Loading...
HomeMy WebLinkAbout2018-03-19-J11 Cove at Kettlestone Lot 2_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 19, 2018 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Cove at Kettlestone Lot 2 (1190 SE University Avenue) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Waukee Investments I, LLC, requests approval of a site plan to allow for the construction of a 14,434 square feet multi-tenant commercial building. Parking will be provided on the north and south sides of the building. Access to the building will be provided via a connection to SE University Avenue west of the proposed building. All utilities have been extended to the site with the initial public improvements for the plat. The applicant has provided elevations for proposed building on the site which meets the intent of the architectural guidelines within the Site Development and Building Standards Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the March 13, 2018 Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Cove at Kettlestone Lot 2 (1190 SE University Avenue) Senior City Planner, Andy Kass, introduced the request for site plan approval made by the applicant, Waukee Investments 1, LLC. The subject property is generally located south of SE University Avenue and west of SE Bishop Drive and contains approximately 2.33 acres. The proposed project includes the construction of a 14,434 square foot multi-tenant commercial building, associated parking, trash enclosure, and site utilities. Access to the site will be off of SE University Avenue aligning with SE Brick Drive, as well as access across lot 2 to reach Bishop Drive. At this time all parking, landscape, and open space ordinances have been met. Mr. Kass advised that the site plan indicates an outdoor patio on the front of the building for the use of a possible restaurant tenant, though no tenants have been identified to date. All utilities have been extended to the site and storm water detention will be maintained in the pond to the southwest within the Cove at Kettlestone Townhome Development. At this time staff is comfortable with the site plan and would recommend approval subject to remaining staff comments. J11 • Commissioner Broderick questioned if the accent color of the trash enclosure would match the building. Mr. Kass advised yes. • Commissioner Hoifeldt questioned if there was a drive thru lane. Mr. Kass advised that there is not a drive thru window proposed. The other building showed a potential drive thru- but there is not a window placed at this time as there is no identified user. • Commissioner Tietz verified that there was an intent for a restaurant in this building. Mr. Kass agreed, stating that it was more towards the west of the building aligning with the patio. • Commissioner Hoifeldt questioned if SE Bishop Drive will continue through the site. Mr. Kass advised that it will not connect into the Townhome complex to the south of the site. • Commissioner Broderick questioned if the zoning for the property was meant for office building in this area. Mr. Kass advised that it is a Planned Development, C-1 commercial zoning which allows flexibility for user type. Commissioner Broderick made a motion to approve the Site Plan for Cove at Kettlestone Lot 2 (1190 SE University Avenue). Commissioner Hoifeldt seconded the motion. Ayes: Ward, Tietz, Broderick, and Hoifeldt. Nays: None. Motion Carries. STAFF REVIEW AND COMMENT: Staff is working with the applicant to address the last few comments. Staff recommends approval subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 18- APPROVING THE SITE PLAN FOR COVE AT KETTLESTONE LOT 2 (1190 SE UNIVERSITY AVENUE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Cove at Kettlestone Lot 2, subject to remaining staff comments on March 13, 2018; AND, WHEREAS, the Site Plan for Cove at Kettlestone Lot 2 is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Cove at Kettlestone Lot 2 is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 19th day of March, 2018 that the Site Plan for Cove at Kettlestone Lot 2 is approved subject to remaining staff comments. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Courtney Clarke Shelly Hughes Larry R. Lyon STAFF REPORT TO: Planning and Zoning Commission PREPARED BY: Andy Kass RE: Cove at Kettlestone Lot 2 – Site Plan DATE: March 13, 2018 GENERAL INFORMATION: Applicant: Waukee Investments I, LLC Requested Action Site Plan Approval Location and Size: Property is generally located south of SE University Avenue and west of SE Bishop Drive and containing approximately 2.33 acres. LAND USES AND ZONING: Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant Multi-Family Stacked High PD/C-1 North Winhall Apartments Neighborhood Residential PD/R-3 South Cove at Kettlestone Townhomes Multi-Family Stacked High PD/C-1 East Vacant Multi-Family Stacked Medium PD/C-1 West Vacant Multi-Family Stacked High PD/C-1 BACKGROUND: The subject property is located within the Cove at Kettlestone development that is located at the intersection of SE University Avenue and SE Waco Place. Initial phases of the development that have been approved are 131 townhomes and three 72 unit apartment buildings. The applicant was also the developer of the multi- tenant commercial building on the adjacent lot to the east. March 9, 2018 2 of 3 ABOVE: Aerial of the site plan (outlined in RED) in relation to the surrounding properties. PROJECT DESCRIPTION: The proposed project includes the construction of a 14,434 square foot multi-tenant commercial building, associated parking, trash enclosure, and site utilities. The site plan identifies the building having a 9,238 square foot retail portion and 5,196 square foot restaurant portion of the building. An outdoor patio is also identified on the front of the building for the use of the restaurant. The trash enclosure is indicated in the southeast corner of the site. ACCESS AND PARKING: Access to the site will be provided on the west side of the site from SE University Avenue, a public street. Access to SE Bishop Drive will also be provided across the adjacent property to the east. The future access off of SE University Avenue will be an un-signalized full access. In the future it is possible that a traffic signal could be located at this location, however, the current Capital Improvements Plan (CIP) does not include this signal as a future project. A total of 115 parking spaces are required for this facility. The total amount of parking proposed is 126 spaces (including 6 handicap accessible stalls). The site plan also identifies 5 bicycle parking spaces. The bike rack is located along the northeast side of the building. As part of the improvements to the site a 5 foot sidewalk will be extended along SE University Avenue. A pedestrian connection into the site from the sidewalk has been indicated on the site plan. March 9, 2018 3 of 3 UTILITIES: Storm water detention will be provided in the detention basin to the southwest of the site that is located within the Cove at Kettlestone Townhome development to the south. Water and sanitary services were stubbed into the lot as part of the initial plat improvements and with the improvements to Lot 3. OPEN SPACE AND LANDSCAPING: A minimum of 15% of