Loading...
HomeMy WebLinkAbout2017-03-06-I06 Alices Rd Corridor Phase 4 - Award Contract AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 6, 2017 AGENDA ITEM: Consideration of approval of a resolution awarding contract [Alice’s Road Corridor Improvements Phase 4 Project, University Avenue to Olson Drive] FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at the Iowa Department of Transportation Office of Contracts in Ames, IA, on February 21, 2017, at 10:00 a.m. Four (4) apparent bids were received, with the low bid submitted by Concrete Technologies, Inc., of Grimes, IA, in the amount of $6,474,076.95. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $6,474,076.95 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: City staff recommends awarding contract to Concrete Technologies, Inc., of Grimes, IA, in the amount of $6,474,076.95. RECOMMENDATION: Approve the resolution awarding contract to Concrete Technologies, Inc., of Grimes, IA, in the amount of $6,474,076.95. ATTACHMENTS: I. Proposed resolution II. Foth letter of recommendation III. Foth bid tabulation PREPARED BY: Becky Schuett REVIEWED BY: RESOLUTION 17- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE SE ALICES ROAD FROM SE UNIVERSITY AVE. TO 425' NORTH OF SE OLSON DR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the following bid for the construction of certain public improvements described in general as the SE Alices Road from SE University Ave. to 425' North of SE Olson Dr., described in the plans and specifications heretofore adopted by this Council on March 6, 2017, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Concrete Technologies, Inc., of Grimes, IA Amount of bid: $6,474,076.95 Portion of project: All construction work Section 2. That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 6th day of March, 2017. Mayor ATTEST: City Clerk 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 February 23, 2017 John Gibson Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Recommendation of Award of Contract PCC Pavement Widening, SE Alices Road SE University Avenue to 425’ North of SE Olson Drive Dear Mr. Gibson: The Bid Letting for the referenced Project was held on February 21, 2017 and bids were received from a total of four (4) different bidders. A summary of the bids is as follows: Bidder Location Total Bid Amount Concrete Technologies, Inc. Grimes, IA $6,474,076.95 Elder Corporation Des Moines, IA $6,890,000.00 Corell Contractor, Inc West Des Moines, IA $6,911,391.35 Absolute Concrete Construction Slater, IA $7,267,798.70 Our Engineer’s Opinion of Probable Cost for the Total Bid Amount for this project