWCC190992 PRELIM I N A R Y NOT FO R CONST R U C T I O N REDWOOD AT WAUKEE HICKMAN ROADNW 18th STREET, WAUKEE, IA, DALLAS COUNTYREDWOOD - 7510 EAST PLEASANT VALLEY ROADINDEPENDENCE, OH 441311PRELIMINARY PLAN11/26/19L-1 I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA. RICHARD R. WASHINGTON, ASLA DATE LICENSE NUMBER: LA00757 MY LICENSE RENEWAL DATE IS: JUNE 30, 2021 PAGES OR SHEETS COVERED BY THIS SEAL: 06-03-2020 L-1 TO L-4 2PRELIMINARY PLAN12/10/193PRELIMINARY PLAN12/23/194FINAL PLANS06/03/20SITE LANDSCAPE PLAN1 AS SHOWN100'50'0 25' NORTH1" = 50' NORTH ENTRY SIGN SEE SHEET L-2 NOTES: 1.SEE SEED/SOD LIMITS PLAN, REFER TO LEGEND. 2.ALL ENTRY LANDSCAPING WILL BE IRRIGATED. 3.MINIMUM PLANTING REQUIREMENTS AT TIME OF PLANTING: a.DECIDUOUS OVERSTORY TREES SHALL BE A MINIMUM OF EIGHT (8) FEET IN HEIGHT. b.EVERGREEN OVERSTORY TREES SHALL BE A MINIMUM OF SIX (6) FEET IN HEIGHT. c.DECIDUOUS ORNAMENTAL TREES SHALL BE A MINIMUM OF SIX (6) FEET IN HEIGHT. 4.REFER TO SPECIFICATIONS FOR SEED AND SOD MIXES. 5.RESEED OR RESOD ANY AREAS DISTURBED BY CONSTRUCTION. BUFFER REQUIREMENTS: R-4 ADJACENT ARTERIAL STREET = 25' BUFFER 665 LF / 50 = 13 REQUIRED SHOWN 13 OVERSTORY TREES . . . . . . . . . . . . . .13 26 EVERGREEN TREES . . . . . . . . . . . . . . .26 26 ORNAMENTAL TREES . . . . . . . . . . . . .26 INTERIOR LANDSCAPING: TWO (2) TREES REQUIRED PER DWELLING UNIT 94 DWELLING UNITS = 188 TREES REQUIRED REQUIRED SHOWN OVERSTORY TREES . . . . . . . . . . . . . . . .66 EVERGREEN TREES . . . . . . . . . . . . . . . .38 ORNAMENTAL TREES . . . . . . . . . . . . . . .84 188 TOTAL. . . . . . . . . . . . . . . . . . . . . . . . .188 -DAYLILY -DWARF FOUNTAIN GRASS GRASSES/PERRENIALS - #2 cont. EVERGREEN SHRUBS - 18" ht. -HOLLY -BURNING BUSH -VIBURNUM LARGE DECIDUOUS SHRUBS - 36" ht. EVERGREEN TREES - 6' ht. ORNAMENTAL TREES - 6' HT MIN. -CRABAPPLE -MAGNOLIA -DOGWOOD PLANTING LEGEND -SPRUCE -FIR -PINE -LILAC -WEIGELA SMALL DECIDUOUS SHRUBS - 18" ht. -SPIREA -ITEA -JUNIPER -TAXUS -SHASTA DAISY SHADE TREES - 2" cal. -MAPLE -OAK -LINDEN BUFFER REQUIREMENTS: R-4 ADJACENT INDUSTRIAL = 40' BUFFER 1,314 LF - 70' R.O.W. = 1,244 / 50 = 25 REQUIRED SHOWN 50 OVERSTORY TREES . . . . . . . . . . . . .50 100 EVERGREEN TREES . . . . . . . . . . . .100 75 ORNAMENTAL TREES . . . . . . . . . . . .75 BUFFER REQUIREMENTS: R-4 ADJACENT TO R-4 = NO BUFFER REQUIRED SHOWN OVERSTORY TREES . . . . . . . . . . . . . . .9 EVERGREEN TREES . . . . . . . . . . . . . . .14 ORNAMENTAL TREES . . . . . . . . . . . . . .3 BUFFER REQUIREMENTS: R-4 ADJACENT TO R-2 = 25' BUFFER 1,314 - 70' R.O.W. = 1,244 LF / 50 = 25 REQUIRED SHOWN 25 OVERSTORY TREES . . . . . . . . . . . . . .25 50 EVERGREEN TREES . . . . . . . . . . . . . . .50 50 ORNAMENTAL TREES . . . . . . . . . . . . .50 R Callbefore you dig. below.Know what's ONE CALL IOWA 1-800-292-8989 www.iowaonecall.com SOUTH ENTRY SIGN SEE SHEET L-2 TEMPORARY SALES SIGN BUFFER REQUIREMENTS: R-4 ADJACENT INDUSTRIAL = 40' BUFFER 666 LF/ 50 = 13 REQUIRED SHOWN 26 OVERSTORY TREES . . . . . . . . . . . . 26 52 EVERGREEN TREES . . . . . . . . . . . . 52 39 ORNAMENTAL TREES . . . . . . . . . . . 39 QTY. KEY BOTANICAL NAME COMMON NAME SIZE NOTES 61 A-R ACER RUBRUM 'RED SUNSET' RED SUNSET MAPLE 2" CAL. B&B 16 A-C ACER CAMPESTRE HEDGE MAPLE 1-1/2" CAL. B&B 12 A-P ACER P. 'PRINCETON GOLD' PRINCETON GOLD MAPLE 2" CAL. B&B 33 A-B AMELANCHIER X G. 'AUTUMN BRILLIANCE'AUTUMN BRILLIANCE SERVICEBERRY 1-1/2" CAL. B&B 53 B-H BETULA NIGRA 'HERITAGE' HERITAGE RIVER BIRCH 8-10' HT B&B, MULTI-STEM 24 C-M CORNUS MAS 'GOLDEN GLORY' GOLDEN GLORY CORNELIAN CHERRY 1-1/2" CAL. B&B 14 G-S GLEDITSEA I 'SKYLINE' SKYLINE HONEYLOCUST 2" CAL. B&B 6 I-V ILEX VERTICILLATA WINTERBERRY 18" B&B 66 J-G JUNIPERUS CH. 'OLD GOLD' OLD GOLD JUNIPER 18" B&B 60 M-R MAGNOLIA S. 'ROYAL STAR' ROYAL STAR MAGNOLIA 1-1/2" CAL.B&B 89 M-S MALUS 'SPRING SNOW' SPRING SNOW CRABAPPLE 1-1/2" CAL. B&B, FRUITLESS 99 P-A PICEA ABIES NORWAY SPRUCE 6' HT B&B 115 P-G PICEA ENGELMANNII GLAUCA ENGELMANN SPRUCE 6' HT B&B 49 P-H PINUS HELDREICHII BOSNIAN PINE 6' HT B&B 18 P-E PLATANUS X A 'EXCLAMATION' EXCLAMATION LONDON PLANETREE 2" CAL. B&B 21 Q-P QUERCUS PALUSTRIS PIN OAK 2" CAL. B&B 25 T-D TAXUS DENSA DENSE YEW 18" B&B 28 T-C TILIA CORDATA 'GREENSPIRE' GREENSPIRE LINDEN 2" CAL. B&B 29 U-P ULMUS 'PRINCETON' PRINCETON AMERICAN ELM 2" CAL. B&B 6 V-S VIBURNUM P.T. 'SHASTA' SHASTA DOUBLEFILE VIBURNUM 36" B&B OVERALL SITE PLANT MATERIAL LIST OPEN SPACE: OPEN SPACE REQUIRED 165,370 SF (20%) OPEN SPACE PROVIDED 485,809 SF (58.8%) LAWN AREAS TO BE SODDED LOW MAINTENANCE SEED MIX AND RIGHT OF WAY ESTABLISHED BY MASTER DEVELOPER LAWN TO BE HYDROSEEDED 24 SF DOUBLE SIDED ENTRY SIGN 15'15'18 H-H 18 J-B 7 C-K SEASONAL ANNUALS SIDEWALK TEMPORARY SALES SIGN 15'15'12 SF SIGLE SIDED ENTRY SIGN 18 H-H 18 J-B 7 C-K SEASONAL ANNUALS SIDEWALK UPLIGHT TYP. SEA GREEN JUNIPERVIBURNUM E H:\2019\190992\DWG\SHEETS\FINAL\L_190992 - LANDSCAPE-CD.DWG - L-2 - 6/4/2020 12:14:03 PM - RICHARD WASHINGTON NOREVISIONDATESHEET NAME SHEET OF DISCIPLINE LANDSCAPEDRAWN BY:CHECKED BY:DESIGNED BY:RWISSUE DATE:11/26/19ISSUED FOR:PRELIM SET4 PROJECT NO.SCALE:RWCC190992 PRELIM I N A R Y NOT FO R CONST R U C T I O N REDWOOD AT WAUKEE HICKMAN ROADNW 18th STREET, WAUKEE, IA, DALLAS COUNTYREDWOOD - 7510 EAST PLEASANT VALLEY ROADINDEPENDENCE, OH 441311PRELIMINARY PLAN11/26/19L-2 I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA. RICHARD R. WASHINGTON, ASLA DATE LICENSE NUMBER: LA00757 MY LICENSE RENEWAL DATE IS: JUNE 30, 2021 PAGES OR SHEETS COVERED BY THIS SEAL: 06-03-2020 L-1 TO L-4 2PRELIMINARY PLAN12/10/193PRELIMINARY PLAN12/23/194FINAL PLANS06/03/20ENTRY LANDSCAPE PLANS2 AS SHOWNNORTH SOUTH ENTRY LANDSCAPE PLAN SCALE: 1"=10' NORTH ENTRY LANDSCAPE PLAN SCALE: 1"=10'NORTH MAIN ENTRY SIGN NOT TO SCALE TEMPORARY SALES SIGN NOT TO SCALE SIGN PLAN VIEWSIGN ELEVATION VIEW NOTES 1.SIGN SHALL BE DOUBLE SIDED, INTERNALLY ILLUMINATED AND LOCATED PERPENDICULAR TO THE RIGHT OF WAY. 2.ALL SIGNS SHALL RECEIVE SEPARATE SIGN PERMIT APPROVAL FROM THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. 