the project area is required to be open space and the site plan indicates that 26.3% open space will be provided. Landscaping has been provided in compliance with the required planting requirements. ELEVATIONS: The proposed building will be constructed of a variety of materials including brick, storefront glazing, and simulated wood panels (fiber cement). Per the adopted Planned Development Agreement for the property, 30% of the street facing façade at pedestrian level shall be fenestration, which the proposed elevations meet that requirement. The proposed elevations meet the intent of both the Site Plan Ordinance as well as the Planned Development Agreement. Material samples will be available for review at the Planning & Zoning Commission meeting. MISCELLANEOUS: The applicant has submitted a photometric plan and associated light fixture cut sheets. The photometric plan and fixtures meet the requirements outlined within the Planned Development Agreement and the Site Plan Ordinance. STAFF RECOMMENDATION: At this time staff is comfortable with the site plan and would recommend approval of the site plan subject to remaining staff comments. CITY OF WAUKEE Andy Kass, AICP Senior Planner 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP01_1170893_TSH.dgn3/6/20183:58:14 PMSnyder1:500V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJMINDEX OF SHEETS PROJECT LOCATION VICINITY MAP Date IOWALICENSEDPROFESSIONAL EN GI NEERLicense Number Pages or sheets covered by this seal: My License Renewal Date is December 31, 2017 18954 18954 CANNON ERIC D.Eric D. Cannon, P.E. under the laws of the State of Iowa. licensed Professional Engineer supervision and that I am a duly by me or under my direct personal engineering document was prepared I hereby certify that this STATE OF IO WA PROFESSIO N ALLANDSCAPE AR CHITECTDate License Number Pages or sheets covered by this seal: 668 NO. ARCHITECT LANDSCAPE under the laws of the State of Iowa. Professional Landscape Architect charge. I am a duly licensed direct supervision and responsible below was prepared by me or under my this technical submission described I hereby certify that the portion of June 30, 2018 License Expires: 668 GULDENPFENNIG LARA F. Lara F. Guldenpfennig, ASLASE BRICK DRSE ALICE'S RDSE UNIVERSITY AVE.98TH STREETGRAND PRARIE PKWY1TITLE SHEET1 OWNER PROJECT CONSTRUCTION MANAGER 8. 7. 6. 5. 4. 3. 2. 1.500'1"=500' DAVENPORT, IA 52807 4620 E 53RD ST, SUITE 200 WAUKEE INVESTMENTS I, INC. CITY OF WAUKEE, DALLAS COUNTY, IOWA 1190 SE UNIVERSITY AVENUE FOR SITE PLAN LANDSCAPE PLAN SIDEWALK RAMP DETAILS EROSION AND SEDIMENT CONTROL PLAN GRADING PLAN UTILITY PLAN DIMENSION PLAN PROJECT INFORMATION TITLE SHEET COVE AT KETTLESTONE LOT 2 SHEET 1-7 SHEET 8 PHONE: (319) 512-2322 CONACT: RANDY PARKS CORALVILLE, IOWA 52241 P.O. BOX 5462 625 1ST AVE, SUITE 201A BUILD TO SUIT, INC. 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP02_1170893_NTS.dgn3/6/20183:58:15 PMSnyder1:1V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJM2 2PROJECT INFORMATIONPARKING REQUIREMENTS: CONTROL POINTS 93 93.0 93 C OC FO E OE 4" G 4" HPG 8" W 8" S 12" ST12" ST G G AST UST Features Existing Proposed G EB W LEGEND 8" W(*) 8" S(*) 4" G(*) 4" HPG(*) C(*) OC(*) FO(*) E(*) OE(*) DUCT(*) 93.0 1 Soil Boring Mailbox Satellite Dish Sign Above Ground Storage Tank Underground Storage Tank Fence Post or Guard Post Gas Apparatus Gas Manhole Gas Valve Fiber Optic Handhole Fiber Optic Manhole Communication Handhole Communication Manhole Communication Pedestal Traffic Sign Electric Transformer Electric Box Yard Light Street Light Utility Pole with Transformer Utility Pole with Light Guy Anchor Utility Pole Well Water Service Valve Water Main Valve Fire Hydrant on Building Fire Hydrant Double Storm Sewer Intake Single Storm Sewer Intake Storm Manhole Storm Sewer with Size Sanitary Manhole (*) Denotes the survey quality service level for utilities Test Hole Location for SUE w/ID Duct Bank Sanitary Sewer with Size Water Main with Size High Pressure Gas Main with Size Gas Main with Size Overhead Electric Underground Electric Fiber Optic Overhead Communication Communication Coniferous Tree or Shrub Deciduous Tree or Shrub Tree Stump Tree Line Fence (Silt) Fence (Wood) Fence (Chain Link) Fence (Barbed, Field, Hog) Contour Elevation Spot Elevation UTILITY CONTACT INFORMATION SYSTEM, TICKET NUMBER 551501715. RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS UTILITY WARNING UTILITY QUALITY SERVICE LEVELS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS. BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINEDQUALITY LEVEL (A) SUBSURFACE UTILITIES. GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE QUALITY LEVEL (B) QUALITY D INFORMATION. UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND QUALITY LEVEL (C) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS.QUALITY LEVEL (D) APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD. QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN EXCEPT WHERE NOTED AS QUALITY LEVEL A. UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR GENERAL NOTES Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Gary@nexgencom.com 515-369-9000 Gary Reimers NEXGEN INTEGRATED COMMUNICATIONS Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Thomas.sturmer@centurylink.com 303-664-8090 Tom Sturmer CENTURYLINK pmay@mediacomcc.com 515-246-2252 Paul May MEDIACOM COMMUNICATIONS CORP Joel.Schroeder@windstream.com 800-289-1901 JOEL SCHROEDER WINSTREAM MCLEOD MECDSMDesignLocates@midamerican.com 515-252-6632 Craig Ranfeld MIDAMER-ELEC jeff@netins.com 515-830-0445 Jeff Klocko IOWA NETWORK SERVICES Joni.McCabe@HickoryTech.com 507-387-1770 Joni McCabe HICKORY TECH GAS NO RESPONSE W-2 C-1 CLEAR C-2 OE/E C-2 FO1 BENCHMARKS IARTN DERIVED - US SURVEY FEET IOWA STATE PLANE SOUTH COORDINATE SYSTEM CP4 CP3 CP2 CP1 SE BISHOP DRIVE, EAST SIDE OF SITE. CUT "X" AT SOUTHEAST CORNER OF SIDEWALK ON WEST SIDE OF N=582877.86 E-1545330.84 EAST SIDE OF SE BISHOP DRIVE, NORTHEAST CORNER OF SITE. CUT "X" ON WEST END OF ISLAND IN UNIVERSITY AVENUE ON N=583274.75 E-1545387.19 EAST SIDE OF SE BRICK DRIVE, NORTH SIDE OF SITE. CUT "X" ON WEST END OF ISLAND IN UNIVERSITY AVENUE ON N=583276.66 E=1544730.94 EAST SIDE OF ALICE'S ROAD, NORTHWEST CORNER OF SITE. CUT "X" ON WEST END OF ISLAND IN UNIVERSITY AVENUE ON N=583274.48 E=1543827.85 IARTN DERIVED - US SURVEY FEET NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) BM2 BM1 SOUTHEAST OF DOUBLE INTAKE, EAST SIDE OF SITE. BURY BOLT ON HYDRANT ON EAST SIDE OF SE BISHOP DRIVE 20' ELEV=1062.12 BISHOP DRIVE, EAST SIDE OF SITE. BURY BOLT ON HYDRANT SOUTH OF SIDEWALK ON WEST SIDE OF SE ELEV=1062.40 BULK REGULATIONS ZONING GENERAL USE IMPERVIOUS AREA PERVIOUS AREA LEGAL DESCRIPTION 73,683 SF 27,774 SF TOTAL AREA OF DISTURBANCE 2.33 AC BEING AN OFFICIAL PLAT DALLAS COUNTY, IOWA. LOT 2, COVE AT KETTLESTONE PLAT 1 RECORDED WITH BOOK 2015 PAGE 9498 COMMERCIAL DISTRICT) (COMMUNITY AND HIGHWAY SERVICE PLANNED UNIT DEVELOPMENT/ C-1 RETAIL/GENERAL COMMERCIAL MINIMUM OPEN SPACE = 15% RESIDENTIAL REAR YARD = NONE EXCEPT FOR 25 FEET ADJACENT TO RESIDENTIAL SIDE YARD = NONE EXCEPT FOR 10 FEET ADJACENT TO LOT AREA = NONE FRONT YARD= ZERO (0') MINIMUM , NO MAXIMUM MAXIMUM NUMBER OF STORIES= 4 DENSITY = 30 DWELLING UNITS/ACRE MAXIMUM N/AAROUND THE EXTERIOR OF THE BUILDING OR FACILITY. OF THE EXTERIOR WALLS OF THE FIRST STORY OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE THE REQUIREMENTS OF SECTION 503.2 AND THIS SECTION SHALL EXTEND TO WITHIN 100 FEET OF ALL PORTIONS A BUILDING AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH FF. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED FOR EVERY FACILITY, BUILDING, OR PORTION OF COORDINATE ANY LANE/ROAD CLOSURES WITH THE CITY OF WAUKEE. NOTIFYING DRIVERS OF LANE CLOSURES AT LEAST ONE WEEK PRIOR TO ANY CLOSURE. CONTRACTOR IS TO EE. PRIOR TO ANY LANE CLOSURE THE CONTRACTOR IS RESPONSIBLE FOR HAVING A DIGITAL MESSAGE BOARD CONSTRUCTION. DD. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO CC. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE 4-INCH STORZ FITTINGS. AND CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TIE-INS. BB. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT SLURRY FROM CONCRETE OPERATIONS TO DISCHARGE OFFSITE. AA. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SHALL WITNESS ALL TESTING. SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY Z. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SHALL PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS. GRADES FOR DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR Y. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT EXPANSION JOINTS SHALL BE SEALED. JOINT BETWEEN SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL X. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION W. ALL CONSTRUCTION TO EXISTING SANITARY MANHOLES SHALL BE CORE DRILL WITH A LINK SEAL. TO THE CITY OF WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED. WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF GRANTED APPROVAL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION. T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE PEDESTRIAN FACILITIES. S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING CONSTRUCTION ACTIVITIES BEGINNING. R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO DISTANCE FROM THE WATER MAIN TO THE STORM SEWER IS AT LEAST TEN FEET. GREATER. O-RING GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL SEWER SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SERVICES WITH UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SHALL BE MET BY CONTRACTOR. A COSESCO PERMIT IS REQUIRED FOR THIS PROJECT. MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS NECESSARY. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS SITE WORK. N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE EVENT. SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND (GUTTER), UNLESS OTHERWISE NOTED. L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB GRADES TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH INTO THE PROJECT TO AN APPROVED OFF-SITE WASTE SITE. J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED WAUKEE STANDARDS. ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO THE TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT ACCORDINGLY ON THE AS-BUILT DOCUMENTS. H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED PLANS SHALL GOVERN. G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED COMPACT TO 95% MAXIMUM DENSITY. F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND PLANNED WEEKEND OR HOLIDAY WORK. ALSO NOTIFY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ANTICIPATED LANE CLOSURE. AND ACTIONS. THE CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON STRUCTURE. C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF REPORTS PREPARED BY OTHERS. SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, STATEWIDE URBAN DESIGN AND SPECIFICATIONS AND THE SOILS B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE. REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY ACCESSIBLE SPACES ) (INCLUDING 6 HANDICAP 126 SPACES PROVIDED 115 SPACES REQUIRED =37 SPACES(9238 SF / 1000 SF) x 4 SPACES RETAIL/ GENERAL COMMERCIAL: =78 SPACESRESTAURANT: (5196 SF / 1000 SF) x 15 SPACES 4 SPACES PER 1000 SF OF RETAIL/GENERAL COMMERCIAL 15 SPACES PER 1000 SF OF RESTAURANT 15.0'R 12.5'6.0'18.0'24.0'19.0' TYP19.0' TYP24.0'TYP18.0'6.0' TYP 5.0' TYP 9.0' 1.5' 4.0' 5.0' 12.0' 210.6'77.6'68.1'64.5' 15.0'70.2'10.2'10.0'18 12 1310 SE BISHOP DRIVESE UNIVERSITY AVE. 11 11 2218 LOT 3 90,939 SF (6 ACCESSIBLE STALLS) 128 STALLS PROVIDED 9,540 SF RETAIL 6,000 SF RESTAURANT PATIO 13 30" ST 24" ST 12"ST 12"ST18" ST18" ST18" ST 12" ST 15" ST18" ST 12" ST 8" STFFE=1061.70 2.09 AC HHHHHSE BRICK DR.COOLER UNITT 24" ST 18 "S T 8" PVC 8" PVC 8" PVCCOOLER UNIT2"GAS 2"GAS306.19'297.00' 297.00'306.19'(Bk.2015, Pg.20833) Existing 10' Public Utility Easement (Bk.2015, Pg.20833) And Water Main Easement Existing 30' Sanitary Sewer (Bk.2015, Pg.20833) Existing 15' Public Utility Easement 331.40' 331.40'306.19'(Bk.2015, Pg.20833) Flowage Easement Existing Surface Water (Bk.2017, Pg.8717) Existing 10' Electric Easement (Bk.2015, Pg.20833) Ingress/Egress Easement Existing 40' (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED LOT 2 FFE=1061.70 12 14 10 911 11 1110 99 11 9 2"GAS 2"GAS2"GAS24"ST18"ST12" S T15"ST 12"ST 2"GAS 2"GAS2"GAS2"GAS2"GAS TRASH 101,474 SF (2.33 AC) 6 TENANT SPACES H H T 2"GAS 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP03_1170893_DIM.dgn3/6/20183:58:16 PMSnyder1:30V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJMFO BM1 BM2 CP2 CP3 CP4 24" RCP W F.E.S.=1050.30 F.L.=1055.64 6" CMP N F.L.=1052.91 15" RCP N F.L.=1052.41 24" RCP E F.L.=1052.26 30" RCP W Intake=1058.64 Rim=1059.41 F.L.=1056.45 6" CMP N F.L.=1054.42 12" RCP N F.L.=1054.37 24" RCP W Intake=1059.25 Rim=1059.97 12" RCP15" RCP15" RCP 18" RCP24" RCP 18" RCP 24" RCP 15" RCP15" PVC 15" PVC 15" PVC 12" PVC 12" P VC F.L.=1056.01 15" PVC E F.L.=1055.95 15" PVC W Intake=1060.93 F.L.=1055.09 15" PVC E F.L.=1054.99 15" RCP SW Intake=1060.89 F.L.=1054.73 15" RCP E Double Intake=1057.55 F.L.=1057.12 12" PVC NW Intake=1060.99 F.L.=1056.91 12" PVC W Bottom of Well=1056.01 Beehive Intake=1060.06 F.L.=1055.62 15" PVC E F.L.=1055.60 15" PVC W Intake=1059.87 F.L.=1054.42 18" RCP S F.L.=1054.39 24" RCP NE F.L.=1054.41 15" RCP W Double Intake=1057.31 Rim=1058.02 C ConcreteConcreteConcrete30" RCP 24" RCP Stockpile Dirt Pile Dirt Pile Dirt PileSE BRICK DR.DIMENSION PLANDIMENSION PLAN CONSTRUCTION NOTES 0 SCALE (FEET) 30 3 330'1A 1B 3F 6 7 4 2 3 height: 0" to 2" Drop curb 5 DETAIL B 2 7Back of curb 1 R bar reinforcing #5 x 36" 1'-0" TYPICAL SECTION Curb Driveway SidewalkPr o pert y line TYPE A WITH RADII as specified Detail B Refer to curb Back of 8 2 'E' joint joint 'C' or 'E' 'B' joint 'C' joint 9 10 10 1'-0" min. Curb opening 18"12" 1'-0" Driveway width NO SCALE3 1 CONCRETE DRIVEWAY, TYPE A detectable warning panel with Engineer. Figure 7030.205; verify need for change requires a curb ramp, comply with sidewalk through driveway. If elevation transition from existing sidewalk to exceeds 2.0%, remove and replace to If cross slope of adjacent sidewalk panel passing space. driveway 5 feet wide to serve as a construct the sidewalk through the specified in the contract documents, maximum cross slope of 2.0%. If Target cross slope of 1.5% with a 2% toward center of alley. For alleys, invert the pavement crown 'B' joint is specified. Provide 'E' joint at back of curb unless 10 9 8 7 6 5 4 3 2 1 8 inches minimum. Match thickness of adjacent roadway, pavement. Center reinforcing bar vertically in the match thickness of driveway. Sidewalk thickness through driveway to minimum. Commercial and industrial: 7 inches Residential: 6 inches minimum. Pavement thickness. across sidewalk. of sidewalk. Do not extend raised curb end of taper/radius or at the front edge Transition the curb height to 0 inches at specified in the contract documents. Commercial and industrial: As maximum. Residential: 10 foot minimum,15 foot Driveway radius (R). 