Loading...
HomeMy WebLinkAbout2019-04-01-J12 Lot 2 The Shops at Kettlestone North Plat 6_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 1, 2019 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Lot 2, The Shops at Kettlestone North Plat 6 (2540 SE Encompass Drive) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Vertical Group, applicant, with Kettleview, LLC, property owner, request approval of a site plan to allow for the construction of a two- story office building. The proposed building is 6,642 square feet in area. Access to the site will be provided off of a short extension of SE Encompass Drive. A total of 27 parking spaces are required for the proposed use of the site and the site plan identifies a total of 34 parking spaces. The applicant has provided elevations for the proposed building on the site, which meets the intent of the architectural guidelines within the Site Plan Ordinance and the Kettlestone Design Guidelines. The building will feature fiber cement siding, glazing, and architectural metal paneling. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the March 12, 2019 Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Lot 2, the Shops at Kettlestone North Plat 6 (2540 SE Encompass Drive) Senior Planner, Andy Kass, introduced the request for approval of a site plan as made by the applicant, Vertical Group. The subject property in located east of SE Parkview Crossing Drive and south of SE Tallgrass Lane, containing approximately 0.60 acres. Mr. Kass reminded the Commission that the area was rezoned in 2018 to allow for some mixed uses within the professional office park intent of the development. The site plan identifies a two-story office building approximately 6,642 square feet in size and a maximum height of 34 feet. Both floors of the building include office space for the proposed tenant and the second floor also houses a roof top patio on the south side of the building. The site plan also identifies an area to the north of the building as an area for future expansion if needed. The trash enclosure is proposed on the north side of the building. Access will be provided on the east side of the site off of SE Encompass Drive, a private street, with an additional access on the south side of the site from a private drive that will be constructed at the same time as SE Encompass Drive. A 10 foot wide trail will be constructed along the west side of SE J12 Parkview Crossing Drive, and sidewalks will be constructed along the internal private streets. All public utilities will service the site, and storm water detention will be provided in the regional detention basin located to the northeast of the subject property which is owned and maintained by the City. At this time the site plan meets the open space, landscaping, lighting, and parking requirements. Staff recommends approval of the site plan subject to any remaining staff comments.  Commissioner Broderick questioned if there was a specific user intended or if it was to be a “Spec” building. Mr. Kass advised that an insurance company was identified as the intended user of the space.  Commissioner Hoifeldt questioned if, with the Planned Development, no bar or restraunt was allowed in this space, just office use. Mr. Kass advised that was correct.  Commissioner Hoifeldt questioned if there was an angle that the mechanical equipment could be seen. Mr. Kass advised staff would verify with the architect and make sure that was not the case.  Commissioner Broderick questioned if the applicants have consulted with a waste hauler company to insure the ability to reach the trash enclosure. A representative for the applicant, Derek Johnson, advised that the calculations for turn radius of a typical waste hauler vehicle have been run and show no issues.  Commissioner Koshy asked for more information about the possible expansion area. Mr. Kass advised that it is a proposed area that if an expansion were to occur it is anticipated to the north of the site. Any future expansions would have to conform to the parking and open space requirements for the added square footage. Commissioner Tietz moved to approve the site plan for Lot 2, The Shops at Kettlestone North Plat 6 (2540 SE Encompass Drive) subject to any remaining staff comments. Commissioner Broderick seconded the motion. Ayes: Tietz, Streit, Broderick, Hoifeldt, and Koshy. Nays: None. Motion Carries. STAFF REVIEW AND COMMENT: Staff recommends approval subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 19- APPROVING THE SITE PLAN FOR LOT 2, THE SHOPS AT KETTLESTONE NORTH PLAT 6 (2540 SE ENCOMPASS DRIVE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Lot 2, The Shops a Kettlestone North Plat 6, subject to remaining staff comments on March 12, 2019; AND, WHEREAS, the Site Plan for Lot 2, The Shops at Kettlestone North Plat 6 is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Lot 2, The Shops at Kettlestone North Plat 6 is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 1st day of April, 2019 that the Site Plan for Lot 2, The Shops at Kettlestone North Plat 6 is approved, subject to remaining staff comments. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Courtney Clarke Shelly Hughes Larry R. Lyon PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Lot 2, The Shops at Kettlestone North Plat 6 – Site Plan PREPARED BY: Andy Kass, AICP – Senior Planner REPORT DATE: March 8, 2019 MEETING DATE: March 12, 2019 GENERAL INFORMATION Applicant / Owner: Kettleview, LLC (owner) & Vertical Group (applicant) Engineer: Derek Johnson, P.E., with ISG Request: The applicant is requesting approval of a site plan for an office building. Location and Size: Property is located east of SE Parkview Crossing Drive and south of SE Tallgrass Lane, containing approximately 0.60 acres. Property Address: 2540 SE Encompass Drive AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. March 8, 2019 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Office K-OF (Kettlestone Office) / PD-1 (Planned Development Overlay) North Vacant – Undeveloped Multi-Family Stacked Medium and Office A-1 (Agricultural District) South Vacant – Undeveloped Community Commercial K-RC (Kettlestone Retail Community District) East Holmes Murphy Office K-OF (Kettlestone Office District) West Vacant – Undeveloped Office K-OF (Kettlestone Office District) HISTORY The proposed project is located within Kettleview Development that was rezoned in 2018. The overall development is intended to be a professional office park. The proposed office building is the second building proposed within the development. In 2018, a site plan for a dental office building was approved which is currently under construction. PROJECT DESCRIPTION The site plan identifies the construction of a 6,642 square foot office building. The proposed building is two stories with an overall maximum height of 34-feet. Both floors of the building include office space for the proposed tenant. In addition to office space and conference rooms, the proposed building will feature a rooftop patio on the south side of the building. The site plan also identifies an area to the north of the building that identifies an area for future expansion. Future expansion of the building will require site plan review and approval. The trash enclosure is proposed to be located on the north side of the building. ACCESS AND PARKING Access to the property will be provided on the east side of the site off of SE Encompass Drive, a private street. SE Encompass Drive which will be constructed at the same time the improvements to the site are being made. Additional access to the site is provided on the south side off of a private drive that will be constructed at the same time as SE Encompass Drive. A total of 27 parking spaces are required for the site and the site plan identifies a total of 32 parking spaces. The site plan identifies three (3) bike racks to accommodate bike parking on the southwest side of the building. SIDEWALKS/TRAILS A 10-foot-wide trail will be constructed along the west side of SE Parkview Crossing Drive. 