12 S.F. SCALE: 1"=20' TYPICAL TRANSFORMER SCREENING ENTRY PLANT MATERIAL LIST QTY. KEY BOTANICAL NAME COMMON NAME SIZE NOTES 14 C-K CALAMAGROSTIS X A. 'KARL FOERSTER' KARL FOERSTER FEATHER REED GRASS #1 CONT. CLUMP, 18" O.C. 36 H-H HEMEROCALLIS 'HAPPY RETURNS' HAPPY RETURNS DAYLILY #1 CONT. CLUMP, 18" O.C. 36 J-B JUNIPERUS S. 'BROADMOOR' ROADMOOR JUNIPER 15" HT B&B POND FOUNTAIN NOT TO SCALE 3 CO-Z 3 C-KF 3 HM-HR 3 PL-D A/CA/C 18" GRAVEL MOW STRIP 3 IT-LH SY-M JU-OG 3 PL-D SY-M 3 SP-GM 3 CO-Z 3 CO-ZJU-OG 3 C-T STONE MULCH TYP. A STONE MULCH TYP. JU-OG SY-M 6 HM-HR 2 SP-NF 3 IT-LH 3 CO-Z B 3 M-A 5 C-T 3 M-A 3 HM-HR 3 PL-D A/CA/C GRAVEL MOW STRIP JU-OG 3 SP-GM SY-M 3 C-KF A B STONE MULCH TYP. 10 L-RP 3 JU-B 3 PE-KR 3 IT-LH 3 RU-G V-SH JU-OG SP-NF 5 HM-PM 3 C-KF A/C 3 C-KF 3 PE-KR A/C 18" GRAVEL MOW STRIP STONE MULCH TYP. A B 3 PE-KR 3 CO-Z 3 TX-M SP-GM A/C 18" GRAVEL MOW STRIP STONE MULCH TYP. A 3 IT-LH 3 SP-LP STONE MULCH TYP. 3 JU-OG A/CA/C A B 18" GRAVEL MOW STRIP 3 IT-LH 5 HM-PM 3 C-KF 3 PE-KR 3 C-T 3 HM-PM 3 C-KF 3 SP-GM 3 M-A A/C A/C SPIRAEA VIBURNUM HETZ JUNIPER STONE MULCH AC UNIT TYP. H:\2019\190992\DWG\SHEETS\FINAL\L_190992 - LANDSCAPE-CD.DWG - L-3 - 6/4/2020 12:14:03 PM - RICHARD WASHINGTON NOREVISIONDATESHEET NAME SHEET OF DISCIPLINE LANDSCAPEDRAWN BY:CHECKED BY:DESIGNED BY:RWISSUE DATE:11/26/19ISSUED FOR:PRELIM SET4 PROJECT NO.SCALE:RWCC190992 PRELIM I N A R Y NOT FO R CONST R U C T I O N REDWOOD AT WAUKEE HICKMAN ROADNW 18th STREET, WAUKEE, IA, DALLAS COUNTYREDWOOD - 7510 EAST PLEASANT VALLEY ROADINDEPENDENCE, OH 441311PRELIMINARY PLAN11/26/19L-3 I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA. RICHARD R. WASHINGTON, ASLA DATE LICENSE NUMBER: LA00757 MY LICENSE RENEWAL DATE IS: JUNE 30, 2021 PAGES OR SHEETS COVERED BY THIS SEAL: 06-03-2020 L-1 TO L-4 2PRELIMINARY PLAN12/10/193PRELIMINARY PLAN12/23/194FINAL PLANS06/03/20UNIT LANDSCAPE PLANS3 AS SHOWNTYPE 10 BREEZEWOOD LANDSCAPE PLAN TYPE B HAYDENWOOD LANDSCAPE PLAN TYPICAL UNIT LANDSCAPE PLANS SCALE: 1"=20' TYPE 2 MEADOWOOD/FORESTWOOD LANDSCAPE PLAN TYPE 7 WILLOWOOD LANDSCAPE PLAN TYPE 10 CAPEWOOD LANDSCAPE PLAN NOTESQTY. HAYDENWOOD TYPE B UNIT A PLANT MATERIAL LIST - 8 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY HAYDENWOOD TYPE B UNIT B PLANT MATERIAL LIST - 14 UNITS NOTESQTY. MEADOWOOD / FORESTWOOD TYPE 2 UNIT A PLANT MATERIAL LIST - 8 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY NOTESQTY. MEADOWOOD / FORESTWOOD TYPE 2 UNIT B PLANT MATERIAL LIST - 12 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY CLUMP, 18" O.C.6 #1 CONT.CALAMAGROSTIS X A. 'KARL FOERSTER'C-KF KARL FOERSTER FEATHER REED GRASS PARDON ME DAYLILYHM-PM HEMEROCALLIS 'PARDON ME'#1 CONT.5 CLUMP, 18" O.C. KARLEY ROSE FOUNTAIN GRASSPE-KR PENNISETUM O. 'KARLEY ROSE'#1 CONT.3 2' O.C. 3 JU-B3 #3 CONT.3 18" HT.ITEA V. 'LITTLE HENRY'IT-LH LITTLE HENRY SWEETSPIRE CLUMP, 18" O.C.#1 CONT.HEMEROCALLIS 'HAPPY RETURNS'HM-HR HAPPY RETURNS DAYLILY #3 CONT.1 24"VIBURNUM P.T. 'SHASTA'V-SH SHASTA DOUBLEFILE VIBURNUM #3 CONT.18" HT.SPIRAEA X 'GOLD MOUND'SP-GM GOLD MOUND SPIREA BROADMOOR JUNIPERJUNIPERUS S. 'BROADMOOR'15" HT #3 CONT. KARLEY ROSE FOUNTAIN GRASSPE-KR PENNISETUM O. 'KARLEY ROSE'#1 CONT.3 2' O.C. 6 3 JU-OG2 OLD GOLD JUNIPERJUNIPERUS CH. 'OLD GOLD'15" HT #3 CONT. CLUMP, 18" O.C.3 #2 CONT.CERASTIUM TOMENTOSUMC-T SNOW IN SUMMER CLUMP, 18" O.C.9 #2 CONT.COREOPSIS 'ZAGREB'CO-Z ZAGREB COREOPSIS #3 CONT.3 18" HT.ITEA V. 'LITTLE HENRY'IT-LH LITTLE HENRY SWEETSPIRE #3 CONT.6 18" HT.P-LD LITTLE DEVIL NINEBARK CLUMP, 18" O.C.#1 CONT. NOTESQTY.SIZECOMMON NAMEBOTANICAL NAMEKEY CLUMP, 18" O.C.#1 CONT.HEMEROCALLIS 'HAPPY RETURNS'HM-HR HAPPY RETURNS DAYLILY SP-NF 3 2 JU-OG1 OLD GOLD JUNIPERJUNIPERUS CH. 'OLD GOLD'15" HT #3 CONT. CLUMP, 18" O.C.3 #2 CONT.COREOPSIS 'ZAGREB'CO-Z ZAGREB COREOPSIS #3 CONT.3 18" HT.ITEA V. 'LITTLE HENRY'IT-LH LITTLE HENRY SWEETSPIRE #5 CONT.18" HT.SYRINGA 'MEYERI'SY-M PALABIN LILAC1 #2 CONT.3 CLUMPM-A ADAGIO MAIDEN GRASS NOTESQTY. CAPEWOOD TYPE 10 UNIT A PLANT MATERIAL LIST - 4 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY 2' O.C.#1 CONT.PENNISETUM O. 'KARLEY ROSE'PE-KR KARLEY ROSE FOUNTAIN GRASS #3 CONT.24"TAXUS M. 'DENSIFORMUS'TX-M DENSE YEW #3 CONT.18" HT.SPIRAEA X 'GOLD MOUND'SP-GM GOLD MOUND SPIREA CLUMP, 18" O.C.3 #2 CONT.COREOPSIS 'ZAGREB'CO-Z ZAGREB COREOPSIS 3 1 3 BLACK-EYED SUSANRU-G RUDBECKIA HIRTA #1 CONT.18" O.C. NOTESQTY. WILLOWOOD TYPE 7 UNIT A PLANT MATERIAL LIST - 14 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY NOTESQTY. WILLOWOOD TYPE 7 UNIT B PLANT MATERIAL LIST - 23 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY 3 JU-OG3 OLD GOLD JUNIPERJUNIPERUS CH. 'OLD GOLD'15" HT #3 CONT. #3 CONT.12" HT.SPIRAEA J 'LITTLE PRINCESS'SP-LP LITTLE PRINCESS SPIREA3 #3 CONT.18" HT.ITEA V. 'LITTLE HENRY'IT-LH LITTLE HENRY SWEETSPIRE NOTESQTY. BREEZEWOOD TYPE 10 UNIT A PLANT MATERIAL LIST - 4 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY NOTESQTY. BREEZEWOOD TYPE 10 UNIT B PLANT MATERIAL LIST - 13 UNITS SIZECOMMON NAMEBOTANICAL NAMEKEY CLUMP, 18" O.C.