4C TYP 1A TYP H. PARKING BARRIER. SPECIFICATIONS. G. 9" DEPTH PCC ENTRANCE APPROACH TO BE CONSTRUCTED AS PER STANDARD TRAFFIC. WARNING SYSTEM AT RAMPS WHERE PEDESTRIAN TRAFFIC MEETS VEHICULAR PEDESTRIAN RAMP WITH A MAXIMUM SLOPE OF 8.33%. PROVIDE DETECTABLE F. E. INTEGRAL CURB. D. STANDARD CURB. C. PCC SIDEWALKS, 4" DEPTH PAVEMENT. STANDARD PROCTOR DENSITY. B. PCC DRIVES, 7" DEPTH PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% COMPACTED TO 95% STANDARD PROCTOR DENSITY. A. PCC DRIVES AND PARKING, 6" DEPTH PAVEMENT ON 12" DEPTH PREPARED SUBGRADE 3. PAVEMENTS, PROVIDE THE FOLLOWING: B. REMOVE GRANULAR SURFACE. A. GRIND CURB. 2. DEMOLITION, REMOVE THE FOLLOWING: EXPENSE WITH WORK BEING PREFORMED TO THE UTILITY OWNER'S SPECIFICATION. SCHEDULED FOR MODIFICATION OR DEMOLITION SHALL BE REMEDIED AT THE CONTRACTORS B. PROTECT EXISTING UTILITIES, ANY DAMAGE TO THE EXISTING UTILITIES THAT ARE NOT A. PAVEMENTS TO REMAIN. 1. EXISTING FEATURES, PROTECT THE FOLLOWING: TYP 4BTYP 9,238 SF RETAIL PATIO THE SANITARY SEWER. SANITARY SEWER EASEMENT IF PAVEMENT NEEDS TO BE REMOVED FOR MAINTENANCE OF 8. THE CITY OF WAUKEE IS NOT RESPONSIBLE FOR PAVEMENT REPLACEMENT WITHING EXISTING D. BIKE RACK LOCATION. COORDINATE WITH OWNER. C. ORNAMENTAL DECORATIVE FENCE. COORDINATE WITH OWNER. B. MONUMENT SIGN. BY OTHERS. SEE ARCHITECTURAL AND ELECTRICAL PLANS FOR DETAILS. A. TRASH ENCLOSURES. 7. SITE AMENITIES, PROVIDE THE FOLLOWING: WITH THE OWNER ALL ASPECTS SITE LIGHTING PRIOR TO CONSTRUCTION. B.SITE LIGHTING SHOWN IS FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR TO COORDINATE ASPECTS OF ELECTRICAL SERVICE. A.CONTRACTOR TO COORDINATE WITH THE UTILITY OWNER AND PROPERTY OWNER ALL 6. SITE LIGHTING, PROVIDE THE FOLLOWING: A. PROVIDE VAN ACCESSIBLE PARKING SIGNAGE AS PER ADAAG REQUIREMENTS. 5. SIGNS, PROVIDE THE FOLLOWING: C. ACCESSIBLE AISLE. 45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN. B. PAINTED STATE OF IOWA APPROVED ACCESSIBLE PARKING SYMBOL. A. 4" WIDE PAINTED PARKING STALL LINES. 4. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: 5,196 SF RETAIL 3E 3D 3D 3C 3E25.0'R25.0'R 15.0'R15.0'R50.0' R 25.0'R15.0'R 5.0' R 5.0'R15.0 'R 5.0'R 5.0'R15.0'R5.0'R5.0'R5.0'R5.0'R 5.0'R 15.0'R 5.0' R 15.0'R 5.0'R5.0'R15.0'R5.0'R 5.0'R5.0'R 9.0' TYP 9.0' TYP TYP 9.0' 15.0'R 6.0' 6.0' 5.0'TYP 38.0' B/B 25.0' B/B 25.0' B/B10.0'5.0'5.0'15.5'TYP9.0'18.0' 3.9' 15.5'R 12.1'5.0'R 5.0'R15.0'R6.0'18.0'24.0'18.0'9.3'9.0' TYP 9.0' TYP 2.0'5.0'R5.5' 4A 3C 3F 4A 2A 1B 1B 1B 3D 3D 3D 3D 3D 3C 3F 3F 7B 3D 3B 3D 4A TYP 3A 3A 3C 1B 1B 1A 1A 1A 1A 3B 3B 3B 3A 3A 3D 3D 3D 3B 3C 3F 3C 3A 3A 3A 3A 3A 3A 3A 3A3A 3C3C 3C 3F 4B4C 3D 3D 3D 3D 3D 4A TYP TYP4A 1B 3D 1B 1B 1B 7A 3B 1B 2B 3D 1B 1B 1B 1B 3A 3D 3E3E 3E 3C 3C 4B 3C 3F 5A 3C 3H 1B 1B 1B 3G 1B ROOM FIRE RISER TYP 9.0'12.0'6.0'3C 5.0'5.0' 4C 7D 6B 6B 6B 6B 6B 6B 6B 5A5A 3F5A 3F 3F 306.19'297.00' 297.00'306.19'(Bk.2015, Pg.20833) Existing 10' Public Utility Easement (Bk.2015, Pg.20833) And Water Main Easement Existing 30' Sanitary Sewer (Bk.2015, Pg.20833) Existing 15' Public Utility Easement 331.40' 331.40'306.19'(Bk.2015, Pg.20833) Flowage Easement Existing Surface Water (Bk.2017, Pg.8717) Existing 10' Electric Easement (Bk.2015, Pg.20833) Ingress/Egress Easement Existing 40' 150' HYDR ANT C OVE R AGE EXISTING 150 ' HYDRANT COVERAGE EXI STI NG 150' HYDRANT COVERAGE18 12 1310 SE BISHOP DRIVESE UNIVERSITY AVE. 11 11 2218 LOT 3 90,939 SF (6 ACCESSIBLE STALLS) 128 STALLS PROVIDED 9,540 SF RETAIL 6,000 SF RESTAURANT PATIO 13 FFE=1061.70 2.09 AC HHHHHSE BRICK DR.COOLER UNITT 8" PVC 8" PVC 8" PVCCOOLER UNIT2"GAS 2"GAS EXISTING 150 ' HYDRANT COVERAGE EXISTING 150' HYDRANT COVERAGE (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED LOT 2 FFE=1061.70 12 14 10 911 11 1110 99 11 9 2"GAS 2"GAS2"GAS 2"GAS 2"GAS2"GAS2"GAS2"GAS TRASH 101,474 SF (2.33 AC) 6 TENANT SPACES H H T 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP04_1170893_ULT.dgn3/6/20183:58:17 PMSnyder1:30V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJMFO BM1 BM2 CP2 CP3 CP4 24" RCP W F.E.S.=1050.30 F.L.=1055.64 6" CMP N F.L.=1052.91 15" RCP N F.L.=1052.41 24" RCP E F.L.=1052.26 30" RCP W Intake=1058.64 Rim=1059.41 F.L.=1056.45 6" CMP N F.L.=1054.42 12" RCP N F.L.=1054.37 24" RCP W Intake=1059.25 Rim=1059.97 12" RCP15" RCP15" RCP 18" RCP24" RCP 18" RCP 24" RCP 15" RCP15" PVC 15" PVC 15" PVC 12" PVC 12" P VC F.L.=1056.01 15" PVC E F.L.=1055.95 15" PVC W Intake=1060.93 F.L.=1055.09 15" PVC E F.L.=1054.99 15" RCP SW Intake=1060.89 F.L.=1054.73 15" RCP E Double Intake=1057.55 F.L.=1057.12 12" PVC NW Intake=1060.99 F.L.=1056.91 12" PVC W Bottom of Well=1056.01 Beehive Intake=1060.06 F.L.=1055.62 15" PVC E F.L.=1055.60 15" PVC W Intake=1059.87 F.L.=1054.42 18" RCP S F.L.=1054.39 24" RCP NE F.L.=1054.41 15" RCP W Double Intake=1057.31 Rim=1058.02 C ConcreteConcreteConcrete30" RCP 24" RCP Stockpile Dirt Pile Dirt Pile Dirt PileSE BRICK DR.10511052 10 5 3 105310541054105510551055 10 5 5 105510551056105610561057 105 7 1058 1058 10 5 8 105810581058105910591059 1059 10591059 1060106010601060106010601 0 6 0106010601060106010601060 10601060 1060 1060 1060 1060 1060 1060 10601060 1060106110611061106110611061 106110601061 1060 1061 1061106110 6 1 10621062106210621062 106210631063 106310 6 4 1064 1064 1064 1065 1065 1065 1066 Inv.=1055.62 Rim=1059.75 ST-1, Type SW-511 Inv.=1053.73 (Out S) Inv.=1053.83 (In NW) Inv.=1053.83 (In NE) T/C=1060.15 ST-4, Type SW-503 Inv.=1054.52 (Out SW) Inv.=1054.62 (In E) Rim=1059.65 ST-2, Type SW-511 Inv.=1054.57 (Out SE) T/C=1059.00 ST-3, Type SW-501 Inv.=1052.82 (Out SE) Inv.=1052.925 (In N) T/C=1058.50 ST-5, Type SW-503 to Construction) (Verify Prior Inv.=1052.25 Connect to Existing 101LF of 15"HDPE @ 1.0% 118LF of 15"HDPE @ 0.6% 69 LF of 12"HDP E @ 1.0 %91LF of 18"HDPE @ 0.9%97LF of 18" H DPE @ 0.6 %TP=1052.30(WAT) BP=1053.89(ST) TP=1052.25(WAT) BP=1053.81(ST) 0 SCALE (FEET) 30 UTILITY PLAN4 430'INV=1054.72(OUT S) INV=1054.82(IN N) RIM=1061.00 ST-5A, TYPE SW-401 INV=1052.99(OUT W) INV=1053.09(IN E) RIM=1059.50 W/ TYPE 6 CASTING ST-11, TYPE SW-511 INV=1054.75(OUT W) INV=1054.85(IN NE) INV=1054.85(IN E) RIM=1059.50 W/ TYPE 6 CASTING ST-10, TYPE SW-502 UTILITY PLAN CONSTRUCTION NOTES INV=1054.23(OUT SW) INV=1056.40(IN E,W) INV=1054.33(IN E) RIM=1061.00 ST-7A, TYPE SW-401 INV=1051.99 W/ FOOTING AND APRON GUARD ST-18A, 30'' FES INV=1052.15(OUT SW) INV=1052.25(IN E) T/C=1059.50 W/ TYPE R CASTING ST-18, TYPE SW-502 INV=1055.59(OUT W) INV=1055.69(IN E) RIM=1059.50 W/ TYPE 6 CASTING ST-9, TYPE SW-511 INV=1056.57(OUT W) RIM=1059.60 W/ TYPE 6 CASTING ST-1, TYPE SW-511 INV=1055.46(OUT W) INV=1055.56(IN E) RIM=1059.75 W/ TYPE 6 CASTING ST-4, TYPE SW-511 INV=1056.05(OUT W) INV=1056.15(IN E) INV=1056.19(IN S) RIM=1059.75 W/ TYPE 6 CASTING ST-3, TYPE SW-511 INV=1055.18(OUT S) INV=1055.28(IN E) T/C=1060.30 ST-5, TYPE SW-503 INV=1056.45 (OUT W) T/C=1060.00 ST-8, TYPE SW-501 17'X16' TRM 8'X12' FTM INV=1056.52(OUT N) GENERAL CONSTRUCTION NOTES TESTED AND DECHLORINATED. E. ALL WATERMAIN SHALL BE PRESSURE AND BACTERIA D. ALL SANITARY MANHOLES TO BE VACUUM TESTED. MANHOLES SHALL BE VACUUM TESTED. SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS C. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND DEPARTMENT. TIE-INS SHALL BE WITNESSED BY THE CITY OF WAUKEE ENGINEERING SPECIFICATION FOR PUBLIC IMPROVEMENTS AND ANY TESTING OR B. ALL UTILITIES SHALL BE TESTED TO THE CITY OF WAUKEE STANDARD CONNECTING TO ANY PUBLIC UTILITY. A. NOTIFY THE CITY OF WAUKEE AT LEAST 48 HRS PRIOR TO (TRANSITION MATS) OUTLET AND CHANNEL SCOUR PROTECTION SECTION VIEW SOIL COVER CULVERT OUTLET PROTECTION - PLAN VIEW (TYPICAL TRANSITION MAT APRON AT CULVERT OUTLET INTO CHANNEL) APPROPRIATE SOIL COVER EROSION WITH DOWNSTREAM SOILS FROM PROTECT BARE/DISTURBED SOIL COVER PROTECTION FOR DOWNSTREAM CALCULATOR TO COMPUTE USE NORMAL-DEPTH DIAMETER. HALF THE CULVERT UP TO A DEPTH AT LEAST AND BOTH SIDE SLOPES WIDTH OF CHANNEL (W) PROTECTION: BOTTOM RECOMMENDED WIDTH OF TRANSITION MATS TRANSITION MAT APRON LENGTH ANCHOR PATTERN OF FLOW DIRECTION EXTRA ANCHORS AS NEEDED FOR UNEVEN SOIL SURFACE. EXTRA ANCHORS AS NEEDED FOR LOOSE OR WET SOILS. USE A MINIMUM OF 8 ANCHORS PER MAT. ADJACENT MATS ABUT TOGETHER LATERALLY AND LONGITUDINALLY. TOP OF SCOURSTOP MATS SHOULD BE FLUSH WITH OR BELOW CULVERT. ABUT TRANSITION MATS TO END OF CULVERT OR CULVERT APRON. TRANSITION MAT WASHER LOCK RECESSED BULLET ANCHOR 36" ANCHOR STRAP ANCHOR ILLUSTRATION EXTRA ANCHORS AS NEEDED TO SECURE MAT TIGHTLY OVER SOIL COVER. MINIMUM DEPTH 24" IN LOOSE, SANDY OR WET SOIL. MINIMUM DEPTH 12" IN COMPACTED, COHESIVE SOIL. DRIVE ANCHOR INTO FIRM SOIL, PULL UP ON STRAP TO SET BULLET. NO SCALE FTM/TRM DETAIL LENGTH OF PROTECTION WIDTH OF PROTECTION4 1 1A 8" HDPE30" HDPE 12"PVC 12"PVC w/ Reducer 6"x6" Tee75 LF of 6"PVC @ 4.0%Inv.=1051.50 Inv.=1055.80 Inv.=1055.10 14,434SF RETAIL GAS METER FIRE RISER ROOM 180LF of 6"PVC @ 2.0%6"PVC @ 2.0%35 LF of Inv.=1055.00 7. TRANSFORMER LOCATION. COORDINATE WITH OWNER AND FRANCHISE UTILITY PROVIDER. 6. EXISTING ROOF DRAIN COLLECTOR LINE. VERIFY LOCATIONS, SIZE AND ELEVATION WITH MECHANICAL PLANS. 5. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18" MINIMUM SEPARATION. ACCORDINGLY. ARCHITECTURAL AND MECHANICAL PLANS FOR INTERIOR UTILITY ROUTING, METERS, DESIGN INFORMATION AND COORDINATE UTILITY CONNECTIONS 4. COORDINATE NATURAL GAS AND ELECTRICAL SERVICES AND METER LOCATION WITH UTILITY SERVICE PROVIDER PRIOR TO CONSTRUCTION. SEE H. ADJUST EXISTING FIRE HYDRANT TO GRADE. G. 2" VALVE F. 6" VALVE E. REMOTE FIRE DEPARTMENT CONNECTION. COORDINATE WITH MECHANICAL PLANS. D. CONNECT TO EXISTING. CONTRACTOR TO VERIFY LOCATION AND DEPTH PROIR TO CONSTRUCTION. C. BUILDING WATER SERVICE CONNECTION. VERIFY LOCATION AND DEPTH WITH MECHANICAL PLANS PRIOR TO CONSTRUCTION. B. 2" DOMESTIC WATER SERVICE A. 6" WATER SERVICE LINE. 3. WATER SERVICES, PROVIDE THE FOLLOWING: F. GREASE INTERCEPTOR WITH CHIMNEY SEALS AT GREASER INTERCEPTOR RISERS. SEE MECHANICAL PLANS FOR DETAILS. E. ADJUST SANITARY MANHOLE TO GRADE. D. CONNECT TO EXISTING 6" SANITARY SEWER. CONTRACTOR TO VERIFY LOCATION AND ELEVATION PRIOR TO CONSTRUCTION C. SANITARY SEWER CLEANOUT. B. CONNECT TO BUILDING SANITARY SERVICE. VERIFY LOCATION AND ELEVATION WITH MECHANICAL PLANS PRIOR TO CONSTRUCTION. A. 6" SANITARY SEWER SERVICE LINE @ MINIMUM 1.0% 2. SANITARY SEWER SERVICES; PROVIDE THE FOLLOWING: BE REMEDIED AT THE CONTRACTORS EXPENSE WITH WORK BEING PERFORMED TO THE UTILITY OWNER'S SPECIFICATION. A. PROTECT EXISTING UTILITES, ANY DAMAGE TO THE EXISTING UTILITIES THAT ARE NOT SCHEDULED FOR MODIFICATION OR DEMOLITION SHALL 1. EXISTING FEATURES, PROTECT THE FOLLOWING:@ 5.0%45LF of 6" PVC to Construction) (Verify Prior Inv.=1048.50 3C3B 3G 3F 3D 3A 1A 2C 2B 2C 2A 2D 4 4 4 4 1A 1A 1A 1A 4 4 6 4 2C 5 7 4 2A 3E 2B 5 5 3H 2F 18 12 1310 SE BISHOP DRIVESE UNIVERSITY AVE. 11 11 2218 LOT 3 90,939 SF (6 ACCESSIBLE STALLS) 128 STALLS PROVIDED 9,540 SF RETAIL 6,000 SF RESTAURANT PATIO 13 FFE=1061.70 2.09 AC HHHHHSE BRICK DR.COOLER UNIT8" PVC 8" PVC 8" PVCCOOLER UNIT2"GAS 2"GAS306.19'297.00' 297.00'306.19'(Bk.2015, Pg.20833) Existing 10' Public Utility Easement (Bk.2015, Pg.20833) And Water Main Easement Existing 30' Sanitary Sewer (Bk.2015, Pg.20833) Existing 15' Public Utility Easement 331.40' 331.40'306.19'(Bk.2015, Pg.20833) Flowage Easement Existing Surface Water (Bk.2017, Pg.8717) Existing 10' Electric Easement (Bk.2015, Pg.20833) Ingress/Egress Easement Existing 40' (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED LOT 2 FFE=1061.70 2"GAS 2"GAS2"GAS24"ST18"ST12" S T15"ST 12"ST 2"GAS 2"GAS2"GAS2"GAS2"GAS TRASH 101,474 SF (2.33 AC) 6 TENANT SPACES H H 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP05_1170893_GRA.dgn3/6/20183:58:18 PMSnyder1:30V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJM1061.501061.501061.501061.501061.501061.501061.501061.501061.501061.501061.501061.501060.70 1060.701061.70 1061.00G 1061.50T/C 1061.701061.501061.601061.25 1061.401061.25 1061.501061.501061.501061.501061.501061.501061.501061.501060.90 1061.40T/C 1060.90G 1061.40T/C 1060.701060.90G1061.40T/C1061.501061.601061.601061.601061.601061.50 1051.06 100 YEAR ELEV.=1055.59 105610571 0 5 8 1058.07 (1058.19) 1058.50 1058.50 (1058.58) 1058.75 1059.00 1059 10591059 1 0 5 9 10591059 1 0 5 9 1059.10 1059.10 1059.10 1059.251059.25 1059.25 1059.25 1059.40 1059.50 1059.501059.50 (1059.51) 1059.65 1059.65 1060.15T/C EXISTING MATCH 1059.70 1059.70 1059.70 1059.75 1059.75 1059.90 1059.901059.95 1060.45T/C 1060.00 1060.001060.00 HP 1060 1060 10601060 10 6 0 1060 10 6 0 10601060 1060.05 1060.55T/C 1060.09 1060.10 1060.10 1060.10 1060.10 1060.15 1060.15 1060.15 1060.15 1060.15 1060.65T/C 1060.17 1060.20 1060.20 1060.201060.20 1060.28 1060.301060.30 1060.35 1060.35 HP 1060.35 1060.35 HP 1060.35 1060.35 1060.35 1060.85T/C EXISTING MATCH1060.901061.40T/C 1060.40 1060.40 1060.401060.40 1060.49 1060.501060.50 1060.50 1060.50 1061.00T/C 1060.55 1060.55 1061.05T/C 1060.601060.60 1060.60 1061.10TC 1060.65 1061.15T/C (1060.69) 1060.701061.20T/C1060.701060.701060.70 1061.20T/C 1060.80 1061.30T/C 1060.80 1061.30T/C 1060.80 1061.30T/C 1060.80 1061.30T/C 1060.80 1060.90 1061.40T/C 1060.86 1060.901060.40T/C 1060.90 1061.40T/C1060.90 1060.40T/C 1060.94 1061.001061.00 1061 1061 1061 1 0 6 1 10 6 1 1 0 6 1 1061 1061 1061 1061.05G 1061.55T/C 1061.051061.051061.101061.151061.151061.151061.15 1061.25 1061.28 1061.36 1061.501061.65 1061.68 1061.70 FO BM1 BM2 CP2 CP3 CP4 24" RCP W F.E.S.=1050.30 F.L.=1055.64 6" CMP N F.L.=1052.91 15" RCP N F.L.=1052.41 24" RCP E F.L.=1052.26 30" RCP W Intake=1058.64 Rim=1059.41 F.L.=1056.45 6" CMP N F.L.=1054.42 12" RCP N F.L.=1054.37 24" RCP W Intake=1059.25 Rim=1059.97 12" RCP15" RCP15" RCP 18" RCP24" RCP 18" RCP 24" RCP 15" RCP15" PVC 15" PVC 15" PVC 12" PVC 12" P VC F.L.=1056.01 15" PVC E F.L.=1055.95 15" PVC W Intake=1060.93 F.L.=1055.09 15" PVC E F.L.