Loading...
HomeMy WebLinkAbout2018-03-19-I02B Alice's Rd Corridor Phase 5_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 19, 2018 AGENDA ITEM:Consideration of approval of a resolution awarding contract [Alice’s Road Phase 5 Project, SE Olson Drive to NE Horizon Drive] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at the Iowa Department of Transportation Office of Contracts in Ames, IA, on February 20, 2018, at 10:00 a.m. Five (5) apparent bids were received, with the low bid submitted by Absolute Concrete Construction of Slater, IA, in the amount of $8,242,530.41. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:$8,242,530.41 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: City staff recommends awarding contract to Absolute Concrete Construction of Slater, IA, in the amount of $8,242,530.41. RECOMMENDATION: Approve the resolution awarding contract to Absolute Concrete Construction of Slater, IA, in the amount of $8,242,530.41. ATTACHMENTS: I. Proposed resolution II. Foth Infrastructure & Environment letter of recommendation III. Foth Infrastructure & Environment bid tabulation PREPARED BY: Becky Schuett REVIEWED BY: I2B RESOLUTION 18- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR ALICE'S ROAD FROM 400' NORTH OF SE OLSON DR. TO NE HORIZON DR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the following bid for the construction of certain public improvements described in general as Alice's Road from 400' North of SE Olson Dr. to NE Horizon Dr., described in the plans and specifications heretofore adopted by this Council on March 19, 2018, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Absolute Concrete Construction of Slater, IA Amount of bid: $8,242,530.41 Portion of project: All construction work Section 2. That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 19th day of March, 2018. Mayor ATTEST: City Clerk 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 March 13, 2018 John Gibson Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Recommendation of Award of Contract 2018 Alice’s Road Improvements (Phase 5) SE Olson Dr. to NE Horizon Drive Dear Mr. Gibson: The Bid Letting for the referenced Project was held at the Department of Transportation on February 20, 2018 and bids were received from a total of five (5) different bidders. A summary of the bids is as follows: Bidder Location Total Bid Amount Absolute Concrete Construction Slater, IA $8,242,530.41 Concrete Technologies, Inc. Grimes, IA $8,472,131.34 Alliance Construction Group Grimes, IA $9,313,560.14 Corell Contractor, Inc West Des Moines, IA $9,699,272.56 Hawkeye Paving Corp. Bettendorf, IA $9,944,442.36 Our Engineer’s Opinion of Probable Cost for the Total Bid Amount for this project was $10,057,953.25. Attached please find a detailed Tabulation of Bids for your information. The DOT Office of Contracts has reviewed the lowest responsive bid and bid attachments and everything appears to be in order. It is recommended that the City of Waukee award contract for this work to Absolute Concrete Construction of Slater, Iowa in the amount of $8,242,530.41. Appropriate contract documents have been prepared for signatures for City Council award on March 19, 2018. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Joshua C. DeBower, P.E. Lead Civil Engineer Encl: Tabulation of Responsive Bids Bid Date: ITEM NO.LINE NO.ITEM CODE ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL 1 0010 2101-0850001 CLEARING AND GRUBBING ACRE 11.30 $1,800.00 20,340.00$ 850.00$ 9,605.00$ 850.00$ 9,605.00$ 850.00$ 9,605.00$ 425.00$ 4,802.50$ 850.00$ 9,605.00$ 2 0020 2102-2625000 EMBANKMENT-IN-PLACE CY 3,109.00 $22.00 68,398.00$ 0.01$ 31.09$ 0.01$ 31.09$ 0.10$ 310.90$ 17.10$ 53,163.90$ 0.01$ 31.09$ 3 0030 2102-2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW CY 8,606.00 $15.00 129,090.00$ 6.90$ 59,381.40$ 6.90$ 59,381.40$ 7.00$ 60,242.00$ 16.65$ 143,289.90$ 7.00$ 60,242.00$ 4 0040 2102-2710090 EXCAVATION, CLASS 10, WASTE CY 4,571.00 $18.00 82,278.00$ 18.50$ 84,563.50$ 18.50$ 84,563.50$ 18.50$ 84,563.50$ 14.35$ 65,593.85$ 19.00$ 86,849.00$ 5 0050 2102-4560000 LOCATING TILE LINES STA 21.80 $420.00 9,156.00$ 870.00$ 18,966.00$ 400.00$ 8,720.00$ 400.00$ 8,720.00$ 2,500.00$ 54,500.00$ 400.00$ 8,720.00$ 6 0060 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD CY 5,333.00 $15.00 79,995.00$ 11.60$ 61,862.80$ 11.60$ 61,862.80$ 12.00$ 63,996.00$ 17.75$ 94,660.75$ 12.00$ 63,996.00$ 7 0070 2109-8225100 SPECIAL COMPACTION OF SUBGRADE STA 60.40 $350.00 21,140.00$ 250.00$ 15,100.00$ 250.00$ 15,100.00$ 250.00$ 15,100.00$ 1,850.00$ 111,740.00$ 250.00$ 15,100.00$ 8 0080 2115-0100000 MODIFIED SUBBASE CY 5,639.00 $35.00 197,365.00$ 33.10$ 186,650.90$ 33.10$ 186,650.90$ 34.00$ 191,726.00$ 47.30$ 266,724.70$ 45.00$ 253,755.00$ 9 0090 2123-7450020 SHOULDER FINISHING, EARTH STA 120.80 $250.00 30,200.00$ 200.00$ 24,160.00$ 200.00$ 24,160.00$ 250.00$ 30,200.00$ 440.00$ 53,152.00$ 200.00$ 24,160.00$ 10 0100 2213-7100400 RELOCATION OF MAIL BOXES EACH 5.00 $500.00 2,500.00$ 365.00$ 1,825.00$ 500.00$ 2,500.00$ 550.00$ 2,750.00$ 315.00$ 1,575.00$ 200.00$ 1,000.00$ 11 0110 2301-1033100 STANDARD OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DUR., 10 IN.SY 30,351.70 $70.00 2,124,619.00$ 55.00$ 1,669,343.50$ 65.60$ 1,991,071.52$ 70.00$ 2,124,619.00$ 64.26$ 1,950,400.24$ 75.00$ 2,276,377.50$ 12 0120 2301-4874106 MEDIAN, DOWELLED P.C. CONCRETE, 6 INCH SY 133.90 $92.00 12,318.80$ 125.00$ 16,737.50$ 65.30$ 8,743.67$ 65.00$ 8,703.50$ 70.50$ 9,439.95$ 98.00$ 13,122.20$ 13 0130 2301-4875006 MEDIAN, P.C. CONCRETE, 6 IN.SY 627.30 $50.00 31,365.00$ 110.00$ 69,003.00$ 61.30$ 38,453.49$ 72.00$ 45,165.60$ 76.00$ 47,674.80$ 98.00$ 61,475.40$ 14 0140 2301-7000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT THICKNESS (BY SCHEDULE)EACH 27,317.00 $1.00 27,317.00$ 1.00$ 27,317.00$ 1.00$ 27,317.00$ 1.00$ 27,317.00$ 1.00$ 27,317.00$ 1.00$ 27,317.00$ 16 0150 2304-0101000 TEMPORARY PAVEMENT SY 2,100.40 $80.00 168,032.00$ 55.00$ 115,522.00$ 57.00$ 119,722.80$ 57.00$ 119,722.80$ 60.00$ 126,024.00$ 105.00$ 220,542.00$ 17 0160 2315-8275025 SURFACING, DRIVEWAY, CLASS A CRUSHED STONE TON 110.00 $45.00 4,950.00$ 41.90$ 4,609.00$ 42.00$ 4,620.00$ 42.00$ 4,620.00$ 52.00$ 5,720.00$ 42.00$ 4,620.00$ 18 0170 2316-0000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT SMOOTHNESS (BY SCHEDULE)EACH 22,764.00 $1.00 22,764.00$ 1.00$ 22,764.00$ 1.00$ 22,764.00$ 1.00$ 22,764.00$ 1.00$ 22,764.00$ 1.00$ 22,764.00$ 20 0180 2416-0100015 APRONS, CONCRETE, 15 IN. DIA.EACH 1.00 $2,000.00 2,000.00$ 952.00$ 952.00$ 3,000.00$ 3,000.00$ 1,500.00$ 1,500.00$ 2,050.00$ 2,050.00$ 1,500.00$ 1,500.00$ 21 0190 2416-0100048 APRONS, CONCRETE, 48 IN. DIA.EACH 1.00 $6,000.00 6,000.00$ 2,502.00$ 2,502.00$ 5,000.00$ 5,000.00$ 3,400.00$ 3,400.00$ 4,500.00$ 4,500.00$ 3,400.00$ 3,400.00$ 22 0200 2417-1040018 CULVERT, CORRUGATED METAL ENTRANCE PIPE, 18 IN. DIA. LF 60.00 $45.00 2,700.00$ 48.50$ 2,910.00$ 50.00$ 3,000.00$ 45.00$ 2,700.00$ 58.00$ 3,480.00$ 45.00$ 2,700.00$ 23 0210 2435-0140148 MANHOLE, STORM SEWER, SW-401, 48 IN.EACH 1.00 $3,500.00 3,500.00$ 4,290.00$ 4,290.00$ 5,000.00$ 5,000.00$ 3,600.00$ 3,600.00$ 3,600.00$ 3,600.00$ 4,500.00$ 4,500.00$ 24 0220 2435-0140160 MANHOLE, STORM SEWER, SW-401, 60 IN.EACH 1.00 $5,000.00 5,000.00$ 4,625.00$ 4,625.00$ 6,000.00$ 6,000.00$ 4,250.00$ 4,250.00$ 5,400.00$ 5,400.00$ 5,200.00$ 5,200.00$ 28 0230 2435-0140210 MANHOLE, STORM SEWER, SW-402 