CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: November 4, 2019
AGENDA ITEM: Consideration of approval of a resolution approving a revised site plan for Lot
2, I-80 West Industrial Park Plat 2 (855 Interstate Parkway)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: JM Commercial Holdings requests approval of a revised
site plan to allow for the construction of four single-story office/warehouse
buildings. The subject property is located north of Interstate Parkway and west
of Ute Avenue. The buildings are identical and each building is 12,000 square
feet in area. Each building has the potential of six tenant spaces.
The applicant has provided elevations for the proposed buildings on the site,
which meets the intent of the architectural guidelines within the Site Plan
Ordinance.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed this project at the October 29, 2019 Commission Meeting and
recommended approval subject to remaining staff comments:
Approval of a Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 (855 Interstate
Parkway)
City Planner, Melissa DeBoer, introduced the request for the approval of a revised site plan. The
applicant is JM Commercial Holdings. The property is located north of Interstate Parkway and west of
Ute Avenue, containing approximately 4.44 acres. The property is zoned M-1, Light Industrial
District.
The site recently received site plan approval from City Council on October 1 st, 2018. The current
request is to revise the approved site plan in order to split up the two buildings into four total
buildings. They are also proposing changes to the approved building elevations. The four buildings are
proposed to be identical. Each building is a single-story building, 12,000 square feet in area. Each
building includes a potential of six tenant spaces.
Two trash enclosures are still proposed on either ends of the site. No changes to the accesses are
proposed. There are two accesses off of Interstate Parkway. A total of 99 parking spaces are required
for this site, and 99 are proposed. A five-foot wide sidewalk will be installed along Interstate Parkway.
The site will be serviced with all public utilities. Stormwater is collected in area intakes and taken to
the detention pond located to the south of Interstate Parkway. A minimum of 15% of the site is
required to be open space, the total amount of open space proposed is 28%.
J7
The revised building elevations show the buildings being constructed mainly of brick with some
architectural metal accents. The submitted photometric plan meets the lighting requirements of the
ordinance. Staff is recommending approval of the revised site plan subject to remaining staff
comments.
Erin Ollendike, Civil Design Advantage, 3405 SE Crossroads Dr #G, Grimes, explained that the
developer is already building the same buildings across the metro so it is more economical to revise
the approved plan.
Commissioner Hoifeldt moved to approve the revised site plan for Lot 2, I-80 West Industrial Park
Plat 2 subject to any remaining staff comments. The motion was seconded by Commissioner
Broderick. Ayes: Ward, Tietz, Broderick, Hoifeldt and Koshy. Nays: None. Motion Carries.
STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to
remaining staff comments.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Melissa DeBoer, Planner II
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 19-
APPROVING THE REVISED SITE PLAN FOR LOT 2, I-80 WEST INDUSTRIAL PARK
PLAT 2
(855 INTERSTATE PARKWAY)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2, subject to remaining staff
comments on October 29, 2019; AND,
WHEREAS, the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 is in general
conformance with §304 – Site and Building Development Standards Ordinance of the Waukee
Municipal Code; AND,
WHEREAS, the Revised Site Plan for Lot 2, I-80 West Industrial Park Plat 2 is in general
conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee
Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 4th day of November, 2019 that the Revised Site Plan for Lot 2, I-80 West Industrial Park
Plat 2 is approved.
____________________________
William F. Peard, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Courtney Clarke
Shelly Hughes
Larry R. Lyon
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Lot 2, I-80 West Industrial Park Plat 2
– Revised Site Plan
PREPARED BY: Melissa DeBoer, AICP – Planner II
REPORT DATE: October 24, 2019
MEETING DATE: October 29, 2019
GENERAL INFORMATION
Owner: JM Sioux City Holdings, LLC
Developer:
JM Commercial Holdings
Project Manager: Erin Ollendike, P.E., Civil Design Advantage, LLC
Request: The applicant is requesting approval of a revised
site plan for four office/warehouse buildings.
Location and Size: Property is located north of Interstate Parkway and
west of Ute Avenue, immediately south of Interstate
80, containing approximately 4.44 acres.
Property Address: 855 Interstate Parkway
AREA MAP
ABOVE: Aerial of subject property (outlined in YELLOW) in relation to the surrounding area.
October 24, 2019
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District)
North Vacant – Undeveloped Light Industrial Office C-1 (Community and
Highway Service Commercial
District)
South Vacant – Undeveloped
Light Industrial Office M-1 (Light Industrial District)
East Vacant – Undeveloped
Light Industrial Office M-1 (Light Industrial District)
West Vacant – Undeveloped Light Industrial Office M-1 (Light Industrial District)
HISTORY
This site received site plan approval from City Council on October 1, 2018. Their request is to revise the
approved site plan in order to further break up the buildings, from two buildings to a total of four. They are
also requesting approval of revised building elevations, including different building materials than what was
originally approved.
PROJECT DESCRIPTION
The project involves the construction of four single-story, office/warehouse buildings. The buildings are to be
identical. Each building is proposed to be 12,000 square feet in area and include a potential of six tenant spaces
each.
Two trash enclosures are proposed on the site, one on the east end of the parking lot and one on the west
end of the parking lot. A potentional monument sign is shown to be located just north of Interstate Parkway
at the east driveway.
ACCESS AND PARKING
Two accesses are provided off Interstate Parkway.
A total of 99 parking spaces are required for this facility; this includes 3 spaces per 1,000 square feet of office
area, 1 space per 1,000 square feet of warehouse area, and 1 space per 2 warehouse employees. The total
amount of parking proposed is 99 spaces, including 4 accessible parking spaces. The proposed site plan meets
the parking requirements of the ordinance.
SIDEWALKS/TRAILS
A five foot wide sidewalk will be installed along Interstate Parkway with site plan improvements.
UTILITIES
This site will be serviced with all public utilities. Storm water will be collected in area intakes and taken to the
detention pond located to the south of Interstate Parkway.
LANDSCAPING & OPEN SPACE
A minimum of 15% of the project area is required to be open space. The total amount of open space
proposed is 28%. The applicant has provided the required amount of plantings per the landscaping ordinance.
October 24, 2019
3 of 3
ELEVATIONS
The elevations of the buildings are proposed to be constructed of mostly brick, in two shades of gray – a light
gray and a dark gray. The elevations will also include architectural metal accents in a darker gray color. The
trash enclosures are to be constructed of brick and include steel gates.
The elevations facing interior to the site will include overhead doors.
MISCELLANEOUS:
The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the
lighting requirements of the Site Plan Ordinance.
STAFF RECOMMENDATION
Staff recommends approval of the revised site plan for Lot 2, I-80 West Industrial Park Plat 2 subject to
remaining staff comments.
A2.004
A2.00
A2.00
3
2
4 4
5 5
G
G
F
F
E
E
D
D
C
C
A
A
3 3
2 2
1 180'-0"20'-0"20'-0"20'-0"20'-0"150'-0"20'-0"20'-0"20'-0"20'-0"80'-0"2
A3.00
2
A3.00
14'-6"
A2.00
1
KITCH
890 SF
OFFICE
101
804 SF
OFFICE
105
804 SF
OFFICE
109
804 SF
OFFICE
113
804 SF
OFFICE
117
895 SF
OFFICE
121
1
A3.01
1
A3.02
