Loading...
HomeMy WebLinkAbout2018-08-06-J01K Waukee Trailhead and Dog Park_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 6, 2018 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Concrete Connections, for the Waukee Trailhead and Dog Park project in the amount of $8,520.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 to Concrete Connection is for additional culvert improvements in the Northwest corner of the property, grade adjustment for better water flow in the Southeast corner of the property, and removal of sidewalk and grade adjustment to the western boarder of the property. The sidewalk was originally put in as a part of the Autumn Ridge Apartments at an elevation that was going to restrict water flow from the dog park to the drainage basin. Confluence and City Staff have reviewed the quantities and find them to be accurate. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1K July 27, 2018 Mr. Matt Jermier, Director Waukee Parks and Recreation Department City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #1 Waukee Trailhead and Dog Park Dear Mr. Jermier: Attached please find Change Order #1 in the amount of $8,520.00, for approval and signature by Waukee City Council. Quantities have been reviewed and agreed upon by the contractor, City staff, and Confluence. Confluence recommends approval and payment as indicated. If there are any questions, please let me know. Respectfully, Confluence Matthew O. Carlile, PLA, ASLA. LEED AP Principal Waukee Trail Head and Dog Park / 16140-01 Page 1 of 1 CHANGE ORDER ISSUED TO: Concrete Connection PROJECT NAME: Waukee Trail Head and Dog Park PROJECT NO.: 16140-01 CHANGE ORDER NO.: 1 CONTRACT FOR: Concrete Connection CONTRACT DATE: April 2, 2018 INITIATION DATE: July 27, 2018 DESCRIPTION: During construction, we identified some grading connections that would make the project and surrounding properties drain better. Secondly the concrete walkway on the West end was significantly higher than design grades exhibited. To adjust sidewalk elevations and connections to the dog park this area needed to be re-worked. Original Contract: $ 639,327.50 Change Order #1: $ 8,520.00 Total Contract: $ 647,847.50 Change Order Summary: Qty. Description Total ADD 1. Culvert Improvement, Northwest corner of property. a. (+/-) 55 lf of 8” PVC Pipe b. 45 degree elbow and 2 flared end sections c. 20’x 4’ x 5” = 113 sf concrete d. Grade Adjustment for better flow to West e. Filter fabric/Soil control measures 2. Grade Adjustment for Waterflow Southeast corner or property. a. Sod cut/remove/replace b. Grade Adjustment for waterflow to South c. Filter fabric/Soil control measures 3. Side walk removal/adjust grade/replacement/backfill. a. Cut/remove PCC concrete to allow for better access at the West end of the dog park. b. Grade Adjustment to match new sidewalk c. Backfill d. Filter Fabric/Soil control measures Subtotal $8,520.00 Change Order Issued by: Matthew O. Carlile, Principal Printed Name Signature Date Approved by: Tim Moerman, City Administrator Printed Name Signature Date