#1 CONT.HEMEROCALLIS 'HAPPY RETURNS'HM-HR HAPPY RETURNS DAYLILY #3 CONT.18" HT.SPIRAEA X 'GOLD MOUND'SP-GM GOLD MOUND SPIREA 3 3 JU-OG1 OLD GOLD JUNIPERJUNIPERUS CH. 'OLD GOLD'15" HT #3 CONT. CLUMP, 18" O.C.5 #2 CONT.CERASTIUM TOMENTOSUMC-T SNOW IN SUMMER #5 CONT.18" HT.SYRINGA 'MEYERI'SY-M PALABIN LILAC1 PHYSOCARPUS OPULIFOLIUS LITTLE DEVIL MISCANTHUS S. 'ADAGIO' CLUMP, 18" O.C.3 #1 CONT.CALAMAGROSTIS X A. 'KARL FOERSTER'C-KF KARL FOERSTER FEATHER REED GRASS ROYAL PURPLE LILY TURFL-RP LIRIOPE M. ROYAL PURPLE CLUMP #2 CONT.10 #3 CONT.3 18" HT.P-LD LITTLE DEVIL NINEBARKPHYSOCARPUS OPULIFOLIUS LITTLE DEVIL CLUMP, 18" O.C.3 #1 CONT.CALAMAGROSTIS X A. 'KARL FOERSTER'C-KF KARL FOERSTER FEATHER REED GRASS #2 CONT.3 CLUMPM-A ADAGIO MAIDEN GRASSMISCANTHUS S. 'ADAGIO' #5 CONT.18" HT.SYRINGA 'MEYERI'SY-M PALABIN LILAC2 #3 CONT.1 18"SPIRAEA X 'NEON FLASH'SP-NF NEON FLASH SPIREA #3 CONT.18"SPIRAEA X 'NEON FLASH'NEON FLASH SPIREA JU-OG1 OLD GOLD JUNIPERJUNIPERUS CH. 'OLD GOLD'15" HT #3 CONT. NOTESQTY. LEASING OFFICE PLANT MATERIAL LIST SIZECOMMON NAMEBOTANICAL NAMEKEY CLUMP, 18" O.C.#1 CONT.HEMEROCALLIS 'HAPPY RETURNS'HM-HR HAPPY RETURNS DAYLILY8 CLUMP, 18" O.C.3 #2 CONT.CERASTIUM TOMENTOSUMC-T SNOW IN SUMMER #2 CONT.3 CLUMPM-A ADAGIO MAIDEN GRASSMISCANTHUS S. 'ADAGIO' CLUMP, 18" O.C.6 #1 CONT.CALAMAGROSTIS X A. 'KARL FOERSTER'C-KF KARL FOERSTER FEATHER REED GRASS 2' O.C.#1 CONT.PENNISETUM O. 'KARLEY ROSE'PE-KR KARLEY ROSE FOUNTAIN GRASS3 #3 CONT.3 18" HT.ITEA V. 'LITTLE HENRY'IT-LH LITTLE HENRY SWEETSPIRE #3 CONT.18" HT.SPIRAEA X 'GOLD MOUND'SP-GM GOLD MOUND SPIREA3 NOT TO SCALE TYPICAL AC UNIT SCREENING NOTE: LANDSCAPE SCREENING ONLY REQUIRED WHERE AC UNIT FACES PUBLIC ROADWAY. LEASING OFFICE LANDSCAPE PLAN SCALE: 1"=20' LANDSCAPE DETAILS ANDSPECIFICATIONS4 AS SHOWNH:\2019\190992\DWG\SHEETS\FINAL\L_190992 - LANDSCAPE-CD.DWG - L-4 - 6/4/2020 12:14:03 PM - RICHARD WASHINGTON PLANTING DETAILS NOT TO SCALE 1 L-4 2 GRAVEL MOW STRIP NOT TO SCALEL-4 SECTION 02900 - LANDSCAPING PART 1 - GENERAL A.DESCRIPTION: 1.Work Included: Planting required for this Work is indicated on the Drawings and, in general, includes the planting and other ground cover throughout the Work. B.QUALITY ASSURANCE: 1.Qualifications of workmen: Provide at least one person who shall be present at all times during execution of this portion of the Work and who shall be thoroughly familiar with the type of materials being installed and the best methods for their installation and who shall direct all work performed under this Section. 2.Codes, Regulations and Standards: a.All plants and planting material shall meet or exceed the Specifications of Federal, State and County laws requiring inspection for plant disease and insect control. b.Quality and Size: (1) General: Quality and size shall conform with the current edition of "Horticultural Standards" for number one grade nursery stock as adopted by the American Association of Nurserymen. (2) Deciduous Trees: Trees will measure in units of average height in feet above the ground or of an average caliper at a point 6 inches above the ground. (3) Evergreen Trees: Trees will measure in units of an average height in feet above the ground. (4) Plant stock: Each ball shall be of sufficient size to insure successful fibrous feeding roots necessary to insure successful recovery and development of the plant. c.Topsoil shall conform with ASTM D 5268-92. C.SUBMITTALS: 1.Material List: Within 35 days after award of Contract, and before any planting materials are delivered to the job site, submit to the Architect a complete list of nurseries where plants are to be obtained and other types proposed to be installed. a.Include complete data on source, size and quality. b.Demonstrate complete conformance with the requirements of this Section. c.This shall in no way be construed as permitting substitutions for specific items described in the Drawings or these Specifications unless the substitution has been approved in advance by the Architect. d.All proposed plant substitutions should be approved by the City prior to making changes. 2.Certificates: a.All certificates required by law shall accompany shipments. b.Upon completion of the installation, deliver all certificates to the Architect. 3.Approval of plants at source does not alter right of rejection at project site. D.PRODUCT HANDLING: 1.Delivery: a.Balled and Burlapped Stock: Care should be taken at all times as to not damage the bark or branches. Plants shall be lifted and handled from the bottom of the ball as much as possible in order to prevent damage to the plant. b.Plant stock to be delivered in B & B shall be moved with a compact natural ball of earth so firmly wrapped in burlap, that upon delivery the soil in the ball is still firm and compact about the small feeding roots. 2.Temporary Storage and Protection: a.Protect plants at all times from sun or drying winds. b.Plants that cannot be planted immediately on delivery shall be kept in the shade, well protected with soil, wood chips, straw or other acceptable material, and shall be kept well watered. 3.Replacements: In the event of damage, immediately make all repairs and replacements necessary for the approval of the architect and at no additional expense to the Owner. E.PRE-LANDSCAPING SITE PREPARATION - BUILDING CONTRACTOR/SUBS 1.Call in for any utility locations as required and follow all approved safety practices. 2.Remove any construction debris from site before grading. Properly mark all utility boxes, drains, or irrigation fixtures before grading. These are to remain marked through completion of grading process. MARK UP A SITE DETAIL PLAN TO IDENTIFY KEY COMPONENTS. 