5-foot-wide sidewalks will be constructed along the private internal streets to allow for pedestrian accessibility throughout the Kettleview development. UTILITIES Sanitary sewer service will be provided from a manhole at the southeast corner of the intersection of SE Tallgrass Lane and SE Parkview Crossing Drive. A public water main that will provide domestic and fire service to the site will be constructed along with the associated street improvements for the overall development. March 8, 2019 3 of 3 Storm water detention will be provided in the regional detention basin located to the northeast of the subject property. The regional detention basin is owned and maintained by the City. LANDSCAPING & OPEN SPACE A minimum of 25% of the project area is required to be open space. The total amount of open space proposed is 28%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance and the Kettlestone Design Guidelines. ELEVATIONS The proposed building includes glazing, architectural metal paneling, three different varieties of fiber cement paneling, and a steel awning. The trash enclosure will incorporate the same siding that will be used on the building. Proposed elevations are attached for your review. The proposed materials and elevations meet the requirements of the Kettlestone Design Guidelines. PHOTOMETRIC PLAN The site plan includes a photometric plan for the proposed site lighting. A total of three (3) pole mounted lights are proposed for parking lot lighting. These proposed fixtures comply with the lighting requirements within the Kettlestone Design Guidelines. In addition to the parking lot lighting the photometric plans identifies two (2) wall pack light fixtures on the building. These fixtures comply with the requirements of the Kettlestone Design Guidelines. STAFF RECOMMENDATION Staff recommends approval of the site plan for Lot 2, The Shops at Kettlestone North Plat 6 subject to remaining staff comments. Private Storm S e w e r E a s e m e n t per Bk 2018 P g 2 1 9 9 4 Pub l i c W a t e r M a in E a s em e n t pe r B k 2 0 1 8 P g 2 2 2 3 1 Priv a t e S t o rm S e w e r E a s e m e n t pe r B k 2 0 1 8 P g 2 1 9 9 4 Public U t i l i t ies E a s emen t pe r Bk 2 0 1 8 Pg 2 2 2 3 0 FUTURE TRAIL(BY OTHERS) 22652 C0-SITE DATA DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY PROJECT LOCATION ADDRESS: 2540 ENCOMPASS DRIVE LEGAL DESCRIPTION: LOT 2 OF THE SHOPS AT KETTLESTONE NORTH PLAT 6 LEGEND EXISTING CITY LIMITS ACCESS CONTROL SECTION LINE QUARTER SECTION LINE RIGHT OF WAY LINE PROPERTY / LOTLINE EASEMENT LINE CULVERT WATER EDGE WETLAND BOUNDARY WETLAND / MARSH WATER FENCE LINE STORM SEWER SANITARY SEWER SANITARY SEWER FORCEMAIN CONTOUR (MAJOR) UNDERGROUND TELEPHONE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS UNDERGROUND FIBER OPTIC CONTOUR (MINOR) DECIDUOUS TREE CONIFEROUS TREE TREE LINE MANHOLE/STRUCTURE CATCH BASIN HYDRANT CURB STOP VALVE UTILITY PEDESTAL / CABINET POWER POLE 990 989 PROPOSED CULVERT STORM SEWER SANITARY SEWER WATER OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS CONTOUR MANHOLE CATCH BASIN HYDRANT VALVE EASEMENT RIGHT OF WAY STORM SEWER (PIPE WIDTH) 1015 LOT LINE SANITARY SEWER (PIPE WIDTH) OVERHEAD UTILITY UNDERGROUND UTILITY 1.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT/ENGINEER. 2.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. 3.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 5.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 6.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 7.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 8.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. 9.THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR UTILITY LOCATIONS, MINIMUM 2 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION (1-800-292-8989). PROJECT GENERAL NOTES HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), ZONE 8, ON THE IOWA REGIONAL COORDINATE SYSTEM, IN U.S. SURVEY FEET. ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND VERTICAL COORDINATES FOR THIS PROJECT. THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN JUNE, 2018 BY LANDMARK ENGINEERING GROUP AND BETWEEN AUGUST & NOVEMBER OF 2018 BY ISG. SPECIFICATIONS REFERENCE PROJECT DATUM TOPOGRAPHIC SURVEY ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT SPECIFICATIONS, THE CITY OF WAUKEE STANDARD SPECIFICATIONS AND THE STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS), 2019 EDITION, UNLESS DIRECTED OTHERWISE. 02/19/2019 SITE PLAN REVIEW - 2ND PJJ SITE DATA - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C0-10 SITE DATA ---- ---- C0-10 SITE SUMMARY ZONING:K-OF/PD-1 SITE/LOT AREA:26,171 SF / 0.60 AC. IMPERVIOUS AREA:18,743 SF / 0.43 AC. GREENSPACE PROVIDED:7,428 SF / 0.17 AC. (REQUIRED 25%) FLOOR AREA RATIO:0.20 (MAXIMUM 0.35) BIKE PARKING:3 RACKS EMPLOYEES:15 SQUARE FOOTAGE:6,642 SF BUILDING HEIGHT:34'-0" CONSTRUCTION TYPE:VB PARKING REQUIREMENTS (PER CITY CODE) TYPE UNIT / AREA STALLS REQUIRED STALLS PROVIDED STANDARD 1/250 GFA 25 32 H.C.2 2 TOTAL:27 34 SETBACKS BUILDING ACCESSORY STRUCTURE FRONT YARD 0'-0"20'-0" SIDE YARD 0'-0"5'-0" REAR YARD 0'-0"5'-0" WAUKEE IOWA C0-10 LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONN S W E LOCATION MAP 0 SCALE IN FEET 500 1000 CITY OF WAUKEE, IA PROJECT MANAGER: ISG - RYAN ANDERSON 7900 INTERNATIONAL DRIVE, SUITE 550 MINNEAPOLIS, MN 55425 PHONE: 952-426-0699 APPLICANT: VERTICAL GROUP 327 NORTH RIVERFRONT DRIVE MANKATO, MN 56001 PHONE: 507-525-3531 PROPERTY OWNER: KETTLEVIEW, LLC 4700 150 STREET URBANDALE, IA 50323 PRINTED SIGNATURE SIGNATURE SIGNATURE DATE REGISTRATION EXPIRES SEAL TSIGEWE LA NOISSEFORP RDERIO A NREENIGEI HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF IOWA. SHEETS COVERED BY THIS SEAL DEREK A. JOHNSON 20894 DEREK A. JOHNSON C0-10 - C6-10 ASHWORTH ROA D GRAND PRAIRIE PKWYSE TALLGRASS L N SE WESTOWN PK W Y SE LA GRANT PKWYCIVIL SHEET INDEX C0-10 SITE DATA C0-11 GENERAL SITE NOTES C0-20 SITE DETAILS C0-21 SITE DETAILS C0-22 SITE DETAILS C1-10 TEMPORARY EROSION & SEDIMENT CONTROL PLAN C1-20 EROSION & SEDIMENT CONTROL PLAN NOTES C1-21 EROSION & SEDIMENT CONTROL PLAN DETAILS C2-10 EXISTING SITE PLAN C3-10 SITE PLAN C3-20 SITE UTILITY PLAN C3-21 HYDRANT COVERAGE MAP C4-10 SITE GRADING PLAN C5-10 SITE PLANTING & RESTORATION PLAN C5-20 PLANTING & RESTORATION PLAN C6-10 PHOTOMETRICS PLAN 03/05/2019 SITE PLAN REVIEW - 3RD PJJ SE E S K E R R I D G E D R I V ESE PARKVIEW CROSSING DRIVE03/14/2019 SITE PLAN REVIEW - 4TH PJJ 22652 C0-DETAILS DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY GENERAL SITE NOTES C0-11 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C0-11 GENERAL SITE NOTES ---- ---- C0-11 WAUKEE IOWA B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONLOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 1.ALL WORK SHALL BE IN ACCORDANCE WITH OSHA CODES AND STANDARDS. NOTHING INDICATED ON THE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH ANY APPROPRIATE SAFETY REGULATIONS. 2.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS. WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT / ENGINEER. 3.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. 4.ALL PROPERTY PINS SHALL BE PROTECTED FROM GRADING OR OTHER OPERATIONS. ANY PINS DISTURBED SHALL BE RESET AT THE CONTRACTOR'S EXPANSE. 5.THE WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND CURRENT EDITION OF THE STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO CONSTRUCTION WORK ON THE PROJECT. A FULL IOWA SUDAS SPECIFICATIONS MANUAL CAN BE FOUND ONLINE FOR FREE AT WWW.IOWASUDAS.COM. 6.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT / ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 7.THE WORK TO BE ACCOMPLISHED FOR THE CONSTRUCTION OF THIS PROJECT WILL OCCUR ON OWNER'S PROPERTY. THE CONTRACTOR SHOULD CONFINE OPERATIONS, PEOPLE, AND EQUIPMENT TO THE OWNER'S PROPERTY. 8.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT TO BE INCORPORATED IN THE WORK INVOLVED IN THE PROJECT (UNSUITABLE EXCAVATION, WASTE PIPE, ETC.). 9.PUBLIC UTILITY FIXTURES ARE EXISTING WITHIN THE CONSTRUCTION AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OWNERS OF THESE UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION. THE CONTRACTOR SHALL AFFORD ACCESS TO THESE FACILITIES FOR ANY NECESSARY MODIFICATION OF SERVICES. NO ADDITIONAL COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH WORK. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING AND PREPARING AREAS DISTURBED BY CONTRACTOR'S OPERATIONS FOR SEEDING. ALL DEBRIS GREATER THAN GOLF BALL SIZE SHALL BE REMOVED AND AREA SHALL BE RAKED SMOOTH. CONTRACTOR SHALL NOT DISTURB AREAS OUTSIDE OF THE OWNER'S PROPERTY DURING OPERATIONS AND SHALL MAKE A REASONABLE EFFORT TO NOT DISTURB AREAS GREATER THEN NECESSARY DURING CONSTRUCTION. AREAS OF NONGERMINATION WILL BE RESEEDED AND REFERTILIZED BY THE CONTRACTOR. COST IS TO BE CONSIDERED INCIDENTAL. 11.IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY TRAFFIC CONTROL SIGNS, DEVICES, ETC., AND TO PLACE, MAINTAIN, AND REMOVE SAME AS CONSTRUCTION COMMENCES AND IS COMPLETED IN ACCORDANCE WITH THE CURRENT EDITION OF THE IOWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS & HIGHWAYS. FAILURE TO COMPLY WITH THIS PORTION OF THE SPECIFICATIONS WILL RESULT IN SUSPENSION OF WORK UNTIL. THE SITUATION IS CORRECTED. A REDUCTION IN THE LUMP SUM TO BE PAID WILL BE MADE FOR EXCESSIVE NONCOMPLIANCE WITH REQUIRED TRAFFIC CONTROL. NO WORK SHALL COMMENCE IN ANY GIVEN AREA UNTIL ALL APPROPRIATE TRAFFIC CONTROL IS IN PLACE. 12.THE CONTRACTOR SHALL NOT DISTURB GRASSED AREAS AND TREES OUTSIDE THE CONSTRUCTION LIMITS. TREES AND BUSHES SHALL BE RETAINED AS POSSIBLE. THE CONTRACTOR WILL NOT BE PERMITTED TO PARK SERVICE VEHICLES AND EQUIPMENT OR USE THESE AREAS FOR STORAGE OF MATERIALS. STORAGE, PARKING AND SERVICE AREA(S) WILL BE SUBJECT TO APPROVAL OF THE ENGINEER. 13.ALL EXISTING TREES AND BUSHES SHALL BE MAINTAINED AND PROTECTED UNLESS NOTED OTHERWISE. AREAS OF HAND FORMING MAY BE REQUIRED TO PROTECT TRESS. 14.THE CONSTRUCTION OPERATIONS ARE TO TAKE PLACE IN A RESIDENTIAL AREA. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENTS INCLUDED IN THE SPECIFICATIONS IN REGARD TO POSITIVE DUST CONTROL DURING ALL OPERATIONS TO INCLUDE REMOVAL, CLEAN UP, ETC. 15.CONTRACTOR SHALL PROVIDE BARRICADES AND SIGNS IDENTIFYING VEHICLES AND OBSTACLES IN THE DRIVEN ROADWAYS. 16.