Loading...
HomeMy WebLinkAbout2018-08-20-J05 Shadow Creek Car Wash - Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 20, 2018 AGENDA ITEM: Consideration of approval of a site plan for Shadow Creek Car Wash [870 NE Douglas Parkway] FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Per City Council direction at the August 6, 2018 meeting, staff sent correspondence to the five residential properties located directly west of the proposed project as well as the one vacant lot located directly south of the proposed project. To date, staff has not received any response from that correspondence. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan IV. Building Elevations PREPARED BY: Brad Deets, Development Services Director REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J5 THE CITY OF WAUKEE, IOWA RESOLUTION 18- APPROVING THE SITE PLAN FOR SHADOW CREEK CAR WASH (870 NE DOUGLAS PARKWAY) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended denial of the Site Plan for Shadow Creek Car Wash on July 10, 2018; AND, WHEREAS, the Site Plan for Shadow Creek Car Wash is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Shadow Creek Car Wash is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 20th day of August, 2018 that the Site Plan for Shadow Creek Car Wash is approved. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Courtney Clarke Shelly Hughes Larry R. Lyon PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Shadow Creek Car Wash – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planner II REPORT DATE: July 3, 2018 MEETING DATE: July 10, 2018 GENERAL INFORMATION Applicant / Owner: Shadow Creek II, LLC Engineer: Erin Ollendike, PE, Civil Design Advantage, LLC Request: The applicant is requesting approval of a site plan for a car wash. Location and Size: Property is located south of NE Douglas Parkway and east of NE Addison Drive, containing approximately 1.92 acres. Property Address: 870 NE Douglas Parkway AREA MAP ABOVE: Aerial of subject property (outlined in YELLOW) in relation to the surrounding area. July 5, 2018 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant / Undeveloped Neighborhood Residential C-1 (Community & Highway Service Commercial District) North City of Clive N/A N/A South Single Family Residential Neighborhood Residential R-2 (One & Two Family Residential District) East Casey’s Gas Station Neighborhood Residential C-1 (Community & Highway Service Commercial District) West Single Family Residential Neighborhood Residential R-2 (One & Two Family Residential District) HISTORY The subject property recently received recommendation for approval from the Planning and Zoning Commission for a daycare. The daycare project never moved forward and the applicant has since come back for a site plan approval of the current project for a car wash. PROJECT DESCRIPTION The project involves the construction of a carwash building that is proposed to be approximately 5,975 square feet in area. A monument sign is planned at the northwest corner of the site. The site plan also identifies vacuums to the south of the proposed building and a trash enclosure at the southeast corner of the site. ACCESS AND PARKING Two accesses are provided to the site from the public streets. One access will be provided off of NE Douglas Parkway through the shared access for the other commercial sites within this development. The other access is provided off of NE Addison Drive. A total of 18 parking spaces are required for this facility, this includes 6 spaces for wash bays and 12 