3.Site should be graded to minus(-) 4” of final grade removing as much rocks and debris as possible. 4.Concrete walks and drives can now be formed and poured following this grade adjustment. Following install of concrete, clean up any concrete debris and construction materials in planting areas. VERIFY UNDERDRAINS ARE IN PLACE AND MARKED. 5.Remove as much of the remaining stabilization seeding plants and weed growth on lawn and planting areas as practical. Loosen existing subsoil to a depth of 4”. 6.Backfill exterior concrete and finish grade per plans with a minimum of 4” of screened topsoil that has rock, wood and debris removed (Screened to< = 1”) Topsoil will be added at 12” of depth to landscape planting beds. The topsoil will come either from onsite stockpiles or will be provide when necessary. Maintain any drainage swales and define new ones as needed. Remove any high or low spots. VERIFY DEPTH OF PLANT BED TOPSOIL PRIOR TO ACCEPTANCE. 7.Provide a finish grade separation of 2” below slab elevation and maintain minimum slope away from buildings. Topsoil should be brought to finish grade of all patios, walks and driveways. VERIFY METAL FLASHING HAS BEEN PLACED TO PROTECT THE INSULATION ATTACHED TO THE FOUNDATION. 8.Subcontractor to be paid additional fees if soils have to be loaded and trucked from one area of site to another. Per hour equipment charges are to be negotiated in advance with the Project Manager. PROVIDE A LOG TO ACCOUNT FOR TIME AND SIGN OFF BY BOTH CONTRACTOR AND MANAGER. 9.Irrigation will be provided on a separate irrigation plan. Site irrigation needs to be installed and working prior to lawn/landscape establishment. 10.Subcontractor will keep streets and walkways clean during and upon completion of work. 11.Clean up all debris created and dispose of in job site dumpster provided. 12.Notify Redwood Landscape that site is being prepared and landscaper has been scheduled (Minimum of 5 business days before install) F.SOIL AND SITE PREPARATION FOR SEEDED, HYDRO-SEEDED AND SODDED LAWNS - LANDSCAPE CONTRACTOR 1.Soil testing by a regional agricultural extension office is suggested prior to establishment and should be done during the planning process to the stockpiled or transported topsoil. Soil testing reveals the soil pH and amount of available nutrients such as phosphorus (P) and potassium (K). 2.Call in for any utility locations as required and follow all approved safety practices. PART 2 - PRODUCTS A.MATERIALS: 1.Topsoil/Planting Mix: a.Lawn Areas: Use on-site stockpiled topsoil. If the quantity of on-site topsoil stockpiled is insufficient to complete the work, provide imported topsoil. b.Planting Beds: Use imported topsoil. Contractor to obtain rights and pay all costs for imported topsoil material. Topsoil shall meet the following requirements: 1)Shall be free from admixture of subsoil, heavy clay, coarse sand, stone, plants roots, sticks, and other foreign material. 2)Shall be classified in the "Loam" portion of the U.S.D.A. Soil Textural Triangle. For topsoil to be classified as "Loam", that fraction passing through a #10 sieve shall meet the following mechanical analysis: a)8 to 25% clay (less than 0.002 mm particle size). b)30 to 55% sand (2.0 to 0.05 mm particle size) c)30 to 50% silt (0.05 mm to .002 mm particle size). 3)Contain neither less than 8%, nor more than 20%, organic matter as determined by loss on ignition of samples oven-dried to constant weight at 212 degrees F. 4)Have a pH level of between 6.2 and 6.8. 5)All topsoil shall be screened through a 1-1/4" screen. 6)Submit an analysis of proposed topsoil. Topsoil shall be acceptable to Landscape Architect and Soils Testing Firm. 2.Suggested Seed or Equivalent a.Where applicable, seed shall be: Pennington - Smart Seed Pro Athletic Field Mixture b.Lawn Seed Mix: A mixture of Water Star Qualified cultivars such as PENN RK4, Rebel Xtreme, Rebel XLR and PENN ATF1258 TTTFs; plus Soprano PRG and Ridgeline KBG. The seed is treated with Myco Advantage and Penkoted for long term sustainability with quicker establishment. This mix is designed to provide a durable playing surface for high-use park settings, a wide range of landscape settings, and home lawns. The Smart Seed Pro Athletic Field Mixture will tolerate extended periods of high temperatures and periods of drought with remarkable color retention. c.Detention Basin Seed Mix if apllicable: Mix shall be a grass like selection of species designed to tolerate fluctuating water levels and poor water quality. Seeding and planting should begin immediately upon completion of the structure while the soil is still friable and before invasive weeds emerge. Plan seeding and planting before the basin is flooded or allow the basin to drain to a few inches before seeding. d.SEED MIXES MAY VARY BY LOCATION AND USE. CONTACT REDWOOD LANDSCAPING TO VERIFY CHANGES. e.SEED LABELS SHALL BE PROVIDED TO REDWOOD LANDSCAPING FOR VERIFICATION. f.Minimum Seed Label Specifications: 1)Weed seed: any weed seed present is listed by percentage of weight. We really don’t want any weed seeds in our seed container, but it is difficult and expensive to catch all weed seeds during the cleaning process. Acceptable limits range from 0.3 to 0.5%. 2)Noxious weed: Your label should read: NONE FOUND. 