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS, NOTIFY ARCHITECT / ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRED INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 17.EXISTING STORM SEWERS, SANITARY SEWERS, AND WATER MAINS ARE LOCATED BASED ON CITY RECORDS AND ACTUAL LOCATIONS MAY VARY GREATLY FROM THAT SHOWN. THE LOCATIONS AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF ISG. NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. 18.CONTRACTOR SHALL REPLACE AND REPAIR ALL EXISTING STORM SEWERS THAT ARE ENCOUNTERED DURING CONSTRUCTION IN ACCORDANCE WITH THE SPECIFICATION. CONTRACTOR SHALL USE 2000D RCP WITH FLEXIBLE O-RING GASKET JOINTS, PLACE PIPES SO JOINTS ARE NOT DIRECTLY OVER WATER MAIN, AND RECONNECT TO EXISTING STORM SEWER WITH REINFORCED FERNCO COUPLING. 19.PROPOSED WATER DISTRIBUTION LINE SHALL BE INSTALLED WITH A MINIMUM OF FIVE AND ONE-HALF (5.5') OF COVER. IN LOCATIONS WITH A SEPARATION DISTANCE OF LESS THAN TEN FEET (10') FROM SANITARY SEWER OR STORM SEWER, THE SANITARY SEWER OR STORM SEWER SHALL BE INSTALLED EIGHTEEN INCHES (18") BELOW THE BOTTOM OF THE WATER MAIN AND SHALL BE PLACED IN A SEPARATE TRENCH AT A MINIMUM HORIZONTAL SEPARATION OF THREE FEET PER SUDAS SPECIFICATIONS. 20.AT ALL SANITARY SEWER AND WATER MAIN CROSSOVER, MAINTAIN A MINIMUM OF 18" SEPARATION BETWEEN BOTTOM OF WATER MAIN AND TOP OF SEWER. PLACE ONE FULL LENGTH OF WATER PIPE, LOCATED SO BOTH JOINTS ARE AS FAR AS POSSIBLE FROM SEWER. USE LOW PERMEABILITY SOIL FOR BACKFILL WITHIN 10' OF CROSSOVER. 21.THRUST BLOCKS SHALL BE POURED CONCRETE, INSTALLED BEHIND ALL BENDS, TEES AND DEAD ENDS IN ACCORDANCE WITH SPECIFICATIONS. 22.GRANULAR BEDDING IS REQUIRED FOR ANY TYPE OF PIPE USED AND SHALL BE AS SPECIFIED. 23.A NEAT VERTICAL EDGE WILL BE REQUIRED FOR ALL JOINTS BETWEEN THE NEW PAVEMENT SURFACE AND EXISTING PAVING AS SHOWN IN THE PLANS. SAW CUTTING OR OTHER TECHNIQUES MAY BE USED TO PROVIDE THIS EDGE. COST OF THE SAW CUT IS TO BE CONSIDERED INCIDENTAL. ADDITIONAL REMOVAL AND REPLACEMENT DUE TO THE CONTRACTOR'S OPERATION WILL BE MEASURED SEPARATELY BUT WILL BE THE CONTRACTOR'S RESPONSIBILITY. 24.ANY DEWATERING NECESSARY FOR CONSTRUCTION SHALL BE CONSIDERED INCIDENTAL TO INDIVIDUAL CONSTRUCTION ITEM. PLEASE REFER TO SUBSURFACE EXPLORATION REPORT FOR ANTICIPATED SITE CONDITIONS. REPORT IS FOR INFORMATIONAL PURPOSES ONLY AND DOES NOT GUARANTEE CONDITIONS TO BE EXPERIENCED. 25.THE CONTRACTOR SHALL INSPECT AND VERIFY SOIL CONDITIONS AS NECESSARY IN ORDER TO DETERMINE THE TYPE OF CONSTRUCTION TO EMPLOY. NATURAL AND/OR MANMADE OBSTRUCTIONS MAY BE ENCOUNTERED IN THE SOIL. THESE CONTRACT DOCUMENTS DO NOT WARRANT THE NATURE OR CONDITIONS OF THE SOILS, AND DO NOT WARRANT THAT NATURAL OR MANMADE OBSTRUCTIONS WILL NOT BE ENCOUNTERED, NOR GUARANTEE THE EXTENT TO WHICH ROCKS, BOULDERS, OR OTHER OBSTRUCTIONS, REGARDLESS OF SIZE, MAY BE ENCOUNTERED DURING BORING OPERATIONS. THE CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR ANY NATURAL OR MANMADE OBSTRUCTIONS ENCOUNTERED DURING TRENCHLESS CONSTRUCTION. 26.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK. 27.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED, AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK. 28.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 29.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF ISG. NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OF VARIATIONS FROM PLAN. 30.THIS SITE WILL HAVE SAWCUTTING AND/OR CONCRETE GRINDING, SO PROTECTION OF STORM SEWERS AND DRAINAGE WAYS WILL NEED TO BE PROTECTED FROM SLURRY FROM THE CONCRETE OPERATION TO DISCHARGE OFFSITE. 31.THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO EXCAVATION / CONSTRUCTIONS (1-800-292-8989). 32.ANY PROPOSED CHANGES TO THE PLAN SET SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. 33.THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. 34.ALL FIRE HYDRANTS ARE TO HAVE 4" STORZ FITTINGS. 35.ALL UTILITIES ARE TO BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARDS. 36.ALL UTILITIES ARE TO BE TESTED TO CITY OF WAUKEE STANDARDS, AND THE CITY IS TO WITNESS ALL TESTING. 37.COORDINATE ALL TIE-INS TO EXISTING UTILITIES WITH CITY OF WAUKEE PUBLIC WORKS DEPARTMENT. 38.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 AND SHALL EXTEND TO WITHIN 100-FEET OF THE EXTERIOR WALLS OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING. CONSTRUCTION NOTES 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 48"1'-0"24"60"36"12" CONCRETE BASE F&I: HANDICAPPED PARKING SIGN WHICH MEETS A.D.A. & STATE OF IOWA REQUIREMENTS. 2" Ø GALVANIZED STEEL POST CONCRETE FILLED 6" STEEL GUARD POST 24"Ø x 4'-0" DEEP CONC. PLUG CONCRETE SLAB (MIN 4000 PSI) AGGREGATE BASE IOWA DOT GRADATION NO. 14 SPEC NUMBER 4123 6"8"COMPACTED SUBGRADE (12" MINIMUM) CONCRETE SLAB (MIN 4000 PSI) AGGREGATE BASE IOWA DOT 14 VARIESVARIESCOMPACTED SUBGRADE (12" MINIMUM) CONCRETE SLAB (MIN 4000 PSI) AGGREGATE BASE 4"6"COMPACTED SUBGRADE (12" MINIMUM) ST160 CONCRETE WALK NTS ST120 STANDARD CONCRETE PAVEMENT SECTION NTS HANDICAPPED SIGN POST W/BOLLARD NTS CONCRETE PAVEMENT W/ INTEGRAL CURB & GUTTER NTS CONCRETE CURB & GUTTER (REFER TO DETAILS FOR DIMENSIONS) 22652 C0-DETAILS DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE DETAILS C0-20 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C0-20 SITE DETAILS ---- ---- C0-20 WAUKEE IOWA B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTION5'-0" 5'-0" min. 5'-0" 5'-0" 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 5 feet by 5 feet. 5 feet by 5 feet. 03/14/2019 SITE PLAN REVIEW - 4TH PJJ TRENCH WIDTH, SEE TABLE PIPE OD (BC) 0.6 BC12"0.15 BC BACKFILL COMPACTED 1 1 1 1 BACKFILL W/GRANULAR MATERIAL OR SELECT MATERIAL FROM EXCAVATION PIPE HAUNCHES STORM DRAIN PIPE 6" GRANULAR BEDDING C TRENCH WIDTH BC + 24" BC + 36" PIPE DIAM 36" OR LESS 42" TO 54" 60" OR OVER 1.5 x B TRENCH WIDTHNOTE: GRANULAR BEDDING AND BACKFILL FOR STORM DRAIN PIPES SHALL BE INCIDENTAL TO STORM DRAIN CONSTRUCTION TRENCH WIDTH, SEE TABLE 0.6 BC 0.15 BC BACKFILL COMPACTED 1 1 1 1 6" GRANULAR BEDDING C TRENCH WIDTH BC + 24" BC + 36" PIPE DIAM 36" OR LESS 42" TO 54" 60" OR OVER 1.5 x B TRENCH WIDTHNOTE: GRANULAR BEDDING AND BACKFILL FOR STORM DRAIN PIPES SHALL BE INCIDENTAL TO STORM DRAIN CONSTRUCTION PIPE OD (BC)12"STORM DRAIN PIPE 8"18"6"13 12"6" 3 1 R3" R12" R3" HORIZONTAL LINE7"2 NOTES: LONGITUDINAL JOINT WHEN ADJACENT TO RIGID PAVEMENT OR BASE. SLOPE 0.06FT/FT NORMAL, UNLESS OTHERWISE SPECIFIED. IF A DIFFERENT GUTTER SLOPE IS PERMITTED, THE FORM MAY BE TILTED. 1 2 1 CONCRETE CURB & GUTTER NTS B618 ST206 4"12"18"7"HORIZONTAL LINE 1 3 2 1 R12" NOTES: LONGITUDINAL JOINT WHEN ADJACENT TO RIGID PAVEMENT OR BASE. SLOPE 0.06FT/FT NORMAL, UNLESS OTHERWISE SPECIFIED. IF A DIFFERENT GUTTER SLOPE IS PERMITTED, THE FORM MAY BE TILTED. 1 2 CONCRETE CURB & GUTTER NTS D418 ST216 NON-CONCRETE STORM DRAIN PIPE BEDDING NTS SD601 RCP STORM DRAIN PIPE BEDDING NTS 22652 C0-DETAILS DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE DETAILS C0-21 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C0-21 SITE DETAILS ---- ---- C0-21 WAUKEE IOWA B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTION02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 12"ODOD+24" MAX 6"NOTE: GRANULAR BEDDING AND ENCASEMENT FOR SANITARY SEWER SHALL BE INCIDENTAL TO CONSTRUCTION COMPACTED BACKFILL GRADE DROP LID TOP BOTTOM EXTENSION BASE CAP TO BE SET 12" BELOW GRADE AND ENCASE IN CONCRETE. BOX TO BE SET WITH 12" OF ADJUSTMENT. RESILIANT WEDGE VALVE CONFORMING TO AWWA C-509-80 STANDARDS GATE VALVE, BOX SCREW TYPE THREE PIECE, 51 4" SHAFT SIZE G BOX, 7'6" EXTENDED, #6 STANDARD BASE GATE VALVE ADAPTOR ALL GATE VALVES SHALL BE IN ACCORDANCE WITH CITY OF STANDARDS GATE VALVE ADAPTER 1-1/2" WASHED ROCK (INCIDENTAL) MEGALUG CONC BLOCKING WATERMAIN PIPE BEDDING (SEE DETAIL) NOTES: INSTALL TOP NUT EXTENDER TO 7' DEPTH ON ALL VALVES WITH OVER-DEPTH TYPICAL GATE VALVE & BOX INSTALLATION NTS WM200 WAUKEE SD400NTS VERTICAL RAIN LEADER 4" PERIMETER DRAIN HORIZONTAL ROOF DRAIN, SIZE VARIES. 