12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6" 6'-6" 12'-0" 6'-6"6'-10"40'-0"4'-7"2'-3"25'-8 13/16"7'-4 5/8"5'-0" 5'-0"4'-7 1/8"4'-7 1/8"3'-11 1/8"8'-8 1/4"8'-8 1/4"2
A3.01
3
A3.01
1
A3.00
1
A3.00
4
A3.01
5
A3.01
2
A3.02
A4.00
1
868 SF
STORAGE
104
965 SF
STORAGE
108
965 SF
STORAGE
112
965 SF
STORAGE
116
965 SF
STORAGE
120
878 SF
STORAGE
124
68 SF
RR
102
67 SF
RR
106
34 SF
UTIL
107
34 SF
UTIL
111
67 SF
RR
110
67 SF
RR
114
34 SF
UTIL
115
34 SF
UTIL
119
67 SF
RR
118
68 SF
RR
122
70 SF
UTIL/RISER
123A
50'-0"25'-0"25'-0"25'-0"25'-0"
6'-6"6'-6"
8'-1 3/4" 7'-2" 9'-4"
6'-6"
5'-0" 11'-4" 8'-0 3/4"
70 SF
UTIL/RISER
103A
8'-0 3/4" 11'-4" 5'-0"
KITCH KITCH
9'-4" 7'-2" 8'-1 3/4"1'-7 5/8"14'-6"1'-7 5/8" 14'-6"
KITCH
5'-0"11'-4"8'-0 3/4"8'-0 3/4" 11'-4" 5'-0"
1'-8" 16'-0" 1'-8"14'-6" 1'-8" 14'-6"1'-8" 16'-0" 1'-8" 14'-6" 1'-8" 14'-6" 1'-8" 16'-0" 1'-8" 14'-6" 1'-7 5/8"3'-11 1/8"1'-7 5/8"9'-2" 1'-8"9'-2" 1'-8"65'-5 5/8"8'-8 1/4"8'-8 1/4"
5'-0" 5'-0"
8'-8 1/4" 8'-8 1/4"
5'-0"3'-11 1/8"4'-7 1/8"4'-7 1/8"3'-11 1/8"4'-7 1/8"4'-7 1/8"1 1
1
10'-10"10'-10"2 2
2
4 4
1
11
4 4 4 4
2 2
2
2 2
2
1111
333
8.0 8.0
7.0 7.0 7.0 7.0
6
6 6 6 6 6 6
7.1 7.1 7.1 7.16666 6 6
7.0 7.0 7.0 7.0 7.0
6
6 6 6 6
66
6 6
6
66
A1
A1
6"
1.1 1.1
4.9 4.9
F9
F9
6"
6"6"6"6"112C 116C 120C 124C
101
124B120B112B116B
108C104C
108B104B
108A
106
104A
116A
114110
112A
124A
122
118
120A
105
102
117 121109113
S1
S1 S1 S1 S1 S1 S1
S1
S2
3'-11 1/8"S4
S3
S2
S4
S3
S2
S4
S3
S2
S4
S3
S2
S4
S3
S2
S4
S3
3'-0" 5'-0 3/4"5'-0 3/4" 3'-0"3'-0" 5'-0 3/4"5'-0 3/4" 3'-0"
4"4"
TYP.
1'-8"
B
B6"103A
103B 8'-0"8'-0"TRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAINTRENCH DRAIN8'-0"8'-0"7.0 7.08.0
123A
123B
6
6.1 6.16.16.1 10'-9"10'-9"PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc.
14225 University
Suite 110
Waukee, Iowa
50263
TEL 515.225.3469
FAX 515.225.9649
1
2
Copyright: 2019
OWNER
TITLE
PROJECT NUMBER
DATE
REVISIONS 09/06/2019C:\Users\dtiric\Desktop\Revit Local Files\219026 - Holland Farms Flex Bldg_dtiric.rvt9/6/2019 6:10:37 PMI 80 - BUSINESS PARKWAUKEE, IOWAA1.01
FLOOR PLAN
N1/8" = 1'-0"1 FLOOR PLAN
12,380 SF
+26'-0"
T.O HIGH PARAPET
+21'-4"
T.O ROOF DECK @ FRONT
+26'-0"
T.O HIGH PARAPET
+21'-4"
T.O ROOF DECK @ FRONT
0'-0"
LEVEL 1
1. POPOUTS
2. MATERIAL CHANGE
3. ARCHITECTURAL BANDING
4. AWNINGS
5. STEPPED PARAPET
6. DEEP-SET WINDOWS
BUILDING FACTORS:
STEPPED PARAPET MATERIAL CHANGES ARCHITECTURAL BANDING AWNINGPOPOUTDEEP-SET WINDOWS
+24'-2"
T.O. HIGH PARAPET
+21'-4"
T.O. ROOF DECK
+24'-2"
T.O. HIGH PARAPET
+21'-6"
T.O. LOW PARAPET
+18'-1 1/2"
T.O. ROOF DECK
0'-0"
LEVEL 1
+18'-1 1/2"
T.O. ROOF DECK
+21'-4"
T.O. ROOF DECK
+24'-2"
T.O. HIGH PARAPET
+21'-6"
T.O. LOW PARAPET
+18'-1 1/2"
T.O. ROOF DECK
+24'-2"
T.O. HIGH PARAPET
0'-0"
LEVEL 1
+21'-4"
T.O. ROOF DECK
+24'-2"
T.O. HIGH PARAPET
MATERIAL LEGEND & INFORMATION
FACE BRICK
color: dark grey
w/ light grey mortar
KLAY COAT BRICK
color: light gray
ELEVATION MATERIAL SQUARE FOOTAGES:
TOTAL SF: 3,592 SF
MASONRY: 1,959 SF 75% (EXCLUDING GLAZING)
METAL PANELS: 636 SF 18%
GLAZING: 997 SF 28%
EAST ELEVATION:
TOTAL SF: 1,907 SF
MASONRY: 1,307 SF 85% (EXCLUDING GLAZING)
METAL PANELS: 202 SF 11%
GLAZING: 374 SF 20%
SOUTH ELEVATION:MATERIAL % OF ELEVATION
METAL PANEL
color: medium dark grey
METAL BAND & COPING
color: dark grey
PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc.