MODIFIED EACH 1.00 $7,000.00 7,000.00$ 9,460.00$ 9,460.00$ 6,000.00$ 6,000.00$ 4,900.00$ 4,900.00$ 6,800.00$ 6,800.00$ 5,900.00$ 5,900.00$ 29 0240 2435-0140400 MANHOLE, STORM SEWER, SW-404 EACH 1.00 $20,000.00 20,000.00$ 14,600.00$ 14,600.00$ 11,995.00$ 11,995.00$ 15,500.00$ 15,500.00$ 17,700.00$ 17,700.00$ 17,100.00$ 17,100.00$ 31 0250 2435-0250100 INTAKE, SW-501 EACH 6.00 $3,500.00 21,000.00$ 2,405.00$ 14,430.00$ 3,500.00$ 21,000.00$ 3,500.00$ 21,000.00$ 2,350.00$ 14,100.00$ 5,000.00$ 30,000.00$ 32 0260 2435-0250300 INTAKE, SW-503 EACH 5.00 $5,500.00 27,500.00$ 4,925.00$ 24,625.00$ 4,000.00$ 20,000.00$ 5,000.00$ 25,000.00$ 4,150.00$ 20,750.00$ 7,100.00$ 35,500.00$ 33 0270 2435-0250310 INTAKE, SW-503 MODIFIED EACH 1.00 $6,500.00 6,500.00$ 6,830.00$ 6,830.00$ 8,000.00$ 8,000.00$ 5,500.00$ 5,500.00$ 8,000.00$ 8,000.00$ 7,600.00$ 7,600.00$ 34 0280 2435-0250500 INTAKE, SW-505 EACH 2.00 $4,500.00 9,000.00$ 3,720.00$ 7,440.00$ 4,000.00$ 8,000.00$ 4,800.00$ 9,600.00$ 3,900.00$ 7,800.00$ 6,900.00$ 13,800.00$ 36 0290 2435-0250600 INTAKE, SW-506 EACH 1.00 $6,500.00 6,500.00$ 6,250.00$ 6,250.00$ 6,000.00$ 6,000.00$ 7,600.00$ 7,600.00$ 7,250.00$ 7,250.00$ 10,800.00$ 10,800.00$ 37 0300 2435-0250610 INTAKE, SW-506 MODIFIED EACH 1.00 $8,000.00 8,000.00$ 10,100.00$ 10,100.00$ 12,000.00$ 12,000.00$ 9,000.00$ 9,000.00$ 12,500.00$ 12,500.00$ 12,200.00$ 12,200.00$ 38 0310 2435-0250700 INTAKE, SW-507 EACH 3.00 $4,500.00 13,500.00$ 2,800.00$ 8,400.00$ 4,000.00$ 12,000.00$ 3,650.00$ 10,950.00$ 4,400.00$ 13,200.00$ 6,400.00$ 19,200.00$ 41 0320 2435-0251224 INTAKE, SW-512, 24 IN.EACH 1.00 $2,000.00 2,000.00$ 1,755.00$ 1,755.00$ 3,500.00$ 3,500.00$ 1,900.00$ 1,900.00$ 2,400.00$ 2,400.00$ 1,900.00$ 1,900.00$ 42 0330 2435-0600010 MANHOLE ADJUSTMENT, MINOR EACH 4.00 $1,500.00 6,000.00$ 1,365.00$ 5,460.00$ 1,400.00$ 5,600.00$ 1,350.00$ 5,400.00$ 2,400.00$ 9,600.00$ 2,200.00$ 8,800.00$ 43 0340 2435-0600020 MANHOLE ADJUSTMENT, MAJOR EACH 5.00 $3,500.00 17,500.00$ 2,285.00$ 11,425.00$ 3,100.00$ 15,500.00$ 2,350.00$ 11,750.00$ 2,250.00$ 11,250.00$ 3,200.00$ 16,000.00$ 44 0350 2435-0700010 CONNECTION TO EXISTING MANHOLE EACH 2.00 $2,000.00 4,000.00$ 4,840.00$ 9,680.00$ 11,995.00$ 23,990.00$ 1,400.00$ 2,800.00$ 7,000.00$ 14,000.00$ 1,400.00$ 2,800.00$ 45 0360 2502-8213206 SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN.LF 3,653.00 $15.00 54,795.00$ 9.60$ 35,068.80$ 12.85$ 46,941.05$ 14.50$ 52,968.50$ 14.00$ 51,142.00$ 14.00$ 51,142.00$ 46 0370 2502-8221006 SUBDRAIN RISER, 6 IN., AS PER PLAN EACH 8.00 $1,200.00 9,600.00$ 800.00$ 6,400.00$ 685.00$ 5,480.00$ 710.00$ 5,680.00$ 675.00$ 5,400.00$ 710.00$ 5,680.00$ 47 0380 2502-8221303 SUBDRAIN OUTLET, DR-303 EACH 20.00 $500.00 10,000.00$ 275.00$ 5,500.00$ 525.00$ 10,500.00$ 265.00$ 5,300.00$ 165.00$ 3,300.00$ 265.00$ 5,300.00$ 48 0390 2503-0114224 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 24 IN.LF 452.00 $90.00 40,680.00$ 79.00$ 35,708.00$ 72.00$ 32,544.00$ 133.00$ 60,116.00$ 129.00$ 58,308.00$ 133.00$ 60,116.00$ 51 0400 2503-0114248 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 48 IN.LF 459.00 $225.00 103,275.00$ 178.00$ 81,702.00$ 165.00$ 75,735.00$ 176.00$ 80,784.00$ 213.00$ 97,767.00$ 176.00$ 80,784.00$ 52 0410 2503-0114615 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 15 IN.LF 1,131.00 $65.00 73,515.00$ 56.50$ 63,901.50$ 59.00$ 66,729.00$ 90.00$ 101,790.00$ 138.00$ 156,078.00$ 90.00$ 101,790.00$ 53 0420 2503-0114618 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 18 IN.LF 471.00 $80.00 37,680.00$ 58.00$ 27,318.00$ 65.00$ 30,615.00$ 97.00$ 45,687.00$ 156.00$ 73,476.00$ 97.00$ 45,687.00$ 54 0430 2503-0116536 STORM SEWER GRAVITY MAIN, TRENCHED, 3000D LOW CLEARANCE RCP, EQUIV. DIA. 36 IN.LF 300.00 $180.00 54,000.00$ 250.00$ 75,000.00$ 175.00$ 52,500.00$ 208.00$ 62,400.00$ 200.00$ 60,000.00$ 208.00$ 62,400.00$ 57 0440 2503-0200036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN.LF 555.00 $16.00 8,880.00$ 17.00$ 9,435.00$ 48.00$ 26,640.00$ 15.00$ 8,325.00$ 39.50$ 21,922.50$ 15.00$ 8,325.00$ 60 0450 2504-0114008 SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC, 8 IN.LF 200.00 $120.00 24,000.00$ 50.00$ 10,000.00$ 66.00$ 13,200.00$ 102.00$ 20,400.00$ 165.00$ 33,000.00$ 102.00$ 20,400.00$ 61 0460 2507-3250005 ENGINEERING FABRIC SY 240.00 $4.00 960.00$ 6.00$ 1,440.00$ 3.00$ 720.00$ 6.00$ 1,440.00$ 4.50$ 1,080.00$ 6.00$ 1,440.00$ 62 0470 2507-6800061 REVETMENT, CLASS E TON 185.00 $75.00 13,875.00$ 76.50$ 14,152.50$ 70.00$ 12,950.00$ 76.50$ 14,152.50$ 46.50$ 8,602.50$ 77.00$ 14,245.00$ 63 0480 2510-6745850 REMOVAL OF PAVEMENT SY 14,779.60 $10.00 147,796.00$ 9.00$ 133,016.40$ 9.70$ 143,362.12$ 10.00$ 147,796.00$ 6.80$ 100,501.28$ 11.00$ 162,575.60$ 64 0490 2510-6750600 REMOVAL OF INTAKES AND UTILITY ACCESSES EACH 7.00 $1,000.00 7,000.00$ 850.00$ 5,950.00$ 1,000.00$ 7,000.00$ 850.00$ 5,950.00$ 600.00$ 4,200.00$ 850.00$ 5,950.00$ 65 0500 2511-0302600 RECREATIONAL TRAIL, PCC, 6 IN.SY 3,261.40 $45.00 146,763.00$ 38.00$ 123,933.20$ 38.10$ 124,259.34$ 37.00$ 120,671.80$ 36.50$ 119,041.10$ 45.00$ 146,763.00$ 66 0510 2511-0310100 SPECIAL COMPACTION OF SUBGRADE FOR RECREATIONAL TRAIL STA 29.10 $320.00 9,312.00$ 350.00$ 10,185.00$ 350.00$ 10,185.00$ 350.00$ 10,185.00$ 500.00$ 14,550.00$ 500.00$ 14,550.00$ 67 0520 2511-6745900 REMOVAL OF SIDEWALK SY 883.10 $10.00 8,831.00$ 6.90$ 6,093.39$ 6.90$ 6,093.39$ 9.00$ 7,947.90$ 10.25$ 9,051.78$ 8.00$ 7,064.80$ 68 0530 2511-7526004 SIDEWALK, PCC, 4 IN.SY 1,030.60 $35.00 36,071.00$ 55.00$ 56,683.00$ 34.15$ 35,194.99$ 35.00$ 36,071.00$ 33.50$ 34,525.10$ 56.00$ 57,713.60$ 69 0540 2511-7526006 SIDEWALK, PCC, 6 IN.SY 356.90 $45.00 16,060.50$ 80.00$ 28,552.00$ 46.25$ 16,506.63$ 46.00$ 16,417.40$ 46.00$ 16,417.40$ 72.00$ 25,696.80$ 70 0550 2511-7528101 DETECTABLE WARNINGS SF 484.00 $50.00 24,200.00$ 40.00$ 19,360.00$ 40.25$ 19,481.00$ 40.00$ 19,360.00$ 41.00$ 19,844.00$ 45.00$ 21,780.00$ 71 0560 2515-2475008 DRIVEWAY, P.C. CONCRETE, 8 IN.SY 2,723.00 $55.00 149,765.00$ 60.00$ 163,380.00$ 45.25$ 123,215.75$ 65.00$ 176,995.00$ 46.00$ 125,258.00$ 83.00$ 226,009.00$ 72 0570 2515-6745600 REMOVAL OF PAVED DRIVEWAY SY 2,378.80 $10.00 23,788.00$ 8.20$ 19,506.16$ 8.85$ 21,052.38$ 13.00$ 30,924.40$ 10.50$ 24,977.40$ 12.00$ 28,545.60$ 73 0580 2518-6910000 SAFETY CLOSURE EACH 18.00 $120.00 2,160.00$ 175.00$ 3,150.00$ 100.00$ 1,800.00$ 100.00$ 1,800.00$ 105.00$ 1,890.00$ 100.00$ 1,800.00$ 74 0590 2519-4200140 REMOVAL OF FENCE, FIELD LF 1,951.00 $5.00 9,755.00$ 1.80$ 3,511.80$ 0.50$ 975.50$ 2.00$ 3,902.00$ 3.00$ 5,853.00$ 2.00$ 3,902.00$ 75 0600 2523-0000100 LIGHTING POLES EACH 17.00 $9,000.00 153,000.00$ 8,060.00$ 137,020.00$ 8,055.00$ 136,935.00$ 8,100.00$ 137,700.00$ 8,200.00$ 139,400.00$ 8,100.00$ 137,700.00$ 76 0610 2523-0000200 ELECTRICAL CIRCUITS LF 6,403.00 $12.00 76,836.00$ 10.00$ 64,030.00$ 10.00$ 64,030.00$ 10.00$ 64,030.00$ 10.20$ 65,310.60$ 10.00$ 64,030.00$ 77 0620 2523-0000310 HANDHOLES AND JUNCTION BOXES EACH 19.00 $600.00 11,400.00$ 500.00$ 9,500.00$ 500.00$ 9,500.00$ 500.00$ 9,500.00$ 510.00$ 9,690.00$ 500.00$ 9,500.00$ 78 0630 2523-0000400 CONTROL CABINET EACH 1.00 $7,500.00 7,500.00$ 7,910.00$ 7,910.00$ 7,900.00$ 7,900.00$ 8,000.00$ 8,000.00$ 8,000.00$ 8,000.00$ 8,000.00$ 8,000.00$ 80 0640 2524-6765010 REMOVE AND REINSTALL SIGN AS PER PLAN EACH 5.00 $250.00 1,250.00$ 150.00$ 750.00$ 150.00$ 750.00$ 150.00$ 750.00$ 158.00$ 790.00$ 150.00$ 750.00$ 81 0650 2524-6765210 REMOVAL OF TYPE A SIGN ASSEMBLY EACH 2.00 $75.00 