6" PVC LEADER 45° FITTING 6" PVC REDUCER 4" DOWNSPOUTBUILDING LINE FINISH FLOOR (SEE PLANS) -NTS BIKE RACK PIPE BEDDING DETAIL FOR SANITARY SEWER NTS 22652 C0-DETAILS DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE DETAILS C0-22 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C0-22 SITE DETAILS ---- ---- C0-22 B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONWAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ Sanitary Sewer EasementPer The Shops AtKettlestone North Plat 110 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 20' Private Sanitary Sewer Easement BK2019 PG1139 20 OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) 1 0 3 91038 10371036103510401039104110411040104010381039103910391040103910381037 103710371 0 3 6 1 0 3 5 1 0 3 1 1 0 3 2 10 3 3 1 0 3 4 1 0 3 5 1 0 3 6 1 0 3 7 1 0 3 8 1 0 3 9 1 0 4 0 10411042103810371 0 3 6 1 0 3 5 10371035103410331031103810391037 1038 10391037FUTURE TRAIL (BY OTHERS) 22652 C1-SWPPP DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY TEMPORARY EROSION & SEDIMENT CONTROL PLAN C1-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C1-10 TEMPORARY EROSION & SEDIMENT CONTROL PLAN ---- ---- C1-10 EXISTING PROPERTY LINE, TYP. B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONEROSION CONTROL LEGEND SYMBOL ITEM NO.DESCRIPTION UNITS QUANTITY 9040-108-G-0 PERIMETER CONTROL LF 1,215 9040-108-T-0 PROPOSED STORM DRAIN INLET PROTECTION EACH 7 9040-108-O-0 STABILIZED CONSTRUCTION EXIT EACH 1 11,050-108-A-0 CONCRETE WASHOUT AREA EA 1 EXISTING DRAINAGE ARROW PROPOSED DRAINAGE ARROW PERIMETER CONTROL CAN BE SILT FENCE, SEDIMENT CONTROL LOG. QUANTITIES ARE FOR INFORMATIONAL PURPOSES TO MEET THE REQUIREMENTS OF THE CONSTRUCTION STORMWATER PERMIT. NO GUARANTEE IS MADE TO THE ACTUAL QUANTITIES REQUIRED. THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET. SEE SITE RESTORATION PLAN FOR FINAL TURF ESTABLISHMENT NOTE #1: SWPPP COVERAGE INCLUDES ELECTRIC, GAS, TELEPHONE, AND CABLE INSTALLATION. EACH COMPANY OR THEIR SUBCONTRACTOR IS RESPONSIBLE TO FOLLOW THE REQUIREMENTS OF THIS SWPPP INCLUDING PROVIDING THEIR OWN RESTORATION IF INSTALLATION OCCURS AFTER PRIMARY INSTALLATION OF SEEDING/SODDING/MULCHING DURING CONSTRUCTION OF EACH UTILITY. NOTE #2: SUDAS TYPE 4 SEED MIX TO BE USED FOR ALL TEMPORARY STABILIZATION (SUDAS 9010) SOD TO BE USED FOR ALL PERMANENT STABILIZATION (SUDAS 9020) (ESTIMATED QUANTITY = 11,563 SF.) NOTE #3: REMOVE ALL DEBRIS AND MUD SPILLED INTO ROW AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. NOTE #4: THE ULTIMATE DISCHARGE LOCATION FOR THE SITE IS FOX CREEK. EXISTING CONTOUR, TYP. PROPOSED CONTOUR, TYP. FUTURE CONTOUR, TYP. (BY OTHERS) WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ TOPSOIL STOCKPILE LOCATION STAGING/MATERIALS/WASTE LOCATION PERIMETER CONTROL OUTLINES PROJECT DISTURBANCE LIMITS AREA=1.07 AC. 0 SCALE IN FEET 30 60 90 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVESE PARKVIEW CROSSING DRIVEFUTURE DEVELOPMENT (BY OTHERS) 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 22652 C1-SWPPP DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY EROSION & SEDIMENT CONTROL PLAN NOTES C1-20 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C1-20 EROSION & SEDIMENT CONTROL PLAN NOTES ---- ---- C1-20 B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONACTIVITY SCHEDULE Install all BMP's needed and associated with the Grading Phase such as stabilized construction entrances, silt basins, riser pipes, outlet pipes silt traps, silt fence, diversions, terraces, temporary berms, and etcetera. Prior to any stripping of existing vegetation or grading. Proceed with stripping of existing vegetation and grading in accordance with the grading plan, while disturbing no more than necessary. After Installing all BMP's needed and associated with the Grading Phase. Furthermore, INSPECTOR approval must be obtained before the start of any stripping of existing vegetation or grading. Proceed with infrastructure installation. Infrastructure installation must occur prior to any building construction. Implement the installation of Temporary Seeding, Permanent Seeding, and/or Mulching. Proceed with removal of BMP's. BMP's may not be removed until each impacted drainage basin has been fully developed. Full development shall mean installation of pavement, buildings, and utilities, landscaping, and fully established permanent seeding. Furthermore, INSPECTOR approval must be obtained before the removal of any BMP's. CONSTRUCTION ACTIVITIES & SCHEDULING CONSTRUCTION ACTIVITY NOTES: EROSION PREVENTION: Construction of silt fence and all other erosion control measures shall be complete before other construction activity occurs. Use phased construction wherever practical and establish turf as soon as possible to minimize sediment transport. Turf establishment or temporary seeding or mulching of all exposed soil not being actively worked should be immediately initiated once earth disturbing activities have ceased. Temporary cover during construction is incidental. Pipe outlets must be provided with temporary or permanent energy dissipation within 24 hours after connection to a surface water. SEDIMENT CONTROL PRACTICES: Construction of silt fence and all other erosion control measures shall be complete prior to land disturbing activities occur. Inlet erosion protection shall be installed and maintained until turf has been established. The contractor shall be responsible to control erosion from leaving the construction zone. All eroded material that leaves the construction zone shall be collected by the contractor and returned to the site at the contractor's expense. All streets must be swept at the end of each working day and prior to a rain event. Silt fence or other effective erosion control measures must be installed around the perimeter of any soil stockpiles, including temporary stockpiles. Stockpiles cannot be placed in surface waters, including storm water conveyances such as curb and gutter systems, or conduits and ditches. Perimeter control shall be installed along the back of curb immediately following curb installation at all locations with positive drainage to parking lot and/or streets, and shall remain until stabilization is achieved. This shall be accomplished through the use of silt fence, biorolls, Rock logs, or other methods approved by the Engineer. CONSTRUCTION ACTIVITY NOTES: DEWATERING AND BASIN DRAINING: Dewater sediment-laden water to sedimentation basins if possible, or use other BMP's to prevent erosion and remove sediment when discharging to surface waters. Use appropriate energy dissipation measures on all discharges. Dewatering practices cannot cause nuisance conditions, erosion or in receiving channels or inundation of wetlands resulting in adverse impacts. POLLUTION PREVENTION: All solid waste collected from the construction site must be disposed in accordance with all applicable regulations. All hazardous materials (oil, gasoline, fuel, paint, etc) must be properly stored to prevent spills, leaks or other discharge, storage areas shall provide secondary containment and a hazardous materials spill kit. Storage and disposal of hazardous waste must be in compliance with all applicable regulations. Equipment maintenance areas must be limited to a defined area of the site. All runoff containing any hazardous material must be properly collected and disposed. No engine degreasing shall be allowed on site. The contractor is responsible for monitoring air pollution and ensuring it does not exceed levels set by local, state, or federal regulations. This includes dust created by work being performed on the site. Air pollution and dust control correction is considered incidental to the unit bid prices for which work is being performed. Additional dust control measures may be required by the Engineer. Concrete washout onsite: All liquid waste generated by concrete washout operations must be contained in a leak-proof containment facility or impermeable liner. The liquid waste must not contact the ground, and there must not be runoff from the concrete washout operations or areas. A sign must be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities. Protect storm sewers and drainage ways from allowing concrete slurry from concrete operations to discharge offsite. INSPECTION AND MAINTENANCE: The Permittees must routinely inspect the construction site once every seven (7) days during active construction. All inspections performed during construction must be recorded and records retained with the SWPPP. Contractor is responsible for keeping a record of all rainfall information & erosion control maintenance until final establishment of turf. All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 12 of the height of the fence. Erosion control, and other BMP's must be replaced, repaired, or supplemented when they reach 50% design load. FINAL STABILIZATION: The Permittees must ensure final stabilization of the site. The Permittees must submit a notice of termination within 30 days after final stabilization is complete or control has been passed to another owner. All temporary erosion control measures and BMP's must be removed as part of the final site stabilization. The storm water permit further defines final stabilization and its requirements. MAINTENANCE SCHEDULE The following Maintenance Schedule has been provided. The INSPECTOR must perform the inspections. The OPERATOR/CONTRACTOR must perform all needed maintenance. Furthermore, all erosion control feature requiring maintenance may not be listed below. The OPERATOR/CONTRACTOR and INSPECTOR must perform their respective duties on all BMP's that are not listed below as well. 1.Construction Entrance - The entrance shall be maintained in a condition which will prevent tracking or flow of sediment onto public rights-of-way. This may require periodic top dressing with additional stone or the washing and reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. All materials spilled, dropped, washed, or materials dropped, washed or tracked onto roadways will not be permitted under any circumstances. 2.Wattles - The maintenance measures are as follows: (2.1) wattles shall be inspected weekly; (2.2) close attention shall be paid to the repair of damaged bales, end runs and undercutting beneath bales; (2.3) necessary repairs to barriers or replacement of wattles shall be accomplished promptly; (2.4) sediment deposits shall be removed after each rainfall, they must be removed when the level of deposition reaches approximately one-half the height of the wattle; and (2.5) any sediment deposits remaining in place after the wattle is no longer required shall be dressed to conform to the existing grade, prepared and seeded. 3.Silt Fence - The maintenance measures are as follows; (3.1) silt fences shall be inspected weekly, any required repairs shall be made immediately; (3.2) close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting; (3.3) should the fabric on a silt fence decompose or become ineffective prior to the end of the expected usable life and the barrier is still necessary, the fabric shall be replaced promptly; (3.4) sediment deposits must be removed when the level of deposition reaches approximately one-half the height of the barrier; and (3.5) any sediment deposits remaining in place after the silt fence is no longer required shall be dressed to conform to the existing grade, prepared and seeded. 4.Storm Drain Inlet Protection - The maintenance measures are as follows: (4.1) structures shall be inspected weekly and repairs made as necessary and (4.2) structures shall be removed and the area stabilized when the remaining drainage area has been properly stabilized. 5.Temporary Seeding - Areas which fail to establish vegetative cover adequate to prevent rill erosion will be re-seeded as soon as such areas are identified. 6.Permanent Seeding - The maintenance measures are as follows: (10.1) in general, a stand of vegetation cannot be determined to be fully established until it has been maintained for one full year after planning; (10.2) new seedlings shall be supplied with adequate moisture, supply water as needed, especially late in the season, in abnormally hot or dry conditions, or on adverse sites, water applications shall be controlled to prevent excessive runoff; (10.3) inspect all seeded areas for failures and make necessary repairs, replacements, and reseedings within the planting season, if possible; [10.3.a] if stand is inadequate for erosion control, over seed and fertilize using half of the rates originally specified; [10.3.b] if stand is 60% damaged, re-establish following seedbed and seeding recommendations; [10.3.c] if stand has less than 40% cover, re-evaluate choice of plant materials and quantities of lime and fertilizer, the soil must be tested to determine if acidity or nutrient imbalances are responsible, re-establish the stand following seedbed and seeding recommendations. 7.Street Cleaning / Sweeping - The maintenance measures are as follows: (13.1) evaluate access points daily for sediment tracking; (13.2) when tracked or spilled sediment is found on paved surfaces, it will be removed daily, during times of heavy track-out, such as during rains, cleaning may be done several times throughout the day; (13.3) all streets shall be swept at the end of each working day and prior to a rain event; (13.4) unknown spills or objects will not be mixed with the sediment; and (13.5) if sediment is mixed with other pollutants, it will be disposed of properly at an authorized landfill. Stabilization of disturbed areas must be initiated immediately whenever any clearing, grading, excavating, or other earth disturbing activities have permanently ceased on any portion of the site or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization of disturbed areas must be initiated immediately whenever any clearing, grading, excavating, or other earth disturbing activities have permanently ceased on any portion of the site or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 22652 C1-SWPPP DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY EROSION & SEDIMENT CONTROL PLAN DETAILS C1-21 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C1-21 EROSION & SEDIMENT CONTROL PLAN DETAILS ---- ---- C1-21 B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONSTANDARD 2" OVERFLOW AREA 11 GA GALVANIZED STEEL SUSPENSION SYSTEM LIFT HANDLES REPLACEABLE SEDIMENT BAGS WITH GEOTEXTILE FILTER FABRIC NOTES: FOR SPECIFICATIONS AND MAINTENANCE GUIDELINES VISIT WWW.INLETFILTERS.COM INSTALLATION: REMOVE GRATE DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE REPLACE GRATE MATERIALS: FRAMING - 11 GAUGE STEEL; CORROSION RESISTANT SEDIMENT BAG - WOVEN GEOTEXTILE FABRIC; 2 CUBIC FOOT TYP VOLUME; STAINLESS STEEL LOCKING BAND SECURING BAG TO FRAME RECTANGULAR FILTER INLET PROTECTION NTS EC211 2'1' MIN3' DEEP10'NATIVE MATERIAL 5'x10'x3' CONCRETE WASHOUT AREA 1' DEEP IMPERVIOUS CLAY LINER MINIMUM 10-MIL THICK PLASTIC SHEETING OR APPROVED EQUAL NOTES: CONTRACTOR SHALL INSTALL A SIGN INDICATING THE CONCRETE WASHOUT AREA. CONTRACTOR SHALL MAINTAIN WASHOUT AREA TO REMOVE MATERIALS BEYOND 75% CAPACITY. WASHOUT AREA SHALL NOT BE PLACED WITHIN 50' OF STORM DRAINS, OPEN DITCHES OR BODIES OF WATER. CONTRACTOR SHALL INSPECT WASHOUT AREA AS NECESSARY TO PREVENT LEAKS AND OVER TOPPING. WASHOUT AREA SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETE. CONCRETE WASHOUT NTS EC500 WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ CB T/C=1038.45 I= CB T/C=1038.40 I= STM MH R=1038.54 I= CB T/C=1038.41 I= CB T/C=1038.31 I= 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 8" WATERMAIN 8" WATERMAIN12" STORM SEWER 24 " S T O R M S E W E R24" STORM SEWER24" STORMSEWER24" STORM SEWER30" STORM SEWER8" WATER SERVICE STUB30" STORM SEWER30" STO R M S E W E R EXISTING 8" WATERMAINEXISTING 15" STORM SEWER 20' Private Sanitary Sewer Easement BK2019 PG1139 20 EXISTING 18" STORM SEWER FUTURE TRAIL (BY OTHERS)1040103910381037 103710371 0 3 6 1 0 3 5 1 0 3 1 1 0 3 2 10 3 3 1 0 3 4 10351 0 3 6 1 0 3 7 1 0 3 8 1 0 3 9 1 0 4 0 10411042103810371 0 3 6 1 0 3 5 1037103510341033103131.09' 70' 22652 C2-EXIST DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY EXISTING SITE PLAN C2-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C2-10 EXISTING SITE PLAN ---- ---- C2-10 0 SCALE IN FEET 20 40 60 EXISTING PROPERTY LINE, TYP. UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONEXISTING CONTOUR, TYP.SE PARKVIEW CROSSING DRIVEWAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ NOTE: ENCOMPASS DRIVE & THE UNNAMED ACCESS DRIVE ARE SHOWN FOR PLANNING PURPOSES ONLY AND ARE NOT PART OF THEIR SITE PLAN SUBMITTAL. 03/14/2019 SITE PLAN REVIEW - 4TH PJJ OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) CB T/C=1038.45 I= CB T/C=1038.40 I= STM MH R=1038.54 I= CB T/C=1038.41 I= CB T/C=1038.31 I= 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 8" WATERMAIN 8" WATERMAIN12" STORM SEWER 24 " S T O R M S E W E R24" STORM SEWER24" STORMSEWER24" STORM SEWER30" STORM SEWER8" WATER SERVICE STUB30" STORM SEWER30" STO R M S E W E R EXISTING 8" WATERMAINEXISTING 15" STORM SEWER 20' Private Sanitary Sewer Easement BK2019 PG1139 20 EXISTING 18" STORM SEWER FUTURE TRAIL (BY OTHERS) 22652 C3-SITE DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE PLAN C3-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C3-10 SITE PLAN ---- ---- C3-10 0 SCALE IN FEET 20 40 60 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVESE PARKVIEW CROSSING DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONEXISTING PROPERTY LINE, TYP. PAVEMENT LEGEND SYMBOL DESCRIPTION CONCRETE PAVEMENT (7") CONCRETE SIDEWALK B618 CONCRETE CURB & GUTTER REVERSE PITCH B618 CONCRETE CURB & GUTTER D418 CONCRETE CURB & GUTTER 11 8 15 6'9'17'24' F&I: LIGHT POLE, TYP. OF 3 (SEE C6-10) CONSTRUCT TRASH ENCLOSURE (REFER TO ARCHITECTURAL PLANS)80'50' F&I: ACCESSIBLE PARKING SIGN & BOLLARD (TYP. OF 2) (SEE DETAIL) NOTE: F&I ALL PARKING LOT STRIPING AND MARKINGS AS SHOWN. R15' R15' R3'R5'R10' R5' R4.98' R5'R5' (3)BIKE RACK LANDSCAPE FORMS STYLE = EMERSON COLOR = MERCURY (SEE DETAIL) CONSTRUCT D418 CURB & GUTTER 3' TRANSITION FROM B618 CURB & GUTTER TO D418 CURB & GUTTER 14' TRANSITION FROM D418 CURB & GUTTER TO B618 CURB & GUTTER CONSTRUCT REVERSE PITCH B618 CURB & GUTTER, TYP. CONSTRUCT B618 CURB & GUTTER, TYP. 6.5' TAPER 7.5' TAPER ACCESSIBLE PARKING MARKING (WHITE PAINT) (TYP. OF 2) CONSTRUCT PEDESTRIAN CURB RAMP W/TRUNCATED DOMES (SEE DETAIL) STALL COUNT, TYP. CONSTRUCT CONCRETE PAVEMENT, TYP. (SEE DETAIL, SHEET C0-20) NO PARKING STRIPING, TYP. CONSTRUCT CONCRETE SIDEWALK, TYP. (SEE DETAIL, SHEET C0-20) WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 NOTES: 1.) ENCOMPASS DRIVE & THE UNNAMED ACCESS DRIVE ARE SHOWN FOR PLANNING PURPOSES ONLY AND ARE NOT PART OF THEIR SITE PLAN SUBMITTAL. 2.) APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 AND SHALL EXTEND TO WITHIN 100' OF ALL PORTIONS OF THE EXTERIOR WALLS OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING. 3.) EITHER PARKING LOT PAVEMENT WILL NEED TO BE INSTALLED BEFORE VERTICAL CONSTRUCTION OR THE ACCESS DRIVE ON THE SOUTH AND SE ENCOMPASS DRIVE WILL NEED TO BE INSTALLED BEFORE VERTICAL CONSTRUCTION WILL BE ALLOWED. 