HomeMy WebLinkAbout2019-02-04-J01G Golf Course Water Supply_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 4, 2019 AGENDA ITEM:Consideration of approval of Change Order No. 1 to RW Excavating Solutions, for the Sugar Creek Golf Course Water Supply Project increases the contract in the amount of $24,270.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 to RW Excavating Solutions in the amount of $24,270.00. During the pond excavation the material being dredged was determined to be unsuitable for disposal onsite as planned during the design process, and was recommend to be disposed of offsite. The original intent of the design was to mix the dredge spoils with the other excavated soils and place in the proposed berm at the end of the driving range. Duet to the amount of dredge spoils, silt material which does not support shaping due to a lack of cohesion between soil particles, there was not enough competent soil to mix the spoils with. After evaluation, it was decided that if the original design approach was followed, the berm would not be able to support golf course operation at project completion. Change Order No. 1 includes the cost for removing the dredge spoils, disposing the material offsite and for the cost of maintaining the truck route on/off the golf course. Representative from Bolten & Menk and City Staff have reviewed the quantities and find them to be accurate. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Change Order No. 1 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1G h:\waukee_ci_ia\a13114815_sugar creek gc irrigation well\7_construction\e_pay applications\ltr-01302019_waukee scgc_co#1 recommendation.docx January 30, 2019 Mr. Matt Jermier Director of Parks and Recreation City of Waukee, Iowa 805 University Ave Waukee, Iowa 50263 RE: Sugar Creek Municipal Golf Course Water Supply Project - Change Order 1 Dear Mr. Jermier: Submitted for your approval is Change Order 1. During the pond excavation at the Sugar Creek Municipal Golf Course, the material being dredged was determined to be unsuitable for disposal onsite as planned during the design process, and should be disposed of offsite. The original intent of the design was to mix the dredge spoils with the other excavated soils and placed in the proposed berm. Due to the amount of dredge spoils, silt material which does not support shaping due to a lack of cohesion between soil particles, there was not enough competent soil to mix the spoils with. After evaluation, it was decided that if the original design approach was followed, the berm would not be able to support golf course operations at project completion. It was determined that the dredge spoils would be disposed at an area at the public works facility north of the golf course using road legal dump trucks. Change Order #1 includes the cost for removing the dredge spoils, disposing the material offsite and for the cost of maintaining the truck route on/off the golf course. The original contract value of $135,805.00 will be increased by $24,270.00 to a new contract value of $160,075.00. Please see the Change Order 1 for a full summary of the additional items. It is anticipated that the total cost of the construction contract will be less than the revised contract amount as approved with this change order, approximately $15,000 due to underrunning of other contract line items. The exact amount of the deductions will be made at project closeout, and included in the final contract closeout change order. Bolton & Menk, Inc. recommends the approval of Change Order 1. Please let me know if you have any questions. Sincerely, Bolton & Menk, Inc. Chadd Kahlsdorf, P.E., PMP Project Manager H:\WAUKEE_CI_IA\A13114815_Sugar Creek GC Irrigation Well\7_Construction\E_Pay Applications\Sugar Creek Water Supply Change Order 1.xlsx1 of 1 309 E 5th Street, Suite 202 CHANGE ORDERDes Moines, IA 50309 (515) 259-9190 Fax (515) 233-4430 Distribution: Owner __X__ Engineer __X__ Contractor __X__ Other _____ Contractor:RW Excavating Solutions Project Title Sugar Creek Municipal Golf Course Water Supply Project 13293 S. 88th Avenue West BMI Project File Number A13.114815 Prairie City, IA 50228 Orig. Contract Amount & Date $135,805.00 10/10/18 Change Order Number 1 Date 01/28/19 THE CONTRACT IS CHANGED AS FOLLOWS: Items listed below are additional line items to complete pond excavation. Item C01.1 is for the excavation and offsite disposal of pond dredge spoils. Item C01.2 is for the additional cost to maintain the truck haul route on/off the golf course and maintain the pavement on Ute Ave. Item Description Unit Unit Price Quantity Adjustment Value Adjustment CO1.1 EXCAVATION, CLASS 10, UNSUITABLE SOIL EXPORT CY $10.50 1,740 $18,270.00 CO1.2 ADDITIONAL MOBILIZATION LS $6,000.00 1.00 $6,000.00 TOTAL $24,270.00 CHANGE ORDER SUMMARY The Original Contract Sum was $135,805.00 Net Change by previously authorized Change Orders $0.00 The Contract Sum prior to This Change Order was $135,805.00 The Contract Sum will be increased by this Change Order in the amount of $24,270.00 The new Contract Sum including this Change Order will be $160,075.00 Aggregate Change Order as a percent of Original Contract 0.00% The Contract Time will be changed by 0 Days The date of Final Completion as of the date of this Change Order therefore is March 1, 2019 NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Contractor:Recommended By:Approved By: RW Excavating Solutions Bolton & Menk, Inc.City of Waukee Signature:Signature:Signature: Name: John Readout Name: Chadd Kahlsdorf, P.E., P.M.P.Name: Tim Moerman Title: Project Manager Title: Project Manager Title: City Administrator Date:Date:Date: