CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: July 2, 2018
AGENDA ITEM: Consideration of approval of a site plan for Waukee High School No. 2
[655 NW 10th Street]
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: The site plan for Waukee High School No. 2
identifies an approximately 390,000 square foot building. Portions of the
building will be constructed as three story with the remainder of the
building being constructed as a two story. The site plan identifies
approximately 1,600 parking stalls on site. In addition, there will be
some opportunities for shared parking on the City property upon
completion of the sports complex/park.
Access to the site will be provided off of NW 10th Street as well as NW
Sunrise Drive. Both water and sanitary sewer are currently being
constructed adjacent to the property to serve the proposed site.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission approved the proposed Preliminary Plat at their
meeting on June 26, 2018:
Approval of a Preliminary Plat for Waukee Second High School
Approval of a Site Plan for Waukee Second High School [655 NW 10th Street]
*these items are directly related and will be presented together, but given separate voting
motions*
Senior Planner Andy Kass, introduced the request, made by the applicant Waukee CSD, for
approval of a preliminary plat and site plan for the development of a second high school and
future City Sports complex. The subject property is generally located north of Hickman on the
east side of 10th street. For the sake of this discussion the preliminary plat will be dealing with the
entire property, but the site plan is specific to the High school grounds which is approximately the
75 acres on the south portion of the property.
Mr. Kass advised that the proposed High school building is set to be 300,000 square feet in size
with parking to the west, south and east with future parking on the north side of the property with
the development of the City grounds. The school is set to have a track and stadium, baseball and
J9
softball fields, tennis courts, soccer fields, and two restroom/ concession stand buildings to
service the fields.
Mr. Kass explained that the access to the property would be off of 10th street, NE Sunrise Drive,
an extension of 4th street to the east, and the future extension of NE Douglas Parkway to the
north. Infrastructure and road widening will be based on development and all utilities will be
extended to the property and the ponds will be owned and maintained by the City of Waukee.
Commissioner Broderick questioned if there would be volleyball courts, and if any
thought had been given to eventual sustainable development and repurposing of the
parking lots in the future. Mr. Deets advised that there were no volley ball courts
indicated in this project. Mr. Deets also advised that sustainable development is
something that the City is working with, but that it was also necessary to plan for current
issues, such as parking, before planning for the event that it is no longer needed.
Commissioner Martin questioned how much bigger this school would be from the current
high school. Eric Rose, a representative of the Applicant, advised that it would be about
50,000 square feet larger than the current high school.
Commissioner Hoifeldt questioned about the 10th street improvements. Mr. Deets advised
that 10th street will be widened to 4 lanes between ne Sunrise and NE Douglas, and
improvements to the intersection will be made to accommodate for the heightened traffic.
There is a possible extension of 6th street to provide a secondary access in the short term
as well. NE Sunrise drive will be 3 lanes and will have 2 round-abouts. It allows for
better circulation of school traffic and comes after a lot of discussions. Johnston reports
that it has had great improvements to traffic after the installation of round-abouts at the
location of their new high school.
Commissioner Broderick questioned what the pedestal access up 10th and 6th street would
be. Mr. Deets advised that it would be with development, but not along the farms. Under
passes for the internal trail systems will be under N. 10th street and NE Douglas parkway.
Commissioner Streit verified that lower speeds would be placed on 10th street. Mr. Kass
advised that was more than likely going to be the case with a school zone.
Commissioner Hoifeldt voiced a concern regarding walking traffic and not having the
connections available from the city south of Hickman safely to the school. Mr. Deets
advised that sidewalks may have to be installed, they just weren’t planned at the time
being. It depends on the boundaries the school chooses.
Commissioner Hoifeldt also verified that the education center was 3 stories tall. Mr. Rose
advised that was correct, kind of like a walk out as the grading would be pushing water to
the ponds on the north portion of the property. Accessibility interior of the school would
be through stairs and elevators.
Commissioner Broderick moved to approve the Preliminary Plat for Waukee Second High
School. The motion was seconded by commissioner Hoifeldt. Ayes: Ward, Sandie, Streit, Tietz,
Broderick, Hoifeldt, and Martin. Nays: None. Motion Carries.
Commissioner Broderick moved to approve the Site Plan for Waukee Second High School [655
NW 10th street]. The motion was seconded by commissioner Sandie. Ayes: Ward, Sandie, Streit,
Tietz, Broderick, Hoifeldt, and Martin. Nays: None. Motion Carries.