was $6,393,406.00. Attached please find a detailed Tabulation of Bids for your information. The DOT has reviewed the lowest responsive bid and bid attachments and everything appears to be in order. It is recommended that the City of Waukee award contract for this work to Concrete Technologies, Inc., of Grimes, Iowa in the amount of $6,474,076.95. The DOT is preparing contract documents to send to the Contractor for signatures and for City Council award on March 6, 2017. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Joshua C. DeBower, P.E. Lead Civil Engineer Encl: Tabulation of Responsive Bids Bid Date: Tuesday, February 21, 2017 at 10:00 amITEM NO. ITEM CODEITEM DESCRIPTIONUNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL1 2101-0850001 CLEARING AND GRUBBINGACRE 10 $5,000.00 50,000.00$ 875.00$ 8,750.00$ 300.00$ 3,000.00$ 350.00$ 3,500.00$ 895.00$ 8,950.00$ 2 2102-2710070 EXCAVATION, CLASS 10, ROADWAY & BORROWCY 19,817 $10.00 198,170.00$ 11.35$ 224,922.95$ 6.00$ 118,902.00$ 8.00$ 158,536.00$ 11.50$ 227,895.50$ 3 2102-2710090 EXCAVATION, CLASS 10, WASTECY 1,424 $8.00 11,392.00$ 12.60$ 17,942.40$ 11.00$ 15,664.00$ 18.50$ 26,344.00$ 12.50$ 17,800.00$ 4 2102-4560000 LOCATING TILE LINESSTA 4 $150.00 600.00$ 412.00$ 1,648.00$ 510.00$ 2,040.00$ 3,795.00$ 15,180.00$ 420.00$ 1,680.00$ 5 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREADCY 7,751 $7.00 54,257.00$ 11.25$ 87,198.75$ 10.00$ 77,510.00$ 15.00$ 116,265.00$ 11.50$ 89,136.50$ 6 2107-0875000 COMPACTION WITH MOISTURE AND DENSITY CONTROLCY 10,246 $4.00 40,984.00$ 3.10$ 31,762.60$ 9.50$ 97,337.00$ 8.30$ 85,041.80$ 3.15$ 32,274.90$ 7 2113-0001000 SUBGRADE STABILIZATION MATERIAL, CRUSHED STONESY 500 $5.00 2,500.00$ 16.70$ 8,350.00$ 28.00$ 14,000.00$ 26.50$ 13,250.00$ 17.00$ 8,500.00$ 8 2113-0001100 SUBGRADE STABILIZATION MATERIAL, POLYMER GRIDSY 500 $2.00 1,000.00$ 6.70$ 3,350.00$ 2.90$ 1,450.00$ 10.00$ 5,000.00$ 7.00$ 3,500.00$ 9 2115-0100000 MODIFIED SUBBASECY 5,366 $35.00 187,810.00$ 31.65$ 169,833.90$ 53.00$ 284,398.00$ 49.85$ 267,495.10$ 32.50$ 174,395.00$ 10 2121-7425010 GRANULAR SHOULDERS, TYPE ATON 470 $25.00 11,750.00$ 40.40$ 18,988.00$ 29.00$ 13,630.00$ 24.00$ 11,280.00$ 41.00$ 19,270.00$ 11 2301-1033100 STANDARD OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 10 IN. SY 27,955 $70.00 1,956,850.00$ 64.50$ 1,803,097.50$ 67.00$ 1,872,985.00$ 65.00$ 1,817,075.00$ 70.00$ 1,956,850.00$ 12 2301-4874106 MEDIAN, DOWELLED P.C. CONCRETE, 6 INCHSY 558 $125.00 69,750.00$ 91.85$ 51,252.30$ 142.00$ 79,236.00$ 92.00$ 51,336.00$ 110.00$ 61,380.00$ 13 2301-6911722 PORTLAND CEMENT CONCRETE PAVEMENT SAMPLESLS 1 $3,000.00 3,000.00$ 1,810.00$ 