3)Seed is to have been tested less than 12 months before planting date. 3.Sod a.Sod shall be of a variety preapproved by Redwood Landscaping for each climatic region. Sod is to be cut no more than 24 hrs. prior to install. Keep delivered sod shaded and watered until it is laid. Time deliveries of sod so that no material is on site more than 24 hrs. before it is installed. No sod shall be laid on a Friday afternoon or weekend without Redwood Landscape’s approval so as to coordinate irrigation Maintenance. 4.Lime: Lime shall be ground limestone containing not less than 85% of total carbonates and shall be ground to such a fineness that 50% will pass through a 200-mesh sieve and 90% will pass through a 900-mesh sieve. 5.Fertilizer For Lawns: Fertilizer shall be 22-0-15, uniform in composition, free flowing and suitable for application with approved equipment delivered to the site in bags or other convenient containers, each fully labeled, conforming to the applicable State Fertilizer Law, and bearing the name, trade name or trademark, and warranty of the producer. 6.Plants: a.Trees, shrubs, and herbaceous plants: 1)All trees, shrubs and herbaceous plants, deciduous plants or evergreens shall be sound, healthy, vigorous, first-class, freshly dug, nursery grown in a climate similar to or more severe than Ohio. 2)All plant material shall be free of insects, their eggs, and larvae. 3)Plants shall be free of mechanical or cultural injury by rodents, and free of noticeable after effects of insects (borers). 4)Plants shall be true to scientific names. The names used are those of "Standardized Plant Names". 7.Soil Amendments: 'Soil Moist' granular soil moisturizer Polymer Product or equal, as manufactured and distributed by JRM Chemical Inc., Cleveland, Ohio, (216-475-8488). 8.Mulch: a.All buffer & tree planting mulch shall be triple shredded, hardwood bark, dark brown in color. b.All signage planting mulch shall be triple shredded, hardwood bark, dark brown in color. c.All landscape beds at project entries as well as trees planted outside of landscape beds shall have hardwood mulch. d.All foundation planting adjacent to units shall be installed with washed rock mulch. Stone mulch shall be 1" native gravel as supplied by DFW Supply (214-649-9975) or approved equal 9.Fertilizer For Plantings: Fertilizer shall be 22-0-15, uniform in composition, free flowing and suitable for application with approved equipment delivered to the site in bags or other convenient containers, each fully labeled, conforming to the applicable State Fertilizer Law, and bearing the name, trade name or trademark, and warranty of the producer. 10.Wood Cellulose Fiber Mulch: Degradable green dyed wood cellulose fiber or 100% recycled long fiber pulp, free from weeds or other foreign matter toxic to seed germination and suitable for hydromulching. 11.Tackifier: Liquid concentrate diluted with water forming a transparent 3-dimensional film like crust permeable to water and air and containing no agents toxic to seed germination. 12.Erosion Control Blanket: S-75 by North American Green as distributed by Meredith Brothers, Phone: (614) 258-4991 or equal. 13.Anti-Desiccant. Emulsion type, film-forming agent designed to permit transpiration but retard excessive loss of moisture from plants. Deliver in manufacturer's fully-identified containers and mix in accordance with manufacturer's instructions. 14.Herbicide: Round Up, or Kleenup or equal. 15.Wrapping: Tree-wrap tape not less than four inches (4") wide, designed to prevent bore damage and winter freezing. 16.Stakes and Guys: Provide stakes and deadmen of sound new hardwood, treated softwood, or redwood, free of knot holes and other defects. Provide wire ties and guys of 2-strand, twisted, pliable galvanized iron wire not lighter than 12 ga. with zinc-coated turnbuckles. Provide not less than one-half inch (1/2") diameter rubber or plastic hose, cut to required lengths and of uniform color, material and size to protect tree trunks from damage by wire. 17.Soil Separator: Shall be non-woven, water-permeable polyester geotextile, manufactured as a landscaping product. 18.Weed mat: Provide 4.1 oz., woven polypropylene, needle-punched fabric, weed barrier. PART 3 - EXECUTION A.SURFACE CONDITIONS: 1.Inspection: Prior to all work in this Section, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this installation may properly commence. 2.Discrepancies: a.In the event of any discrepancies, immediately notify the Architect. b.Do not proceed with the installation in the areas of discrepancy until all such discrepancies have been fully resolved. B.LAYOUT: Shrubs and trees shall be installed within 1'-0" and groundcover shall be installed within 6" of plant location shown on plan. C.SOIL AND SITE PREPARATION FOR SEEDED, HYDRO-SEEDED AND SODDED LAWNS - LANDSCAPE CONTRACTOR 1.Soil testing by a regional agricultural extension office is suggested prior to establishment and should be done during the planning process to the stockpiled or transported topsoil. Soil testing reveals the soil pH and amount of available nutrients such as phosphorus (P) and potassium (K). 2.Call in for any utility locations as required and follow all approved safety practices. 3.Seed installation: Fall: Seed from August 15 to October 15, Spring: Seed from time ground is workable to July 1. 4.Confirm install with Redwood Landscape 3-5 business days prior to commencement of work each time a lawn is installed. Schedule a preconstruction meeting with Redwood Landscaping and construction prior to install of first lawns on the construction site. 5.Remaining perennial weeds and grasses on site need to be controlled prior to lawn seeding or sodding. Weed control options include using a systemic nonselective herbicide, digging by hand, or tilling/excavation. 