HomeMy WebLinkAbout2020-12-21-J01S Warrior Ln Joint Utility Trench_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 21, 2020 AGENDA ITEM:Consideration of approval of Change Order No. 1 to TD&I Cable Maintenance for the Warrior Lane Joint Utility Trench project increasing the contract price in the amount of $24,000.00 FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is for reduction in the quantity of Type I handholes, increase in the quantity of Type IV handholes and reduction in the quantity of handholes provided by Utility Providers. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $24,000.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Motion to Approve. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1S Project# 4185870 December 16th, 2020 TO: Rudy Koester City of Waukee 805 University Ave Waukee IA, 50263 RE: Change Order #1 Warrior Lane Joint Utility Trench SH Project Number 4185870 Mr. Koester, Please find attached Change Order #1 for the Warrior Lane Joint Utility Trench. The change order includes the following items: • Reduction in the quantity of Type I Handholes • Increase in the quantity of Type IV Handholes • Reduction in the quantity of handholes provided by Utility Providers This change order eliminates the Type I Handholes on the project and changes all the handholes to Type IV. Type I handholes are small round handholes and Type IV handholes are larger rectangular handholes. After bidding the unit prices for the Type I and Type IV were the same and through discussions with City Staff, the contractor, and the engineer it was decided to recommend changing the handholes to the larger type IV. Additionally, the unit price of $2,600 for type IV handholes is a favorable price in regard to historical perspectives and thus additional type IV handholes are included in this change order to add value to the Joint Utility Trench. We have reviewed the change order items and unit prices, both are line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $24,000 to the construction contract for the Warrior Lane Joint Utility Trench with TD&I Cable Maintenance of Lakeland, MN. Sincerely, Shive-Hattery, Inc. Nathan Hardisty, PE Project Manager Enc. Change Order #1 City of Waukee 230 W Hickman Road Waukee, IA 50263 Distribution: Owner __X__ Engineer __X__ Contractor __X__ Contractor: 1378 Quinlan Circle South Lakeland, MN 55043 $389,134.25 September 17, 2020 CO-1.1 EA $2,600.00 (20)($52,000.00) CO-1.2 EA $2,600.00 30 $78,000.00 CO-1.3 EA $2,000.00 (1)($2,000.00) $24,000.00 $389,134.25 $0.00 $389,134.25 $24,000.00 $413,134.25 6.17% 0 Days March 1, 2021 Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Signature: Name: Nathan T. Hardisty, PE Title: Project Manager Name: Title: Date: Warrior Lane Joint Utility Trench 4185870 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description THE CONTRACT IS CHANGED AS FOLLOWS: CO-1.1 - Deduction of qty 20 Type I Handholes, Furnish and Install. These will be replaced with Type IV Handholes. CO-1.2 - Addition of qty 30 Type IV Handholes, Furnish and Install. These replace the 20 Type I Handholes and add an additional 10 Type IV handholes to provide a consitancy between the 4 Handholes Banks (10 Handholes at each bank) CO-1.3 - Deduction of qty 1 Handhole and Junction Box, Furnish and Install Only. It was discussed with the utilities, and no utilities requested to have the contractor install an utility provided handhole. Item Value AdjustmentQuantity AdjustmentUnit Price Signature: TD & I Cable Maintenance, Inc CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Deduct Type I Handholes, Furnish and Install Add Type IV Handholes, Furnish and Install Deduct Handhole and Junction Box, Install Only Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date Unit December 16th, 2020 1 The Contract Time will be changed by CHANGE ORDER SUMMARY Contractor: TD & I Cable Maintenance, Inc TOTAL The Original Contract Sum was 1 of 1P:\Projects\DM\4185870\Construction\JUT\CASupport\CO\CO #1\Warrior Lane Joint Utility Trench Change Order #1