HomeMy WebLinkAbout2018-11-05-J01O Waukee Dog Park and Trailhead_Change Order 2AGENDA ITEM: J1O CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 5, 2018 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Concrete Connections, for the Waukee Trailhead and Dog Park project increasing the contract in the amount of $1,800.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 to Concrete Connection is for the installation of a PCC Flume in the front detention basin at the entrance into the dog park. The area has minimal slope and standing water has been present in this area the entire summer. The installation of the a PCC flume will allow the water to flow at minimal slop and will allow for the native seeding and erosion matting to be installed. This option will additionally provide the city with a long-term solution to standing water at entrance to the park. The flume is approximately 90’ long and 3’ wide. Change order No. 2 also adjusts the Substantial Completion Date from October 15, 2018 to December 15th, 2018. This is to account for the wet fall that we have encountered. Attempts at seeding and planting have been delayed multiple times. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Change Order No. 2 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: October 16, 2018 Mr. Matt Jermier, Director Waukee Parks and Recreation Department City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #2 Waukee Trailhead and Dog Park Dear Mr. Jermier: Attached please find Change Order #2 in the amount of $1,800.00, for approval and signature by Waukee City Council. Quantities have been reviewed and agreed upon by the contractor, City staff, and Confluence. Confluence recommends approval and payment as indicated. If there are any questions, please let me know. Respectfully, Confluence Matthew O. Carlile, PLA, ASLA. LEED AP Principal Waukee Trail Head and Dog Park / 16140-01 Page 1 of 1 CHANGE ORDER ISSUED TO: Concrete Connection PROJECT NAME: Waukee Trail Head and Dog Park PROJECT NO.: 16140-01 CHANGE ORDER NO.: 2 CONTRACT FOR: Concrete Connection CONTRACT DATE: April 2, 2018 INITIATION DATE: July 27, 2018 DESCRIPTION: During construction, we identified some grading connections that would make the project and surrounding properties drain better. Secondly the concrete walkway on the West end was significantly higher than design grades exhibited. To adjust sidewalk elevations and connections to the dog park this area needed to be re-worked. Original Contract: $ 639,327.50 Change Order #1: $ 8,520.00 Change Order #2: $ 1,800.00 Total Contract: $ 649,647.50 Change Order Summary: Qty. Description Total ADD 1. Installation of a PCC Flume in the front detention basin at the entrance to the dog park. The area has minimal slope and standing water has been present in this area the entire summer. The installation of a PCC flume would allow the water to flow at minimal slope and would allow us the opportunity to eliminate the mud and complete the native seeding and erosion matting. This option will additionally provide the city with a long-term solution to standing water at entrance to the park. The proposed flume would be approximately 90' long and 3' wide. 2. Adjust the Substantial Completion Date from October 15th , 2018 to December 15th, 2018. This is to account for the wet fall that we have encountered. Attempts at seeding and planting have been delayed several times. Subtotal $1,800.00 Change Order Issued by: Matthew O. Carlile, Principal Printed Name Signature Date Approved by: Tim Moerman, City Administrator Printed Name Signature Date