4.) ANY FUTURE EXPANSION OF THE BUILDING IS SUBJECT TO REVIEW AND APPROVAL OF AN AMENDED SITE PLAN. 24'9'24'03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ PROPOSED INGRESS/EGRESS EASEMENT PER ENCOMPASS DRIVE SITE PLANS OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) cp MAGNAIL 7 1036.39 Sanitary Sewer EasementPer The Shops AtKettlestone North Plat 1CB T/C=1038.45 I= CB T/C=1038.40 I= STM MH R=1038.54 I= CB T/C=1038.41 I= CB T/C=1038.31 I= SAN MH R=1032.77 I=1018.12 8" PVC NE 1018.15 8" PVC SW 1018.64 8" PVC N SAN MH R=1033.11 I=1018.35 W 1018.35 E 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 8" WATERMAIN 8" WATERMAIN12" STORM SEWER 24 " S T O R M S E W E R24" STORM SEWER24" STORMSEWER24" STORM SEWER30" STORM SEWER8" WATER SERVICE STUB30" STORM SEWER30" STO R M S E W E R EXISTING 8" WATERMAINEXISTING 15" STORM SEWER 20' Private Sanitary Sewer Easement BK2019 PG1139 20 EXISTING 18" STORM SEWER FUTURE TRAIL (BY OTHERS) FUTURE CATCH BASIN R=1033.84 I=1029.43P-01I=1030.89 (P-02) I=1030.64 (P-01) R=1035.25 A-01 P-02 P-03 I=1031.98 (P-02) I=1032.23 (P-03) R=1037.47 A-02 SP-3 SP-2 I=1023.48 (SP-3) I=1023.28 (SP-2) R=1039.14 S-2 I=1019.24 (SP-2) I=1019.04 (SP-1) R=1036.36 S-1 SP-1 I=1033.05 (P-04) I=1032.80 (P-03) R=1038.44 A-03 P-04 I=1027.86 (SP-3) R=1040.69 S-3 SP-4 STORM DRAIN SCHEDULE STRUCTURE NO. A-01 A-02 A-03 STRUCTURE TYPE SW-501 SW-501 NYLOPLAST DRAIN BASIN STRUCTURE SIZE (In) 36 x 24 36 x 24 12 Ø STRUCTURE MATERIAL RC RC PVC CASTING SW-603 TYPE R SW-603 TYPE R SOLID COVER PAY HEIGHT LN FT 4.61 5.49 5.64 * TOP OF CASTING ELEVATION 1035.25 1037.47 1038.44 INVERT ELEVATION 1030.64 1031.98 1032.80 OUTLET PIPE P-01 P-02 P-03 STORM DRAIN PIPE SCHEDULE PIPE NO. P-01 P-02 P-03 P-04 DRAIN FROM A-01 A-02 A-03 CAP INLET ELEVATION 1030.64 1031.98 1032.80 1033.67 DRAIN TO A-3C A-01 A-02 A-03 OUTLET ELEVATION 1029.93 1030.89 1032.23 1033.05 PIPE SIZE (IN) 12 12 12 12 MATERIAL RCP RCP HDPE HDPE PIPE CLASS 5 5 SCH. 40 SCH. 40 PIPE GRADE 1.50% 1.50% 1.00% 1.00% PIPE LENGTH (FT) 48 72 57 62 SANITARY SEWER STRUCTURE SCHEDULE STRUCTURE NO. S-1 S-2 S-3 STRUCTURE TYPE SW-301 SW-301 SW-301 STRUCTURE SIZE (In) 48 Ø 48 Ø 48 Ø STRUCTURE MATERIAL RC RC RC CASTING SW-601 TYPE A GRATE SW-601 TYPE A GRATE SW-601 TYPE A GRATE PAY HEIGHT LN FT 17.31 15.85 12.83 TOP OF CASTING ELEVATION 1036.36 1039.14 1040.69 INVERT ELEVATION 1019.04 1023.28 1027.86 PIPE NO. SP-1 SP-2 SP-3 SANITARY SEWER PIPE SCHEDULE PIPE NO. SP-1 SP-2 SP-3 SP-4 DRAIN FROM S-1 S-2 S-3 CAP INLET ELEVATION 1019.04 1023.28 1027.86 1030.00 DRAIN TO EXISTING SANITARY MANHOLE S-1 S-2 OUTLET ELEVATION 1018.62 1019.24 1023.48 1024.40 PIPE SIZE 8" 8" 8" 6" PIPE CLASS SDR-26 SDR-26 SDR-26 SDR-26 PIPE GRADE 2.00% 2.00% 2.00% 6.45% PIPE LENGTH (FT) 21 202 219 87 22652 C3-SITE DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE UTILITY PLAN C3-20 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C3-20 SITE UTILITY PLAN ---- ---- C3-20 0 SCALE IN FEET 30 60 90 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVESE PARKVIEW CROSSING DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONFUTURE DEVELOPMENT (BY OTHERS) * TOP OF CASTING ELEVATIONS OF CURB STYLE CATCH BASINS REPRESENTS TOP OF CURB BOX AND NOT GUTTER ELEVATIONS UTILITY LEGEND EXISTING PROPOSED STORM DRAIN SANITARY SEWER SANITARY SEWER FORCEMAIN WATER MAIN GAS OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE UNDERGROUND TV OVERHEAD UTILITY UNDERGROUND UTILITY FIBER OPTIC NOTES: 1.) CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. 2.) ALL UTILITIES THAT ARE TO BE CONSTRUCTED TO 5' OUTSIDE OF BUILDING ARE TO BE CONNECTED TO BUILDING BY MECHANICAL CONTRACTOR. 3.) ENSURE 18" VERTICAL SEPARATION BETWEEN ALL PROPOSED & EXISTING WATER, STORM & SANITARY UTILITIES. 4.) WATER SERVICE MUST HAVE 5.5 FT MINIMUM COVER. 5.) GAS SERVICE AND METER TO BE INSTALLED AND SET BY THE CITY OF WAUKEE. PROPOSED TRANSFORMER (VERIFY LOCATION W/UTILITY COMPANY) CONSTRUCT: 4 LF 2" WATER SERVICE 4 LF 6" FIRE SERVICE (CONNECT TO EXISTING SERVICE STUBS) (STUB 5' FROM BUILDING, CAP END) (CONNECTION TO THE BUILDING BY OTHERS) CONSTRUCT 4 LF 6" ROOF DRAIN LEADER @ 1.0% MIN. (TYP. OF 4)(SEE DETAIL) STUB 6" SANITARY SEWER 5' FROM BUILDING, CAP END I=1027.63 CONNECT P-01 TO FUTURE CATCH BASIN (VERIFY DEPTH & LOCATION) CONNECT SP-1 TO EXISTING SANITARY MANHOLE WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 FIRE RISER ROOOM (REFER TO MECHANICAL PLANS) GAS METER LOCATION CRITICAL CROSSING 6" SANITARY SERVICE TOP=1030.00 12" STORM SEWER BOTTOM=1032.66 03/05/2019 SITE PLAN REVIEW - 3RD PJJ CRITICAL CROSSING 8" SANITARY SEWER TOP=1019.41 BOTTOM=1018.75 15" STORM SEWER TOP=1027.33 BOTTOM=1026.08 CONSTRUCT SUBDRAIN @ 1.0% MIN. (MAINTAIN 2' COVER MIN.) 03/14/2019 SITE PLAN REVIEW - 4TH PJJ F&i: 8"x6" WYE OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS)Sanitary Sewer EasementPer The Shops AtKettlestone North Plat 1SAN MH R=1032.77 I=1018.12 8" PVC NE 1018.15 8" PVC SW 1018.64 8" PVC N SAN MH R=1033.11 I=1018.35 W 1018.35 E 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 20' Private Sanitary Sewer Easement BK2019 PG1139 20 FUTURE TRAIL (BY OTHERS) 22652 C3-SITE DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY HYDRANT COVERAGE MAP C3-21 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C3-21 HYDRANT COVERAGE MAP ---- ---- C3-21 0 SCALE IN FEET 30 60 90 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVESE PARKVIEW CROSSING DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONHYDRANT COVERAGE LEGEND EXISTING HYDRANT PROPOSED HYDRANT R150' R150' WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 20' Private Sanitary Sewer Easement BK2019 PG1139 20 OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) 1 0 3 91038 103710361035103810401040103810391040103910381037 103710371 0 3 6 1 0 3 5 1 0 3 1 1 0 3 2 10 3 3 1 0 3 7 1 0 3 8 1 0 3 9 1 0 4 0 10411042103810371 0 3 6 1 0 3 5 1037103510341033103110381039.301039.51 1039.47 1039.43 1039.31 1039.30 1 0 3 9 . 9 7 1039.771039.841039.90TAPER1039.54MATCH1039.211039.301039.40TAPER1039.001039.091038.951039.041038.851038.941038.231038.251038.101037.941037.421037.841037.43 1037.841 0 3 7 . 9 4 1037.901038.001037.901035.031034.801034.911035.151035.181034.86E.O.F.10 3 5 . 0 9 103 5 . 0 7 1035.021034.931037.561037.471037.561037.56EOF1037.471038.061037.961037.861038.221 0 3 8 . 3 9 1038.171038.111038.011037.911037.89CROWN 1035.21CROWN1035.001039.41MATCH1039.14MATCH1038.84MATCH1038.91MATCH1034.99MATCH1034.26MATCH1034.18MATCH???MATCH???MATCH1038.001038.001038.171035.271038.591038.381038.291037.68103710381037 10381039 1039 10401040103810391040104010391041104110381038.281038.50-4.8%-20.2%-13.5%-2. 2 % 1038.50 1038.401038.501038.401037.82MATCH1037.82MATCH1037.75MATCH1037.75MATCH1038.50 1038.501039.701038.891038.141036.281037.13100 YR1034.831 0 0 Y R -1.8%-2.2 % -3.9%-4.5%-2.7% -30.4% -31.3% -27.4% -27.2%-2.4%-0.7%1038.551038.461038.261038.171037.871037.781 0 3 7 . 9 51037.861038.221038.201 0 3 8 . 4 0 1 0 3 8 . 5 0 1038.501038.401038.411038.321038.021038.141 0 3 8 . 2 5 1038.341038.091 0 3 7 . 7 0 1038.50-4.9%-1.3%-1.9%-1.0%-7.5%-1.5%1038-1.5% -1.5% -1.5% -1.5% -1.5%-7.5%-1.3%-4.9%1038.5022652 C4-GRADE DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE GRADING PLAN C4-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C4-10 SITE GRADING PLAN ---- ---- C4-10 0 SCALE IN FEET 20 40 60 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONSE PARKVIEW CROSSING DRIVEGRADING LEGEND FUTURE CONTOUR (BY OTHERS) (MINOR INTERVAL) FUTURE CONTOUR (BY OTHERS) (MAJOR INTERVAL) EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB SPOT ELEVATION PROPOSED EMERGENCY OVERFLOW SPOT ELEVATION PROPOSED 100 YEAR SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES 1.) SEE GEOTECHNICAL REPORT 08185138-01 PREPARED BY TERRACON FOR CONSTRUCTION DIRECTIONS. 2.) PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. 101 100 101 100 101 100 XXX.XXXXX.XX-X.X% INSET A SCALE 1"=10' INSET A EXISTING PROPERTY LINE, TYP.EXISTING CONTOUR, TYP. PROPOSED CONTOUR, TYP. FUTURE CONTOUR, TYP. (BY OTHERS) WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ XXX.XXE.O.F.XXX.XX100 YRGRADE 18" BERM ABOVE TOP BACK OF CURB 03/14/2019 SITE PLAN REVIEW - 4TH PJJ FUTURE TRAIL (BY OTHERS) OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) ST2 - (5) SM2 - (2) JF - (4) SM2 - (5) JF - (4) SM2 - (5) JF - (4) FS - (2) SH - (1) FS - (2) SH - (1) FS - (1) (5) - SO CK - (5) PL2 - (6) PS3 - (5) RC - (2) HH - (3) SM2 - (1) VC - (3) SM2 - (2) SGL - (4) SM2 - (2) VC - (3) RC - (3) ST - (2) HL - (1) CK - (5) ST - (1) HL - (3) (2) - ST (3) - CA2 (4) - ST (1) - CA2 (2) - RC (2) - SM2 (2) - HH 1 2 (1) - VC (4) - HH SGL - (5) SC - (1) CK - (11) QR - (4) SC - (6) TREES CODE QTY COMMON / BOTANICAL NAME SIZE ROOT REMARKS FS 5 Fat Albert Colorado Blue Spruce 6` Ht B & B Picea pungens glauca `Fat Albert` QR 4 Regal Prince English Oak 12` HT MIN B & B Quercus robur `Regal Prince` SC 7 Spring Snow Crabapple 6` HT MIN B & B Malus x `Spring Snow` SH 2 Skyline Honey Locust 6` HT MIN B & B Gleditsia triacanthos `Skyline` SO 5 Swamp White Oak 12` HT MIN B & B Quercus bicolor SHRUBS CODE QTY COMMON / BOTANICAL NAME SIZE ROOT REMARKS CA2 4 Artic Fire Dogwood 24" HT MIN CONT Cornus sericea `Artic Fire` HH 9 Oakleaf Hydrangea 24" HT MIN CONT Hydrangea quercifolia `Harmony` HL 4 Oakleaf Hydrangea 24" HT MIN CONT Hydrangea quercifolia `Little Honey` JF 12 Sea Green Juniper 18" HT MIN CONT Juniperus chinensis `Sea Green` PL2 6 Dwarf Ninebark 18" HT MIN CONT Physocarpus opulifolius `Little Devil` TM RC 7 Rose 18" HT MIN CONT Rosa x `Carefree Wonder` SGL 9 Gro-Low Fragrant Sumac 18" HT MIN CONT Rhus aromatica `Gro-Low` SM2 19 Dwarf Korean Lilac 24" HT MIN CONT Syringa meyeri `Palibin` ST2 5 Tinkerbelle Lilac 18" HT MIN CONT Syringa patula `Tinkerbelle` VC 8 Arrowwood Viburnum 18" HT MIN CONT Viburnum dentatum `Compactum` PERENNIALS CODE QTY COMMON / BOTANICAL NAME SIZE ROOT REMARKS