Loading...
HomeMy WebLinkAbout2019-04-01-J01N NW Area Water Main Chloramination_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 1, 2019 AGENDA ITEM:Consideration of approval of Change Order No. 1 Koester Construction Company for the Northwest Area Water Main Chloramination Project, the change order increases the contract price by $3,888.00. FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The change order is for specification changes required to obtain an Iowa Department of Natural Resources Construction permit. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price by a total of $3,888.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Motion to Approve. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Kevin Vrchoticky PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1N VEENSTRA & KIMM, INC. 3000 Westown Parkway • West Des Moines, Iowa 50266-1320 515-225-8000 • 515-225-7848(FAX) • 800-241-8000(WATS) 275311 March 29, 2019 CHANGE ORDER NO. 1 CITY OF WAUKEE, IOWA NORTHWEST AREA WATER MAIN CHLORAMINATION Change Order No. 1 is for specification changes required to obtain an Iowa Department of Natural Resources Construction Permit. Revision to Specification Amount SECTION 02610 – BURIED PIPING, Page 02610-3 Under “BURIED PIPE SPECIFICATION TABLE”, under “Ductile Iron (DI)” in Material column, delete “AWWA C105” and insert “AWWA C151”. SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-1 Under “INDEX” delete “2.23 CHEMICAL TANK SCALE” and insert “2.23 RADAR LEVEL TRANSDUCER”. SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-2 Under “INDEX” following “2.51 INSTANTANEOUS WATER HEATER” add “2.52 CHEMICAL FLOW METERS”. No Cost No Cost No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-2 Under side heading “1.01 SCOPE OF WORK” following paragraph C. add the following: “D. All potable water treatment chemicals are to be certified in conformance with ANSI/NSF 60. E. All potable water treatment equipment including but not limited to tanks, pumps and appurtenances are to be certified in conformance with ANSI/NSF 61.”. No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-17 Under side heading “2.19 CHEMICAL FEED PUMPS” subparagraph A.2.b. delete “5.3 GPH” and insert “7.9 GPH”. No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-17 Under side heading “2.19 CHEMICAL FEED PUMPS” subparagraph A.3.b. delete “5.3 GPH” and insert “7.9 GPH”. No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-18 Under side heading “2.19 CHEMICAL FEED PUMPS” paragraph G. delete “QDOS 20” and insert “QDOS 30”. No Cost 275311 SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-18 Under side heading “2.19 CHEMICAL FEED PUMPS” following paragraph G. add the following: “H. Chemical feed pumps shall be programmed to limit the maximum chemical solution flow rate to that which is needed at the maximum water flow rate.”. No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-18 Delete side heading “2.23 CHEMICAL TANK SCALE” and paragraphs A.-E. in their entirety. SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-18 Following side heading “2.22 PRESSURE GAUGE” paragraph A. add the following: “2.23 RADAR LEVEL TRANSDUCER A. Provide a quantity of four (4) radar level transducers to measure liquid level in the bulk chemical storage tanks. B. Accuracy is up to ±0.2 inches.”. No Cost No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-19 Under side heading “2.24 CHEMICAL TANKS” following paragraph A. add the following: “B. Chemical tanks to have drain and valve to be able to empty tanks. Drain is to be located over the spill containment basin.”. No Cost SECTION 13120 – PACKAGED CHEMICAL FEED BUILDING, Page 13120-27 Following side heading “2.51 INSTANTANEOUS WATER HEATER” paragraph G. add the following: “2.52 CHEMICAL FLOW METERS A. Provide a quantity of two (2) chemical flow meters to measure sodium hypochlorite solution and ammonium sulphate solution flow into the water system. B. Manufacturer: Yokogawa AXF, or approved equal.”. No Cost SECTION 13570 – INSIDE PROCESS PIPING, Page 13570-2 Under side heading “1.01 DESCRIPTION” following paragraph G. add the following: “H. All potable water treatment chemicals are to be certified in conformance with ANSI/NSF 60. I. All potable water treatment equipment including but not limited to tanks, pumps and appurtenances are to be certified in conformance with ANSI/NSF 61.”. No Cost SECTION 13570 – INSIDE PROCESS PIPING, Page 13570-10 Under side heading “2.17 ELECTRIC MOTOR ACTUATORS” following paragraph M. add the following: “N. Actuator on butterfly control valve in Valve Chamber #2 to have back-up battery. Actuator to be programmed to automatically go to “Close” position if there is a loss of power.”. $3,888.00