STAFF REVIEW AND COMMENT: At this time all staff comments related to the site plan
for the second High School have been addressed.
RECOMMENDATION: Staff would recommend approval of the resolution.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report (see preliminary plat information)
III. Preliminary Plat/Site Plan (see preliminary plat information)
IV. Proposed Building Elevations
PREPARED BY: Brad Deets, Development Services Director
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 18-
APPROVING WAUKEE HIGH SCHOOL NO. 2 SITE PLAN
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended
approval of a Site Plan for Waukee High School No. 2 on June 26, 2018, subject to remaining
staff comments; AND,
WHEREAS, the Site Plan for Waukee High School No. 2 is in general conformance with
section §304 – Site and Building Development Standards Ordinance of the Waukee Municipal
Code.
WHEREAS, the Site Plan for Waukee High School No. 2 is in general conformance with
§301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code.
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this the 2nd day of July, 2018, that the Site Plan for Waukee High School No. 2 be approved
subject to remaining staff comments.
____________________________
William F. Peard, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Courtney Clarke
Shelly Hughes
Larry R. Lyon
TRANSLUCENT GLASS PANELS
ALUMINUM CURTAINWALL FRAMING
FACE BRICK COLOR B
CONCRETE RETAINING WALL
FACE BRICK COLOR A
FACE BRICK COLOR B
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-
E GLASS - TYPICAL
PREFINISHED METAL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
PREFINISHED METAL PANELS
DARK FINISHED PRECAST WALL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-
E GLASS - TYPICAL
TRANSLUCENT GLASS PANELS
TRANSLUCENT GLASS PANELS
CONCRETE RETAINING WALL
FACE BRICK COLOR B
EL: 0"
MAIN LEVEL
+ 24' 0"
+ 34' 0"
T.O. MASONRY
+ 68' 4"
FACE BRICK COLOR B
ALUMINUM CURTAINWALL FRAMING W/
TINTED LOW-E GLASS - TYPICAL
PREFINISHED METAL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
FACE BRICK COLOR B
ALUMINUM CURTAINWALL FRAMING
W/ TINTED LOW-E GLASS - TYPICAL
FACE BRICK COLOR A
FACE BRICK COLOR B
PREFINISHED METAL PANELS
DARK FINISHED PRECAST WALL PANELS
FACE BRICK COLOR B
PREFINISHED METAL
HORIZONTAL WALL PANELS
- 14' 0"
LOWER LEVEL
+ 31' 0"
FACE BRICK COLOR B
PREFINISHED METAL HORIZONTAL
WALL PANELS
TRANSLUCENT GLASS PANELS
FACE BRICK COLOR A
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-E
GLASS -TYPICAL
FACE BRICK COLOR A
DARK FINISHED PRECAST WALL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
ALUMINUM SUN CONTROL LOUVER
FACE BRICK COLOR B
PREFINISHED METAL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
SCHOOL SIGN - NAME T.B.D.