CK 21 Feather Reed Grass 12" HT MIN CONT Calamagrostis x acutiflora `Karl Foerster` PS3 5 Switch Grass 12" HT MIN CONT Panicum virgatum `Shenandoah` ST 9 Prairie Dropseed 12" HT MIN CONT Sporobolus heterolepis `Tara` GROUND COVERS CODE QTY COMMON / BOTANICAL NAME SIZE ROOT REMARKS SOD 11,616 SOD SOD SF BLUEGRASS SOD PLANT SCHEDULE REFERENCE NOTES SCHEDULE SYMBOL DESCRIPTION QTY DETAIL STEEL EDGING / COLOR : BLACK 503 lf 2" CLEAN RIVER GRAVEL 29.75 cy 1 2 REFERENCE NOTES SCHEDULE 22652 C5-LAND DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY SITE PLANTING & RESTORATION PLAN C5-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C5-10 SITE PLANTING & RESTORATION PLAN ---- ---- C5-10 0 SCALE IN FEET 20 40 60 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONSE PARKVIEW CROSSING DRIVEAS REQUIRED IN THE CITY OF WAUKEE, IOWA ZONING CODE. LOT DATA: TOTAL LOT AREA = 26,136 SF / 0.60 AC K-OF / PD-1 = LOT'S ZONING DISTRICT 179 LF = LENGTH OF SETBACK BETWEEN R/W AND PARKING REQUIRED OPEN SPACE (CODE: 25% OF TOTAL LOT AREA, 26,136 x 25% = 6,534SF REQUIRED) .17 AC / 7,405 SF PROVIDED 10 OVERSTORY TREES REQUIRED, 11 PROVIDED (CODE: REQ. OPEN SPACE / 6,534 SF / 1000 x 1.5 = 9.8 OR 10 TREES) 3 OVERSTORY TREES = NUMBER OF OVERSTORY TREES FOR PARKING SETBACK REQ. 7 UNDERSTORY TREES REQUIRED, 7 PROVIDED (CODE: REQ. OPEN SPACE / 6,534 SF / 1000 X 0.5 = 6.5 OR 7 TREES) 14 SHRUBS REQUIRED, 81 PROVIDED (CODE: REQ. OPEN SPACE / 6,534 SF / 1000 x 2 = 13.06 OR 14 SHRUBS) CITY LANDSCAPE REQUIREMENTS BUFFER BETWEEN PARKING AND R/W (179 LF) 2 OVERSTORY TREES PER 50 LF = 8 REQUIRED, 6 OVERSTORY, 3 EVERGREEN AND 6 UNDERSTORY PROVIDED 8 SHRUBS PER 50 LF = 29 REQUIRED, 29 PROVIDED STREET TREES 1 OVERSTORY TREE PER 40 LF (150 LF) 4 REQUIRED, 4 PROVIDED. OTHER REQUIREMENTS: * 10 OF REQ. TREES MUST BE OVERSTORY (CODE: 50% OF REQ. TREES SHALL BE OVERSTORY), 11 OVERSTORY TREES PROVIDED * 5 OF REQ. TREES MUST BE EVERGREEN (CODE: 25% OF REQ. TREES SHALL BE EVERGREEN), 5 EVERGREEN TREES PROVIDED. TOTAL PLANTS SHOWN ON PLAN 11 OVERSTORY TREES 5 EVERGREEN TREES 7 UNDERSTORY TREES 83 SHRUBS 35 PERENNIALS & GRASSES WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 22652 C5-LAND DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY PLANTING & RESTORATION PLAN C5-20 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C5-20 PLANTING & RESTORATION PLAN ---- ---- C5-20 B.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONGENERAL PLANTING NOTES LANDSCAPE EDGING DETAIL SCALE: 1" = 1'-0" MULCH - PER PLANS & NOTES PLANTING BED - SOIL PREPARATION PER PLANS & NOTES LAWN OR GROUND COVER FINISH GRADE LANDSCAPE EDGING AND STAKING - PER PLANS & NOTES SUBGRADE - PER PLANS & NOTES DECIDUOUS TREE PLANTING DETAIL SCALE: 1" = 1'-0" TOP OF ROOTBALL TO BE SET ABOVE GRADE 3" CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE TRUNK OF TREES IS PLUMB 3"LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWN ROOTBALL DIA 2X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES *NOTE: DO NOT STAKE TREES UNLESS INDICATED. FINISH GRADE CONIFER / EVERGREEN TREE PLANTING DETAIL SCALE: 1" = 1'-0" TIE NYLON STRAP AROUND TRUNK AS SHOWN CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE TRUNK OF TREES IS PLUMB 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWN ROOTBALL DIA 2X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES FINISH GRADE MULTI STEM PLANTING DETAIL SCALE: 1" = 1'-0" TOP OF ROOTBALL TO BE SET SLIGHTLY ABOVE GRADE 3" CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE TRUNK OF TREES IS PLUMB 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWN ROOTBALL DIA. 2X ROOTBALL DIA. DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADERS - 3 LARGEST DIAMETER STEMS PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES NOTE: 1. DO NOT STAKE TREES UNLESS INDICATED. 2. THOROUGHLY WATER-IN ALL TREES IMMEDIATELY AFTER PLANTING AND ENSURE NO UNDESIRABLE SETTLING OCCURS - TREE STAYS PLUMB FINISH GRADE SHRUB PLANTING DETAIL SCALE: 1" = 1'-0" 3" LAYER OF MULCH, PER PLANS & NOTES BACKFILL PLANTING PIT PER SHRUB PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL / CONTAINER MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL / CONTAINER - TILL ALL PLANTING BEDS TO A MINIMUM DEPTH OF 6" THROUGHT PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE PLANT IS PLUMB ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF THE CROWN OF THE PLANT IS SLIGHTLY ABOVE FINISH GRADE 3" ROOTBALL DIA 2X ROOTBALL DIA DEPTH OF ROOTBALL FINISH GRADE CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE, OR ENTIRE CONTAINER, AND REMOVE FROM THE PLANTING PIT, SCARIFY ROOTS FOR ALL CONTAINERIZED PLANTS 5 GALLONS FOR SMALLER CONTAINER DIA 2X CONTAINER DIA PLAN PERENNIAL PLANTING DETAIL SCALE: 1" = 1'-0" EDGE OF PLANTING BED - PER PLANS & NOTES PLANT UNDER DRIP LINE OF LIMBED UP SHRUBS AND TREES STAGGER SPACING WHERE POSSIBLE EDGE OF STRUCTURE OR PAVING PLANT PERIMETER AT SPECIFIED SPACING FINISH GRADE UNLESS OTHERWISE NOTED, PLANT UP TO EXISTING DRIP LINE OF ADJACENT SHRUBS SECTION 3" LAYER OF MULCH PER MATERIALS SCHEDULE, OR AS NOTED ON PLAN TILL ALL PLANT BEDS TO A MINIMUM DEPTH OF 6" AND BACKFILL PER SPECIFICATIONS, WHEN PROVIDED - IN AREAS WITH HEAVY CLAY OR ROCKY SOILS AMEND WITH AMENDED PLANTING SOIL FROM A LOCAL SOURCE ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF THE CROWN OF THE PLANT IS SLIGHTLY ABOVE FINISH GRADE 3" CUT AND REMOVE THE ENTIRE CONTAINER AND SCARIFY, AS NECESSARY, ROOTS FOR ALL CONTAINERIZED PLANTS 5 GALLONS FOR SMALLERBED EDGE PER PLANS PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE PLANT IS PLUMB PLAN PERENNIAL PLANTING DETAIL SCALE: 1" = 1'-0" FINISH GRADE SECTION BED EDGE PER PLANS SYMMETRICAL SPACING 1/2 SPECIFIED PLANT SPACING TIE NYLON STRAPPING AROUND TRUNK AS SHOWN 1/2" WIDE NYLON STRAPPING - COLOR TO BE APPROVED BY LANDSCAPE ARCHITECT ORANGE CAUTION MARKERS #4 REBAR, 18" LONG - DRIVE TOP STAKE BELOW GRADE STAKING DIAGRAM TREES 8'+TREES 6'-8' TOP OF ROOTBALL TO BE SET ABOVE GRADE 3" 1/2" WIDE NYLON STRAPPING - COLOR TO BE APPROVED BY LANDSCAPE ARCHITECT *NOTE: DO NOT STAKE TREES UNLESS INDICATED. HARDWOOD STAKES 2"X2"X8' LONG - INSTALL OUTSIDE OF ROOTBALL AT 5' MAX HT STAKING DIAGRAM, NO STAKING TREES UNDER 6' 3" LAYER OF MULCH PER MATERIALS SCHEDULE, OR AS NOTED ON PLAN TILL ALL PLANT BEDS TO A MINIMUM DEPTH OF 6" AND BACKFILL PER SPECIFICATIONS, WHEN PROVIDED - IN AREAS WITH HEAVY CLAY OR ROCKY SOILS AMEND WITH AMENDED PLANTING SOIL FROM A LOCAL SOURCE ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF THE CROWN OF THE PLANT IS SLIGHTLY ABOVE FINISH GRADE 3" CUT AND REMOVE THE ENTIRE CONTAINER AND SCARIFY, AS NECESSARY, ROOTS FOR ALL CONTAINERIZED PLANTS 5 GALLONS FOR SMALLER PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE PLANT IS PLUMB EDGE OF PLANTING BED / GROUND COVER AREA INSTALL PLANTS PER PLANS AND PLANT LIST SPACING - ALL PLANTS SHALL BE EQUALLY SPACED TO ACHIEVE A SYMMETRICAL LAYOUT FOR BOTH TRIANGULAR AND LINEAR PLANTING SCHEMES 1.COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (FENCE, FOOTINGS, TREE ROOTBALLS, ETC.). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK. 2.SAVE AND PROTECT ALL EXISTING TREES NOT NOTED TO BE REMOVED. 3.REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT GROWTH FROM PLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING MIX. 4.LAWN AREAS SHALL HAVE 8" MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL BE COMPACTED TO 85% MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. SHOULD MEET SUDAS STANDARD SECTION 2010. 5.REFER TO PLANTING DETAILS PLAN FOR AMENDED SOIL DEPTH IN PLANTING BEDS AND SURROUNDING TREES. REFER TO SPECIFICATIONS FOR MIX TYPE. 6.FIELD STAKE PLANTINGS ACCORDING TO PLAN. OWNER'S REPRESENTATIVE SHALL APPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION. 7.ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS INDICATED IN THE PLANT SCHEDULE. 8.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING PLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING PLAN SHALL GOVERN. 9.OWNER RESERVES THE RIGHT TO REVISE QUANTITIES TO SUIT BUDGET LIMITATIONS. CONTRACTOR'S UNIT BID PRICES SHALL PREVAIL FOR ANY CHANGES IN QUANTITIES. 10.ALL SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. 11.ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERY STOCK (A.N.S.I.), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE SPECIES LISTED MAY BE USED IF THE STOCK CONFORMS TO A.N.S.I. 12.ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN A LIVE AND HEALTHY GROWING CONDITION FOR ONE FULL GROWING SEASON (ONE YEAR) AFTER FINAL PROJECT ACCEPTANCE OR SHALL BE REPLACED FREE OF CHARGE WITH THE SAME GRADE AND SPECIES. ALL TREES SHALL HAVE A STRONG CENTRAL LEADER. 13.CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO OPERATIONS. ANY AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER. 14.PLANTING BED EDGING - USE 3/4" x 6" PROFESSIONAL GRADE STEEL EDGING IN ALL AREAS WHERE PLANTING BED MEETS LAWN AREAS OR WHERE INDICATED. USE 12" METAL SPIKES AS INSTRUCTED BY MANUFACTURER. 15.PROVIDE SHREDDED HARDWOOD MULCH, NATURAL COLOR, SURROUNDING ALL PROPOSED TREES TO A 3-INCH MINIMUM DEPTH AS SHOWN IN TREE PLANTING DETAIL. DO NOT USE AN UNDERLAYMENT SUCH AS PLASTIC SHEET OR LANDSCAPE FABRIC. IF LOCATED WITHIN A ROCK MULCHED PLANT BED, SUBSTITUTE THIS MULCH WITH THE MULCH CALLED FOR WITHIN THAT PLANT BED. APPLY PRE-EMERGENT TO ALL PLANTING BEDS PRIOR TO MULCHING. 