1,810.00$ 11,000.00$ 11,000.00$ 10,710.00$ 10,710.00$ 10,000.00$ 10,000.00$ 14 2304-0101000 TEMPORARY PAVEMENTSY 4,632 $65.00 301,080.00$ 59.50$ 275,604.00$ 60.50$ 280,236.00$ 59.25$ 274,446.00$ 61.00$ 282,552.00$ 15 2315-8275025 SURFACING, DRIVEWAY, CLASS A CRUSHED STONETON 34 $23.00 782.00$ 40.40$ 1,373.60$ 33.50$ 1,139.00$ 29.50$ 1,003.00$ 41.00$ 1,394.00$ 16 2401-6750001 REMOVALS, AS PER PLANLS 1 $3,000.00 3,000.00$ 30,900.00$ 30,900.00$ 11,000.00$ 11,000.00$ 13,850.00$ 13,850.00$ 3,150.00$ 3,150.00$ 17 2402-0425031 GRANULAR BACKFILLTON 2,265 $30.00 67,950.00$ 20.60$ 46,659.00$ 21.00$ 47,565.00$ 23.50$ 53,227.50$ 24.15$ 54,699.75$ 18 2402-0425040 FLOODED BACKFILLCY 290 $35.00 10,150.00$ 72.10$ 20,909.00$ 73.50$ 21,315.00$ 66.30$ 19,227.00$ 68.00$ 19,720.00$ 19 2402-2720000 EXCAVATION, CLASS 20CY 3,463 $23.00 79,649.00$ 29.90$ 103,543.70$ 39.00$ 135,057.00$ 20.50$ 70,991.50$ 9.00$ 31,167.00$ 20 2403-0100000 STRUCTURAL CONCRETE (MISCELLANEOUS)CY 262 $550.00 144,100.00$ 1,116.50$ 292,523.00$ 1,100.00$ 288,200.00$ 882.25$ 231,149.50$ 900.00$ 235,800.00$ 21 2403-0100020 STRUCTURAL CONCRETE (RCB)CY 296 $550.00 162,800.00$ 948.00$ 280,608.00$ 970.00$ 287,120.00$ 1,717.00$ 508,232.00$ 1,770.00$ 523,920.00$ 22 2404-7775000 REINFORCING STEELLB 88,240 $1.00 88,240.00$ 3.60$ 317,664.00$ 3.70$ 326,488.00$ 2.70$ 238,248.00$ 2.77$ 244,424.80$ 23 2414-6460000 ORNAMENTAL METAL RAILINGLF 962 $125.00 120,250.00$ 76.25$ 73,352.50$ 82.50$ 79,365.00$ 82.50$ 79,365.00$ 78.00$ 75,036.00$ 24 2416-0100015 APRON, CONC, 15"EACH 1 $800.00 800.00$ 2,265.00$ 2,265.00$ 1,700.00$ 1,700.00$ 1,825.00$ 1,825.00$ 2,310.00$ 2,310.00$ 25 2416-0100018 APRON, CONC, 18"EACH 1 $900.00 900.00$ 2,370.00$ 2,370.00$ 1,800.00$ 1,800.00$ 1,925.00$ 1,925.00$ 2,400.00$ 2,400.00$ 26 2416-0100024 APRON, CONC, 24"EACH 2 $1,200.00 2,400.00$ 2,780.00$ 5,560.00$ 2,100.00$ 4,200.00$ 2,775.00$ 5,550.00$ 2,800.00$ 5,600.00$ 27 2416-0100036 APRON, CONC, 36"EACH 1 $2,000.00 2,000.00$ 3,810.00$ 3,810.00$ 3,100.00$ 3,100.00$ 3,525.00$ 3,525.00$ 3,900.00$ 3,900.00$ 28 2430-0000100 MODULAR BLOCK RETAINING WALLSF 593 $40.00 23,720.00$ 33.00$ 19,569.00$ 33.50$ 19,865.50$ 36.00$ 21,348.00$ 37.00$ 21,941.00$ 29 2435-0140148 MANHOLE, STORM SEWER, SW-401, 48 IN.EACH 3 $8,000.00 24,000.00$ 2,990.00$ 8,970.00$ 2,600.00$ 7,800.00$ 3,350.00$ 10,050.00$ 3,000.00$ 9,000.00$ 30 2435-0140172 MANHOLE, STORM SEWER, SW-401, 72 IN.EACH 1 $10,000.00 10,000.00$ 6,180.00$ 6,180.00$ 5,900.00$ 5,900.00$ 7,000.00$ 7,000.00$ 6,300.00$ 6,300.00$ 31 2435-0140196 MANHOLE, STORM SEWER, SW-401, 96 IN.EACH 1 $15,000.00 15,000.00$ 18,025.00$ 18,025.00$ 20,000.00$ 20,000.00$ 52,000.00$ 52,000.00$ 