queuing spaces (2 per bay). The total amount of parking proposed is 18 spaces plus one accessible parking stall in front of the building. The proposed site plan meets the parking requirements of the ordinance. SIDEWALKS/TRAILS A 5 foot wide sidewalk will be constructed along both the north and west sides of the site along NE Addison Drive and NE Douglas Parkway. A pedestrian connection into the site is being provided from the sidewalk along NE Douglas Parkway. UTILITIES This site will be serviced with all public utilities. Storm water detention will be provided through the detention pond located on the south side of the site. July 5, 2018 3 of 3 LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 47%. This site includes landscape buffers on the north, south, and west sides of the property. The buffer requirement along the north is 25 feet and the buffer requirements along the west and south is 30 feet. A substantial berm is being provided along the west side of the site, adjacent to NE Addison Drive. The applicant has provided the required amount of plantings per the landscaping ordinance. ELEVATIONS The proposed building is a single story building. The elevations of the building are proposed to be constructed of cultured stone, cement paneling, architectural metal paneling, Nichiha panel siding and storefront glazing. The trash enclosure, located just south of the building, will also be constructed of the same masonry block material to match the building. The building materials proposed for this building are the same as the Shadow Creek Shopping Center building located on the site to the southeast of the subject property. MISCELLANEOUS: The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the lighting requirements of the Site Plan Ordinance. STAFF RECOMMENDATION Staff recommends approval of the site plan for Shadow Creek Car Wash subject to remaining staff comments. 3405 SE CROSSROADS DR. SUITE G, GRIMES, IOWA 50111PH: (515) 369-4400 Fax: (515) 369-4410CIVIL DESIGN ADVANTAGEUTILITY WARNINGwww.iowaonecall.com1-800-292-8989ONE CALLIOWAONE CALLKnow what'sbefore you dig.below.CallCONSTRUCTION SCHEDULEDEVELOPMENT SUMMARYSUBMITTAL DATESARCHITECTPROJECT SITE ADDRESSSURVEYORZONINGINDEX OF SHEETSVICINITY MAPGENERAL LEGENDENGINEERLEGAL DESCRIPTIONDATE OF SURVEYBENCHMARKSSHADOW CREEK CAR WASHSHADOW CREEK CAR WASHSITE PLAN FOR:870 NE DOUGLAS PARKWAY - WAUKEE, IOWA····OWNER / DEVELOPERWAUKEENOTESllllllMBULK REGULATIONS:SHADOW CREEK CAR WASHPRELIMINARYNOT FOR CONSTRUCTIONSITETGENERAL CONTRACTOR CIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKOEI: GHREVISIONSDATEWAUKEE, IOWA8 FIRST SUBMITTAL03/29/18PHONE: (515) 369-4400 FAX: (515) 369-44103405 S.E. CROSSROADS DRIVE, SUITE GGRIMES, IOWA 50111SHADOW CREEK CAR WASHSECOND SUBMITTAL04/24/18THIRD SUBMITTAL06/19/182SPOT ELEVATION REFERENCE DETAIL INTEGRAL 6" STANDARD CURB 12" SUBGRADE PREPARATION CURB RAMPS OUTSIDE OF INTERSECTION RADIUS CLASS 'A' 6" CURB AND SIDEWALK SW-203 SANITARY CLEANOUT DUMPSTER ENCLOSURE DETAIL DETECTABLE WARNING DETAIL HYDRANT ASSEMBLY DETAIL DETAILSROCK APRON FOR PIPE OUTLET CIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKOEI: GHREVISIONSDATEWAUKEE, IOWA8 FIRST SUBMITTAL03/29/18PHONE: (515) 369-4400 FAX: (515) 369-44103405 S.E. CROSSROADS DRIVE, SUITE GGRIMES, IOWA 50111SHADOW CREEK CAR WASHSECOND SUBMITTAL04/24/18THIRD SUBMITTAL06/19/183RCP APRON FOOTING DETAIL TYPICAL SIGN POST DOWNSPOUT CONNECTION WITH WYE ° SANITARY SEWER SERVICE RISER DETAILS NE DOUGLAS PARKWAY NE ADDISON DRIVEPRIVATE DRIVECIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKOEI: GHREVISIONSDATEWAUKEE, IOWA8 FIRST SUBMITTAL03/29/18PHONE: (515) 369-4400 FAX: (515) 369-44103405 S.E. CROSSROADS DRIVE, SUITE GGRIMES, IOWA 50111SHADOW CREEK CAR WASHSECOND SUBMITTAL04/24/18THIRD SUBMITTAL06/19/184 GENERAL NOTES TRAFFIC CONTROL NOTES PAVEMENT THICKNESS SIGN LEGEND VAN ACCESSIBLE DIMENSION PLAN NE DOUGLAS PARKWAY NE ADDISON DRIVEPRIVATE DRIVECIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKOEI: GHREVISIONSDATEWAUKEE, IOWA8 FIRST SUBMITTAL03/29/18PHONE: (515) 369-4400 FAX: (515) 369-44103405 S.E. CROSSROADS DRIVE, SUITE GGRIMES, IOWA 50111SHADOW CREEK CAR WASHSECOND SUBMITTAL04/24/18THIRD SUBMITTAL06/19/185 GRADING NOTES DETAIL 'A'GRADING PLANDETAIL 'C' DETAIL 'B' DETAIL 'D' NE DOUGLAS PARKWAYNE ADDISON DRIVE PRIVATE DRIVE CIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKO EI: GH REVISIONS DATE WAUKEE, IOWA8 FIRST SUBMITTAL 03/29/18 PHONE: (515) 369-4400 FAX: (515) 369-4410 3405 S.E. CROSSROADS DRIVE, SUITE G GRIMES, IOWA 50111SHADOW CREEK CAR WASH SECOND SUBMITTAL 04/24/18 THIRD SUBMITTAL 06/19/186UTILITY NOTESUTILITY PLAN NE DOUGLAS PARKWAYNE ADDISON DRIVE PRIVATE DRIVE Rlllll l llll l l l lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllDA #12.11 ACllllllllllllllll l lllllllllllllll l llEROSION AND SEDIMENT CONTROL PLANRllllSWPPP LEGENDSHADOW CREEK CAR WASHVICINITY MAPSHADOW CREEK CAR WASHDISCHARGE POINT SUMMARYSTABILIZATION QUANTITIESCIVIL DESIGN ADVANTAGE1802.055SHADOW CREEK CAR WASH ENGINEER: EKO EI: GH REVISIONS DATE WAUKEE, IOWA FIRST SUBMITTAL 03/29/18 PHONE: (515) 369-4400 FAX: (515) 369-4410 3405 S.E. CROSSROADS DRIVE, SUITE G GRIMES, IOWA 50111 EROSION AND SEDIMENT CONTROL PLAN7 8WAUKEESITENOTESSECOND SUBMITTAL 04/24/18 THIRD SUBMITTAL 06/XX/18 NE DOUGLAS PARKWAY NE ADDISON DRIVEPRIVATE DRIVEPLANT SCHEDULE BUFFER PLANT SCHEDULE OPENSPACE CIVIL DESIGN ADVANTAGE1802.055ENGINEER: EKOEI: GHREVISIONSDATEWAUKEE, IOWA8 FIRST SUBMITTAL03/29/18PHONE: (515) 369-4400 FAX: (515) 369-44103405 S.E. CROSSROADS DRIVE, SUITE GGRIMES, IOWA 50111SHADOW CREEK CAR WASHSECOND SUBMITTAL04/24/18THIRD SUBMITTAL06/19/188 LANDSCAPE PLANLANDSCAPE NOTES LANDSCAPE REQUIREMENTS 30' BUFFER REQUIREMENT (380 LF WEST & SOUTH) 25' BUFFER REQUIREMENT (233 LF NORTH) LEVEL 1100'-0"T.O. PARAPET B117'-0"T.O. CLERESTORY121'-0"T.O.W.115'-0"T.O. PARAPET C119'-0"M4M3M2M1D1S1F1M3M2M1M3M4LEVEL 1100'-0"T.O. PARAPET B117'-0"T.O. CLERESTORY121'-0"SPACE FOR COIN/VENDING MACHINES(WITH BACK ACCESSIBLE FROM OFFICE)M4M3D1T.O.W.115'-0"T.O. PARAPET C119'-0"M2M1M3M4M1M2S1SF1F1LEVEL 1100'-0"T.O. PARAPET B117'-0"T.O. CLERESTORY121'-0"T.O.W.115'-0"T.O. PARAPET C119'-0"F1SF1M4M3LEVEL 1100'-0"T.O. PARAPET B117'-0"T.O. CLERESTORY121'-0"T.O.W.115'-0"T.O. PARAPET C119'-0"F1S1SF1M4M3PRELIMINARY- NOT FOR CONSTRUCTION1605 N. ANKENY BLVD #130ANKENY, IOWA 50023PHONE: (515) 965-5336FAX: (515) 965-5335info@imprintarchitects.comPROJECT:DATE:DRAWN BY:CHK'D BY:REVISED:C:\Users\mlawler\Documents\18118-Shadow Creek Carwash_R19_imprintarchitects.rvt6/6/2018 1:08:16 PMA20118-1185-14-18WAUKEE, IOWAML KCNE ALICE'S ROADSHADOW CREEK CAR WASH1/8" = 1'-0"1WEST ELEVATION3/16" = 1'-0"2EAST ELEVATION1/8" = 1'-0"3SOUTH ELEVATION1/8" = 1'-0"4NORTH ELEVATIONSHADOW CREEK CARWASH KEYNOTE LEGENDKey ValueKeynote TextD1 CARWASH DOORF1 FIRESTONE METAL PANEL- DARK GRAYM1 MASONRY- ELDORADO LIMESTONE "LONGITUDE24"- FOGGY MEADOWM2 MASONRY- ELDORADO LIMESTONE "LONGITUDE24"- SNOWDRIFTM3 MASONRY- ELDORADO "STACKED STONE"M4 MASONRY- ELDORADO "SIERRACUT24"- ZENITH GRAYS1 RAINSCREEN- NICHIHA PANEL SIDINGSF1 STOREFRONT