=1054.99 15" RCP SW Intake=1060.89 F.L.=1054.73 15" RCP E Double Intake=1057.55 F.L.=1057.12 12" PVC NW Intake=1060.99 F.L.=1056.91 12" PVC W Bottom of Well=1056.01 Beehive Intake=1060.06 F.L.=1054.42 18" RCP S F.L.=1054.39 24" RCP NE F.L.=1054.41 15" RCP W Double Intake=1057.31 Rim=1058.02 C 30" RCP 24" RCP 10511052 10 5 3 105310541054105510551055 10 5 5 1055105610561057 1057 1058 1058 10 5 8 105810581058105910591059 1059 10591059 1060106010601060106010601060 106010601060106010601060 10601060 1060 1060 1060 1060 1060 1060 10601060 1060106110611061106110611061 106110601061 1060 1061 1061106110 6 1 1062106210621062 106210631063 106310 6 4 1064 1064 1064 1065 1065 1065 1066 0 SCALE (FEET) 30 GRADING PLAN5 530'GRADING PLAN GENERAL NOTESPOLLUTION PREVENTION NOTES THE CODE OF IOWA. REQUEST. FAILURE TO COMPLY WITH THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND ITEMS, SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED TO ANY JURISDICTIONAL AGENCIES UPON INTENT, PROOF OF PUBLICATIONS, DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER 2. ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT NOT LIMITED TO, THE NOTICE OF THE IDNR. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND POSSIBLY OBTAINING THE GENERAL PERMIT COVERAGE FROM FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. 2 INCLUDING CREATING OR MAINTAINING THE (EPA). THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH AND ASSOCIATED WITH CONSTRUCTION ACTIVITIES FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY 1. THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR STORM WATER DISCHARGES B. STORM WATER DISCHARGE PERMIT TO THE CONTRACTOR. PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE REASONABLE ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE NECESSARY STEPS CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING 2. DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER HARMLESS FROM ANY AND ALL DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR PERMIT, THE U.S. CLEAN WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY EROSION CONTROL REQUIREMENTS OF THE IOWA CODE, THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES 1. CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL POTENTIAL POLLUTION AND SOIL A. POLLUTION PREVENTION AND EROSION PROTECTION DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY. REPAIRING, REPLACEMENT, AND SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL d. MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING ORDER, INCLUDING CLEANING, DISTURBED BY CONSTRUCTION OPERATIONS AT ANY TIME. c. PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT TO A MINIMUM THE TOTAL AREA OPERATIONS. OR SEDIMENTATION BASINS DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING b. INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, DITCH CHECKS, DIVERSION BERMS, INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL COMPACTION. AND MAINTAIN NATURAL BUFFERS AROUND SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO a. UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN DISCHARGING FROM BASINS, PROVIDE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: 4. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE GENERAL PERMIT AND SWPPP, THE PROJECT SITE. 3. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT CONSTRUCTION PROGRESS AND CHANGES AT BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED. CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF 2. THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES (BMP) FOR COMPLIANCE WITH THE POLLUTION PREVENTION PLAN MADE DURING CONSTRUCTION. DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE 1. THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN ADDITION TO THESE PLAN C. POLLUTION PREVENTION PLAN: NOTICE OF DISCONTINUATION. COPY AND PROVIDE THE ORIGINAL DOCUMENTS TO THE OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE BE RETAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A RECORD REMOVAL OF ALL TEMPORARY EROSION CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST 3. A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL STABILIZATION OF THE DISTURBED SITE AND CONSTRUCTION ACTIVITIES. FROM STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY F. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES. E. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE SECTION. STRUCTURE TO CENTER OF STRUCTURE AND INCLUDE FLARED END D. ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF NOTED. GRADES AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE C. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED RELOCATIONS WITH UTILITY PROVIDER. CONTRACTOR'S EXPENSE. COORDINATE ANY UTILITY CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED AT THE AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. LOCATION INDICATED. DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY A. UTILITY WARNING: OVERFLOW OVERFLOW OVERFLOWOVERFLOW OVERFLOW OVERFLOWOVERFLOW2.2%2.2%2.0% 2.8%8.1%2.0%4.4%2.0% MIN 2.0%1060.35 DISCONTINUATION". k. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO FILING OF THE "NOTICE OF MUST BE CONTAINED ONSITE. BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE FOLLOWING: JOB TRAILERS, j. COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE SWPPP. IMMEDIATELY IF NO WORK IS PLANNED WITHIN THE NEXT 14 DAYS FOR AN AREA. i. STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT SEED MIX, OR SOD BUILDINGS OR OTHER IMPROVEMENTS ARE LOCATED TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. h. RESPREAD TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, SEWERS ARE INSTALLED. ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS STORM OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO g. INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL MATS, MULCH, DITCH CHECKS ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR FUTURE PREVENTION. PROPERTIES, INCLUDING STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY f. PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 7 DAYS. THE SWPPP WITH A COPY SUBMITTED WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION. REVISE THE EVERY SEVEN CALENDAR DAYS. RECORD THE FINDINGS OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN e. INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL ASSIGNED BY THE CONTRACTOR) OVERFLOW100 YR=1058.28 100 YR=1060.08 100 YR=1059.97 100 YR=1060.05 100 YR=1058.77 100 YR=1059.75 100 YR=1059.69 100 YR=1059.67 18 12 1310 SE BISHOP DRIVESE UNIVERSITY AVE. 11 11 2218 LOT 3 90,939 SF (6 ACCESSIBLE STALLS) 128 STALLS PROVIDED 9,540 SF RETAIL 6,000 SF RESTAURANT PATIO 13 30" ST 24" ST 12"ST 12"ST18" ST18" ST18" ST 12" ST 15" ST18" ST 12" ST 8" STFFE=1061.70 2.09 AC HHHHHSE BRICK DR.COOLER UNIT24" ST 18 "S T 8" PVC 8" PVC 8" PVCCOOLER UNIT2"GAS 2"GAS (Bk.2015, Pg.20833) Existing 10' Public Utility Easement (Bk.2015, Pg.20833) And Water Main Easement Existing 30' Sanitary Sewer (Bk.2015, Pg.20833) Existing 15' Public Utility Easement (Bk.2015, Pg.20833) Flowage Easement Existing Surface Water (Bk.2017, Pg.8717) Existing 10' Electric Easement (Bk.2015, Pg.20833) Ingress/Egress Easement Existing 40' (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED LOT 2 FFE=1061.70 12 14 10 911 11 1110 99 11 9 2"GAS 2"GAS2"GAS24"ST18"ST12" S T15"ST 12"ST 2"GAS 2"GAS2"GAS2"GAS2"GAS TRASH 101,474 SF (2.33 AC) 6 TENANT SPACES H H 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP06_1170893_ERO.dgn3/6/20183:58:19 PMSnyder1:30V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJMFO BM1 BM2 CP2 CP3 CP4 24" RCP W F.E.S.