16.PROVIDE ROCK MULCH, 2" RIVER ROCK, IN ALL PLANTING TO A 2" MINIMUM DEPTH. USE A PROFESSIONAL GRADE WOVEN WATER PERMEABLE LANDSCAPE FABRIC UNDERLAYMENT. DO NOT USE PLASTIC SHEETING. APPLY PRE-EMERGENT TO ALL PLANTING BEDS PRIOR TO MULCHING. 17.TURF AREAS DISTURBED BY CONSTRUCTION SHALL BE SODDED IF NOT INDICATED ON PLANS AS ANOTHER SURFACE. SOD SECTIONS SHALL BE NO SMALLER THAN 24" X 36" STAKED IN PLACE WITH BIODEGRADABLE SOD STAKES WHEN SLOPE IS STEEPER THAN 5:1 OR WHEN CONDITIONS REQUIRE. ALSO STAKE AT STORMWATER BASIN ON SLOPES AND BOTTOM TO PREVENT MOVEMENT. 18.IRRIGATION NOT REQUIRED 19.FOR PLANT, SHRUB, AND TREE LOCATIONS: CONTRACTOR IS PERMITTED TO USE DISCRETION AS NECESSARY TO AVOID DRIVEWAYS, UTILITIES, OR OTHER CONFLICTS. THE TOTAL NUMBER OF PLANTS, INCLUDING SHRUBS AND TREES SHALL MEET CITY CODE. 21.INDICATED QUANTITIES ARE ESTIMATES AND SHOULD BE CONFIRMED BY THE CONTRACTOR/BIDDER. 22.MINIMUM PLANT SIZES SHALL BE AS FOLLOW: A.DECIDUOUS OVERSTORY TREES SHALL BE 8 FOOT MINIMUM HEIGHT B.EVERGREEN OVERSTORY TREES SHALL BE 6 FOOT MINIMUM HEIGHT C.DECIDUOUS UNDERSTORY TREES SHALL BE 6 FOOT MINIMUM HEIGHT D.DECIDUOUS EVERGREEN SHRUBS SHALL BE 2 FOOT MINIMUM HEIGHT WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ 10 10' PUE BK2019 PG1138 10' PUE BK2019 PG1138 15' Public Water Main Easement BK2019 PG1137 8" WATERMAIN 8" WATERMAIN8" WATER SERVICE STUB EXISTING 8" WATERMAIN20' Private Sanitary Sewer Easement BK2019 PG1139 20 OFFICE BUILDING (3,959 1ST FLOOR SF) (6,642 TOTAL SF) FFE=1038.50 Proposed 24' Access Easement Proposed 24' Access Easement Proposed 20' Private Sanitary Sewer Easement FUTURE TRAIL (BY OTHERS) BB BB AA AA AA 22652 C6-ELECTRICAL DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY PHOTOMETRICS PLAN C6-10 - PJJ RJA DAJ SITE PLAN 02/01/19 19-22652 C6-10 PHOTOMETRICS PLAN ---- ---- C6-10 0 SCALE IN FEET 20 40 60 UNNAMED ACCESS DRIVE SE ENCOMPASS DRIVESE PARKVIEW CROSSING DRIVEB.M. ELEVATION=1032.32 BURY BOLT ON FIRE HYDRANT, EAST SIDE OF GRAND PRARIE PARKWAY, 790' NORTH OF S.E. ESKER RIDGE DRIVE PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY NOT FOR CONSTRUCTIONFOOTCANDLE LEGEND MANUFACTURER/MODEL NUMBER LIGHT FIXTURE SCHEDULE STYLETYPE LAMPS REMARKS Provide light fixtures as shown on Fixture Schedule. Substitutions shall have prior approval by the Project Engineer before bid date. Being listed as an acceptable Manufacturer in no way relieves the Contractors obligation to provide all equipment and features in accordance with these specifications. AA (1) ALT4-P35-180L-4K-FGL-NFO (1) #PTRS20-61120 HEAD(S) SITE POLE SINGLE HEAD POLE 20'-0" POLE (1) 213W LED KIM LIGHTING / BB #SLIM12N WALL PACK RAB LIGHTING (1) 12W LED LIGHT POLE DETAIL N.T.S.1 WAUKEE IOWA 02/19/2019 SITE PLAN REVIEW - 2ND PJJ LOT 2 THE SHOPS AT KETTLESTONE NORTH PLAT 6 MOUNT @ 10'-0" 03/05/2019 SITE PLAN REVIEW - 3RD PJJ 03/14/2019 SITE PLAN REVIEW - 4TH PJJ WH OFFICE RECEPTION PLAN NORTH 50' - 0"OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICE CONFERENCE 9' - 2"40' - 10"UTILITY KITCHEN VEST UP SPRINKLER 3,404 sf Office Space 417 sf Core 95 sf Lobby TRUE NORTH 80' - 0" 11' - 0"69' - 0" MEN WOMEN Phase 2 1,378 sf TRASH ENCLOSURE PHASE 220' - 4"10' - 2" WILKUS ARCHITECTS FIRST FLOOR Page 01 KETTLEVIEW INSURANCE BUILDING 2019.02.01 SD - V4.1 MILLER, FIDLER & HINKE INSURANCE AGENCY EXECUTIVE OFFICE EXECUTIVE OFFICE COLLABORATIVE MEN WOMEN OFFICE PERGOLA STORAGE MECH40' - 10"39' - 5 1/4"26' - 1 1/8" 65' - 6 3/8" ROOF OVER FLOOR 1 (SHADED) PHASE 2 PLAN NORTH TRUE NORTH Phase 2 1,378 sf 1,050 sf Office Space 1,068 sf Office Pergola 567 sf Core WILKUS ARCHITECTS SECOND FLOOR Page 02 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY ROOF OVER FLOOR 1 (SHADED) ROOF OVER FLOOR 2 (SHADED) MECH AREA (RAISED PARAPET WALLS) PERGOLA OVER FLOOR 2 (SHADED) PHASE 2 ROOF PLAN NORTH TRUE NORTH WILKUS ARCHITECTS ROOF PLAN Page 03 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY FINISH SLAB 0' -0" SECOND LEVEL 14' -0" LOW PARAPET 29' -0" TOP ROOF 28' -0" MID PARAPET 32' -0" HIGH PARAPET 34' -0" TRASH ENCLOSURE 20' - 4" MECH AREA WITHIN PARAPET, REFER TO ROOF PLAN WILKUS ARCHITECTS PLAN WEST ELEVATION Page 04 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY FINISH SLAB 0' -0" SECOND LEVEL 14' -0" LOW PARAPET 29' -0" TOP ROOF 28' -0" MID PARAPET 32' -0" HIGH PARAPET 34' -0" TRASH ENCLOSURE 10' - 2"7' - 6"MECH AREA WITHIN PARAPET, REFER TO ROOF PLAN WILKUS ARCHITECTS PLAN SOUTH ELEVATION Page 05 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY FINISH SLAB 0' -0" SECOND LEVEL 14' -0" LOW PARAPET 29' -0" TOP ROOF 28' -0" MID PARAPET 32' -0" HIGH PARAPET 34' -0" MECH AREA WITHIN PARAPET, REFER TO ROOF PLAN WILKUS ARCHITECTS PLAN EAST ELEVATION Page 06 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY FINISH SLAB 0' -0" SECOND LEVEL 14' -0" LOW PARAPET 29' -0" TOP ROOF 28' -0" MID PARAPET 32' -0" HIGH PARAPET 34' -0"7' - 6"TRASH ENCLOSURE 10' - 2" MECH AREA WITHIN PARAPET, REFER TO ROOF PLAN WILKUS ARCHITECTS PLAN NORTH ELEVATION Page 07 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY WILKUS ARCHITECTS ISOMETRIC VIEW 1 Page 08 KETTLEVIEW INSURANCE BUILDING 2019.02.01 ANODIZED CAP FLASHING DARK BRONZE CAP FLASHING / FRAMES / MISCELLANEOUS BREAK METAL NICHIHA FIBER CEMENT SIDING -REDWOOD NICHIHA FIBER CEMENT SIDING -GUNSMOKE NICHIHA FIBER CEMENT SIDING -MOTHER OF PEARL NICHIHA FIBER CEMENT SIDING -MOCHA MILLER, FIDLER & HINKE INSURANCE AGENCY MECH AREA WITHIN PARAPET, REFER TO ROOF PLAN TRASH ENCLOSURE WILKUS ARCHITECTS ISOMETRIC VIEW 2 Page 09 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY WILKUS ARCHITECTS EXTERIOR Page 10 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY WILKUS ARCHITECTS EXTERIOR Page 11 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY WILKUS ARCHITECTS EXTERIOR Page 12 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY WILKUS ARCHITECTS EXTERIOR Page 13 KETTLEVIEW INSURANCE BUILDING 2019.02.01 MILLER, FIDLER & HINKE INSURANCE AGENCY 10' - 0"2"8"2 A100 TYP. 4 A100 TYP. 2"20' - 0"2" CL3' - 0" CL 3' - 0" CL CL CL CL4' - 0"4' - 8 3/4"4' - 0" 6 YARD TRASH 6' X 6' X 6' 6 YARD RECYCLING 6' X 6' X 6' 8" INTERIOR BOLLARDS FILLED WITH CONCRETE FINISHED 20' - 4"FINISHED10' - 2"A100 7 A100 8 A100 9 WALL CONSTRUCTION NICHIHA SIDING SYSTEM CMU WALL - SEE STRUCT METAL CAP - MATCH PARAPET FLASHING FASTENER APPLIED TO MASONRY BACK-UP WALL NICHIHA CLIP, TYP NICHIHA PANEL AS SCHED. FACE FASTENER (HIDDEN) NICHIHA SPACER NICHIHA STARTER TRACK "Z" DRIP FLASHING, COLOR TO MATCH CAP FLASHING 2"SEE CIVIL GRADE7' - 6"1' - 0"1' - 7"6"2"6"3"1"1-1/2" I.D. x 6" LONG STEEL PIPE SLEEVE FLUSH WITH TOP OF PAVING - PROVIDE AT CLOSED AND FULLY OPEN POSITION, TYPICAL CONCRETE PAVING 3/4" DIAMETER STEEL CANE BOLT BOTTOM OF GATE PIPE SLEEVE - WELD TO FRAME, GALVANIZED FINISH 1/8" BAR IN "ZEE" PROFILE, 1" WIDE - PROFILE TO ACCEPT CANE BOLT - WELD TO FRAME TRASH ENCLOSURE DOOR: 2" X 2" X 1/4" STEEL ANGLE STILES & RAILS WITH 1-1/2", 22 GA GALVANIZED CORRUGATED METAL DECKING "C" PANELS & 1-1/4" x 1-1/4" x 3/16" STEEL ANGLE BRACE 5" NOTE: ALL EXPOSED METAL AND CMU SURFACES FOR TRASH ENCLOSURE TO BE PAINTED WITH EXTERIOR GRADE EPOXY PAINT, COLOR TO MATCH FLASHING, TYP. NICHIHA PANEL TO MATCH BUILDING 9" DIA SCHEDULE 80 STEEL PIPE PIVOT - PROVIDE STEEL SHIM BETWEEN PIVOT & BOLLARD 8" DIA SCHEDULE 40 BOLLARD GROUT SOLID & ROUND & TROWEL @ TOP. ENCASE IN 24" DIA CONCRETE BASE 36" DEEP GREASE FITTING AT EACH HINGE POINT 2" X 2" X 1/4" STL ANGLE DOOR FRAME (STILES & RAILS) -WELD TO DOOR PIVOT -SHOP PRIME & PAINT 1-1/2", 22 GA GALVANIZED CORRUGATED METAL DECKING "C" PANELS (PAINTED) -WELD TO DOOR FRAME AS SHOWN 16" X 8" BLOCK 8" NOTE: ALL EXPOSED METAL AND CMU SURFACES FOR TRASH ENCLOSURE TO BE PAINTED WITH EXTERIOR GRADE EPOXY PAINT, COLOR TO MATCH FLASHING, TYP. 9" DIA. SCHEDULE 80 STEEL PIPE PIVOT - PROVIDE STEEL SHIM BETWEEN PIVOT & BOLLARD - PAINT W/ EXTERIOR GRADE EPOXY PAINT, COLOR TO MATCH FLASHING GREASE FITTING AT EACH HINGE POINT 2" x 2" x 1/4" STL. ANGLE DOOR FRAME (STILES & RAILS) - WELD TO DOOR PIVOT - SHOP PRIME & PAINT 8" DIA. SCHEDULE 40 STEEL BOLLARD GROUT SOLID & ROUND & TROWEL @ TOP. ENCASE IN 24" DIA CONCRETE BASE 36" DEEP - PAINT W/ EXTERIOR GRADE EPOXY PAINT, COLOR TO MATCH FLASHING TRASH ENCLOSURE DOOR: 2" x 2" x 1/4" STEEL ANGLE STILES & RAILS WITH 1-1/2", 22 GA GALVANIZED CORRUGATED METAL DECKING "C" PANELS & 1-1/4" x 1-1/4" X 3/16" STEEL ANGLE BRACE - SHOP PRIME ANGLES & PAINT 1' - 0"2"PLAN NORTH10 15397 TRASH ENCLOSURE 1 A100 Sim OFFICE BLDG PHASE 1 1ST FLOOR 3,916 SF 2ND FLOOR 1,618 SF 5,534/250 = 22.136 STALLS FUTURE OFFICE ADDITION 1ST FLOOR 1,378 2ND FLOOR 1,378 2,756/250 = 11.24 FINISHED 20' - 4"FINISHED7' - 6"FINISHED 10' - 2"FINISHED7' - 6"2 A100 Sim FINISHED 20' - 4"FINISHED7' - 6"2 A100 Sim WILKUS ARCHITECTS Trash Enclosure Plan, Details A100 KETTLEVIEW INSURANCE BUILDING 2019.02.01 A100 ENLARGED TRASH ENCLOSURE PLAN1 A100 TYP. TRASH ENCLOSURE WALL2 A100 DUMPSTER CANE BOLT DETAIL3 A100 DUMPSER WALL DETAIL4 A100 DUMPSTER PIVOT DETAIL5 A100 DUMPSTER ENCLOSURE ELEVATION7 A100 DUMPSTER ENCLOSURE8 A100 DUPSTER ENCLOSURE9 MILLER, FIDLER & HINKE INSURANCE AGENCY