6.When preparing the soil, it’s important to establish a favorable final grade. Rough grading should include removal of any rock or other debris in excess of 1”. Gravel/stone/debris areas should be cleaned up and soil added as needed to restore grade. Avoid burying construction debris, as this could cause problems for the grass later. 7.Eliminate any depressions or raised areas. Provide a finish grade separation of 2” below slab elevation and maintain minimum slope away from buildings. Topsoil should be brought to finish grade of all patios, walks and driveways. 8.Final slopes should be one to two percent away from buildings (1 to 2 feet drop per 100 feet of run) to assure good surface drainage. Maintain established drainage swales and define new ones as required to remove excess water runoff from site. 9.Before seeding or sodding, it’s important to thoroughly loosen the soil one last time and to remove any remaining stone and debris. 10.Amend poor soils, such as heavy clay or straight sand, by adding organic matter. Sources include compost, composted organics, peat, and quality topsoil. If major modifications are needed, it is easier to make these prior to establishing the lawn. Required soil amendments should be mixed at the recommend rates into the soil surface prior to lawn establishment. Apply any amendments such as lime as directed by earlier soil testing at this time. 11.Soil preparation should be done when the soil is not too dry or wet as tillage at these times will destroy soil structure, and create problems with air and water holding capacity and drainage after a rain event. 12.Hydro seed, seed, or sod site per standards, using Redwood approved seed mix .. Provide initial starter fertilizer application in hydro seed mix or apply to soils at time of seeding/sod at recommended rates. Install erosion control mats as specified in the landscaping specifications as required. 13.Provide initial irrigation of prepared site and schedule a follow up visit with Redwood landscape/maintenance within 15 days of install for an inspection walk through. 14.Landscape install contractor provides 90 days of follow up and maintenance recommendations and guarantees all work for that same period. D.HYDRO-SEEDING PROTOCOL 1.All seeded areas to be installed with hydroseed mixture per seed supplier and hydromulch manufacturer. 2.Erosion Control, Steep Slopes and Low Maintenance areas. 3.Per erosion mat supplier and seed supplier recommendations as well as Redwood Landscaping’s approval. 4.All slopes in excess of 3:1 (H:V) to be hydroseeded and matted with NAG S75 minimum with rolls orinted downslope and staked to mfg. recommendations. 5.Erosion Control Matting Recommendations: Western Excelsior’s Excel SR-1 Erosion Control Blanket (ECB) consists of a 100% certified weed free straw matrix stitched to a single net (top). Excel SR-1 is available with photodegradable, synthetic netting (Regular); rapid photodegradable, synthetic netting (Rapid-Go) or all natural, biodegradable netting (All Natural). 6.Variations, alternate products or exceptions are to be cleared through Redwood Landscaping before any changes are made ** Information and/or questions pertaining to Pennington seed or fertilizer products along with Western Excelsior / Wind, Water and Soil matting can be resourced through: Scott Fisher Pennington Seed Ohio Cell: (513)426-4543 sfisher@penningtonseed.com E. Sod 1.Soil preparation should be done as per the specifications in the Soil and Site Preparation for Seeded, Hydro-seeded and Sodded Lawns - Landscape contractor section when the soil is not too dry or wet as tillage at these times will destroy soil structure, and create problems with air and water holding capacity and drainage after a rain event. 2.Sod work can be performed from time ground is workable to the first frost. 3.Add starter fertilizer at the recommended rate to the soil and lightly rake it in prior to laying sod. 4.Water the soil lightly before laying sod. Soil should just be moist and water added incrementally in front of the sod laying process. 5.Start laying the sod on a straight edge such as a driveway. Lay one piece of sod at a time laying each piece snug against each other. Work the seams tightly together without overlapping. Lay the sod like bricks in a staggered or stair step fashion so end seams don’t lineup. Cut the sod to size as needed. 6.Use a water-filled roller to help level the sod. Rolling the sod also makes sure there’s good contact between the sod and soil so it can root in properly. 7.Water newly laid sod thoroughly each day (if there is no rainfall) for the first 14 days as per maintenance protocols. Slowly cut back on the watering to encourage deep root growth .. Water will need to be maintained until weather conditions cool and sod is established and fully rooted. 8.Follow up in 6 weeks with an approved maintenance level fertilizer F.TREE, SHRUB, PERENNIAL AND ANNUAL PLANTINGS 1.Tree and shrub planting shall be done according to the International Society of Arboriculture (ISA) guidelines and landscape plan specs. 2.ISA Guidelines can be found here: https://wwv.isa-arbor.com/education/onlineresources/cadplanningspecifications #Planting 3.Contractor is responsible for verifying plant quantities. If quantities listed in Plant Material List do not correlate with plantings indicated on plan, the quantities indicated on the plan shall govern. 