HomeMy WebLinkAbout2019-11-04-J07 Lot 2 I-80 West Industrial Park Plat 2 - Revised Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 4, 2019 AGENDA ITEM: Consideration of approval of a resolution approving a revised site plan for Lot 2, I-80 West Industrial Park Plat 2 (855 Interstate Parkway) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: JM Commercial Holdings requests approval of a revised site plan to allow for the construction of four single-story office/warehouse buildings. The subject property is located north of Interstate Parkway and west of Ute Avenue. The buildings are identical and each building is 12,000 square feet in area. Each building has the potential of six tenant spaces. The applicant has provided elevations for the proposed buildings on the site, which meets the intent of the architectural guidelines within the Site Plan Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the October 29, 2019 Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 (855 Interstate Parkway) City Planner, Melissa DeBoer, introduced the request for the approval of a revised site plan. The applicant is JM Commercial Holdings. The property is located north of Interstate Parkway and west of Ute Avenue, containing approximately 4.44 acres. The property is zoned M-1, Light Industrial District. The site recently received site plan approval from City Council on October 1 st, 2018. The current request is to revise the approved site plan in order to split up the two buildings into four total buildings. They are also proposing changes to the approved building elevations. The four buildings are proposed to be identical. Each building is a single-story building, 12,000 square feet in area. Each building includes a potential of six tenant spaces. Two trash enclosures are still proposed on either ends of the site. No changes to the accesses are proposed. There are two accesses off of Interstate Parkway. A total of 99 parking spaces are required for this site, and 99 are proposed. A five-foot wide sidewalk will be installed along Interstate Parkway. The site will be serviced with all public utilities. Stormwater is collected in area intakes and taken to the detention pond located to the south of Interstate Parkway. A minimum of 15% of the site is required to be open space, the total amount of open space proposed is 28%. J7 The revised building elevations show the buildings being constructed mainly of brick with some architectural metal accents. The submitted photometric plan meets the lighting requirements of the ordinance. Staff is recommending approval of the revised site plan subject to remaining staff comments. Erin Ollendike, Civil Design Advantage, 3405 SE Crossroads Dr #G, Grimes, explained that the developer is already building the same buildings across the metro so it is more economical to revise the approved plan. Commissioner Hoifeldt moved to approve the revised site plan for Lot 2, I-80 West Industrial Park Plat 2 subject to any remaining staff comments. The motion was seconded by Commissioner Broderick. Ayes: Ward, Tietz, Broderick, Hoifeldt and Koshy. Nays: None. Motion Carries. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Planner II REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 19- APPROVING THE REVISED SITE PLAN FOR LOT 2, I-80 WEST INDUSTRIAL PARK PLAT 2 (855 INTERSTATE PARKWAY) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2, subject to remaining staff comments on October 29, 2019; AND, WHEREAS, the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 4th day of November, 2019 that the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 is approved. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Courtney Clarke Shelly Hughes Larry R. Lyon PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Lot 2, I-80 West Industrial Park Plat 2 – Revised Site Plan PREPARED BY: Melissa DeBoer, AICP – Planner II REPORT DATE: October 24, 2019 MEETING DATE: October 29, 2019 GENERAL INFORMATION Owner: JM Sioux City Holdings, LLC Developer: JM Commercial Holdings Project Manager: Erin Ollendike, P.E., Civil Design Advantage, LLC Request: The applicant is requesting approval of a revised site plan for four office/warehouse buildings. Location and Size: Property is located north of Interstate Parkway and west of Ute Avenue, immediately south of Interstate 80, containing approximately 4.44 acres. Property Address: 855 Interstate Parkway AREA MAP ABOVE: Aerial of subject property (outlined in YELLOW) in relation to the surrounding area. October 24, 2019 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District) North Vacant – Undeveloped Light Industrial Office C-1 (Community and Highway Service Commercial District) South Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District) East Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District) West Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District) HISTORY This site received site plan approval from City Council on October 1, 2018. Their request is to revise the approved site plan in order to further break up the buildings, from two buildings to a total of four. They are also requesting approval of revised building elevations, including different building materials than what was originally approved. PROJECT DESCRIPTION The project involves the construction of four single-story, office/warehouse buildings. The buildings are to be identical. Each building is proposed to be 12,000 square feet in area and include a potential of six tenant spaces each. Two trash enclosures are proposed on the site, one on the east end of the parking lot and one on the west end of the parking lot. A potentional monument sign is shown to be located just north of Interstate Parkway at the east driveway. ACCESS AND PARKING Two accesses are provided off Interstate Parkway. A total of 99 parking spaces are required for this facility; this includes 3 spaces per 1,000 square feet of office area, 1 space per 1,000 square feet of warehouse area, and 1 space per 2 warehouse employees. The total amount of parking proposed is 99 spaces, including 4 accessible parking spaces. The proposed site plan meets the parking requirements of the ordinance. SIDEWALKS/TRAILS A five foot wide sidewalk will be installed along Interstate Parkway with site plan improvements. UTILITIES This site will be serviced with all public utilities. Storm water will be collected in area intakes and taken to the detention pond located to the south of Interstate Parkway. LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 28%. The applicant has provided the required