18,500.00$ 18,500.00$ 32 2435-0250100 INTAKE, SW-501EACH 7 $4,000.00 28,000.00$ 3,090.00$ 21,630.00$ 2,400.00$ 16,800.00$ 3,300.00$ 23,100.00$ 3,200.00$ 22,400.00$ 33 2435-0250300 INTAKE, SW-503EACH 5 $6,500.00 32,500.00$ 4,735.00$ 23,675.00$ 4,600.00$ 23,000.00$ 5,325.00$ 26,625.00$ 4,800.00$ 24,000.00$ 34 2435-0250500 INTAKE, SW-505EACH 3 $5,500.00 16,500.00$ 4,430.00$ 13,290.00$ 3,700.00$ 11,100.00$ 5,000.00$ 15,000.00$ 4,500.00$ 13,500.00$ 35 2435-0250600 INTAKE, SW-506EACH 2 $7,700.00 15,400.00$ 6,180.00$ 12,360.00$ 6,500.00$ 13,000.00$ 8,100.00$ 16,200.00$ 6,300.00$ 12,600.00$ 36 2435-0250610 INTAKE, SW-506 MOD 2EACH 1 $8,700.00 8,700.00$ 8,035.00$ 8,035.00$ 8,700.00$ 8,700.00$ 10,000.00$ 10,000.00$ 8,200.00$ 8,200.00$ 37 2435-0251224 INTAKE, SW-512, 24"EACH 2 $5,500.00 11,000.00$ 1,750.00$ 3,500.00$ 1,600.00$ 3,200.00$ 1,500.00$ 3,000.00$ 1,800.00$ 3,600.00$ 38 2435-0251236 INTAKE, SW-512, 36"EACH 3 $7,000.00 21,000.00$ 2,472.00$ 7,416.00$ 4,000.00$ 12,000.00$ 2,500.00$ 7,500.00$ 2,500.00$ 7,500.00$ 39 2435-0600020 MANHOLE ADJUSTMENT, MAJOREACH 15 $2,500.00 37,500.00$ 1,442.00$ 21,630.00$ 2,900.00$ 43,500.00$ 2,900.00$ 43,500.00$ 1,500.00$ 22,500.00$ 40 2435-0600120 INTAKE ADJUSTMENT, MAJOREACH 5 $2,500.00 12,500.00$ 2,060.00$ 10,300.00$ 1,400.00$ 7,000.00$ 2,100.00$ 10,500.00$ 2,100.00$ 10,500.00$ 41 2435-0700010 SW-211, CONNECTION TO EXISTING STORM SEWER STRUCTUREEACH 6 $1,600 9,600.00$ 1,153.50$ 6,921.00$ 2,100.00$ 12,600.00$ 1,800.00$ 10,800.00$ 1,200.00$ 7,200.00$ 42 2501-8400172 TEMPORARY SHORINGLS 1 $30,000 30,000.00$ 72,100.00$ 72,100.00$ 74,000.00$ 74,000.00$ 179,550.00$ 179,550.00$ 175,000.00$ 175,000.00$ 43 2502-2308110 CONTINUOUS TRENCH DRAIN (500-20)LF 25 $250 6,250.00$ 1,235.00$ 30,875.00$ 1,200.00$ 30,000.00$ 750.00$ 18,750.00$ 1,250.00$ 31,250.00$ 44 2502-8213206 SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN.LF 2,388 $20 47,760.00$ 14.45$ 34,506.60$ 17.25$ 41,193.00$ 18.50$ 44,178.00$ 15.00$ 35,820.00$ 45 2502-8221006 SUBDRAIN RISER, 6 IN., AS PER PLANEACH 4 $500 2,000.00$ 800.00$ 3,200.00$ 450.00$ 1,800.00$ 550.00$ 2,200.00$ 850.00$ 3,400.00$ 46 2502-8221303 SUBDRAIN OUTLET, DR-303EACH 20 $300 6,000.00$ 309.00$ 6,180.00$ 450.00$ 9,000.00$ 450.00$ 9,000.00$ 315.00$ 6,300.00$ 47 2503-0111012 STORM SEWER GRAVITY MAIN, TRENCHED, (HDPE), 12 IN. LF 251 $45 11,295.00$ 66.00$ 16,566.00$ 47.00$ 11,797.00$ 66.00$ 16,566.00$ 68.00$ 17,068.00$ 48 2503-0114218 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 18 IN.LF 995 $75 74,625.00$ 77.25$ 76,863.75$ 93.50$ 93,032.50$ 151.00$ 150,245.00$ 80.00$ 79,600.00$ 49 2503-0114224 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 