HomeMy WebLinkAbout2017-05-23-E01E SE Westown Pkwy Extension, GPP Greenbelt Weirs_Pmt Est 2NO Ulaukee
f ■f r THE KEY TO GOOD LIVING
AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: May 23, 2017
AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 2 to McAninch
Corporation for the SE Westown Parkway Extension and Grand Prairie
Parkway Greenbelt Weirs SE Parkview Crossing Drive to Grand Prairie
Parkway Project in the amount of $745,022.03
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON:
Partial Payment No.2 is for work completed from April 1, 2017 to April 28,
2017.
FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: $745,022.03
COMMISSIONBOARD/COMMITTEE COMMENT: McAninch Corporation has requested
Payment Estimate No. 2 for the work completed on the SE Westown Parkway
Extension and Grand Prairie Parkway Greenbelt Weirs SE Parkview Crossing
Drive to Grand Prairie Parkway Project in the amount of $745,022.03. Foth
Infrastructure and Environment, LLC has reviewed the payment estimate and
recommends payment.
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Partial Payment No. 2
ATTACHMENTS: 1. Partial Payment No. 2
11. Letter of Recommendation
PREPARED BY: Beth Richardson/Rudy Koester
REVIEWED BY: John Gibson
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
Fot h
May 16, 2017
John Gibson
Director of Public Works
805 University Avenue
Waukee, IA 50263
RE: Pay Request #2
SE Westown Pkwy Extension and GPP Greenbelt Weirs
SE Parkview Crossing Dr. to Grand Prairie Pkwy
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on May 23, 2017.
Submitted Quantity
• 0.11 LS of Item 1.1, Construction Staking
• 0.90 LS of Item 1.2, Mobilization
• 0.75 LS of Item 2.1, Clearing & Grubbing
• 1318 CY of Item 2.2, Topsoil, Onsite
• 8287 CY of Item 2.3, Excavation, Class 10, Onsite
• 10,632 CY of Item 2.4, Excavation, Class 10, Borrow
• 0.50 LS of Item 3.1, Dewatering
• 37 LF of Item 4.4, 72" RCP Storm Sewer
• 665 LF of Item 4.8, Subdrain, PVC, 4"
• 3 EA of Item 4.10, Clermont, Type A-1
• 1 EA of Item 4.11, Subdrain Connection to Intake or Storm Sewer
• 0.11 LS of Item 9.7, SWPPP Management
• 313 LF of Item 9.8, Silt Fence Installation
• 2.0 EA of Item 9.10, Inlet Protection
• 183 CY of Item 12.2, Excavation, Class 20
• 168.5 CY of Item 12.3, Structural Concrete (RCB)
• 24,779 LB of Item 12.4, Reinforcing Steel
• 366 CY of Item 12.8, Excavation, Class 20
• 200.4 CY of Item 12.9, Structural Concrete (Misc.)
• 24,089 LB of Item 12.10, Reinforcing Steel
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay McAninch
Corp. of Des Moines, Iowa in the amount of $745,022.03 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Foth Infrastructure and Environment, LLC
1 V~-117--
Joshua C. DeBower, P.E., Lead Civil Engineer Encl: Pay Request #2 dated 05/16/17
8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642
Waukee Public Works Department
' 805 Univerelty Avenue
Wauke, IA 50263
Phone (515) 978-7920
Fee (515)907.3979
Waukee
Contractor: MLANo1hCOrporati0n
4001 Delaware Avenue
Des Moines, IA 50313
Phone (515) 267-2500
PAY REQUEST 2
Project Title
SE W.erown Pkwy Extension and GRP Greenbelt Weirs
BE Parkvlew Cnor,ring or W Grand Prairie Pkwy
Waukee IA
Project File No,
Project Number 1 UW0G1.d2
Purchase Order Number
ON9. Controm Arnmal&Date
$2,103,29D.59 v9rz%]
Notice to Proceed Date
2117G017
Estimated Completion Data
WIES017
Pay Period
9112.17 to 412MD17
Pay Request Number
2
Date
511612%T
Contract lD
BID ITEMS
Rem
No.
Item
Cotle
Description
Unit
Esl.
pry.