4.All planting operations shall be performed between the dates of March 1 and November 1. All plantings to be performed between the dates of June 1 and August 31 to be wilt proofed with anti-desiccant. 5.Perennials and small shrub landscape plantings should be installed as follows: a.Dig up the soil to aerate it, reduce compaction and remove any weeds. Then dig in some organic matter, such as well-rotted manure or compost. b.Planting Depth:Most perennials/shrubs flourish when their crowns are planted at the same depth or slightly higher as they were in the growing container. Test planting depth by laying a tool handle across the planting hole with the perennial placed at the proposed planting depth in the hole. Adjust the soil in the planting hole accordingly. When the crown is even with the tool handle, the plant is at the proper depth. c.The hole for each perennial should be twice the size of the container the perennial/shrub comes in. The wider the hole, the better, since plant’s roots grow out more easily into loosened, enriched soil. Remove the perennial from the container and lightly loosen the roots so the plant will grow out of its tightly wrapped ball and settle in more quickly. d.Refill the hole with enriched soil that has been be amended with organics. Set plants into holes at their original growing level or slightly higher. Never bury a plant deeper than its crown (where the roots and the stems meet) Buried crowns mean suffocated plants! Plant 2 inches higher than ground level if you are going to mulch. Backfill the rest of the hole with enriched soil. Tamp down the soil to remove any large air pockets. e.Water well, with a soft trickle of water that lasts long enough to saturate the root ball deep into the soil. Different soil types may need slightly more or less water. Monitor the soil moisture to help you judge when the plant should receive more water. 6.Annuals: a.Refer to Redwood Landscape Design Standards Handout for spring, summer and fall seasonal annual and bulb varieties and planting layout. b.All annual planting beds shall have a minimum of 10" of "annual bed mix". c."Annual bed mix" shall be processed shredded topsoil with organic compost and fine silica gravel for annuals. d.Mulch with 1" of compost mulch or treat soil with a granular pre-emergence herbicide suitable for annual plantings. 7.Pruning: a.Prune all new trees and shrubs in accordance with acceptable standard practices. All cuts over one inch in diameter shall be treated with an approved tree paint. In the same manner, prune existing trees which are to remain if indicated on the landscape plan. 8.Protection: a.Protect all plant areas and plants from damage. If any plants are injured, treat and replace as required. Execute no work in or over prepared plant areas, or adjacent to planting without proper safeguards and protection. G.Maintenance During Installation: 1.Maintain immediately following the accomplishment of planting operations of any plant unit. 2.Spray foliage with water, where required, during the evening after sundown or otherwise as directed. Keep all plantings in a healthy, growing condition by watering, weeding, cultivating, pruning, spraying, trimming and by performing any other necessary operations of maintenance. 3.The Contractor shall be responsible for continued proper care of the lawn areas during the period when the grass is becoming established. The period of maintenance for all lawn area shall extend for sixty (60) days with two (2) mowings required or as long as necessary to establish over the entire lawn areas a uniform stand of grasses as specified, free of weeds and undesirable grasses. After the required maintenance period and upon acceptance of lawn area by the Architect, the Owner will assume maintenance responsibility. 4.Mowing: The lawn seeded area shall be mowed with approved mowing equipment to a height of two inches (2") whenever the average height of grass becomes three inches (3"). If weeds or other undesirable vegetation threaten to smother the planted species, such vegetation shall be mowed, or in the case of exceedingly rank growths, be uprooted, raked and removed from the area. 5.Refertilizing: Areas needing refertilization will be designated by the Architect at least fifteen (15) days prior to the time that the application is required. The fertilizer shall be distributed on the seeded area between August 15 and October 15, during a period when the grass is dry. The fertilizer shall be 10-6-4 grade and shall be applied uniformly at the rate of ten (10) pounds per one thousand (1,000) square feet. Physical condition, packaging and marking of the fertilizer shall be as specified for original seeding. 6.Reseeding: Areas that require reseeding will be designated by the Architect at least fifteen (15) days prior to the period specified for reseeding. Reseeding shall be with the seed specified therein before and shall be drilled at four (4) pounds per one thousand (1,000) square feet in a manner which will cause a minimum of disturbance to the existing stand of grass, and at an angle of not less than fifteen (15) degrees from the direction of the rows of prior seeding. 7.Lawns shall be protected against damage, including erosion and washouts. Damaged areas shall be promptly replanted. Use erosion netting as required. 8.The contractor is responsible to clean the site of all mulching materials and other debris prior to the final inspection. 