FACE BRICK COLOR A
FACE BRICK COLOR B
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-E
GLASS -TYPICAL
TRANSLUCENT
GLASS PANELS
+ 20' 4"
0' 0"
MAIN LEVEL
+ 26' 10"+ 28' 4"
0' 0"
MAIN LEVEL
+ 68' 4"
WOOD PATTERNED ALUMINUM
WALL PANELS
PREFINISHED METAL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
VERTICAL ALUMINUM SUN
CONTROL BLADES
FACE BRICK COLOR B
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-E
GLASS -TYPICAL
PREFINISHED METAL PANELS
DARK FINISHED PRECAST
WALL PANELS
WOOD PATTERNED ALUMINUM
WALL PANELS
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-E
GLASS -TYPICAL
PREFINISHED METAL PANELS
PREFINISHED METAL HORIZONTAL
WALL PANELS
TRANSLUCENT GLASS PANELS
FACE BRICK COLOR A
FACE BRICK COLOR B
+ 20' 4"
0' 0"
MAIN LEVEL
+ 29' 8"
+ 35' 8"
+ 68' 4"COPYRIGHT 2015 FREVERT-RAMSEY-KOBES ARCHITECTS-ENGINEERS P.C. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED FROM WITHOUT THE EXPRESS WRITTEN PERMISSION OF FREVERT-RAMSEY-KOBES ARCHITECTS-ENGINEERS P.C. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY THE COPYRIGHT LAWPRELIMINARYNOT TO BE USEDFOR CONSTRUCTIONPROJECT NO.:
DATE:
REVISIONS:
DRAWING TITLE:
DRAWING NO.:2600 westown parkway, suite 340, west des moines, iowa 50266p 515.223.5100f 515.223.7226www.frk-ae.comarchitects + engineers4/17/2018 4:56:48 PM1018R
COLORED
EXTERIOR
ELEVATIONS
1
APRIL 2018WAUKEE SECOND HIGH SCHOOLWAUKEE COMMUNITY SCHOOL DISTRICTPROPOSED NEWWAUKEE, IOWA 1" = 20'-0"1
1 NORTH ELEVATION
1" = 20'-0"1
2 EAST ELEVATION
1" = 20'-0"1
3 SOUTH ELEVATION
1" = 20'-0"1
4 WEST ELEVATION
WOOD PATTERNED
ALUMINUM
WALL PANELS
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-
E GLASS -TYPICAL
PREFINISHED
METAL PANELS
PREFINISHED
METAL HORIZONTAL
WALL PANELS
FACE BRICK
COLOR A
FACE BRICK COLOR B
OVERHEAD COILING
DOORS
HOLLOW METAL
DOOR & FRAME
BUILDING SIGNAGE
EL: 0'-0"
FLOOR LEVEL
EL: +16'-0"
T.O. MASONRY
STEEL COLUMN
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-
E GLASS -TYPICAL
PREFINISHED METAL PANELS
PREFINISHED METAL
HORIZONTAL WALL PANELS
FACE BRICK
COLOR A
FACE BRICK
COLOR B
OVERHEAD COILING
DOORS
HOLLOW METAL
DOOR & FRAME
BUILDING
SIGNAGE - T.B.D.
CONCRETE
RETAINING WALL
PREFINISHED METAL
ACCENT COLOR
FASCIA - COLOR T.B.D.
CONCRETE
RETAINING WALL
PREFINISHED METAL
PANELS
PREFINISHED SCREEN
GATE
ALUMINUM CURTAINWALL FRAMING
W/ TINTED LOW -E GLASS -TYPICAL
PREFINISHED
METAL PANELS
PREFINISHED METAL
HORIZONTAL WALL
PANELS
FACE BRICK
COLOR A
FACE BRICK
COLOR B
OVERHEAD COILING
DOORS
HOLLOW METAL
DOOR & FRAME
CONCRETE
RETAINING WALL
PREFINISHED METAL
ACCENT COLOR FASCIA
COLOR T.B.D.
ALUMINUM CURTAINWALL
FRAMING W/ TINTED LOW-
E GLASS -TYPICAL
PREFINISHED METAL PANELS
PREFINISHED METAL
HORIZONTAL WALL
PANELS
FACE BRICK
COLOR A
FACE BRICK COLOR B
OVERHEAD COILING DOORS
HOLLOW METAL
DOOR & FRAME
CONCRETE
RETAINING WALL
PREFINISHED METAL
ACCENT COLOR FASCIA -
COLOR T.B.D.
EL: 0'-0"
FLOOR LEVEL
EL: +16'-0"
T.O. MASONRY
EL: -14'-8"
FLOOR LEVEL
EL: +12'-0"
T.O. MASONRY
PREFINISHED METAL PANELS
FACE BRICK
COLOR A
FACE BRICK COLOR B
HOLLOW METAL
DOOR & FRAME
PREFINISHED METAL
HORIZONTAL WALL
PANELS
EL: 0'-0"
FLOOR LEVEL
EL: +21'-1"
T.O. WALL
EL: +10'-8"
T.O. MASONRY
EL: 0'-0"
FLOOR LEVEL
EL: +14'-0"
T.O WALL
PREFINISHED METAL PANELS
FACE BRICK COLOR B
PREFINISHED
METAL PANELS
FACE BRICK
COLOR A
FACE BRICK COLOR B
SECTIONAL
OVERHEAD
DOOR
PREFINISHED METAL
HORIZONTAL WALL
PANELS
FACE BRICK COLOR A
PREFINISHED METAL
HORIZONTAL WALL PANELS
BUILDING SIGNAGE - T.B.D.