UnR
Price
Boomed
Price
Quantity
Completed
Value
Completed
DIVISION 1 -GENERAL
11
10.NA1000
CONSTRUCTION STAKING
LS
1
$1170000
$11,700.00
025
$292500
1.2
1090.h2000
MOBILIZATION
I L$
1
1 $114,600,001
$114,600 001
1 GD
I 1114,6D09D
DIVISION 2 - EARTH WORK, SUBGRADE AND SUBBASE
21
2010.U000
CLEARING B GRUBBING
53,BOO.OD
53.600.00
iSu
$1 sun re
2.2
2m0.0�100O
TOPSOIL ON 017E
95]5
520.69550
istroo
$1045350
23
2010.E-1000
EXCAVATION CLASS 10, ON SITE
$500
548,11608
954]00
$48,11688
2A
2m0.E-20n0
EXCAVATION CLASS 10. BORROW
Z.�.E47
$6,18
$358.90008
1M320D
$65,493.12SO
2m0.E-ID24
BELOW GRADE EXCAVATON(CORE OUI]
EBDO
$6.]62.Be
000
$00
26
2010.G1012
$UBGRAOE PREPARATION. 121N,
sHrul
526HOU
000
$0.00
DIVISION 3 -TRENCH AND TRENCHLESS CONSTRUCTION
3.1 DEWATERINGI LS 1 $24,00ABU S240W00 050 1 112,OW.0D
DIVISION 4 -SEWERS AND DRAINS
4A
4020'A 1015
STORM SEWER, TRENCHED, FOR CUSS V, 151N.
LF
572
E]BOO
$44,61600
000
$000
42
40200.1018
STORM SEWER. TRENCHED, FOR, CLASS q 161N
LF
329
$8000
526.320.00
0,00
SOLO
4.3
4020 A RMS)
STORM SEWER. TRENCHED, RCP, CLASS III, 601N.
LE
25
$350.00
$0,95000
Dan
$OLO
44
4020 A-10]2
STORM SEWER, TRENCHED. RCP, CLASS III, R IN.
U,
ttA
S46].00
$53,23800
109.OD
SO, aVr 00
4.5
4020A-2051
STORM SEWER.TRENCHED, ROAR. CLASS A-II1. 5l'X3Z
LF
134
$226.00
53O5520D
134,OD
$E011r0
48
4030-0-1852
PIPE APRON, CONCRETE, SPX32"ARCH
EA
1
53,48Bo0
51488W
Ion
$3 488 00
41
403O131=
PIPE APRON, CONCRETE, 72 IN.
EA
1
$5.904.00
55,984D0
1.00
5598400
4.8
4040 X1004
SUBDRNN, PVC.(WAUKEE SPECIFICATIONS), 41N.
LF
885
$1630
Sir,-3950
fifi5W
$10,0nso
49
4040-A-10W
SUBDRNN, PVC. CASE D(WAUKEE SPECIFICATONSI, B IN.
LF
] 362
$1840
$43,40000
G00
SOLO
4.10
404OG100.
SUBDRNN CLEANOUT, TYPE AI
EA
6
E357.00
E214200
300
$1,07100
4.tt
4040.d1000
SUBDRNN CONNECTION TO INTAKE OR STORM SEWER
EA
1]
Q55.00
s4.335W
1.Po
$25500
4.12
4. A_R_ 00
SUBDRAIN OUTLET, W/RODENT GUARD
EA
1
$35].00
535]W
O.Po
$000
4TT
FIELD TILE AND FITRNGS, PVC, UNSPECIFIED DIA
LF
500
$11,al
Us.. be
AGO
5000
4,14
408DO-1000
JVIEEO INSPECTION OF STORM SEWER AND CULVERTS
LS
1
1 $2,910001
$2,9100o
OOD
s000
DIVISION 5 - WATER MAIN AND APPURTENANCES
51
501OA-1012
WATER MAIN, TRENCHED, PVC C900, DR 10, 121N.
I LF
1 1,110
1 53300
$36.6300
0So
SO NO
52
5010.A-1112
WATER MAIN.TRENCHED, PVCC900, DR 18.12 IN.. RESTRANEDJOINT
LF
18]
DIP SIR
1 50,9]6O0
ODD
50.00
5.3
5010-04000
WATER MAIN FITTINGS
LB
1 912
$500
$4.1. or
OOO
SOLO
5.4
5020 A-1012
VALVE, GATE, 121N
EA
3
$191900
$5.61700
8D0
SO OO
55
VALVE BO%ADJUSTMENT. MINOR
EA
1
sly, RC
596300
ED
SO DD
66
SD20.G1Dn0
FIRE HYDRANT ASSEMBLY
EA
4
St 2.rA
$11, 1720O
0.00
SOLO
5.7
5020.G1050
REMOVAL OF HYDRANT ASSEMBLY
EA
1
1141/1/0
$111111
000
SOLO
PuaOnat mm P" soureon.alvn
page 1 of 3
DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWER
SIT
6010�A1084
MANHOLE. STORM SEWER SW401, 841N,
EA
1
$5.UEG,
$6,18000
075
$483500
62
6010 A-20Y2
MANHOLE STORM SEWER, SW 402, 72 IN.