150.00$ 100.00$ 200.00$ 100.00$ 200.00$ 100.00$ 200.00$ 105.00$ 210.00$ 100.00$ 200.00$ 82 0660 2524-9276010 PERFORATED SQUARE STEEL TUBE POSTS LF 455.00 $12.00 5,460.00$ 8.50$ 3,867.50$ 12.00$ 5,460.00$ 12.00$ 5,460.00$ 12.60$ 5,733.00$ 12.00$ 5,460.00$ 83 0670 2524-9276021 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY SOIL INSTALLATIONEACH 26.00 $150.00 3,900.00$ 75.00$ 1,950.00$ 50.00$ 1,300.00$ 50.00$ 1,300.00$ 52.50$ 1,365.00$ 50.00$ 1,300.00$ 84 0680 2524-9276024 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY CONCRETE INSTALLEACH 8.00 $250.00 2,000.00$ 225.00$ 1,800.00$ 150.00$ 1,200.00$ 150.00$ 1,200.00$ 157.50$ 1,260.00$ 150.00$ 1,200.00$ 85 0690 2524-9325001 TYPE A SIGNS, SHEET ALUMINUM SF 317.00 $22.00 6,974.00$ 16.00$ 5,072.00$ 10.00$ 3,170.00$ 10.00$ 3,170.00$ 10.50$ 3,328.50$ 10.00$ 3,170.00$ 87 0700 2525-0000100 TRAFFIC SIGNALIZATION - HY-VEE ACCESS LS 1.00 $250,000.00 250,000.00$ 235,000.00$ 235,000.00$ 235,000.00$ 235,000.00$ 245,000.00$ 245,000.00$ 239,700.00$ 239,700.00$ 240,000.00$ 240,000.00$ 88 0710 2525-0000100 TRAFFIC SIGNALIZATION - SE LAUREL STREET LS 1.00 $250,000.00 250,000.00$ 255,000.00$ 255,000.00$ 254,900.00$ 254,900.00$ 260,000.00$ 260,000.00$ 260,100.00$ 260,100.00$ 260,000.00$ 260,000.00$ 90 0720 2526-8285000 CONSTRUCTION SURVEY LS 1.00 $17,500.00 17,500.00$ 21,700.00$ 21,700.00$ 14,300.00$ 14,300.00$ 35,000.00$ 35,000.00$ 13,020.00$ 13,020.00$ 12,000.00$ 12,000.00$ 91 0730 2527-9263109 PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASED STA 33.68 $75.00 2,526.00$ 45.00$ 1,515.60$ 38.00$ 1,279.84$ 60.00$ 2,020.80$ 40.00$ 1,347.20$ 38.00$ 1,279.84$ 92 0740 2527-9263117 PAINTED PAVEMENT MARKING, DURABLE STA 138.86 $135.00 18,746.10$ 30.00$ 4,165.80$ 55.00$ 7,637.30$ 64.00$ 8,887.04$ 58.00$ 8,053.88$ 55.00$ 7,637.30$ 93 0750 2527-9263131 WET RETROREFLECTIVE REMOVABLE TAPE MARKINGS STA 180.27 $120.00 21,632.40$ 115.00$ 20,731.05$ 115.00$ 20,731.05$ 130.00$ 23,435.10$ 121.00$ 21,812.67$ 115.00$ 20,731.05$ 94 0760 2527-9263143 PAINTED SYMBOLS AND LEGENDS, DURABLE EACH 38.00 $250.00 9,500.00$ 150.00$ 5,700.00$ 120.00$ 4,560.00$ 125.00$ 4,750.00$ 126.00$ 4,788.00$ 120.00$ 4,560.00$ 95 0770 2527-9263152 PRE-CUT SYMBOLS AND LEGENDS, REGULAR MARKING TAPE EACH 2.00 $250.00 500.00$ 400.00$ 800.00$ 180.00$ 360.00$ 180.00$ 360.00$ 189.00$ 378.00$ 180.00$ 360.00$ 96 0780 2527-9263180 PAVEMENT MARKINGS REMOVED STA 16.91 $65.00 1,099.15$ 75.00$ 1,268.25$ 50.00$ 845.50$ 50.00$ 845.50$ 52.50$ 887.78$ 50.00$ 845.50$ Tuesday, February 20, 2018 at 10:00 am Hawkeye Paving Corp. Bettendorf, IA 52722 DIVISION 1: STP-U-8177(621)--70-25 Corell Contractor, Inc. & Subsidiary Slater, IA 50244 Tabulation of Bids City of Waukee ALICE'S ROAD IMPROVEMENTS (PHASE 5) SE OLSON DRIVE TO NE HORIZON DRIVE Waukee, Iowa - 2018 West Des Moines, IA 50265 Concrete Technologies, Inc Alliance Construction Group, LLC Grimes, IA 50211Grimes, IA 50211 Engineer's Opinion of Cost Absolute Concrete Construction, Inc. Foth Infrastructure Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 Phone: 515.254.1393 Fax: 515.254.1642 BidTab1 Page 1 Date Prepared: 3/1/2018 BTAB-2018-0222-WAUKEE-SE ALICES ROAD PHASE 5.xls Bid Date: ITEM NO.LINE NO.ITEM CODE ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL Tuesday, February 20, 2018 at 10:00 am Hawkeye Paving Corp. Bettendorf, IA 52722 Corell Contractor, Inc. & Subsidiary Slater, IA 50244 Tabulation of Bids City of Waukee ALICE'S ROAD IMPROVEMENTS (PHASE 5) SE OLSON DRIVE TO NE HORIZON DRIVE Waukee, Iowa - 2018 West Des Moines, IA 50265 Concrete Technologies, Inc Alliance Construction Group, LLC Grimes, IA 50211Grimes, IA 50211 Engineer's Opinion of Cost Absolute Concrete Construction, Inc. 97 0790 2527-9263190 SYMBOLS AND LEGENDS REMOVED EACH 8.00 $150.00 1,200.00$ 100.00$ 800.00$ 95.00$ 760.00$ 95.00$ 760.00$ 100.00$ 800.00$ 95.00$ 760.00$ 98 0800 2527-9270111 GROOVES CUT FOR PAVEMENT MARKINGS STA 138.86 $25.00 3,471.50$ 55.00$ 7,637.30$ 34.00$ 4,721.24$ 34.00$ 4,721.24$ 36.00$ 4,998.96$ 34.00$ 4,721.24$ 99 0810 2527-9270120 GROOVES CUT FOR SYMBOLS AND LEGENDS EACH 38.00 $150.00 5,700.00$ 110.00$ 4,180.00$ 95.00$ 3,610.00$ 95.00$ 3,610.00$ 100.00$ 3,800.00$ 95.00$ 3,610.00$ 102 0820 2528-8445110 TRAFFIC CONTROL LS 1.00 $22,500.00 22,500.00$ 17,000.00$ 17,000.00$ 20,500.00$ 20,500.00$ 25,000.00$ 25,000.00$ 21,500.00$ 21,500.00$ 30,000.00$ 30,000.00$ 103 0830 2528-8445113 FLAGGERS EACH 10.00 $500.00 5,000.00$ 462.00$ 4,620.00$ 462.00$ 4,620.00$ 462.00$ 4,620.00$ 462.00$ 4,620.00$ 462.00$ 4,620.00$ 104 0840 2528-9290050 PORTABLE DYNAMIC MESSAGE SIGN (PDMS)CDAY 120.00 $70.00 8,400.00$ 85.00$ 10,200.00$ 80.00$ 9,600.00$ 85.00$ 10,200.00$ 84.00$ 10,080.00$ 80.00$ 9,600.00$ 105 0850 2533-4980005 MOBILIZATION LS 1.00 $250,000.00 250,000.00$ 360,000.00$ 360,000.00$ 148,000.00$ 148,000.00$ 296,000.00$ 296,000.00$ 89,000.00$ 89,000.00$ 250,000.00$ 250,000.00$ 106 0860 2554-0114008 WATER MAIN, TRENCHED, PVC, 8 IN.LF 602.00 $85.00 51,170.00$ 28.00$ 16,856.00$ 62.00$ 37,324.00$ 64.00$ 38,528.00$ 92.00$ 55,384.00$ 64.00$ 38,528.00$ 107 0870 2554-0114012 WATER MAIN, TRENCHED, PVC, 12 IN.LF 77.00 $95.00 7,315.00$ 52.00$ 4,004.00$ 87.00$ 6,699.00$ 80.00$ 6,160.00$ 113.00$ 8,701.00$ 80.00$ 6,160.00$ 108 0880 2554-0203000 FITTINGS BY WEIGHT, DUCTILE IRON LB 591.00 $8.50 5,023.50$ 18.00$ 10,638.00$ 8.00$ 4,728.00$ 12.50$ 7,387.50$ 13.50$ 7,978.50$ 13.00$ 7,683.00$ 110 0890 2554-0207008 VALVE, GATE, DIP, 8 IN.EACH 2.00 $2,500.00 5,000.00$ 1,540.00$ 3,080.00$ 1,400.00$ 2,800.00$ 1,700.00$ 3,400.00$ 1,400.00$ 2,800.00$ 1,700.00$ 3,400.00$ 111 0900 2554-0207012 VALVE, GATE, DIP, 12 IN.EACH 2.00 $3,500.00 7,000.00$ 2,400.00$ 4,800.00$ 2,000.00$ 4,000.00$ 2,500.00$ 5,000.00$ 2,300.00$ 4,600.00$ 2,500.00$ 5,000.00$ 112 0910 2554-0208012 TAPPING VALVE ASSEMBLY, 12 IN.EACH 2.00 $5,000.00 10,000.00$ 5,850.00$ 11,700.00$ 7,000.00$ 14,000.00$ 7,000.00$ 14,000.00$ 6,700.00$ 13,400.00$ 7,000.00$ 14,000.00$ 113 0920 2554-0210201 FIRE HYDRANT ASSEMBLY, WM-201 EACH 7.00 $7,500.00 52,500.00$ 5,970.00$ 41,790.00$ 5,000.00$ 35,000.00$ 5,000.00$ 35,000.00$ 5,100.00$ 35,700.00$ 5,000.00$ 35,000.00$ 114 0930 2554-0212020 VALVE BOX EXTENSION EACH 7.00 $500.00 3,500.00$ 200.00$ 1,400.00$ 110.00$ 770.00$ 260.00$ 1,820.00$ 172.00$ 1,204.00$ 260.00$ 1,820.00$ 115 0940 2554-0212030 VALVE BOX REPLACEMENT EACH 5.00 $2,000.00 10,000.00$ 410.00$ 2,050.00$ 700.00$ 3,500.00$ 500.00$ 2,500.00$ 1,100.00$ 5,500.00$ 500.00$ 2,500.00$ 116 0950 2554-0214000 FIRE HYDRANT ADJUSTMENT EACH 2.00 $1,200.00 2,400.00$ 760.00$ 1,520.00$ 2,000.00$ 4,000.00$ 800.00$ 1,600.00$ 1,100.00$ 2,200.00$ 800.00$ 1,600.00$ 117 0960 2599-9999005 REMOVAL OF FIRE HYDRANT ASSEMBLY EACH 4.00 $1,200.00 4,800.00$ 1,480.00$ 5,920.00$ 2,500.00$ 10,000.00$ 600.00$ 2,400.00$ 830.00$ 3,320.00$ 600.00$ 2,400.00$ 118 0970 2599-9999005 WATER MAIN VERTICAL RELOCATION EACH 7.00 $10,000.00 70,000.00$ 6,900.00$ 48,300.00$ 9,000.00$ 63,000.00$ 5,500.00$ 38,500.00$ 11,000.00$ 77,000.00$ 5,500.00$ 38,500.00$ 119 0980 2599-9999009 WATER MAIN REMOVAL LF 67.00 $25.00 1,675.00$ 15.00$ 1,005.00$ 25.00$ 1,675.00$ 8.00$ 536.00$ 55.00$ 3,685.00$ 8.00$ 536.00$ 120 0990 2599-9999010 RELOCATION OF GATE LS 1.00 $8,000.00 8,000.00$ 5,000.00$ 5,000.00$ 2,500.00$ 2,500.00$ 4,500.00$ 4,500.00$ 525.00$ 525.00$ 10,000.00$ 10,000.00$ 121 1000 2599-9999010 STORMWATER POLLUTION PREVENTION PLAN (SWPPP), MANAGEMENT LS 1.00 $5,000.00 5,000.00$ 3,500.00$ 3,500.00$ 3,500.00$ 