PREFINISHED METAL
HORIZONTAL WALL
PANELS
PREFINISHED RAMP
EL: 0'-0"
GRADE LEVEL
EL: +12'-10"
T.O. WALL
PREFINISHED METAL
HORIZONTAL WALL
PANELS
PREFINISHED RAMP
PREFINISHED METAL
HORIZONTAL WALL
PANELS
PREFINISHED RAMP
HOLLOW METAL
DOOR & FRAME
PREFINISHED METAL
HORIZONTAL WALL
PANELS
PREFINISHED RAMP
ALUMINUM WINDOWS
FACE BRICK COLOR B FACE BRICK COLOR B FACE BRICK COLOR B
HOLLOW METAL
DOOR & FRAME
PREFINISHED METAL
HORIZONTAL WALL PANELS
EL: 0'-0"
FLOOR LEVEL
EL: +14'-0"
T.O. MASONRY
PREFINISHED METAL
HORIZONTAL WALL
PANELS
ALUMINUM WINDOWS
PREFINISHED METAL
HORIZONTAL WALL
PANELS
ALUMINUM WINDOWS
HOLLOW METAL
DOOR AND FRAME
PREFINISHED METAL
HORIZONTAL WALL
PANELS
ALUMINUM WINDOWS COPYRIGHT 2015 FREVERT-RAMSEY-KOBES ARCHITECTS-ENGINEERS P.C. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED FROM WITHOUT THE EXPRESS WRITTEN PERMISSION OF FREVERT-RAMSEY-KOBES ARCHITECTS-ENGINEERS P.C. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY THE COPYRIGHT LAWPRELIMINARYNOT TO BE USEDFOR CONSTRUCTIONPROJECT NO.:
DATE:
REVISIONS:
DRAWING TITLE:
DRAWING NO.:frk2600 westown parkway, suite 340, west des moines, iowa 50266p 515.223.5100f 515.223.7226www.frk-ae.comarchitects + engineers4/17/2018 4:59:15 PM1018R
COLORED
EXTERIOR
ELEVATIONS
2
PRINT DATEWAUKEE SECOND HIGH SCHOOLWAUKEE COMMUNITY SCHOOL DISTRICTPROPOSED NEWWAUKEE, IOWA 1" = 20'-0"2
1 TEAM BUILDING FRONT ELEVATION
1" = 20'-0"2
3 TEAM BUILDING BACK ELEVATION
1" = 20'-0"2
2 TEAM BUILDING SOUTHEAST ELEVATION
1" = 20'-0"2
4 TEAM BUILDING NORTHWEST ELEVATION
1" = 20'-0"2
5 BALLFIELD WEST ELEVATION
1" = 20'-0"2
8 BALLFIELD NORTH ELEVATION
1" = 20'-0"2
7 BALLFIELD EAST ELEVATION
1" = 20'-0"2
6 BALLFIELD SOUTH ELEVATION
1" = 20'-0"2
9 VISITOR PRESS BOX - EAST
1" = 20'-0"2
10 VISITOR PRESS BOX - NORTH
1" = 20'-0"2
11 VISITOR PRESS BOX - SOUTH
1" = 20'-0"2
12 VISITOR PRESS BOX - WEST
1" = 20'-0"2
16 HOME RESTROOM - EAST
1" = 20'-0"2
17 HOME RESTROOM - SOUTH
1" = 20'-0"2
18 HOME RESTROOM - WEST
1" = 20'-0"2
13 HOME PRESS BOX - EAST
1" = 20'-0"2
14 HOME PRESS BOX - SOUTH
1" = 20'-0"2
15 HOME PRESS BOX - WEST
PAINTED STEEL TUBE GATES W/ PREFINISHED METAL PANELSFACEBRICK COLOR 'B'PAINTED STEEL BOLLARDFACEBRICK COLOR 'B'FACEBRICK COLOR 'B'PAINTED STEEL BOLLARDfrkarchitects + engineersWAUKEE COMMUNITY SCHOOL DISTRICTWAUKEE SECOND HIGH SCHOOLWAUKEE, IOWA 1/8" = 1'-0"A1DUMPSTER NORTH ELEVATION 1/8" = 1'-0"A3DUMPSTER SOUTH ELEVATION 1/8" = 1'-0"A2DUMPSTER WEST ELEVATION