14225 University
Suite 110
Waukee, Iowa
50263
TEL 515.225.3469
FAX 515.225.9649
1
2
Copyright: 2019
TITLE
PROJECT NUMBER
DATE
REVISIONS 09/06/2019is now...
Farnsworth Group, Inc.C:\Users\dtiric\Desktop\Revit Local Files\OPTION 3 - Brick, EIFS, Metal Panel_dtiric.rvt9/6/2019 4:31:19 PMI 80 - BUSINESS PARKWAUKEE, IOWAA2.00
0191220.00
EXTERIOR
ELEVATIONS
1/8" = 1'-0"1 SOUTH ELEVATION
1/8" = 1'-0"2 WEST ELEVATION
1/8" = 1'-0"3 NORTH ELEVATION
1/8" = 1'-0"4 EAST ELEVATION
BRICK VENEER / METAL PANEL (or NICHIHA PANEL)
GENERAL NOTES:
1. EXACT LOCATION FOR FOR "KNOX BOXES" IN FRONT OF EACH ENTRANCE
TO BE DETERMINED BY OWNER.
2. MECHANICAL ROOFTOP UNITS ARE 4'-0"L x 4'-0"W x 4'-6"H ON 10" CURB.
PROPER SCREENING TO BE DETERMINED AT LATER DATE.
A3.0323A3.0311'-5 1/2"13'-0"2'-0" EQ EQ 2'-0"4" x 2" x 1/4" GALV. STEEL GATE FRAME W/ 2" FIXED ALUM. LOUVERCONCRETE FILLED BOLLARD (TYP)4" x 4" x 1/4" GALV. STEEL POST -PAINTFIELD BRICK ON CMU WALL4" x 2" x 1/4" GALV. STEEL GATE FRAME W/ 2" FIXED ALUM. LOUVERCONCRETE FILLED BOLLARD (TYP)4" x 4" x 1/4" GALV. STEEL POST -PAINTFIELD BRICK ON CMU WALLHEAVY DUTY FLAT MOUNT GORILLA HINGE OR EQ.(3 PER LEAF)METAL WALL CAPCANE BOLT WITHRECEIVER (2 PER GATE)T.O. MASONRY6'-0"PREFINISHED METALCOPINGWOOD BLOCKINGBOND BEAM w/ 2 #5, CONT. -GROUT SOLIDFIELD BRICK8" CMU WALL w/ #5 VERTS @ 40" O.C. w/ EPOXY COATING7'-6" X 6" DIA. STEEL TUBE FILLED w/ CONC. -SEE PLANCONCRETE PAVING-SEE CIVIL CONCRETE FOOTING, 2'x3'-4" TRENCH FOOTING w/ 2 #5 CONT. TOP & BOTTOM & #5 TIES @ 40" O.C. MAX. T.O. FOOTING ELEV. = (-0'-8") BELOW GRADE -SEE STRUCTURAL1/2" EXP. JOINT MATERIAL w/ BACKER ROD @ SEALANT#4 DOWEL @ 40" O.C. #5 CONT.12" DIA. CONC. PIER W/ PIPE EXTENDED THROUGHRADIUS T.O. CONCAIR GAP4'-0"T.O. MASONRY6'-0"3/4"6" 3'-6" 4'-0"1'-0"PROGRESS PRINTNOT FOR CONSTRUCTIONDesign Alliance Inc.14225 UniversitySuite 110Waukee, Iowa 50263TEL 515.225.3469FAX 515.225.964912Copyright: 2019TITLEPROJECT NUMBERDATEREVISIONS08/27/2019is now... Farnsworth Group, Inc.C:\Users\kvetter\Desktop\Revit Local Files\OPTION 3 - Brick, EIFS, Metal Panel_kdvetter1.rvt8/27/2019 4:35:23 PMPRINCETON SUBDIVISION (LOT 7)NW 62nd AVENUE -GRIMES, IOWAA3.030191220.00TRASH ENCLOSURE& DETAILS1/4" = 1'-0"1TRASH ENCLOSURE1/4" = 1'-0"2TRASH ENCLOSURE1/2" = 1'-0"3WALL SECTION @ TRASH ENCLOSURE