24 IN.LF 363 $105 38,115.00$ 87.50$ 31,762.50$ 100.00$ 36,300.00$ 189.00$ 68,607.00$ 90.00$ 32,670.00$ 50 2503-0114230 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 30 IN.LF 45 $125 5,625.00$ 108.25$ 4,871.25$ 93.50$ 4,207.50$ 124.00$ 5,580.00$ 110.00$ 4,950.00$ 51 2503-0114236 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D (CLASS III), 36 IN.LF 1,070 $140 149,800.00$ 119.50$ 127,865.00$ 127.00$ 135,890.00$ 170.50$ 182,435.00$ 120.00$ 128,400.00$ 52 2503-0114615 STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 3750D (CLASS V), 15 IN.LF 1,043 $65 67,795.00$ 77.25$ 80,571.75$ 65.50$ 68,316.50$ 115.50$ 120,466.50$ 80.00$ 83,440.00$ 53 2503-0200036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN.LF 1,044 $25 26,100.00$ 15.45$ 16,129.80$ 27.75$ 28,971.00$ 36.00$ 37,584.00$ 16.00$ 16,704.00$ 54 2504-0150410 SANITARY SEWER FORCE MAIN, TRENCHED, (PVC), 10 IN.LF 130 $40 5,200.00$ 84.50$ 10,985.00$ 54.00$ 7,020.00$ 54.00$ 7,020.00$ 90.00$ 11,700.00$ 55 2507-8029000 EROSION STONETON 30 $45 1,350.00$ 64.40$ 1,932.00$ 63.50$ 1,905.00$ 50.00$ 1,500.00$ 65.00$ 1,950.00$ 56 2510-6745850 REMOVAL OF PAVEMENTSY 14,804 $7 103,628.00$ 8.75$ 129,535.00$ 9.10$ 134,716.40$ 6.30$ 93,265.20$ 10.00$ 148,040.00$ 57 2510-6750600 REMOVAL OF INTAKES AND UTILITY ACCESSESEACH 7 $900 6,300.00$ 900.00$ 6,300.00$ 930.00$ 6,510.00$ 1,500.00$ 10,500.00$ 950.00$ 6,650.00$ 58 2511-0300000 REMOVAL OF RECREATION TRAILSY 810 $6 4,860.00$ 6.60$ 5,346.00$ 8.50$ 6,885.00$ 5.00$ 4,050.00$ 10.00$ 8,100.00$ 59 2511-0302600 RECREATIONAL TRAIL, PORTLAND CEMENT CONCRETE, 6 IN.SY 2,893 $40 115,720.00$ 37.40$ 108,198.20$ 38.00$ 109,934.00$ 40.00$ 115,720.00$ 50.00$ 144,650.00$ 60 2511-6745900 REMOVAL OF SIDEWALKSY 296 $11 3,256.00$ 9.50$ 2,812.00$ 9.85$ 2,915.60$ 6.50$ 1,924.00$ 10.00$ 2,960.00$ Tabulation of BidsWaukee, Iowa - 2017Des Moines, IA 50327SE ALICES ROADEngineer'sOpinion of CostConcrete Technologies, IncGrimes, IA 50211Absolute Concrete Construction Inc.Slater, IA 50244Elder CorporationSE UNIVERSITY AVENUE TO 425 FT NORTH OF SE OLSON DRIVECity of WaukeeCorell Contractor, Inc.West Des Moines, IA 50265Foth Infrastructure Environment, LLC8191 Birchwood Court, Suite LJohnston, Iowa 50131Phone: 515.254.1393Fax: 515.254.1642BidTab1Page 1Date Prepared: 2/23/2017BTAB-2017-0221-WAUKEE-SE ALICES ROAD PHASE 4.xls Bid Date: Tuesday, February 21, 2017 at 10:00 amITEM NO. ITEM CODEITEM DESCRIPTIONUNIT QUANTITY UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTALTabulation of BidsWaukee, Iowa - 2017Des Moines, IA 50327SE ALICES ROADEngineer'sOpinion of CostConcrete Technologies, IncGrimes, IA 50211Absolute Concrete