3,500.00$ 1,800.00$ 1,800.00$ 1,900.00$ 1,900.00$ 1,800.00$ 1,800.00$ 122 1010 2599-9999010 VIDEO INSPECTION OF SANITARY SEWER AND STORM SEWER LS 1.00 $2,500.00 2,500.00$ 8,950.00$ 8,950.00$ 15,000.00$ 15,000.00$ 12,000.00$ 12,000.00$ 15,400.00$ 15,400.00$ 12,000.00$ 12,000.00$ 123 1020 2601-2634100 MULCHING ACRE 7.80 $900.00 7,020.00$ 700.00$ 5,460.00$ 700.00$ 5,460.00$ 650.00$ 5,070.00$ 683.00$ 5,327.40$ 650.00$ 5,070.00$ 124 1030 2601-2634105 MULCHING, BONDED FIBER MATRIX ACRE 7.80 $1,500.00 11,700.00$ 2,950.00$ 23,010.00$ 2,950.00$ 23,010.00$ 3,800.00$ 29,640.00$ 4,000.00$ 31,200.00$ 3,800.00$ 29,640.00$ 125 1040 2601-2636044 SEEDING AND FERTILIZING (URBAN)ACRE 7.80 $1,500.00 11,700.00$ 1,300.00$ 10,140.00$ 1,300.00$ 10,140.00$ 1,050.00$ 8,190.00$ 1,100.00$ 8,580.00$ 1,100.00$ 8,580.00$ 126 1050 2601-2642120 STABILIZING CROP - SEEDING AND FERTILIZING (URBAN)ACRE 7.80 $800.00 6,240.00$ 1,000.00$ 7,800.00$ 1,000.00$ 7,800.00$ 1,050.00$ 8,190.00$ 1,100.00$ 8,580.00$ 1,100.00$ 8,580.00$ 127 1060 2602-0000020 SILT FENCE LF 5,156.00 $2.00 10,312.00$ 1.50$ 7,734.00$ 1.50$ 7,734.00$ 1.75$ 9,023.00$ 1.85$ 9,538.60$ 2.00$ 10,312.00$ 128 1070 2602-0000071 REMOVAL OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 2,578.00 $0.50 1,289.00$ 0.50$ 1,289.00$ 0.50$ 1,289.00$ 0.10$ 257.80$ 0.11$ 283.58$ 0.10$ 257.80$ 129 1080 2602-0000101 MAINTENANCE OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 516.00 $1.00 516.00$ 0.50$ 258.00$ 0.50$ 258.00$ 1.00$ 516.00$ 1.05$ 541.80$ 1.00$ 516.00$ 130 1090 2602-0000312 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA.LF 7,900.00 $3.50 27,650.00$ 3.25$ 25,675.00$ 3.25$ 25,675.00$ 2.40$ 18,960.00$ 2.50$ 19,750.00$ 2.00$ 15,800.00$ 131 1100 2602-0000320 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 20 IN. DIA.LF 60.00 $4.50 270.00$ 13.00$ 780.00$ 13.00$ 780.00$ 3.50$ 210.00$ 3.75$ 225.00$ 4.00$ 240.00$ 132 1110 2602-0000350 REMOVAL OF PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE LF 7,960.00 $0.50 3,980.00$ 0.50$ 3,980.00$ 0.50$ 3,980.00$ 0.50$ 3,980.00$ 0.55$ 4,378.00$ 0.10$ 796.00$ 133 1120 2602-0000500 OPEN-THROAT CURB INTAKE SEDIMENT FILTER LF 36.00 $5.00 180.00$ 25.00$ 900.00$ 25.00$ 900.00$ 28.00$ 1,008.00$ 30.00$ 1,080.00$ 28.00$ 1,008.00$ 134 1130 2602-0000510 MAINTENANCE OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER EACH 3.00 $350.00 1,050.00$ 25.00$ 75.00$ 25.00$ 75.00$ 10.00$ 30.00$ 11.00$ 33.00$ 10.00$ 30.00$ 135 1140 2602-0000520 REMOVAL OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER EACH 3.00 $350.00 1,050.00$ 25.00$ 75.00$ 25.00$ 75.00$ 20.00$ 60.00$ 0.55$ 1.65$ 0.50$ 1.50$ 136 1150 2602-0000530 GRATE INTAKE SEDIMENT FILTER BAG EACH 20.00 $250.00 5,000.00$ 245.00$ 4,900.00$ 245.00$ 4,900.00$ 210.00$ 4,200.00$ 220.00$ 4,400.00$ 210.00$ 4,200.00$ 137 1160 2602-0000540 MAINTENANCE OF GRATE INTAKE SEDIMENT FILTER BAG EACH 20.00 $350.00 7,000.00$ 25.00$ 500.00$ 25.00$ 500.00$ 25.00$ 500.00$ 26.00$ 520.00$ 25.00$ 500.00$ 138 1170 2602-0000550 REMOVAL OF GRATE INTAKE SEDIMENT FILTER BAG EACH 20.00 $250.00 5,000.00$ 25.00$ 500.00$ 25.00$ 500.00$ 10.00$ 200.00$ 5.25$ 105.00$ 5.00$ 100.00$ 139 1180 2602-0010010 MOBILIZATIONS, EROSION CONTROL EACH 2.00 $800.00 1,600.00$ 500.00$ 1,000.00$ 500.00$ 1,000.00$ 500.00$ 1,000.00$ 500.00$ 1,000.00$ 500.00$ 1,000.00$ 140 1190 2602-0010020 MOBILIZATIONS, EMERGENCY EROSION CONTROL EACH 1.00 $1,200.00 1,200.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ TOTAL DIVISION 1 5,697,174.95$ 4,920,128.94$ 4,989,974.25$ 5,427,224.78$ 5,504,922.77$ 5,858,828.82$ 1 1200 2101-0850001 CLEARING AND GRUBBING ACRE 3.70 $1,800.00 6,660.00$ 1,950.00$ 7,215.00$ 1,950.00$ 7,215.00$ 1,950.00$ 7,215.00$ 450.00$ 1,665.00$ 2,000.00$ 7,400.00$ 2 1210 2102-2625000 EMBANKMENT-IN-PLACE CY 3,108.00 $22.00 68,376.00$ 0.01$ 31.08$ 0.01$ 31.08$ 0.10$ 310.80$ 17.10$ 53,146.80$ 0.01$ 31.08$ 3 1220 2102-2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW CY 8,606.00 $15.00 129,090.00$ 6.90$ 59,381.40$ 6.90$ 59,381.40$ 7.00$ 60,242.00$ 16.65$ 143,289.90$ 7.00$ 60,242.00$ 4 1230 2102-2710090 EXCAVATION, CLASS 10, WASTE CY 4,571.00 $18.00 82,278.00$ 18.50$ 84,563.50$ 18.50$ 84,563.50$ 18.50$ 84,563.50$ 14.35$ 65,593.85$ 19.00$ 86,849.00$ 5 1240 2102-4560000 LOCATING TILE LINES STA 4.50 $420.00 1,890.00$ 1,010.00$ 4,545.00$ 410.00$ 1,845.00$ 400.00$ 1,800.00$ 2,800.00$ 12,600.00$ 400.00$ 1,800.00$ 6 1250 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD CY 5,333.00 $15.00 79,995.00$ 11.60$ 61,862.80$ 11.60$ 61,862.80$ 12.00$ 63,996.00$ 17.75$ 94,660.75$ 12.00$ 63,996.00$ 7 1260 2109-8225100 SPECIAL COMPACTION OF SUBGRADE STA 20.80 $350.00 7,280.00$ 250.00$ 5,200.00$ 250.00$ 5,200.00$ 250.00$ 5,200.00$ 1,900.00$ 39,520.00$ 250.00$ 5,200.00$ 8 1270 2115-0100000 MODIFIED SUBBASE CY 1,967.00 $35.00 68,845.00$ 33.10$ 65,107.70$ 33.10$ 65,107.70$ 34.00$ 66,878.00$ 47.50$ 93,432.50$ 45.00$ 88,515.00$ 9 1280 2123-7450020 SHOULDER FINISHING, EARTH STA 41.60 $250.00 10,400.00$ 200.00$ 8,320.00$ 200.00$ 8,320.00$ 200.00$ 8,320.00$ 450.00$ 18,720.00$ 200.00$ 8,320.00$ 11 1290 2301-1033100 STANDARD OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DUR., 10 IN.SY 7,821.00 $70.00 547,470.00$ 55.00$ 430,155.00$ 70.00$ 547,470.00$ 70.00$ 547,470.00$ 64.26$ 502,577.46$ 75.00$ 586,575.00$ 12 1300 2301-4874106 MEDIAN, DOWELLED P.C. CONCRETE, 6 INCH SY 105.70 $92.00 9,724.40$ 125.00$ 13,212.50$ 65.30$ 6,902.21$ 65.00$ 6,870.50$ 70.50$ 7,451.85$ 98.00$ 10,358.60$ 13 1310 2301-4875006 MEDIAN, P.C. CONCRETE, 6 IN.SY 310.80 $50.00 15,540.00$ 110.00$ 34,188.00$ 61.30$ 19,052.04$ 76.00$ 23,620.80$ 76.00$ 23,620.80$ 98.00$ 30,458.40$ 14 1320 2301-7000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT THICKNESS (BY SCHEDULE)EACH 9,564.00 $1.00 9,564.00$ 1.00$ 9,564.00$ 1.00$ 9,564.00$ 1.00$ 9,564.00$ 1.00$ 9,564.00$ 1.00$ 9,564.00$ 15 1330 2302-1200100 PORTLAND CEMENT CONCRETE PAVEMENT WIDENING, 10 IN.SY 2,804.70 $90.00 252,423.00$ 65.00$ 182,305.50$ 66.85$ 187,494.20$ 75.00$ 210,352.50$ 66.30$ 185,951.61$ 75.00$ 210,352.50$ 16 1340 2304-0101000 TEMPORARY PAVEMENT SY 1,768.10 $80.00 141,448.00$ 55.00$ 97,245.50$ 57.00$ 100,781.70$ 57.00$ 100,781.70$ 60.00$ 106,086.00$ 53.00$ 93,709.30$ 18 1350 2316-0000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT SMOOTHNESS (BY SCHEDULE)EACH 7,970.00 $1.00 7,970.00$ 1.00$ 7,970.00$ 1.00$ 7,970.00$ 1.00$ 7,970.00$ 1.00$ 7,970.00$ 1.00$ 7,970.00$ 19 1360 2401-6745354 REMOVAL OF CONCRETE FOOTINGS, AS PER PLAN EACH 1.00 $5,000.00 5,000.