=1050.30 F.L.=1055.64 6" CMP N F.L.=1052.91 15" RCP N F.L.=1052.41 24" RCP E F.L.=1052.26 30" RCP W Intake=1058.64 Rim=1059.41 F.L.=1056.45 6" CMP N F.L.=1054.42 12" RCP N F.L.=1054.37 24" RCP W Intake=1059.25 Rim=1059.97 12" RCP15" RCP15" RCP 18" RCP24" RCP 18" RCP 24" RCP 15" RCP15" PVC 15" PVC 15" PVC 12" PVC 12" P VC F.L.=1056.01 15" PVC E F.L.=1055.95 15" PVC W Intake=1060.93 F.L.=1055.09 15" PVC E F.L.=1054.99 15" RCP SW Intake=1060.89 F.L.=1054.73 15" RCP E Double Intake=1057.55 F.L.=1057.12 12" PVC NW Intake=1060.99 F.L.=1056.91 12" PVC W Bottom of Well=1056.01 Beehive Intake=1060.06 F.L.=1055.62 15" PVC E F.L.=1055.60 15" PVC W Intake=1059.87 F.L.=1054.42 18" RCP S F.L.=1054.39 24" RCP NE F.L.=1054.41 15" RCP W Double Intake=1057.31 Rim=1058.02 C 30" RCP 24" RCP 10511052 10 5 3 105310541054105510551055 1 0 5 5 105510551056105610561057 10 57 1058 1058 10 5 8 105810581058105910591059 1059 10591059 1060106010601060106010601060106010601060106010601060 10601060 1060 1060 1060 1060 1060 1060 10601060 1060106110611061106110611061 106110601061 1060 1061 1061106110 6 1 10621062106210621062 106210631063 106310 6 4 1064 1064 1064 1065 1065 1065 1066105610571 0 5 8 1059 10591059 1 0 5 9 10591059 1 0 5 9 1060 1060 10601060 10 6 0 1060 10 6 0 10601060 1061 1061 1061 1 0 6 1 10 6 1 1 0 6 1 1061 1061 1061 0 SCALE (FEET) 30 6 630'EROSION AND SEDIMENT CONTROL PLANSTORMWATER MANAGEMENT QUANTITIES ATTACHMENT TO POST Fabric Post cable ties Wire or 5 TYPICAL SILT FENCE DITCH CHECK F oresl o p eVariable (20' for a normal 10' wide ditch.) (5'-0" max.) Post spacing (5'-0" max.) Post spacing 4 5 1 3 Backslope 902 904 906 908 910 TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES individual section of silt fence Install "J-hook" at each end of an ground contour Install parallel to (Plan View) (600' if slope is flatter than 5%) 200' max. length per section documents or as directed by the Jurisdictional Engineer. Section 9040, 3.07 and at locations shown in the contract Install silt fence according to the requirements of GENERAL NOTES: 1 2 3 4 5 Insert 12 in. of fabric a minimum of 6 in. deep (fabric may be folded below the ground line) Compact ground by driving along each side of the silt fence as required to sufficiently secure the fabric in the trench to prevent pullout and flow under the fence. In ditches, extend silt fence up side slope so the bottom elevation at the end of the fence is a minimum of 2 in. higher than the top of the fence in the low point of the ditch. Steel posts to be embedded 20 in. unless otherwise allowed by the Jurisdictional Engineer. Secure top of engineering fabric to steel posts using wire or plastic ties (50 lb. min.). See details of "Attachment to Posts." TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES Ground line Fabric Flow 4'-0" minimum 'T' steel fence post (Profile View) 4 1 1 2 See plans for spacing NO SCALE SILT FENCE DETAIL Ground line Fabric 1 5 4 or as required to adequately support fence Reduce post spacing to 5'-0" at water concentration areas, 8'-0"spacing 24"DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES36"6 1 WITH PROPERTY OWNER) LOCATION (COORDINATE SIZE AND LOCATION APPROXIMATE TOPSOIL (COORDINATE WITH PROPERTY OWNER) STAGING AREA ENTRANCE CONSTRUCTION STABILIZED DISTURBANCE LIMITS 2.50 ACDISTURBED AREA 117 SQSODDING 2.50 ACTYPE 1 SEEDING, FERTILIZING & MULCHING 9 EASEDIMENT BASKETS 977 LFSILT FENCE BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT 11'x17' TRM 8'x12' FTM 100YR PONDING EL=1055.59 DETENTION BASIN BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT SILT FENCE BASKET SEDIMENT Q=28.67 CFS TO SUGAR CREEK EXISTING DETENTION BASIN DISCHARGE LOCATION TO ENGINEER) (FIELD VERIFY W/ WASHOUT CONCRETE APPROXIMATE SILT FENCE SILT FENCE 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP07_1170893_DTL.dgn3/6/20183:58:20 PMSnyder1:10V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJM11 (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED LOT 2 FFE=1061.70 12 14 10 911 11 1110 99 11 9 TRASH 101,474 SF (2.33 AC) 6 TENANT SPACES SIDEWALK RAMP DETAILS7 710'7 1 SCALE: 1"=10' SIDEWALK RAMP AREA 1 DETAIL 7 2 SCALE: 1"=10' SIDEWALK RAMP AREA 2 DETAIL 7 3 SCALE: 1"=10' SIDEWALK RAMP AREA 3 DETAIL 7 4 SCALE: 1"=10' SIDEWALK RAMP AREA 4 DETAIL 1060.80 1061.30 0.0% 1060.80 6.7%7.1%1061.30 1061.40 1061.40 1061.50 1061.36 1061.45 1060.74 1060.80 0.0% 0.0% 1.0%7.5% 7.5%1.0%1.7%1.5%1.0%1.0% 1060.35 1060.30 1060.70 1060.80 1060.80 1060.80 1060.80 1060.90 1060.90 1060.35 1060.30 1.7% 1.7% 1.7% 1.7% 1.0%5.6%6.3%1.7%1.7%1.7%1.7%6.3%5.6%1.0%1.2%0.5%1.8%2.0%0.5% 1060.601060.60 1061.101061.10 1061.20 1061.20 6.0% 0.0% 0.0%6.3%6.3%1.7%1.7%1061.55 1061.65 1061.60 1061.60 1061.70 1061.70 1061.05 1061.15 1061.60 1061.701061.70 1061.60 1061.15 1061.05 1061.15 4.1% 4.1%1.7%6.0%6.0%2.0%2.0%1.7%6.0%6.0%2.0%2.0%1.7%1.7%5.6% 5.6% 1059.651059.60 1059.751059.70 1059.20 1059.101059.10 1059.20 1059.601059.65 1059.75 1059.70 2.0%2.0%2.0%2.0%2.0%1.0% 1.0% 6.3% 6.3% 6.3% 6.3% 1.0% 1.0% 1.0% 1.0%2.0%1061.50 1061.50 1061.00 1061.00 1061.50 1061.50 1061.401061.401060.901060.901061.401061.40 1.7%1.7%1.7%1.7%1.7%1.7%0.0% 0.0% 7.9% 7.9% 0.0% 0.0% 0.0% 0.0% 6.3% 6.3% 7 5 SCALE: 1"=40' SITE MAP DETAIL RAMP AREA 1 RAMP AREA 2 RAMP AREA 3 RAMP AREA 42.0%1.0% 1.0%1.0%1061.45 1061.30 1061.361.0%1.0% 1061.40 1.6% 1061.601061.60 1.7%1.3%1.0%1061.15 1061.05 1061.15 1061.70 1061.40 1061.50 1061.500.0%0.0%1.7%0.0% 1061.50 1061.40 1.7%0.0%1.7%0.0%1061.55 1061.65 1.7%0.0%1.7%0.0% 105610571 0 5 8 1059 10591059 1 0 5 9 10591059 1 0 5 9 1060 1060 10601060 1 0 6 0 1060 10 6 0 10601060 1061 1061 1061 1 0 6 1 10 6 1 1 0 6 1 1061 1061 1061 10511052 10 5 3 105310541054105510551055 10 5 5 105510551056105610561057 1057 1058 1058 10 5 8 105810581058105910591059 1059 10591059 106010601060106010601060106 0106010601060106010601060 10601060 1060 1060 1060 1060 1060 1060 10601060 1060106110611061106110611061 106110601061 1060 1061 1061106110 6 1 10621062106210621062 106210631063 106310 6 4 1064 1064 1064 1065 1065 1065 1066 FO BM1 BM2 CP3 CP4 24" RCP W F.E.S.=1050.30 F.L.=1055.64 6" CMP N F.L.=1052.91 15" RCP N F.L.=1052.41 24" RCP E F.L.=1052.26 30" RCP W Intake=1058.64 Rim=1059.41 F.L.=1056.45 6" CMP N F.L.=1054.42 12" RCP N F.L.=1054.37 24" RCP W Intake=1059.25 Rim=1059.97 12" RCP15" RCP15" RCP 18" RCP24" RCP 18" RCP 24" RCP 15" RCP15" PVC 15" PVC 15" PVC 12" PVC 12" P VC F.L.=1056.01 15" PVC E F.L.=1055.95 15" PVC W Intake=1060.93 F.L.=1055.09 15" PVC E F.L.=1054.99 15" RCP SW Intake=1060.89 F.L.=1054.73 15" RCP E Double Intake=1057.55 F.L.=1057.12 12" PVC NW Intake=1060.99 F.L.=1056.91 12" PVC W Bottom of Well=1056.01 Beehive Intake=1060.06 F.L.=1055.62 15" PVC E F.L.=1055.60 15" PVC W Intake=1059.87 F.L.=1054.42 18" RCP S F.L.=1054.39 24" RCP NE F.L.