Construction Inc.Slater, IA 50244Elder CorporationSE UNIVERSITY AVENUE TO 425 FT NORTH OF SE OLSON DRIVECity of WaukeeCorell Contractor, Inc.West Des Moines, IA 5026561 2511-7526005 SIDEWALK, P.C. CONCRETE, 5 IN.SY 868 $45 39,060.00$ 35.00$ 30,380.00$ 34.50$ 29,946.00$ 36.50$ 31,682.00$ 60.00$ 52,080.00$ 62 2511-7528101 DETECTABLE WARNINGSSF 328 $45 14,760.00$ 42.25$ 13,858.00$ 42.00$ 13,776.00$ 44.00$ 14,432.00$ 45.00$ 14,760.00$ 63 2515-2475008 DRIVEWAY, P.C. CONCRETE, 8 IN.SY 1,001 $65 65,065.00$ 47.40$ 47,447.40$ 47.50$ 47,547.50$ 49.50$ 49,549.50$ 70.00$ 70,070.00$ 64 2515-6745600 REMOVAL OF PAVED DRIVEWAYSY 2,046 $12 24,552.00$ 5.40$ 11,048.40$ 11.20$ 22,915.20$ 7.75$ 15,856.50$ 10.00$ 20,460.00$ 65 2518-6910000 SAFETY CLOSUREEACH 12 $200 2,400.00$ 103.00$ 1,236.00$ 105.00$ 1,260.00$ 102.50$ 1,230.00$ 210.00$ 2,520.00$ 66 2523-0000100LIGHTING POLESEACH18 $4,00072,000.00$ 8,035.00$ 144,630.00$ 8,200.00$ 147,600.00$ 7,995.00$ 143,910.00$ 8,200.00$ 147,600.00$ 67 2523-0000200ELECTRICAL CIRCUITSLF5,903 $18106,254.00$ 10.30$ 60,800.90$ 10.50$ 61,981.50$ 10.25$ 60,505.75$ 10.50$ 61,981.50$ 68 2523-0000310HANDHOLES AND JUNCTION BOXESEACH25 $1,00025,000.00$ 515.00$ 12,875.00$ 530.00$ 13,250.00$ 513.00$ 12,825.00$ 550.00$ 13,750.00$ 69 2523-0000400CONTROL CABINETEACH1 $8,0008,000.00$ 6,500.00$ 6,500.00$ 6,600.00$ 6,600.00$ 6,473.00$ 6,473.00$ 6,700.00$ 6,700.00$ 70 2524-6765210REMOVAL OF TYPE A SIGN ASSEMBLYEA49 $1607,840.00$ 72.00$ 3,528.00$ 73.50$ 3,601.50$ 71.75$ 3,515.75$ 50.00$ 2,450.00$ 71 2524-9089100DELINEATOR, RIGID - TYPE IEACH4 $60240.00$ 51.50$ 206.00$ 52.50$ 210.00$ 51.25$ 205.00$ 105.00$ 420.00$ 72 2524-9276010PERFORATED SQUARE STEEL TUBE POSTSLF518 $157,770.00$ 10.25$ 5,309.50$ 10.50$ 5,439.00$ 10.25$ 5,309.50$ 9.00$ 4,662.00$ 73 2524-9325001TYPE A SIGNS, SHEET ALUMINUMSF355 $207,100.00$ 20.60$ 7,313.00$ 21.00$ 7,455.00$ 20.50$ 7,277.50$ 15.00$ 5,325.00$ 74 2525-0000100TRAFFIC SIGNALIZATIONLS1 $175,000175,000.00$ 210,000.00$ 210,000.00$ 214,000.00$ 214,000.00$ 208,633.00$ 208,633.00$ 214,000.00$ 214,000.00$ 75 2526-8285000 CONSTRUCTION SURVEYLS 1 $25,000 25,000.00$ 21,600.00$ 21,600.00$ 29,000.00$ 29,000.00$ 25,858.00$ 25,858.00$ 40,000.00$ 40,000.00$ 76 2527-9263109PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASEDSTA131 $101,310.00$ 71.00$ 9,301.00$ 72.50$ 9,497.50$ 70.75$ 9,268.25$ 37.00$ 4,847.00$ 77 2527-9263117PAINTED PAVEMENT MARKINGS, DURABLESTA88 $1,00088,000.00$ 123.75$ 10,890.00$ 126.00$ 11,088.00$ 123.00$ 10,824.00$ 188.00$ 16,544.00$ 78 2527-9263131 WET RETROREFLECTIVE REMOVABLE TAPE MARKINGSSTA 191 $125 23,875.00$ 108.25$ 20,675.75$ 110.50$ 21,105.50$ 108.00$ 20,628.00$ 