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 1,300.00$ 1,300.00$ 500.00$ 500.00$ 24 1370 2435-0140160 MANHOLE, STORM SEWER, SW-401, 60 IN.EACH 2.00 $5,000.00 10,000.00$ 4,625.00$ 9,250.00$ 8,000.00$ 16,000.00$ 4,200.00$ 8,400.00$ 4,800.00$ 9,600.00$ 5,200.00$ 10,400.00$ 26 1380 2435-0140196 MANHOLE, STORM SEWER, SW-401, 96 IN.EACH 2.00 $10,000.00 20,000.00$ 12,685.00$ 25,370.00$ 14,000.00$ 28,000.00$ 12,500.00$ 25,000.00$ 12,300.00$ 24,600.00$ 13,900.00$ 27,800.00$ 30 1390 2435-0140500 MANHOLE, STORM SEWER, SW-405 EACH 1.00 $3,500.00 3,500.00$ 7,300.00$ 7,300.00$ 4,800.00$ 4,800.00$ 3,600.00$ 3,600.00$ 4,450.00$ 4,450.00$ 4,500.00$ 4,500.00$ 31 1400 2435-0250100 INTAKE, SW-501 EACH 1.00 $3,500.00 3,500.00$ 2,450.00$ 2,450.00$ 2,500.00$ 2,500.00$ 3,500.00$ 3,500.00$ 2,400.00$ 2,400.00$ 5,000.00$ 5,000.00$ 32 1410 2435-0250300 INTAKE, SW-503 EACH 1.00 $5,500.00 5,500.00$ 5,000.00$ 5,000.00$ 4,000.00$ 4,000.00$ 5,000.00$ 5,000.00$ 4,500.00$ 4,500.00$ 7,100.00$ 7,100.00$ 34 1420 2435-0250500 INTAKE, SW-505 EACH 3.00 $4,500.00 13,500.00$ 3,810.00$ 11,430.00$ 3,800.00$ 11,400.00$ 4,800.00$ 14,400.00$ 3,900.00$ 11,700.00$ 6,900.00$ 20,700.00$ 35 1430 2435-0250510 INTAKE, SW-505 MODIFIED EACH 1.00 $5,500.00 5,500.00$ 6,980.00$ 6,980.00$ 7,000.00$ 7,000.00$ 5,800.00$ 5,800.00$ 8,100.00$ 8,100.00$ 7,900.00$ 7,900.00$ 36 1440 2435-0250600 INTAKE, SW-506 EACH 2.00 $6,500.00 13,000.00$ 5,950.00$ 11,900.00$ 13,000.00$ 26,000.00$ 7,600.00$ 15,200.00$ 7,200.00$ 14,400.00$ 10,800.00$ 21,600.00$ 37 1450 2435-0250610 INTAKE, SW-506 MODIFIED EACH 2.00 $8,000.00 16,000.00$ 11,970.00$ 23,940.00$ 8,000.00$ 16,000.00$ 9,000.00$ 18,000.00$ 8,500.00$ 17,000.00$ 12,200.00$ 24,400.00$ 42 1460 2435-0600010 MANHOLE ADJUSTMENT, MINOR EACH 1.00 $1,500.00 1,500.00$ 1,365.00$ 1,365.00$ 1,600.00$ 1,600.00$ 1,350.00$ 1,350.00$ 3,300.00$ 3,300.00$ 2,200.00$ 2,200.00$ 43 1470 2435-0600020 MANHOLE ADJUSTMENT, MAJOR EACH 2.00 $3,500.00 7,000.00$ 2,320.00$ 4,640.00$ 2,500.00$ 5,000.00$ 2,350.00$ 4,700.00$ 3,300.00$ 6,600.00$ 3,200.00$ 6,400.00$ 44 1480 2435-0700010 CONNECTION TO EXISTING MANHOLE EACH 1.00 $2,000.00 2,000.00$ 4,850.00$ 4,850.00$ 7,000.00$ 7,000.00$ 1,400.00$ 1,400.00$ 4,800.00$ 4,800.00$ 1,400.00$ 1,400.00$ 45 1490 2502-8213206 SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN.LF 1,585.00 $15.00 23,775.00$ 16.50$ 26,152.50$ 12.85$ 20,367.25$ 14.00$ 22,190.00$ 14.00$ 22,190.00$ 14.00$ 22,190.00$ 46 1500 2502-8221006 SUBDRAIN RISER, 6 IN., AS PER PLAN EACH 13.00 $1,200.00 15,600.00$ 600.00$ 7,800.00$ 685.00$ 8,905.00$ 725.00$ 9,425.00$ 450.00$ 5,850.00$ 725.00$ 9,425.00$ 47 1510 2502-8221303 SUBDRAIN OUTLET, DR-303 EACH 3.00 $500.00 1,500.00$ 300.00$ 900.00$ 525.00$ 1,575.00$ 260.00$ 780.00$ 165.00$ 495.00$ 260.00$ 780.00$ 48 1520 2503-0114224 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 24 IN.LF 564.00 $90.00 50,760.00$ 76.00$ 42,864.00$ 72.00$ 40,608.00$ 130.00$ 73,320.00$ 171.00$ 96,444.00$ 130.00$ 73,320.00$ 49 1530 2503-0114230 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 30 IN.LF 117.00 $125.00 14,625.00$ 104.00$ 12,168.00$ 100.00$ 11,700.00$ 110.00$ 12,870.00$ 191.00$ 22,347.00$ 110.00$ 12,870.00$ 50 1540 2503-0114236 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 36 IN.LF 214.00 $150.00 32,100.00$ 120.00$ 25,680.00$ 115.00$ 24,610.00$ 180.00$ 38,520.00$ 180.00$ 38,520.00$ 180.00$ 38,520.00$ DIVISION 1: STP-U-8177(621)--70-25 CONTINUED DIVISION 2: STP-A-8177(623)--86-25 Foth Infrastructure Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 Phone: 515.254.1393 Fax: 515.254.1642 BidTab1 Page 2 Date Prepared: 3/1/2018 BTAB-2018-0222-WAUKEE-SE ALICES ROAD PHASE 5.xls Bid Date: ITEM NO.LINE NO.ITEM CODE ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL Tuesday, February 20, 2018 at 10:00 am Hawkeye Paving Corp. Bettendorf, IA 52722 Corell Contractor, Inc. & Subsidiary Slater, IA 50244 Tabulation of Bids City of Waukee ALICE'S ROAD IMPROVEMENTS (PHASE 5) SE OLSON DRIVE TO NE HORIZON DRIVE Waukee, Iowa - 2018 West Des Moines, IA 50265 Concrete Technologies, Inc Alliance Construction Group, LLC Grimes, IA 50211Grimes, IA 50211 Engineer's Opinion of Cost Absolute Concrete Construction, Inc. 51 1550 2503-0114248 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 48 IN.LF 699.00 $225.00 157,275.00$ 188.00$ 131,412.00$ 170.00$ 118,830.00$ 185.00$ 129,315.00$ 339.00$ 236,961.00$ 185.00$ 129,315.00$ 52 1560 2503-0114615 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 15 IN.LF 231.00 $65.00 15,015.00$ 57.50$ 13,282.50$ 57.00$ 13,167.00$ 85.00$ 19,635.00$ 132.00$ 30,492.00$ 85.00$ 19,635.00$ 53 1570 2503-0114618 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 18 IN.LF 235.00 $80.00 18,800.00$ 62.00$ 14,570.00$ 53.00$ 12,455.00$ 110.00$ 25,850.00$ 137.00$ 32,195.00$ 110.00$ 25,850.00$ 57 1580 2503-0200036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN.LF 917.00 $16.00 14,672.00$ 17.00$ 15,589.00$ 17.00$ 15,589.00$ 15.00$ 13,755.00$ 50.00$ 45,850.00$ 15.00$ 13,755.00$ 59 1590 2503-0200341 STORM SEWER ABANDONMENT, FILL AND PLUG, LESS THAN OR EQUAL TO 36 IN. DIA.LF 54.00 $35.00 1,890.00$ 69.00$ 3,726.00$ 42.00$ 2,268.00$ 48.00$ 2,592.00$ 66.00$ 3,564.00$ 48.00$ 2,592.00$ 60 1600 2504-0114008 SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC, 8 IN.LF 120.00 $120.00 14,400.00$ 52.00$ 6,240.00$ 66.00$ 7,920.00$ 102.00$ 12,240.00$ 128.00$ 15,360.00$ 102.00$ 12,240.00$ 63 1610 2510-6745850 REMOVAL OF PAVEMENT SY 4,996.00 $10.00 49,960.00$ 9.00$ 44,964.00$ 11.00$ 54,956.00$ 11.00$ 54,956.00$ 8.50$ 42,466.00$ 12.00$ 59,952.00$ 64 1620 2510-6750600 REMOVAL OF INTAKES AND UTILITY ACCESSES EACH 6.00 $1,000.00 6,000.00$ 850.00$ 5,100.00$ 300.00$ 1,800.00$ 840.00$ 5,040.00$ 550.00$ 3,300.00$ 850.00$ 5,100.00$ 65 1630 2511-0302600 RECREATIONAL TRAIL, PCC, 6 IN.SY 1,084.40 $45.00 48,798.00$ 38.00$ 41,207.20$ 40.85$ 44,297.74$ 37.00$ 40,122.80$ 36.50$ 39,580.60$ 45.00$ 48,798.00$ 66 1640 2511-0310100 SPECIAL COMPACTION OF SUBGRADE FOR RECREATIONAL TRAIL STA 9.70 $320.00 3,104.00$ 350.00$ 3,395.00$ 350.00$ 3,395.00$ 350.00$ 3,395.00$ 510.00$ 4,947.00$ 500.00$ 4,850.00$ 67 1650 2511-6745900 REMOVAL OF SIDEWALK SY 535.10 $10.00 5,351.00$ 6.80$ 3,638.68$ 6.80$ 3,638.68$ 9.00$ 4,815.90$ 10.00$ 5,351.00$ 8.00$ 4,280.80$ 68 1660 2511-7526004 SIDEWALK, PCC, 4 IN.SY 11.80 $35.00 413.00$ 75.00$ 885.00$ 34.15$ 402.97$ 33.00$ 389.40$ 33.50$ 395.30$ 56.00$ 660.80$ 69 1670 2511-7526006 SIDEWALK, PCC, 6 IN.SY 29.10 $45.00 1,309.50$ 90.00$ 2,619.00$ 46.25$ 1,345.88$ 45.00$ 1,309.50$ 46.00$ 1,338.60$ 72.00$ 2,095.20$ 70 1680 2511-7528101 DETECTABLE WARNINGS SF 40.00 $50.00 2,000.00$ 40.00$ 1,600.00$ 40.25$ 1,610.00$ 40.00$ 1,600.00$ 41.00$ 1,640.00$ 45.00$ 1,800.00$ 71 1690 2515-2475008 DRIVEWAY, P.C. CONCRETE, 8 IN.SY 711.20 $55.00 39,116.00$ 60.00$ 42,672.00$ 46.25$ 32,893.00$ 65.00$ 46,228.00$ 46.00$ 32,715.20$ 83.00$ 59,029.60$ 72 1700 2515-6745600 REMOVAL OF PAVED DRIVEWAY SY 1,788.30 $10.00 17,883.00$ 10.20$ 18,240.66$ 11.00$ 19,671.30$ 13.00$ 23,247.90$ 10.00$ 17,883.00$ 14.00$ 25,036.20$ 73 1710 2518-6910000 SAFETY CLOSURE EACH 8.00 $120.00 960.00$ 175.00$ 1,400.00$ 100.00$ 800.00$ 100.00$ 800.00$ 105.00$ 840.00$ 100.00$ 800.00$ 74 1720 2519-4200140 REMOVAL OF FENCE, FIELD LF 334.00 $5.00 1,670.00$ 3.50$ 1,169.00$ 0.50$ 167.00$ 3.50$ 1,169.00$ 3.00$ 1,002.00$ 4.00$ 1,336.00$ 80 1730 2524-6765010 REMOVE AND REINSTALL SIGN AS PER PLAN EACH 1.00 $250.00 250.00$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00$ 150.00$ 160.00$ 160.00$ 150.00$ 150.00$ 81 1740 2524-6765210 REMOVAL OF TYPE A SIGN ASSEMBLY EACH 3.00 $75.00 225.00$ 100.00$ 300.00$ 100.00$ 300.00$ 100.00$ 300.00$ 105.00$ 315.00$ 100.00$ 300.00$ 82 1750 2524-9276010 PERFORATED SQUARE STEEL TUBE POSTS LF 104.00 $12.00 1,248.00$ 8.50$ 884.00$ 12.00$ 1,248.00$ 12.00$ 1,248.00$ 13.00$ 1,352.00$ 12.00$ 1,248.00$ 83 1760 2524-9276021 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY SOIL INSTALLATIONEACH 3.00 $150.00 450.00$ 75.00$ 225.00$ 50.00$ 150.00$ 50.00$ 150.00$ 53.00$ 159.00$ 50.00$ 150.00$ 84 1770 2524-9276024 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY CONCRETE INSTALLEACH 3.00 $250.00 750.00$ 225.00$ 675.00$ 150.00$ 450.00$ 150.00$ 450.00$ 158.00$ 474.00$ 150.00$ 450.00$ 85 1780 2524-9325001 TYPE A SIGNS, SHEET ALUMINUM SF 129.00 $22.00 2,838.00$ 16.00$ 2,064.00$ 10.00$ 1,290.00$ 10.00$ 1,290.00$ 11.00$ 1,419.00$ 10.00$ 1,290.00$ 86 1790 2525-0000100 