amount of plantings per the landscaping ordinance. October 24, 2019 3 of 3 ELEVATIONS The elevations of the buildings are proposed to be constructed of mostly brick, in two shades of gray – a light gray and a dark gray. The elevations will also include architectural metal accents in a darker gray color. The trash enclosures are to be constructed of brick and include steel gates. The elevations facing interior to the site will include overhead doors. MISCELLANEOUS: The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the lighting requirements of the Site Plan Ordinance. STAFF RECOMMENDATION Staff recommends approval of the revised site plan for Lot 2, I-80 West Industrial Park Plat 2 subject to remaining staff comments. A2.004 A2.00 A2.00 3 2 4 4 5 5 G G F F E E D D C C A A 3 3 2 2 1 180'-0"20'-0"20'-0"20'-0"20'-0"150'-0"20'-0"20'-0"20'-0"20'-0"80'-0"2 A3.00 2 A3.00 14'-6" A2.00 1 KITCH 890 SF OFFICE 101 804 SF OFFICE 105 804 SF OFFICE 109 804 SF OFFICE 113 804 SF OFFICE 117 895 SF OFFICE 121 1 A3.01 1 A3.02 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6"6'-10"40'-0"4'-7"2'-3"25'-8 13/16"7'-4 5/8"5'-0" 5'-0"4'-7 1/8"4'-7 1/8"3'-11 1/8"8'-8 1/4"8'-8 1/4"2 A3.01 3 A3.01 1 A3.00 1 A3.00 4 A3.01 5 A3.01 2 A3.02 A4.00 1 868 SF STORAGE 104 965 SF STORAGE 108 965 SF STORAGE 112 965 SF STORAGE 116 965 SF STORAGE 120 878 SF STORAGE 124 68 SF RR 102 67 SF RR 106 34 SF UTIL 107 34 SF UTIL 111 67 SF RR 110 67 SF RR 114 34 SF UTIL 115 34 SF UTIL 119 67 SF RR 118 68 SF RR 122 70 SF UTIL/RISER 123A 50'-0"25'-0"25'-0"25'-0"25'-0" 6'-6"6'-6" 8'-1 3/4" 7'-2" 9'-4" 6'-6" 5'-0" 11'-4" 8'-0 3/4" 70 SF UTIL/RISER 103A 8'-0 3/4" 11'-4" 5'-0" KITCH KITCH 9'-4" 7'-2" 8'-1 3/4"1'-7 5/8"14'-6"1'-7 5/8" 14'-6" KITCH 5'-0"11'-4"8'-0 3/4"8'-0 3/4" 11'-4" 5'-0" 1'-8" 16'-0" 1'-8"14'-6" 1'-8" 14'-6"1'-8" 16'-0" 1'-8" 14'-6" 1'-8" 14'-6" 1'-8" 16'-0" 1'-8" 14'-6" 1'-7 5/8"3'-11 1/8"1'-7 5/8"9'-2" 1'-8"9'-2" 1'-8"65'-5 5/8"8'-8 1/4"8'-8 1/4" 5'-0" 5'-0" 8'-8 1/4" 8'-8 1/4" 5'-0"3'-11 1/8"4'-7 1/8"4'-7 1/8"3'-11 1/8"4'-7 1/8"4'-7 1/8"1 1 1 10'-10"10'-10"2 2 2 4 4 1 11 4 4 4 4 2 2 2 2 2 2 1111 333 8.0 8.0 7.0 7.0 7.0 7.0 6 6 6 6 6 6 6 7.1 7.1 7.1 7.16666 6 6 7.0 7.0 7.0 7.0 7.0 6 6 6 6 6 66 6 6 6 66 A1 A1 6" 1.1 1.1 4.9 4.9 F9 F9 6" 6"6"6"6"112C 116C 120C 124C 101 124B120B112B116B 108C104C 108B104B 108A 106 104A 116A 114110 112A 124A 122 118 120A 105 102 117 121109113 S1 S1 S1 S1 S1 S1 S1 S1 S2 3'-11 1/8"S4 S3 S2 S4 S3 S2 S4 S3 S2 S4 S3 S2 S4 S3 S2 S4 S3 3'-0" 5'-0 3/4"5'-0 3/4" 3'-0"3'-0" 5'-0 3/4"5'-0 3/4" 3'-0" 4"4" TYP. 1'-8" B B6"103A 103B 8'-0"8'-0"TRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAIN8'-0"8'-0"7.0 7.08.0 123A 123B 6 6.1 6.16.16.1 10'-9"10'-9"PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc. 14225 University Suite 110 Waukee, Iowa 50263 TEL 515.225.3469 FAX 515.225.9649 1 2 Copyright: 2019 OWNER TITLE PROJECT NUMBER DATE REVISIONS 09/06/2019C:\Users\dtiric\Desktop\Revit Local Files\219026 - Holland Farms Flex Bldg_dtiric.rvt9/6/2019 6:10:37 PMI 80 - BUSINESS PARKWAUKEE, IOWAA1.01 FLOOR PLAN N1/8" = 1'-0"1 FLOOR PLAN 12,380 SF +26'-0" T.O HIGH PARAPET +21'-4" T.O ROOF DECK @ FRONT +26'-0" T.O HIGH PARAPET +21'-4" T.O ROOF DECK @ FRONT 0'-0" LEVEL 1 1. POPOUTS 2. MATERIAL CHANGE 3. ARCHITECTURAL BANDING 4. AWNINGS 5. STEPPED PARAPET 6. DEEP-SET