120.00$ 22,920.00$ 79 2527-9263137PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASEDEACH13 $1001,300.00$ 92.75$ 1,205.75$ 94.50$ 1,228.50$ 92.25$ 1,199.25$ 130.00$ 1,690.00$ 80 2527-9263143PAINTED SYMBOLS AND LEGENDS, DURABLEEACH29 $1504,350.00$ 216.50$ 6,278.50$ 220.50$ 6,394.50$ 215.25$ 6,242.25$ 300.00$ 8,700.00$ 81 2527-9263152PRE-CUT SYMBOLS AND LEGENDS, REGULAR MARKING TAPEEACH14 $2503,500.00$ 103.00$ 1,442.00$ 105.00$ 1,470.00$ 102.50$ 1,435.00$ 240.00$ 3,360.00$ 82 2527-9263180 PAVEMENT MARKINGS REMOVEDSTA 8 $20 160.00$ 62.00$ 496.00$ 63.00$ 504.00$ 61.50$ 492.00$ 210.00$ 1,680.00$ 83 2528-8400048 TEMPORARY BARRIER RAIL, CONCRETELF 4,551 $12 54,612.00$ 7.90$ 35,952.90$ 8.00$ 36,408.00$ 8.00$ 36,408.00$ 8.00$ 36,408.00$ 84 2528-8445110 TRAFFIC CONTROLLS 1 $200,000 200,000.00$ 18,335.00$ 18,335.00$ 19,000.00$ 19,000.00$ 18,245.00$ 18,245.00$ 25,000.00$ 25,000.00$ 85 2528-8445113 FLAGGERSEACH 15 $500 7,500.00$ 450.00$ 6,750.00$ 450.00$ 6,750.00$ 450.00$ 6,750.00$ 450.00$ 6,750.00$ 86 2528-9290050 PORTABLE DYNAMIC MESSAGE SIGN (PDMS)CDAY 240 $60 14,400.00$ 62.00$ 14,880.00$ 63.00$ 15,120.00$ 61.50$ 14,760.00$ 80.00$ 19,200.00$ 87 2533-4980005 MOBILIZATIONLS 1 $250,000 250,000.00$ 442,000.00$ 442,000.00$ 480,439.20$ 480,439.20$ 224,535.00$ 224,535.00$ 595,000.00$ 595,000.00$ 88 2554-0114012WATER MAIN, TRENCHED, POLYVINYL CHLORIDE PIPE (PVC), 12 IN.LF610 $4024,400.00$ 80.50$ 49,105.00$ 56.00$ 34,160.00$ 105.00$ 64,050.00$ 82.00$ 50,020.00$ 89 2554-0202400FITTINGS BY COUNT, POLYVINYL CHLORIDE (PVC),EACH7 $7004,900.00$ 600.00$ 4,200.00$ 980.00$ 6,860.00$ 1,150.00$ 8,050.00$ 610.00$ 4,270.00$ 90 2554-0207012VALVE, GATE, DIP, 12 IN.EACH4 $2,50010,000.00$ 2,575.00$ 10,300.00$ 2,400.00$ 9,600.00$ 2,400.00$ 9,600.00$ 2,600.00$ 10,400.00$ 91 2554-0208012TAPPING VALVE ASSEMBLY, 12 IN.EACH4 $6,40025,600.00$ 23,700.00$ 94,800.00$ 17,000.00$ 68,000.00$ 7,100.00$ 28,400.00$ 24,000.00$ 96,000.00$ 92 2554-0210201 FIRE HYDRANT ASSEMBLY, WM-201EACH 10 $6,000 60,000.00$ 7,210.00$ 72,100.00$ 5,700.00$ 57,000.00$ 4,865.00$ 48,650.00$ 7,400.00$ 74,000.00$ 93 2599-9999005 ADJUSTMENT OF FIXTURESEACH 20 $2,000 40,000.00$ 465.00$ 9,300.00$ 500.00$ 10,000.00$ 524.00$ 10,480.00$ 500.00$ 10,000.00$ 94 2599-9999005 WATERMAIN VERTICAL RELOCATIONEACH 2 $10,000 20,000.00$ 9,475.00$ 18,950.00$ 4,800.00$ 9,600.00$ 11,000.00$ 22,000.00$ 9,500.00$ 19,000.00$ 95 2599-9999010SUBMERSIBLE CENTRIFUGAL STORMWATER PUMPSLS1 $110,000110,000.00$ 83,925.00$ 83,925.00$ 103,000.00$ 103,000.00$ 102,740.00$ 102,740.00$ 100,000.00$ 100,000.00$ 96 2599-9999010ELECTRICAL SYSTEM FOR STORMWATER PUMPSLS1 $150,000150,000.00$ 47,210.00$ 47,210.00$ 