TRAFFIC SIGNALIZATION - HICKMAN ROAD LS 1.00 $350,000.00 350,000.00$ 304,000.00$ 304,000.00$ 303,850.00$ 303,850.00$ 330,000.00$ 330,000.00$ 310,000.00$ 310,000.00$ 305,000.00$ 305,000.00$ 89 1800 2525-0000120 REMOVAL OF TRAFFIC SIGNALIZATION LS 1.00 $35,000.00 35,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,100.00$ 5,100.00$ 5,000.00$ 5,000.00$ 90 1810 2526-8285000 CONSTRUCTION SURVEY LS 1.00 $7,000.00 7,000.00$ 3,500.00$ 3,500.00$ 5,450.00$ 5,450.00$ 3,000.00$ 3,000.00$ 13,000.00$ 13,000.00$ 12,000.00$ 12,000.00$ 92 1820 2527-9263117 PAINTED PAVEMENT MARKING, DURABLE STA 48.61 $135.00 6,562.35$ 30.00$ 1,458.30$ 55.00$ 2,673.55$ 70.00$ 3,402.70$ 58.00$ 2,819.38$ 55.00$ 2,673.55$ 93 1830 2527-9263131 WET RETROREFLECTIVE REMOVABLE TAPE MARKINGS STA 79.12 $120.00 9,494.40$ 115.00$ 9,098.80$ 115.00$ 9,098.80$ 130.00$ 10,285.60$ 121.00$ 9,573.52$ 115.00$ 9,098.80$ 94 1840 2527-9263143 PAINTED SYMBOLS AND LEGENDS, DURABLE EACH 25.00 $250.00 6,250.00$ 150.00$ 3,750.00$ 120.00$ 3,000.00$ 120.00$ 3,000.00$ 126.00$ 3,150.00$ 120.00$ 3,000.00$ 95 1850 2527-9263152 PRE-CUT SYMBOLS AND LEGENDS, REGULAR MARKING TAPE EACH 12.00 $250.00 3,000.00$ 400.00$ 4,800.00$ 180.00$ 2,160.00$ 180.00$ 2,160.00$ 189.00$ 2,268.00$ 180.00$ 2,160.00$ 97 1860 2527-9263190 SYMBOLS AND LEGENDS REMOVED EACH 15.00 $150.00 2,250.00$ 100.00$ 1,500.00$ 95.00$ 1,425.00$ 95.00$ 1,425.00$ 100.00$ 1,500.00$ 95.00$ 1,425.00$ 98 1870 2527-9270111 GROOVES CUT FOR PAVEMENT MARKINGS STA 48.61 $25.00 1,215.25$ 55.00$ 2,673.55$ 34.00$ 1,652.74$ 34.00$ 1,652.74$ 36.00$ 1,749.96$ 34.00$ 1,652.74$ 99 1880 2527-9270120 GROOVES CUT FOR SYMBOLS AND LEGENDS EACH 25.00 $150.00 3,750.00$ 110.00$ 2,750.00$ 95.00$ 2,375.00$ 95.00$ 2,375.00$ 100.00$ 2,500.00$ 95.00$ 2,375.00$ 100 1890 2528-8400048 TEMPORARY BARRIER RAIL, CONCRETE LF 437.50 $12.00 5,250.00$ 15.55$ 6,803.13$ 20.00$ 8,750.00$ 20.00$ 8,750.00$ 21.00$ 9,187.50$ 20.00$ 8,750.00$ 102 1900 2528-8445110 TRAFFIC CONTROL LS 1.00 $9,000.00 9,000.00$ 7,000.00$ 7,000.00$ 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$ 2,100.00$ 2,100.00$ 10,000.00$ 10,000.00$ 103 1910 2528-8445113 FLAGGERS EACH 6.00 $500.00 3,000.00$ 462.00$ 2,772.00$ 462.00$ 2,772.00$ 462.00$ 2,772.00$ 462.00$ 2,772.00$ 462.00$ 2,772.00$ 105 1920 2533-4980005 MOBILIZATION LS 1.00 $100,000.00 100,000.00$ 50,000.00$ 50,000.00$ 102,500.00$ 102,500.00$ 135,000.00$ 135,000.00$ 69,000.00$ 69,000.00$ 210,000.00$ 210,000.00$ 107 1930 2554-0114012 WATER MAIN, TRENCHED, PVC, 12 IN.LF 974.00 $95.00 92,530.00$ 42.00$ 40,908.00$ 60.00$ 58,440.00$ 72.00$ 70,128.00$ 96.00$ 93,504.00$ 72.00$ 70,128.00$ 108 1940 2554-0203000 FITTINGS BY WEIGHT, DUCTILE IRON LB 2,340.00 $8.50 19,890.00$ 16.00$ 37,440.00$ 6.00$ 14,040.00$ 12.50$ 29,250.00$ 10.50$ 24,570.00$ 13.00$ 30,420.00$ 109 1950 2554-0204120 WATER SERVICE STUB, COPPER, 2 IN. EACH 1.00 $4,000.00 4,000.00$ 7,735.00$ 7,735.00$ 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$ 4,300.00$ 4,300.00$ 3,000.00$ 3,000.00$ 111 1960 2554-0207012 VALVE, GATE, DIP, 12 IN.EACH 5.00 $3,500.00 17,500.00$ 2,610.00$ 13,050.00$ 2,500.00$ 12,500.00$ 2,500.00$ 12,500.00$ 2,300.00$ 11,500.00$ 2,500.00$ 12,500.00$ 112 1970 2554-0208012 TAPPING VALVE ASSEMBLY, 12 IN.EACH 1.00 $5,000.00 5,000.00$ 7,050.00$ 7,050.00$ 12,000.00$ 12,000.00$ 12,500.00$ 12,500.00$ 8,300.00$ 8,300.00$ 12,500.00$ 12,500.00$ 113 1980 2554-0210201 FIRE HYDRANT ASSEMBLY, WM-201 EACH 6.00 $7,500.00 45,000.00$ 5,500.00$ 33,000.00$ 6,000.00$ 36,000.00$ 7,000.00$ 42,000.00$ 5,300.00$ 31,800.00$ 7,000.00$ 42,000.00$ 114 1990 2554-0212020 VALVE BOX EXTENSION EACH 3.00 $500.00 1,500.00$ 305.00$ 915.00$ 300.00$ 900.00$ 250.00$ 750.00$ 175.00$ 525.00$ 250.00$ 750.00$ 117 2000 2599-9999005 REMOVAL OF FIRE HYDRANT ASSEMBLY EACH 4.00 $1,200.00 4,800.00$ 1,475.00$ 5,900.00$ 700.00$ 2,800.00$ 575.00$ 2,300.00$ 1,000.00$ 4,000.00$ 600.00$ 2,400.00$ 118 2010 2599-9999005 WATER MAIN VERTICAL RELOCATION EACH 3.00 $10,000.00 30,000.00$ 7,445.00$ 22,335.00$ 8,500.00$ 25,500.00$ 5,800.00$ 17,400.00$ 10,200.00$ 30,600.00$ 5,800.00$ 17,400.00$ 119 2020 2599-9999009 WATER MAIN REMOVAL LF 1,935.00 $25.00 48,375.00$ 14.00$ 27,090.00$ 1.00$ 1,935.00$ 8.00$ 15,480.00$ 38.00$ 73,530.00$ 8.00$ 15,480.00$ 121 2030 2599-9999010 STORMWATER POLLUTION PREVENTION PLAN (SWPPP), MANAGEMENT LS 1.00 $2,000.00 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 1,800.00$ 1,800.00$ 1,900.00$ 1,900.00$ 1,800.00$ 1,800.00$ 122 2040 2599-9999010 VIDEO INSPECTION OF SANITARY SEWER AND STORM SEWER LS 1.00 $1,000.00 1,000.00$ 6,350.00$ 6,350.00$ 7,000.00$ 7,000.00$ 6,000.00$ 6,000.00$ 9,600.00$ 9,600.00$ 6,000.00$ 6,000.00$ 123 2050 2601-2634100 MULCHING ACRE 3.50 $900.00 3,150.00$ 700.00$ 2,450.00$ 700.00$ 2,450.00$ 650.00$ 2,275.00$ 683.00$ 2,390.50$ 650.00$ 2,275.00$ 124 2060 2601-2634105 MULCHING, BONDED FIBER MATRIX ACRE 3.50 $1,500.00 5,250.00$ 2,950.00$ 10,325.00$ 2,950.00$ 10,325.00$ 3,800.00$ 13,300.00$ 4,000.00$ 14,000.00$ 3,800.00$ 13,300.00$ 125 2070 2601-2636044 SEEDING AND FERTILIZING (URBAN)ACRE 3.50 $1,500.00 5,250.00$ 1,300.00$ 4,550.00$ 1,300.00$ 4,550.00$ 1,050.00$ 3,675.00$ 1,100.00$ 3,850.00$ 1,100.00$ 3,850.00$ 126 2080 2601-2642120 STABILIZING CROP - SEEDING AND FERTILIZING (URBAN)ACRE 3.50 $800.00 2,800.00$ 1,000.00$ 3,500.00$ 1,000.00$ 3,500.00$ 1,050.00$ 3,675.00$ 1,100.00$ 3,850.00$ 1,100.00$ 3,850.00$ 127 2090 2602-0000020 SILT FENCE LF 654.00 $2.00 1,308.00$ 1.50$ 981.00$ 1.50$ 981.00$ 1.75$ 1,144.50$ 1.85$ 1,209.90$ 2.00$ 1,308.00$ 128 2100 2602-0000071 REMOVAL OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 327.00 $0.50 163.50$ 0.50$ 163.50$ 0.50$ 163.50$ 0.10$ 32.70$ 0.15$ 49.05$ 0.10$ 32.70$ 129 2110 2602-0000101 MAINTENANCE OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 66.00 $1.00 66.00$ 0.50$ 33.00$ 0.50$ 33.00$ 1.00$ 66.00$ 1.05$ 69.30$ 1.00$ 66.00$ 130 2120 2602-0000312 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA.LF 2,460.00 $3.50 8,610.00$ 3.25$ 7,995.00$ 3.25$ 7,995.00$ 2.40$ 5,904.00$ 2.50$ 6,150.00$ 2.00$ 4,920.00$ 132 2130 2602-0000350 REMOVAL OF PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE LF 2,460.00 $0.50 1,230.00$ 0.50$ 1,230.00$ 0.50$ 1,230.00$ 0.50$ 1,230.00$ 0.55$ 1,353.00$ 0.10$ 246.00$ 136 2140 2602-0000530 GRATE INTAKE SEDIMENT FILTER BAG EACH 18.00 $250.00 4,500.00$ 245.00$ 4,410.00$ 245.00$ 4,410.00$ 210.00$ 3,780.00$ 220.00$ 3,960.00$ 210.00$ 3,780.00$ 137 2150 2602-0000540 MAINTENANCE OF GRATE INTAKE SEDIMENT FILTER BAG EACH 18.00 $350.00 6,300.00$ 25.00$ 450.00$ 25.00$ 450.00$ 25.00$ 450.00$ 26.25$ 472.50$ 25.00$ 450.00$ 138 2160 2602-0000550 REMOVAL OF GRATE INTAKE SEDIMENT FILTER BAG EACH 18.00 $250.00 4,500.00$ 25.00$ 450.00$ 25.00$ 450.00$ 5.00$ 90.00$ 5.25$ 94.50$ 5.00$ 90.00$ 139 2170 2602-0010010 MOBILIZATIONS, EROSION CONTROL EACH 1.00 $800.00 800.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 140 2180 2602-0010020 MOBILIZATIONS, EMERGENCY EROSION CONTROL EACH 1.00 $1,200.00 1,200.