=1054.41 15" RCP W Double Intake=1057.31 Rim=1058.02 C 30" RCP 24" RCP (Bk.2015, Pg.20833) Existing 10' Public Utility Easement (Bk.2015, Pg.20833) And Water Main Easement Existing 30' Sanitary Sewer (Bk.2015, Pg.20833) Existing 15' Public Utility Easement (Bk.2015, Pg.20833) Flowage Easement Existing Surface Water (Bk.2017, Pg.8717) Existing 10' Electric Easement (Bk.2015, Pg.20833) Ingress/Egress Easement Existing 40' 12 14 10 911 11 1110 99 11 9 2"GAS 2"GAS2"GAS 2"GAS 2"GAS2"GAS2"GAS2"GAS TRASH H H T 18 12 1310 SE BISHOP DRIVESE UNIVERSITY AVE. 11 11 2218 LOT 3 90,939 SF (6 ACCESSIBLE STALLS) 128 STALLS PROVIDED 9,540 SF RETAIL 6,000 SF RESTAURANT PATIO 13 FFE=1061.70 2.09 AC HHHHH COOLER UNITT COOLER UNIT2"GAS 2"GAS 1"= 117.0893KMMEDCTLS10/10/17117.089388WAUKEE, IOWACOVE AT KETTLESTONE LOT 2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= kmarshV:\Projects\2017\117.0893.01\CADD\SP08_1170893_LND.dgn3/6/20183:58:22 PMSnyder1:30V:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Pen_Tables\date.tblV:\RefLibrary\CADDStandards\WorkSpace\Standards\Printing\Print_Drivers\Black_Gray\V8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.KSS1REVISED PER COMMENTS11/07/1722/20/18KSSREVISED PER NEW BUILDING LAYOUTAS PER CITY COMMENTS33/06/18LJMLANDSCAPE PLAN0 SCALE (FEET) 30 8 830'PLANTING PLAN GENERAL NOTES LANDSCAPE REQUIREMENTS AND CALCULATIONS BOTANICAL NAMEKEY SHRUBSSIZE COMMENTS B&B AG AUTUMN BRILLANCE SERVICEBERRYAmelanchier x grandiflora 'Autumn Brilliance' B&B B&B PLANT SCHEDULE CONT. (6' O.C.)36" Ht. COMMON NAME Malus 'Spring Snow'SPRING SNOW CRABAPPLETREES 18" Ht. 24" Ht. AT 8' HT. GB TREESUNDERSTORYPhysocarpus opulifolius 'Donna May'LITTLE DEVIL NINEBARK VD SB BLUES FESTIVAL ST. JOHN'S WORT Taxus x media 'Taunton'TAUNTON YEW Spiraea betulifolia 'Tor'TOR BIRCHLEAF SPIREA Acer tataricum 'Hot Wings' GT Gleditisia triacanthos var. inermis 'Skyline'B&B MA UL SKYLINE HONEYLOCUST PRINCETON SENTRY GINKGOGinkgo biloba 'Princeton Sentry' HOT WINGS TATARIAN MAPLE 1 1/2" MS 1 1/2" 1 1/2" 1 1/2" 8' HT. Viburnum dentatum 'Rastzam'RASPBERRY TART VIBURNUM CONT. (4' O.C.) CONT. (3' O.C.) CONT. (3' O.C.) HK PO Hypericum kalmianum 'Blues Festival' 24" Ht. 18" Ht. CONT. (3' O.C.) 18" Ht. CA 24" Ht.CONT. (3' O.C.)& GRASSESPERENNIALS HE Calamagrostis x acutiflora 'Karl Foerster' Hemerocallis 'Royal Occasion' KARL FOERSTER FEATHER REED GRASS ROYAL OCCASION DAYLILY CONT. (2' O.C.) AR 18" Ht.CONT. (4' O.C.)Aronia melanocarpa 'Morton'IROQUOIS BEAUTY BLACK CHOKEBERRY FG 18" Ht.CONT. (3' O.C.)Fothergilla gardenii DWARF FOTHERGILLA B&B B&B B&B TT B&B8' HT.JV Juniperus virginiana 'Skyrocket'SKYROCKET JUNIPER (5 TREES COUNTED TOWARDS OFF STREET PARKING REQUIREMENTS) STREET TREES MAY BE COUNTED TOWARDS OFF STREET PARKING REQUIREMENTS. 331 LF/40 LF = 8.28 STREET TREES REQUIRED (9 STREET TREES PROVIDED) 1 OVERSTORY TREE PER 40 LF OF FRONTAGE STREET TREE REQUIREMENT: THERE ARE NO BUFFER REQUIREMENTS. BUFFER REQUIREMENT: (5 TREES PROVIDED) PARKING LOT ISLANDS SHALL HAVE A MINIMUM OF 1 OVERSTORY TREE. OFF-STREET PARKING AREAS: FOUNDATION PLANTINGS ARE REQUIRED AT THE BASE OF ALL BUILDINGS FOUNDATION PLANTINGS: 30.44 REQUIRED (32 SHRUBS PROVIDED)2 SHRUBS x 15.221 PU'S = (8 UNDERSTORY TREES PROVIDED) 0.5 UNDERSTORY TREE x 15.221 PU'S = 7.61 REQUIRED REQUIRED (15 OVERSTORY TREES PROVIDED)1 OVERSTORY TREE x 15.221 PU'S = 15.22 15,221/1,000 = 15.221 PLANT UNITS (PU'S) 24 TREES REQUIRED X 25% = 6 EVERGREEN TREES REQUIRED (9 PROVIDED) MINIMUM OF 25% OF TOTAL REQUIRED TREES SHALL BE EVERGREEN. REQUIRED OPEN SPACE. 1.0 OVERSTORY TREES, 0.5 UNDERSTORY TREES, AND 2.0 SHRUBS PER 1,000 SF OF 101,475 SF (TOTAL LOT) x 15% = 15,221.25 SF REQUIRED (30,383 SF PROVIDED - 29.94%) 15% OPEN SPACE REQUIRED AND THE KETTLESTONE DESIGN GUIDELINES PUD) (LANDSCAPE CALCULATIONS BASED UPON CITY OF WAUKEE ZONING CODE REQUIREMENTS SN 18" Ht.CONT. (2' O.C.)Salvia nemorosa 'Caradonna'CARADONNA SALVIA JH BLUE FOREST JUNIPER CONT. 3" Ht.Juniperus horizontalis 'Blue Prince' (PP10,134) Ulmus x 'Patriot'PATRIOT ELM CO PRAIRIE PRIDE HACKBERRY 1 1/2" B&BCeltis occidentalis 'Prairie Pride' (6 ACCESSIBLE STALLS) 126 STALLS PROVIDED 8 TENANT SPACES FFE=1061.70 101,474 SF (2.33 AC) LOT 2 Malus 'Pink Spires'PINK SPIRES CRABAPPLE 12' HT. MC Malus 'Coralburst'CORALBURST CRABAPPLE 8' HT.B&B 12' Ht.B&BGDGymnocladus dioicus 'Espresso'ESPRESSO KENTUCKY COFFEETREE H. TREES INDICATED ALONG SE BISHOP DRIVE SHALL BE INSTALLED WITH THIS PROJECT. DEPARTMENT. G. PLANTING SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY THE WAUKEE DEVELOPMENT SERVICES INFORMATION. F. SOD ALL DISTURBED AREAS UNLESS NOTED OTHERWISE. REFER TO EROSION CONTROL PLAN FOR ADDITIONAL AND IN ALL AREAS INDICATED ON PLAN. E. PROVIDE 3-INCH DEPTH SHREDDED HARDWOOD MULCH AROUND ALL PLANTINGS TO A MIN. 3-FOOT PERIMETER, INSTALLATION. D. CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). C. ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN STANDARDS CONSTRUCTION. CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY COMPANIES DURING SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S CARELESSNESS SHALL BE DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES AND B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR SHOWN ARE IN THE EXACT LOCATION INDICATED. AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. A. UTILITY WARNING: 8-HK 3-VD 2-JV3-VD3-JV 1-JV 5-HK 5-HK 5-HK 5-HK 11-HK 1-GB 16-HK 14-PO14-PO16-HK 14-PO14-PO14-HK14-HK 22-CA 40-HE 2-MC 1-MA1-MA1-MA 4-TT 2-TT 3-TT 2-TT 7-FG 8-SB 8-SB 1-GB 1-GB 1-UL 1-UL 1-UL 1-UL 1-UL 11-PO 11-PO 11-HK 3-CO 1-GT 4-GT 1-AT 1-AT 1-AT 1-AT 1-MS 1-MS 1-MS 1-MS 1-MS 4-JH 24-SN 2-JV 3-VD 8-FG 2-TT 1-MA 7-SB 2-MC 1-AG 1-GT 2-AG 3-GD 4-GD 5-VD Level 1 0' - 0" T.O. PARAPET 20' - 0" Level 3 3' - 7 7/8" 1234567 T.O. ROOF 15' - 0" FCB-2 FCB-1 BR-1 FCB-2 BR-1 FCB-3 Level 1 0' - 0" T.O. PARAPET 20' - 0" Level 3 3' - 7 7/8" F G H J KEDCBA T.O. ROOF 15' - 0"FCB-1 FCB-2 FCB-1 FCB-1 FCB-2 WALL BEHIND FCB-1 FCB-2 FCB-1 FCB-2 BR-1 BR-1 BR-1 BR-1 BR-1 BR-1 GV-1 FCB-3 Level 1 0' - 0" T.O. PARAPET 20' - 0" Level 3 3' - 7 7/8" 1 2 3 4 5 6 7 T.O. ROOF 15' - 0" FCB-2 FCB-1 BR-1 BR-1 BR-1 BR-1 Level 1 0' - 0" T.O. PARAPET 20' - 0" Level 3 3' - 7 7/8" FGHJK E D C B A T.O. ROOF 15' - 0" FCB-2 FCB-1 FCB-1 BR-1 BR-1 BR-1 EXTERIOR MATERIAL SCHEDULE BR-1 FULL WYTHE BRICK VENEER SIOUX CITY BRICK N/A NORMAN EVONITE (SMOOTH) FCB-1 FIBER CEMENT BOARD (CEDAR)NICHIHA FIBER CEMET VINTAGE WOOD AWP 3030 (18" x 120")CEDAR FCB-2 FIBER CEMENT BOARD (BARK)NICHIHA FIBER CEMET VINTAGE WOOD AWP 3030 (18" x 120")BARK GV-1 GALVANIZED STEEL TUBING TBD N/A SEE DETAILS GALVANIZED KEY DISCRIPTION MANUFACTURER STYLE SIZE COLOR www.buildbyarchitects.com Scale Project number Date Drawn by Checked by [design] by architects, P.L.C. Andrew Dasso, AIA 318 E. Third Street Davenport, IA 52801 309-737-8587 andrew@buildbyarchitects.com Zach Enderle, AIA 309 S. Main Street, Suite 2 Rockford IL 61101 (815)-904-6666 zach@buildbyarchitects.com NOT FOR CONSTRUCTION As indicated 12/27/2017 12:36:11 PMA200 EXTERIOR ELEVATIONS 17-083 WAUKEE, IA ROEMER RETAIL 2 11-29-17 Author Checker No. Description Date 1/8" = 1'-0"1 East 1/8" = 1'-0"2 North 1/8" = 1'-0"3 West 1/8" = 1'-0"4 South CORRUGATED METAL PANEL TO MATCH FIBER CEMENT PANEL 8' - 8"40' - 0"ScaleProject numberDateDrawn byChecked by 1/8" = 1'-0"2/20/2018 2:20:55 PMA303Unnamed17-083ROEMER RETAIL 2WAUKEE, IA11-29-17AuthorChecker 1/8" = 1'-0"1 TRASH ENCLOSURE