EA
1
$9.97700
$99]].00
0.50
$49805F
03
6010AARS
MANHOLE, STORM SEWER, BW-404, 9'X9'
EA
2
$31]]0.00
US 54000
2.00
563.54000
64
6010 SH501
lN.E. SINGLE GRATE, SW-501
EA
3
$2,195IS
565.500
000
$000
5.5
SIR B-1503
INIANE SINGLE GRATE W THI MANHOLE, AM 503
EA
2
$4,3W.00
$e fit? 00
0.00
so
66
.010.9-1505
INTAKE, DOUBLE GRATE. SW-505
EA
3
$3.470.00
$1OA1000
0.00
SO DD
6.7
8010.E-15W
INTAKE, DOUBLE GRATE WITH MANHOLE, SW-508
EA
2
$6,289.00
$12,5]600
000
SO OO
6.8
8010.E-1100
MANHOLE ADJUSTMENT, MNOR
EA
3
5384000
$10,92000
0.00
$DOD
69
6010-HI
REMOVAL OF MANHOLE OR INTAKE, STORM
EA
0
$4,32000
$172.0 D0
9.OR
$17.280.00
DIVISION 7 - STREETS & RELATED WORK
7.1
7010.A-1090
PAVEMENT, PCC, CLASS C, 91N.
SY
6,190
$6600
$4504AII
000
$000
7.2
7010M2090
PAVEMENT, REINFORCED PCC, CL43S C. B IN.
SY
299
$7000
$20,93000
000
5000
7.3
701D 1-1OW
PCC PAVEMENTSAMPLES AND TESTING
LS
1
$2,270,00
$2,2700D
0.00
SO OD
7.4
7G0Gt005
SHAREO USE PATH, PC4fi IN.
SY
1,418
$35.50
$50.339.00
0.00
5000
75
7030 D 1012
SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATHS, 11 IN.
By
2,044
$1t5
$643660
000
01.
7,6
7030.E-1004
SIDEWALK, FEE, 41N.
BY
725
$34.50
$25.012.50
0.00
SOLO
7Y
N.F.R.]0
SIDEWALK, PCC,6 IN.
BY
53
$460D
$2,54400
000
$A.
26
7030-61000
DETECTABLE WARNINGS
SF
fi0
$430D
$2.5B0.00
0,00
SOLO
7.9
7040 H-1000
PAVEMENTREMOVAL
BY
85
IRSO
51,472.50
00D
$0.00
DIVISION B -TRAFFIC SIGNALS AND TRAFFIC CONTROL
6t
POSTS FOR SIGNS, STEEL
lF
20
$12.50
$2.fi00 O0
000
$000
62
NPEASIGNS
SF
141
$1650
$260850
000
$0.00
8.3
PAINTED PAVEMENT MARKINGS, DURABLE
BTA
SS
$13100
$11,28904
000
$0.00
64
PAINTED SYMBOLS AND MARKINGS, DURABLE
EA
24
$204.00
$4,896.0
0.00.
MOLL
65
PAINTED PAVEMENT MARKINGS,WATERBORNE
STA
9
$B]00
$78734
000
$000
OB
TRAFFIC CONTROL
LS
1
E3,55000
$3,85000
000
SOLO
67
HANDI TYPE 111. 30"X 46
EA
3
$1,02000
$306000
0A0
$000
88
FIBER TERMINATION PANEL, 48 POSITION, RACK MOUNT
EA
2
$51000
$102000
00D
SOLO
09
FIBER OPTC TERMINATIONS
EA
72
VA
$2 MY 3.
000
SOLO
.10
CONDUIT -21N PVCMOPE
EA
3,715
$867
$12,209 D5
0.00
50.00
0.11
TRACER WIRE
STA
4050
$035
$1458 OF
000
$000
612
PULL ROPE
LF
4,050
WI'
S50]50
ODO
$000
8.13
]251NGLEMODE FIBER OPTIC CABLE. DRY CORE
EA
4850
$1.80
50,3]0.00
0.00
SOLO
814
TRPFFIC BONAUZATON
EA
1
$t 0,280.00
$10,2600D
000
OF 00
6.15
LIGHTING
EA
1
$8600000
$8600000
000
SOLO
DIVISION 9-SITEWORK AND LANDSCAPING
9.1
9016h1300
CONVENTIONAL SEEDING& MULCHING, TYPE 3
ACRE
4
$765.00
$3,36SLO
0.00.