WINDOWS BUILDING FACTORS: STEPPED PARAPET MATERIAL CHANGES ARCHITECTURAL BANDING AWNINGPOPOUTDEEP-SET WINDOWS +24'-2" T.O. HIGH PARAPET +21'-4" T.O. ROOF DECK +24'-2" T.O. HIGH PARAPET +21'-6" T.O. LOW PARAPET +18'-1 1/2" T.O. ROOF DECK 0'-0" LEVEL 1 +18'-1 1/2" T.O. ROOF DECK +21'-4" T.O. ROOF DECK +24'-2" T.O. HIGH PARAPET +21'-6" T.O. LOW PARAPET +18'-1 1/2" T.O. ROOF DECK +24'-2" T.O. HIGH PARAPET 0'-0" LEVEL 1 +21'-4" T.O. ROOF DECK +24'-2" T.O. HIGH PARAPET MATERIAL LEGEND & INFORMATION FACE BRICK color: dark grey w/ light grey mortar KLAY COAT BRICK color: light gray ELEVATION MATERIAL SQUARE FOOTAGES: TOTAL SF: 3,592 SF MASONRY: 1,959 SF 75% (EXCLUDING GLAZING) METAL PANELS: 636 SF 18% GLAZING: 997 SF 28% EAST ELEVATION: TOTAL SF: 1,907 SF MASONRY: 1,307 SF 85% (EXCLUDING GLAZING) METAL PANELS: 202 SF 11% GLAZING: 374 SF 20% SOUTH ELEVATION:MATERIAL % OF ELEVATION METAL PANEL color: medium dark grey METAL BAND & COPING color: dark grey PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc. 14225 University Suite 110 Waukee, Iowa 50263 TEL 515.225.3469 FAX 515.225.9649 1 2 Copyright: 2019 TITLE PROJECT NUMBER DATE REVISIONS 09/06/2019is now... Farnsworth Group, Inc.C:\Users\dtiric\Desktop\Revit Local Files\OPTION 3 - Brick, EIFS, Metal Panel_dtiric.rvt9/6/2019 4:31:19 PMI 80 - BUSINESS PARKWAUKEE, IOWAA2.00 0191220.00 EXTERIOR ELEVATIONS 1/8" = 1'-0"1 SOUTH ELEVATION 1/8" = 1'-0"2 WEST ELEVATION 1/8" = 1'-0"3 NORTH ELEVATION 1/8" = 1'-0"4 EAST ELEVATION BRICK VENEER / METAL PANEL (or NICHIHA PANEL) GENERAL NOTES: 1. EXACT LOCATION FOR FOR "KNOX BOXES" IN FRONT OF EACH ENTRANCE TO BE DETERMINED BY OWNER. 2. MECHANICAL ROOFTOP UNITS ARE 4'-0"L x 4'-0"W x 4'-6"H ON 10" CURB. PROPER SCREENING TO BE DETERMINED AT LATER DATE. A3.0323A3.0311'-5 1/2"13'-0"2'-0" EQ EQ 2'-0"4" x 2" x 1/4" GALV. STEEL GATE FRAME W/ 2" FIXED ALUM. LOUVERCONCRETE FILLED BOLLARD (TYP)4" x 4" x 1/4" GALV. STEEL POST -PAINTFIELD BRICK ON CMU WALL4" x 2" x 1/4" GALV. STEEL GATE FRAME W/ 2" FIXED ALUM. LOUVERCONCRETE FILLED BOLLARD (TYP)4" x 4" x 1/4" GALV. STEEL POST -PAINTFIELD BRICK ON CMU WALLHEAVY DUTY FLAT MOUNT GORILLA HINGE OR EQ.(3 PER LEAF)METAL WALL CAPCANE BOLT WITHRECEIVER (2 PER GATE)T.O. MASONRY6'-0"PREFINISHED METALCOPINGWOOD BLOCKINGBOND BEAM w/ 2 #5, CONT. -GROUT SOLIDFIELD BRICK8" CMU WALL w/ #5 VERTS @ 40" O.C. w/ EPOXY COATING7'-6" X 6" DIA. STEEL TUBE FILLED w/ CONC. -SEE PLANCONCRETE PAVING-SEE CIVIL CONCRETE FOOTING, 2'x3'-4" TRENCH FOOTING w/ 2 #5 CONT. TOP & BOTTOM & #5 TIES @ 40" O.C. MAX. T.O. FOOTING ELEV. = (-0'-8") BELOW GRADE -SEE STRUCTURAL1/2" EXP. JOINT MATERIAL w/ BACKER ROD @ SEALANT#4 DOWEL @ 40" O.C. #5 CONT.12" DIA. CONC. PIER W/ PIPE EXTENDED THROUGHRADIUS T.O. CONCAIR GAP4'-0"T.O. MASONRY6'-0"3/4"6" 3'-6" 4'-0"1'-0"PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc.14225 UniversitySuite 110Waukee, Iowa 50263TEL 515.225.3469FAX 515.225.964912Copyright: 2019TITLEPROJECT NUMBERDATEREVISIONS08/27/2019is now... Farnsworth Group, Inc.C:\Users\kvetter\Desktop\Revit Local Files\OPTION 3 - Brick, EIFS, Metal Panel_kdvetter1.rvt8/27/2019 4:35:23 PMPRINCETON SUBDIVISION (LOT 7)NW 62nd AVENUE -GRIMES, IOWAA3.030191220.00TRASH ENCLOSURE& DETAILS1/4" = 1'-0"1TRASH ENCLOSURE1/4" = 1'-0"2TRASH ENCLOSURE1/2" = 1'-0"3WALL SECTION @ TRASH ENCLOSURE