162,000.00$ 162,000.00$ 127,320.00$ 127,320.00$ 160,000.00$ 160,000.00$ 97 2599-9999010 STORMWATER POLLUTION PREVENTION PLAN (SWPPP), MANAGEMENTLS 1 $10,000 10,000.00$ 5,720.00$ 5,720.00$ 4,700.00$ 4,700.00$ 6,150.00$ 6,150.00$ 5,000.00$ 5,000.00$ 98 2599-9999010 UNDERPASS LIGHTINGLS 1 $20,000 20,000.00$ 14,420.00$ 14,420.00$ 15,000.00$ 15,000.00$ 14,350.00$ 14,350.00$ 14,500.00$ 14,500.00$ 99 2599-9999018 ANTI-GRAFFITI COATINGSY 975 $25 24,375.00$ 19.50$ 19,012.50$ 26.25$ 25,593.75$ 21.00$ 20,475.00$ 25.00$ 24,375.00$ 100 2599-9999020 GRANULAR BEDDINGTON 525 $25 13,125.00$ 36.00$ 18,900.00$ 37.00$ 19,425.00$ 33.00$ 17,325.00$ 40.00$ 21,000.00$ 101 2601-2634100MULCHINGACRE7 $1,0007,000.00$ 875.00$ 6,125.00$ 1,300.00$ 9,100.00$ 1,435.00$ 10,045.00$ 1,250.00$ 8,750.00$ 102 2601-2636044SEEDING AND FERTILIZING (URBAN)ACRE7 $2,00014,000.00$ 1,415.00$ 9,905.00$ 1,900.00$ 13,300.00$ 5,894.00$ 41,258.00$ 1,800.00$ 12,600.00$ 103 2601-2642120STABILIZING CROP - SEEDING AND FERTILIZING (URBAN)ACRE10 $1,50015,000.00$ 670.00$ 6,700.00$ 1,300.00$ 13,000.00$ 1,077.00$ 10,770.00$ 1,200.00$ 12,000.00$ 104 2602-0000020SILT FENCELF3,656 $310,968.00$ 1.80$ 6,580.80$ 1.60$ 5,849.60$ 1.75$ 6,398.00$ 1.50$ 5,484.00$ 105 2602-0000030SILT FENCE FOR DITCH CHECKSLF810 $32,430.00$ 1.80$ 1,458.00$ 1.65$ 1,336.50$ 1.75$ 1,417.50$ 1.55$ 1,255.50$ 106 2602-0000071REMOVAL OF SILT FENCE OR SILT FENCE FOR DITCH CHECKSLF3,465 $26,930.00$ 0.50$ 1,732.50$ 0.05$ 173.25$ 0.30$ 1,039.50$ 0.05$ 173.25$ 107 2602-0000101MAINTENANCE OF SILT FENCE OR SILT FENCE FOR DITCH CHECKLF347 $1347.00$ 1.00$ 347.00$ 1.00$ 347.00$ 1.00$ 347.00$ 1.00$ 347.00$ 108 2602-0000130TEMPORARY SEDIMENT CONTROL BASINEACH32 $1,30041,600.00$ 215.00$ 6,880.00$ 380.00$ 12,160.00$ 155.00$ 4,960.00$ 250.00$ 8,000.00$ 109 2602-0000312 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA.LF 1,320 $4 5,280.00$ 3.15$ 4,158.00$ 3.70$ 4,884.00$ 4.00$ 5,280.00$ 3.50$ 4,620.00$ 110 2602-0000350 REMOVAL OF PERIMETER AND SLOPE SEDIMENT CONTROL DEVICELF 1,320 $2 2,640.00$ 0.50$ 660.00$ 0.40$ 528.00$ 0.30$ 396.00$ 0.40$ 528.00$ 111 2602-0010010MOBILIZATIONS, EROSION CONTROLEACH3 $5001,500.00$ 500.00$ 1,500.00$ 500.00$ 1,500.00$ 500.00$ 1,500.00$ 500.00$ 1,500.00$ 112 2602-0010020MOBILIZATIONS, EMERGENCY EROSION CONTROLEACH1 $1,0001,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ TOTAL BASE BID (Items 1 to 112)6,393,406.00$ 6,474,076.95$ 6,890,000.00$ 6,911,391.35$ 7,267,798.70$ Foth Infrastructure Environment, LLC8191 Birchwood Court, Suite LJohnston, Iowa 50131Phone: 515.254.1393Fax: 515.254.1642BidTab1Page 2Date Prepared: 2/23/2017BTAB-2017-0221-WAUKEE-SE ALICES ROAD PHASE 4.xls