S0D0
9.2
GOOD X17W
CONVENTIONAL SEEDING& MULCHING, WET -AND SEEDING
ACRE
2
1g000.00
$6.12000
0.00
SO DO
9.3
90BUF1100
HYDRAULIC SEEDING. FERTILIZING &MULCHING. TYPE 1(PERM. LAWN MIXTURE)
ACRE
1
$2550,00
$2.55000
000
$ODD
64
90100-14M
HYDRAULIC SEEDING. FERTILIZIW&MULCHING. TYPE 4(UBRANTEMP. MIXTURE)
ACRE
6
$183000
E1098000
000
SA BB
95
9010.13-1000
WATERING
MEN-
523
$1100
$11.441 OU
000
SOLO
96
9010-E-0000
WARRANTY
LS
1
$3,570.00
$3,90.00
000
$0.00
9.7
9040.A-1000
BTORMWATER POLLUTION PREVENTION PLAN (SWPPP),MANAGEMENT
LB
1
$3060.00
$3.W0.00
0.25
S16500
BB
90SUERER
SILT FENCE. INSTALLATION
LE
3.123
$143
$4.46589
394900
$56470]
9.9
9040 W3000
SILT FENCE, REMOVAL
LF
3123
50. D5
$156.15
0.00
5000
9.t0
9040.TH.00
INLET PROTECTION
EA
a
$153.00
$1.22400
4B0
$E20B
91t
9040.Y0320
RIP RAP, CLASS
TON
127
$560D
51112.0
142,30
$7.95680
DIVISION 12-STRUCTURES
CULVERT QUANTITIES
121
FLOODED BACKFILL
CV
t53
$]650
$tt ]04.50
000
SOLO
122
EXCAVATION, CUS520
CY
183
$26OR
$5,21550
10300
$5, 21550
123
STRUCTURAL CONCRETE REST
CY
218
$woX0
$167.394,00
168,50
$144.910.00
12.4
REINFORCING STEEL
LB
41 ]49
$326
5136.10174
24]]900
$80]]95;
125
ORNAMENTAL METAL RAILING
LF
122
EYX OD
$e.74600
000
W00
12.6
ANT GRAFFITI COATING
MY
482
$2000
$9,8<000
000
S.
GREENBELT WEIR QUANTITIES
121
GRANULAR BACKFILL
TON
1.556
$2660
$4t11*
000
SOLO
128
EXCAVATION, CLAS520
CY
1.075
$12,25
$13,18R75
3AS A
5449350
12A
STRUCTURAL CONCRETE(MGCEL.EONG)
CY
402
598300
$395,06770
20010
$196. 10
12.10
REINFORCING STEEL
LB
41078
$362
$170.42236
240M3B
$07202.1.
1211
ORNAMENTAL METAL RAILING
LF
281
$7200
$16,799.20
0.00
$100
1212
ANT GRAFFITI COATING
SY
.4
53100
5616408
0 BO
SO LO
BID ALTERNATE Yt
Al
i
I MOOTED SUBBASE, IF iBY
B,7B0
i $8.35
$55753.0
0.00
$000
Ai.2
2010-E 2000
1 EXCAVATION CLASS IO, BORROW
CY
"465
$Fm
$8,22050
000
1 $000
TOTAL
$2933,290.59
$985,W1.29
PN-IDR.3 -'"Ea ..... am
rn�..a wernr.mluu..�a. P.V. 2.13
MATERIALS STORED SUMMARY
Description
of Units
Unit Price
Exceeded! Cost
TOTAL
$0A0
PAY REQUEST SUMMARY
Total Approved
Total Lom pluletl
Contract Pnce
52, 933.20059
5985, 5D129
Approved Claims Orderl
50 lal
Appall Change Order 2
SO. DD
snowed Change Order
50 00
Revised C.m. Pace
$2.3.29059
5905Id' 21
M alerinls SNretl
SD 00
playmate Id,
$sa.21, an
Total Lamest Leae Rummage
Sg9821821
Total Pmnausly Approved(Ibt each)
Pay Request
$191204 20
Pay Requestt
Pay Request
Pay Request
Pay Requests
Pay Request
NY Request/
Pay Request
Pay Normal
Pay Request 10
Total Previously Approved
$191204_20
Amount D a e This Request
S745.02203
Perr a nl Ca mpl ele
338%
Percent of Contract Period Unrest (in Calendar 0eys, Based on NDEre b Pmeeed
Date B Contrast Cemplehen Dab)
919%
The amount $74602101 is rewmmov andad for appral for
r payn accordance with the terms of comas
Certain.,
Recommended! By
Owner
Me..,
Name
Name
Title
Title
Title:
Belo
1.1111.4m.E.daymiye y Eomeranalem
maronnvevnen mr u�em am Page 3 ot3