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ TOTAL DIVISION 2 2,946,185.40$ 2,304,330.80$ 2,415,980.04$ 2,620,711.54$ 2,952,004.33$ 2,815,012.27$ 1 2190 2101-0850001 CLEARING AND GRUBBING ACRE 1.80 $1,800.00 3,240.00$ 850.00$ 1,530.00$ 850.00$ 1,530.00$ 850.00$ 1,530.00$ 400.00$ 720.00$ 850.00$ 1,530.00$ 3 2200 2102-2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW CY 2,799.00 $15.00 41,985.00$ 6.90$ 19,313.10$ 6.90$ 19,313.10$ 7.00$ 19,593.00$ 14.70$ 41,145.30$ 7.00$ 19,593.00$ 4 2210 2102-2710090 EXCAVATION, CLASS 10, WASTE CY 2,231.00 $18.00 40,158.00$ 18.50$ 41,273.50$ 18.50$ 41,273.50$ 18.50$ 41,273.50$ 15.35$ 34,245.85$ 19.00$ 42,389.00$ 6 2220 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD CY 1,363.00 $15.00 20,445.00$ 11.60$ 15,810.80$ 11.60$ 15,810.80$ 12.00$ 16,356.00$ 20.25$ 27,600.75$ 12.00$ 16,356.00$ 7 2230 2109-8225100 SPECIAL COMPACTION OF SUBGRADE STA 54.50 $350.00 19,075.00$ 250.00$ 13,625.00$ 250.00$ 13,625.00$ 250.00$ 13,625.00$ 730.00$ 39,785.00$ 250.00$ 13,625.00$ 8 2240 2115-0100000 MODIFIED SUBBASE CY 1,308.00 $35.00 45,780.00$ 33.10$ 43,294.80$ 33.10$ 43,294.80$ 34.00$ 44,472.00$ 61.50$ 80,442.00$ 45.00$ 58,860.00$ 9 2250 2123-7450020 SHOULDER FINISHING, EARTH STA 54.50 $250.00 13,625.00$ 200.00$ 10,900.00$ 200.00$ 10,900.00$ 200.00$ 10,900.00$ 550.00$ 29,975.00$ 200.00$ 10,900.00$ 12 2260 2301-4874106 MEDIAN, DOWELLED P.C. CONCRETE, 6 INCH SY 6.60 $92.00 607.20$ 125.00$ 825.00$ 65.30$ 430.98$ 65.00$ 429.00$ 70.50$ 465.30$ 98.00$ 646.80$ 13 2270 2301-4875006 MEDIAN, P.C. CONCRETE, 6 IN.SY 193.50 $50.00 9,675.00$ 115.00$ 22,252.50$ 64.30$ 12,442.05$ 76.00$ 14,706.00$ 76.00$ 14,706.00$ 98.00$ 18,963.00$ 14 2280 2301-7000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT THICKNESS (BY SCHEDULE)EACH 5,446.00 $1.00 5,446.00$ 1.00$ 5,446.00$ 1.00$ 5,446.00$ 1.00$ 5,446.00$ 1.00$ 5,446.00$ 1.00$ 5,446.00$ 15 2290 2302-1200100 PORTLAND CEMENT CONCRETE PAVEMENT WIDENING, 10 IN.SY 6,050.70 $90.00 544,563.00$ 65.00$ 393,295.50$ 77.70$ 470,139.39$ 90.00$ 544,563.00$ 66.30$ 401,161.41$ 75.00$ 453,802.50$ 16 2295 2304-0101000 TEMPORARY PAVEMENT SY 125.90 $80.00 10,072.00$ 105.00$ 13,219.50$ 57.50$ 7,239.25$ 100.00$ 12,590.00$ 60.00$ 7,554.00$ 110.00$ 13,849.00$ DIVISION 2: STP-A-8177(623)--86-25 CONTINUED DIVISION 3: CS-TSF-8177(625)--85-25 Foth Infrastructure Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 Phone: 515.254.1393 Fax: 515.254.1642 BidTab1 Page 3 Date Prepared: 3/1/2018 BTAB-2018-0222-WAUKEE-SE ALICES ROAD PHASE 5.xls Bid Date: ITEM NO.LINE NO.ITEM CODE ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL Tuesday, February 20, 2018 at 10:00 am Hawkeye Paving Corp. Bettendorf, IA 52722 Corell Contractor, Inc. & Subsidiary Slater, IA 50244 Tabulation of Bids City of Waukee ALICE'S ROAD IMPROVEMENTS (PHASE 5) SE OLSON DRIVE TO NE HORIZON DRIVE Waukee, Iowa - 2018 West Des Moines, IA 50265 Concrete Technologies, Inc Alliance Construction Group, LLC Grimes, IA 50211Grimes, IA 50211 Engineer's Opinion of Cost Absolute Concrete Construction, Inc. 18 2300 2316-0000110 PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR PCC PAVEMENT SMOOTHNESS (BY SCHEDULE)EACH 4,539.00 $1.00 4,539.00$ 1.00$ 4,539.00$ 1.00$ 4,539.00$ 1.00$ 4,539.00$ 1.00$ 4,539.00$ 1.00$ 4,539.00$ 19 2310 2401-6745354 REMOVAL OF CONCRETE FOOTINGS, AS PER PLAN EACH 4.00 $5,000.00 20,000.00$ 500.00$ 2,000.00$ 500.00$ 2,000.00$ 500.00$ 2,000.00$ 900.00$ 3,600.00$ 500.00$ 2,000.00$ 23 2320 2435-0140148 MANHOLE, STORM SEWER, SW-401, 48 IN.EACH 1.00 $3,500.00 3,500.00$ 3,380.00$ 3,380.00$ 3,000.00$ 3,000.00$ 3,400.00$ 3,400.00$ 3,400.00$ 3,400.00$ 4,300.00$ 4,300.00$ 25 2330 2435-0140172 MANHOLE, STORM SEWER, SW-401, 72 IN.EACH 1.00 $6,500.00 6,500.00$ 6,540.00$ 6,540.00$ 5,000.00$ 5,000.00$ 5,300.00$ 5,300.00$ 6,700.00$ 6,700.00$ 6,300.00$ 6,300.00$ 27 2340 2435-0140200 MANHOLE, STORM SEWER, SW-402 EACH 1.00 $5,000.00 5,000.00$ 9,565.00$ 9,565.00$ 8,000.00$ 8,000.00$ 5,300.00$ 5,300.00$ 8,300.00$ 8,300.00$ 6,300.00$ 6,300.00$ 38 2350 2435-0250700 INTAKE, SW-507 EACH 4.00 $4,500.00 18,000.00$ 3,020.00$ 12,080.00$ 2,700.00$ 10,800.00$ 3,700.00$ 14,800.00$ 4,500.00$ 18,000.00$ 6,500.00$ 26,000.00$ 39 2360 2435-0250900 INTAKE, SW-509 EACH 1.00 $6,000.00 6,000.00$ 4,295.00$ 4,295.00$ 4,200.00$ 4,200.00$ 5,300.00$ 5,300.00$ 5,600.00$ 5,600.00$ 10,000.00$ 10,000.00$ 40 2370 2435-0251010 INTAKE, SW-510 MODIFIED EACH 1.00 $9,000.00 9,000.00$ 7,000.00$ 7,000.00$ 1,800.00$ 1,800.00$ 15,500.00$ 15,500.00$ 5,500.00$ 5,500.00$ 20,900.00$ 20,900.00$ 43 2380 2435-0600020 MANHOLE ADJUSTMENT, MAJOR EACH 2.00 $3,500.00 7,000.00$ 2,110.00$ 4,220.00$ 3,000.00$ 6,000.00$ 2,350.00$ 4,700.00$ 3,000.00$ 6,000.00$ 3,200.00$ 6,400.00$ 48 2390 2503-0114224 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 24 IN.LF 629.00 $90.00 56,610.00$ 76.00$ 47,804.00$ 70.00$ 44,030.00$ 125.00$ 78,625.00$ 140.00$ 88,060.00$ 125.00$ 78,625.00$ 49 2400 2503-0114230 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 30 IN.LF 14.00 $125.00 1,750.00$ 102.00$ 1,428.00$ 100.00$ 1,400.00$ 112.00$ 1,568.00$ 325.00$ 4,550.00$ 112.00$ 1,568.00$ 50 2410 2503-0114236 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 36 IN.LF 91.00 $150.00 13,650.00$ 121.00$ 11,011.00$ 130.00$ 11,830.00$ 135.00$ 12,285.00$ 170.00$ 15,470.00$ 135.00$ 12,285.00$ 52 2420 2503-0114615 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 15 IN.LF 58.00 $65.00 3,770.00$ 58.00$ 3,364.00$ 66.00$ 3,828.00$ 80.00$ 4,640.00$ 120.00$ 6,960.00$ 80.00$ 4,640.00$ 53 2430 2503-0114618 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 18 IN.LF 15.00 $80.00 1,200.00$ 66.00$ 990.00$ 80.00$ 1,200.00$ 90.00$ 1,350.00$ 178.00$ 2,670.00$ 90.00$ 1,350.00$ 55 2440 2503-0116542 STORM SEWER GRAVITY MAIN, TRENCHED, 3000D LOW CLEARANCE RCP, EQUIV. DIA. 42 IN.LF 46.00 $200.00 9,200.00$ 210.00$ 9,660.00$ 230.00$ 10,580.00$ 190.00$ 8,740.00$ 237.00$ 10,902.00$ 190.00$ 8,740.00$ 56 2450 2503-0116548 STORM SEWER GRAVITY MAIN, TRENCHED, 3000D LOW CLEARANCE RCP, EQUIV. DIA. 48 IN.LF 36.00 $225.00 8,100.00$ 270.00$ 9,720.00$ 300.00$ 10,800.00$ 220.00$ 7,920.00$ 280.00$ 10,080.00$ 220.00$ 7,920.00$ 57 2460 2503-0200036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN.LF 673.00 $16.00 10,768.00$ 17.00$ 11,441.00$ 17.00$ 11,441.00$ 15.00$ 10,095.00$ 50.00$ 33,650.00$ 15.00$ 10,095.00$ 58 2470 2503-0200136 REMOVE STORM SEWER PIPE GREATER THAN 36 IN.LF 67.00 $20.00 1,340.00$ 24.00$ 1,608.00$ 23.00$ 1,541.00$ 20.00$ 1,340.00$ 74.00$ 4,958.00$ 20.00$ 1,340.00$ 59 2480 2503-0200341 STORM SEWER ABANDONMENT, FILL AND PLUG, LESS THAN OR EQUAL TO 36 IN. DIA.LF 33.00 $35.00 1,155.00$ 51.00$ 1,683.00$ 63.00$ 2,079.00$ 48.00$ 1,584.00$ 96.00$ 3,168.00$ 48.00$ 1,584.00$ 63 2490 2510-6745850 REMOVAL OF PAVEMENT SY 4,482.50 $10.00 44,825.00$ 9.00$ 40,342.50$ 11.25$ 50,428.13$ 19.00$ 85,167.50$ 17.50$ 78,443.75$ 20.00$ 89,650.00$ 64 2500 2510-6750600 REMOVAL OF INTAKES AND UTILITY ACCESSES EACH 10.00 $1,000.00 10,000.00$ 850.00$ 8,500.00$ 343.00$ 3,430.00$ 850.00$ 8,500.00$ 600.00$ 6,000.00$ 850.00$ 8,500.00$ 65 2510 2511-0302600 RECREATIONAL TRAIL, PCC, 6 IN.SY 333.80 $45.00 15,021.00$ 71.50$ 23,866.70$ 36.15$ 12,066.87$ 37.00$ 12,350.60$ 36.50$ 12,183.70$ 45.00$ 15,021.00$ 66 2520 2511-0310100 SPECIAL COMPACTION OF SUBGRADE FOR RECREATIONAL TRAIL STA 2.70 $320.00 864.00$ 500.00$ 1,350.00$ 500.00$ 1,350.00$ 500.00$ 1,350.00$ 800.00$ 2,160.00$ 900.00$ 2,430.00$ 67 2530 2511-6745900 REMOVAL OF SIDEWALK SY 372.00 $10.00 3,720.00$ 8.20$ 3,050.40$ 8.20$ 3,050.40$ 9.00$ 3,348.00$ 10.50$ 3,906.00$ 10.00$ 3,720.00$ 68 2540 2511-7526004 SIDEWALK, PCC, 4 IN.SY 8.30 $35.00 290.50$ 95.00$ 788.50$ 34.15$ 283.45$ 33.00$ 273.90$ 33.50$ 278.05$ 56.00$ 464.80$ 69 2550 2511-7526006 SIDEWALK, PCC, 6 IN.SY 97.40 $45.00 4,383.00$ 95.00$ 9,253.00$ 46.25$ 4,504.75$ 45.00$ 4,383.00$ 46.00$ 4,480.40$ 72.00$ 7,012.80$ 70 2560 2511-7528101 DETECTABLE WARNINGS SF 124.00 $50.00 6,200.00$ 40.00$ 