9.Final Inspection: Inspection of work for lawns will be made after the second cutting; written notice requesting inspection shall be submitted at least ten (10) days prior to anticipated date. 10.Acceptance: Final inspection shall determine acceptance or non-acceptance of lawn areas. Acceptance indicates a complete cover of grasses in all lawn areas, which have been maintained by weeding, reseeding and refertilizing as necessary, watering and mowing as stated above and appears to be in a potential healthy state with weeds, rocks, stones and debris removed and all erosion or ruts repaired. Lawns not maintained or appearing as stated herein shall be unacceptable and shall be reworked as necessary until desired results are obtained. 11.Maintain trees, shrubs and other plants until final acceptance, but in no case less than 60 days after substantial completion of planting. 12.Maintain trees, shrubs and other plants by pruning, cultivating, watering and weeding as required for healthy growth. Restore planting saucers. Tighten and repair stake and guy supports and reset trees and shrubs to proper grades or vertical position as required. Restore or replace damaged wrappings. Spray as required to keep trees and shrubs free of insects and disease. H.CLEAN-UP 1.Upon completion of the planting, all excess soil, stones and debris which has not previously been cleaned up shall be removed from the site or disposed of as directed by the Architect. 2.Any soil, manure, peat, or similar material which has been brought onto paved areas by hauling operations or otherwise shall be removed promptly, keeping these areas clean at all times. 3.Protect landscape work and materials from damage due to landscape operations, operations by other contractors, trades and trespassers. Maintain protection during installation and maintenance periods. Treat, repair or replace damaged landscape work as directed. I.ACCEPTANCE 1.Final Inspection: a.Inspection: At the conclusion of the contract work, (exclusive of maintenance and replacement) one inspection will be made by the Architect. Written notice to the Architect requesting such an inspection shall be submitted by the Contractor at least ten days prior to the anticipated date. b.The purpose of this inspection will be to determine whether or not the Contractor has completed all the work of the contract. c.The condition of the lawns and shrubs will be noted and a determination will be made by the Architect whether maintenance shall continue in any part as specified under 'Maintenance During Installation.' 2.Acceptance Inspection: a.At the conclusion of the maintenance during installation period, an inspection will be made by the Architect. Written notice requesting the inspection shall be submitted by the Contractor at least 10 days prior to the anticipated date. b.The purpose of the inspection shall be for the acceptance of the contract work including maintenance during installation, but exclusive of replacements. c.After the inspection of the Architect, the Contractor shall be notified in writing of acceptance of the work. If there are any deficiencies in the maintenance, during installation, the Contractor will be notified of these deficiencies in writing by the Architect, and the work shall be subject to reinspection before acceptance. 3.Guarantee Period: a.Guarantee period shall begin at the issuance of the Certificate of Completion and shall end exactly one year from that date. b.At the conclusion of the guarantee period, a final inspection of the work will be made to determine the condition of the plant material. All plant material not in a healthy or 40% defoliated growing condition will be noted. c.Remove the material so noted from the site at the direction of the Architect and replace during the following planting season with the materials of like kind and size, and in a manner specified for the original planting at no extra cost. d.Guarantee period also applies to replaced material. 3 LANDSCAPE LIGHTING NOT TO SCALE LIGHTING LEGEND LIGHTING NOTES: 1.LOCATE UPLIGHTS AS SHOWN ON THE PLAN. STAKE FINAL LOCATIONS OF LIGHTS FOR APPROVAL BY THE OWNER OR OWNER'S REPRESENTATIVE. 2.LIGHT SYSTEM BY KICHLER OR OWNER-APPROVED EQUAL. 3.LIGHTING SHALL BE INSTALLED WITH A REMOTE SWITCH CONTROL SYSTEM. 4.ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND PER CURRENT ELECTRICAL CODE REQUIREMENTS. 5.CHOOSE TEMPORARY SIGN UPLIGHTING, ACCORDING TO SIGN TYPE USED. (EITHER 2'w X 4'h, OR 4'w X 8'h) TREE UPLIGHT - ONE (1) EACH TREE - KICHLER #15753 BKT - (60° Flood) - 12.4w - LED - #15701 BKTP SHORT SHROUD - ONE (1) EACH FACE (4'W X 8'H) - KICHLER #15742 BKT - (35° Flood) - 8.5w - LED - #15701 BKTP SHORT SHROUD - ONE (1) EACH FACE (2'W X 4'H) - KICHLER #15741 BKT - (10° Spot) - 8.5w - LED - #15701 BKTP SHORT SHROUD SALES SIGN SALES SIGN L-4 - ONE (1) EACH FACE - KICHLER #15742 BKT - (35° Flood) - 8.5w - LED - #15701 BKTP SHORT SHROUD SECONDARY ENTRY SIGN H:\2019\190992\DWG\SHEETS\FINAL\L_190992 - LANDSCAPE-CD.DWG - L-4 - 6/4/2020 12:14:03 PM - RICHARD WASHINGTON NOREVISIONDATESHEET NAME SHEET OF DISCIPLINE LANDSCAPEDRAWN BY:CHECKED BY:DESIGNED BY:RWISSUE DATE:11/26/19ISSUED FOR:PRELIM SET4 PROJECT NO.SCALE:RWCC190992 PRELIM I N A R Y NOT FO R CONST R U C T I O N REDWOOD AT WAUKEE HICKMAN ROADNW 18th STREET, WAUKEE, IA, DALLAS COUNTYREDWOOD - 7510 EAST PLEASANT VALLEY ROADINDEPENDENCE, OH 441311PRELIMINARY PLAN11/26/19L-4 I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA. RICHARD R. WASHINGTON, ASLA DATE LICENSE NUMBER: LA00757 MY LICENSE RENEWAL DATE IS: JUNE 30, 2021 PAGES OR SHEETS COVERED BY THIS SEAL: 06-03-2020 L-1 TO L-4 2PRELIMINARY PLAN12/10/193PRELIMINARY PLAN12/23/194FINAL PLANS06/03/20