4,960.00$ 40.25$ 4,991.00$ 40.00$ 4,960.00$ 41.00$ 5,084.00$ 45.00$ 5,580.00$ 71 2570 2515-2475008 DRIVEWAY, P.C. CONCRETE, 8 IN.SY 213.50 $55.00 11,742.50$ 65.00$ 13,877.50$ 46.25$ 9,874.38$ 65.00$ 13,877.50$ 46.00$ 9,821.00$ 83.00$ 17,720.50$ 72 2580 2515-6745600 REMOVAL OF PAVED DRIVEWAY SY 244.10 $10.00 2,441.00$ 10.20$ 2,489.82$ 16.25$ 3,966.63$ 19.00$ 4,637.90$ 10.00$ 2,441.00$ 14.00$ 3,417.40$ 73 2590 2518-6910000 SAFETY CLOSURE EACH 2.00 $120.00 240.00$ 175.00$ 350.00$ 100.00$ 200.00$ 100.00$ 200.00$ 105.00$ 210.00$ 100.00$ 200.00$ 79 2600 2523-6765009 REMOVE AND REINSTALL LIGHT POLE AND LUMINAIRE EACH 4.00 $5,000.00 20,000.00$ 2,000.00$ 8,000.00$ 2,000.00$ 8,000.00$ 2,000.00$ 8,000.00$ 2,000.00$ 8,000.00$ 2,000.00$ 8,000.00$ 80 2610 2524-6765010 REMOVE AND REINSTALL SIGN AS PER PLAN EACH 8.00 $250.00 2,000.00$ 150.00$ 1,200.00$ 150.00$ 1,200.00$ 150.00$ 1,200.00$ 158.00$ 1,264.00$ 150.00$ 1,200.00$ 81 2620 2524-6765210 REMOVAL OF TYPE A SIGN ASSEMBLY EACH 7.00 $75.00 525.00$ 100.00$ 700.00$ 100.00$ 700.00$ 100.00$ 700.00$ 105.00$ 735.00$ 100.00$ 700.00$ 82 2630 2524-9276010 PERFORATED SQUARE STEEL TUBE POSTS LF 124.00 $12.00 1,488.00$ 8.50$ 1,054.00$ 12.00$ 1,488.00$ 12.00$ 1,488.00$ 13.00$ 1,612.00$ 12.00$ 1,488.00$ 83 2640 2524-9276021 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY SOIL INSTALLATIONEACH 9.00 $150.00 1,350.00$ 75.00$ 675.00$ 50.00$ 450.00$ 50.00$ 450.00$ 53.00$ 477.00$ 50.00$ 450.00$ 84 2650 2524-9276024 PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY CONCRETE INSTALLEACH 4.00 $250.00 1,000.00$ 225.00$ 900.00$ 150.00$ 600.00$ 150.00$ 600.00$ 158.00$ 632.00$ 150.00$ 600.00$ 85 2660 2524-9325001 TYPE A SIGNS, SHEET ALUMINUM SF 55.00 $22.00 1,210.00$ 16.00$ 880.00$ 10.00$ 550.00$ 10.00$ 550.00$ 11.00$ 605.00$ 10.00$ 550.00$ 90 2670 2526-8285000 CONSTRUCTION SURVEY LS 1.00 $10,500.00 10,500.00$ 5,800.00$ 5,800.00$ 11,250.00$ 11,250.00$ 3,000.00$ 3,000.00$ 6,500.00$ 6,500.00$ 10,000.00$ 10,000.00$ 92 2680 2527-9263117 PAINTED PAVEMENT MARKING, DURABLE STA 190.63 $135.00 25,735.05$ 30.00$ 5,718.90$ 55.00$ 10,484.65$ 70.00$ 13,344.10$ 58.00$ 11,056.54$ 55.00$ 10,484.65$ 94 2690 2527-9263143 PAINTED SYMBOLS AND LEGENDS, DURABLE EACH 25.00 $250.00 6,250.00$ 150.00$ 3,750.00$ 120.00$ 3,000.00$ 120.00$ 3,000.00$ 126.00$ 3,150.00$ 120.00$ 3,000.00$ 96 2700 2527-9263180 PAVEMENT MARKINGS REMOVED STA 26.86 $65.00 1,745.90$ 75.00$ 2,014.50$ 50.00$ 1,343.00$ 50.00$ 1,343.00$ 53.00$ 1,423.58$ 50.00$ 1,343.00$ 97 2710 2527-9263190 SYMBOLS AND LEGENDS REMOVED EACH 4.00 $150.00 600.00$ 100.00$ 400.00$ 95.00$ 380.00$ 95.00$ 380.00$ 100.00$ 400.00$ 95.00$ 380.00$ 98 2720 2527-9270111 GROOVES CUT FOR PAVEMENT MARKINGS STA 190.63 $25.00 4,765.75$ 55.00$ 10,484.65$ 34.00$ 6,481.42$ 34.00$ 6,481.42$ 36.00$ 6,862.68$ 34.00$ 6,481.42$ 99 2730 2527-9270120 GROOVES CUT FOR SYMBOLS AND LEGENDS EACH 25.00 $150.00 3,750.00$ 110.00$ 2,750.00$ 95.00$ 2,375.00$ 95.00$ 2,375.00$ 100.00$ 2,500.00$ 95.00$ 2,375.00$ 101 2740 2528-8400256 TEMPORARY TRAFFIC SIGNALS EACH 1.00 $85,000.00 85,000.00$ 33,625.00$ 33,625.00$ 33,600.00$ 33,600.00$ 33,700.00$ 33,700.00$ 34,300.00$ 34,300.00$ 35,000.00$ 35,000.00$ 102 2750 2528-8445110 TRAFFIC CONTROL LS 1.00 $13,500.00 13,500.00$ 10,000.00$ 10,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,800.00$ 15,800.00$ 20,000.00$ 20,000.00$ 104 2760 2528-9290050 PORTABLE DYNAMIC MESSAGE SIGN (PDMS)CDAY 120.00 $70.00 8,400.00$ 85.00$ 10,200.00$ 80.00$ 9,600.00$ 80.00$ 9,600.00$ 84.00$ 10,080.00$ 80.00$ 9,600.00$ 105 2770 2533-4980005 MOBILIZATION LS 1.00 $150,000.00 150,000.00$ 40,000.00$ 40,000.00$ 47,600.00$ 47,600.00$ 75,000.00$ 75,000.00$ 49,000.00$ 49,000.00$ 100,000.00$ 100,000.00$ 109 2780 2554-0204120 WATER SERVICE STUB, COPPER, 2 IN. EACH 1.00 $4,000.00 4,000.00$ 7,460.00$ 7,460.00$ 1,000.00$ 1,000.00$ 3,600.00$ 3,600.00$ 4,800.00$ 4,800.00$ 3,600.00$ 3,600.00$ 121 2790 2599-9999010 STORMWATER POLLUTION PREVENTION PLAN (SWPPP), MANAGEMENT LS 1.00 $3,000.00 3,000.00$ 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00$ 1,800.00$ 1,800.00$ 1,900.00$ 1,900.00$ 1,800.00$ 1,800.00$ 122 2800 2599-9999010 VIDEO INSPECTION OF SANITARY SEWER AND STORM SEWER LS 1.00 $1,500.00 1,500.00$ 2,600.00$ 2,600.00$ 3,500.00$ 3,500.00$ 4,500.00$ 4,500.00$ 3,700.00$ 3,700.00$ 4,500.00$ 4,500.00$ 123 2810 2601-2634100 MULCHING ACRE 2.40 $900.00 2,160.00$ 700.00$ 1,680.00$ 700.00$ 1,680.00$ 650.00$ 1,560.00$ 683.00$ 1,639.20$ 650.00$ 1,560.00$ 124 2820 2601-2634105 MULCHING, BONDED FIBER MATRIX ACRE 2.40 $1,500.00 3,600.00$ 2,950.00$ 7,080.00$ 2,950.00$ 7,080.00$ 3,800.00$ 9,120.00$ 4,000.00$ 9,600.00$ 3,800.00$ 9,120.00$ 125 2830 2601-2636044 SEEDING AND FERTILIZING (URBAN)ACRE 2.40 $1,500.00 3,600.00$ 1,300.00$ 3,120.00$ 1,300.00$ 3,120.00$ 1,050.00$ 2,520.00$ 1,100.00$ 2,640.00$ 1,100.00$ 2,640.00$ 126 2840 2601-2642120 STABILIZING CROP - SEEDING AND FERTILIZING (URBAN)ACRE 2.40 $800.00 1,920.00$ 1,000.00$ 2,400.00$ 1,000.00$ 2,400.00$ 1,050.00$ 2,520.00$ 1,100.00$ 2,640.00$ 1,100.00$ 2,640.00$ 127 2850 2602-0000020 SILT FENCE LF 48.00 $2.00 96.00$ 1.50$ 72.00$ 1.50$ 72.00$ 1.75$ 84.00$ 1.85$ 88.80$ 2.00$ 96.00$ 128 2860 2602-0000071 REMOVAL OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 24.00 $0.50 12.00$ 0.50$ 12.00$ 0.50$ 12.00$ 0.10$ 2.40$ 0.15$ 3.60$ 0.10$ 2.40$ 129 2870 2602-0000101 MAINTENANCE OF SILT FENCE OR SILT FENCE FOR DITCH CHECKS LF 5.00 $1.00 5.00$ 0.50$ 2.50$ 0.50$ 2.50$ 1.00$ 5.00$ 1.05$ 5.25$ 1.00$ 5.00$ 130 2880 2602-0000312 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA.LF 2,200.00 $3.50 7,700.00$ 3.25$ 7,150.00$ 3.25$ 7,150.00$ 2.40$ 5,280.00$ 2.50$ 5,500.00$ 2.00$ 4,400.00$ 132 2890 2602-0000350 REMOVAL OF PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE LF 2,200.00 $0.50 1,100.00$ 0.50$ 1,100.00$ 0.50$ 1,100.00$ 0.50$ 1,100.00$ 0.50$ 1,100.00$ 0.10$ 220.00$ 133 2900 2602-0000500 OPEN-THROAT CURB INTAKE SEDIMENT FILTER LF 80.00 $5.00 400.00$ 25.00$ 2,000.00$ 25.00$ 2,000.00$ 28.00$ 2,240.00$ 30.00$ 2,400.00$ 28.00$ 2,240.00$ 134 2910 2602-0000510 MAINTENANCE OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER EACH 6.00 $350.00 2,100.00$ 25.00$ 150.00$ 25.00$ 150.00$ 10.00$ 60.00$ 11.00$ 66.00$ 10.00$ 60.00$ 135 2920 2602-0000520 REMOVAL OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER EACH 6.00 $350.00 2,100.00$ 25.00$ 150.00$ 25.00$ 150.00$ 0.50$ 3.00$ 0.55$ 3.30$ 0.50$ 3.00$ 139 2930 2602-0010010 MOBILIZATIONS, EROSION CONTROL EACH 1.00 $800.00 800.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 500.00$ 140 2940 2602-0010020 MOBILIZATIONS, EMERGENCY EROSION CONTROL EACH 1.00 $1,200.00 1,200.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ TOTAL DIVISION 3 1,414,592.90$ 1,018,070.67$ 1,066,177.05$ 1,265,623.82$ 1,242,345.46$ 1,270,601.27$ TOTAL PROJECT CONSTRUCTION 10,057,953.25$ 8,242,530.41$ 8,472,131.34$ 9,313,560.14$ 9,699,272.56$ 9,944,442.36$ I hereby certify that this is a true and correct tabulation of bids received by the Iowa DOT on February 20, 2018 for the 2018 Alices Road Improvements (Phase 5). Waukee, Iowa - 2018. __________________________________________________________________ Joshua C. DeBower, P.E. License No. 20508 Renewal Date: 12/31/2018 DIVISION 3: CS-TSF-8177(625)--85-25 CONTINUED Foth Infrastructure Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 Phone: 515.254.1393 Fax: 515.254.1642 BidTab1 Page 4 Date Prepared: 3/1/2018 BTAB-2018-0222-WAUKEE-SE ALICES ROAD PHASE 5.xls