Loading...
HomeMy WebLinkAbout2017-06-05-J01N Alices Rd-I80 Interchange_Contract Modification 27NO 1v/aukee `1WIP THE KEY TO GOOD 11VING AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 5, 2017 AGENDA ITEM: Consideration of approval of a Contract Modification No. 27 to the Iowa Department of Transportation for the 105"' Street/Alice's Road I-80 Interchange Project with a increase in the contract of $7,854.58. FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Reason: Decrease: o Paved Shoulder, PCC, 11.5'; Longitudinal Grooving in Concrete; Recreational Trail, PCC 6"; Type B Sign, Extruded Aluminum Structural Panel Increase: o STD/S-F PCC Pavement, CL C CL 3, 10"; Detour Pavement; Granular Backfill; Electrical Circuit FISCAL IMPACT INCLUDING COSTIBENEFIT ANALYSIS: Increase the contract by $7,854.58 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Contract Modification No. 27 to the Iowa Department of Transportation for the l 05"' Street/Alice's Road I-80 Interchange Project with a net increase in the contract of $7,584.58. ATTACHMENTS: 1. Contract Modification 27 PREPARED BY: Beth Richardson/Rudy Koester REVIEWED BY: John Gibson PUBLIC NOTICE INFORMATION — NAME OF PUBLICATION: DATE OF PUBLICATION: �4 Iowa Department of Transportation Contract Modification 4/4/2017 1:10 PM Field Manager 5.3a Contract: 25-0803.175, PCC PAVEMENT - GRADE AND NEW Cont. Mod. Number 27 Revision Number Cont. Mod. Date 4/4/2017 Net Change $7,854.58 Awarded Contract Amount $13,423,922.46 Route Entered By HWY 1-80 (C31912) Jennifer Strunk Contract Location DALLAS IMN-080-3(175)119--0E-25 Short Description Decrease Items, Increase Items Description of Changes Decrease: (1) 0160 Paved Shoulder, PCC, 11.5" Decrease: (2) 0380 Longitudinal Grooving in Concrete Decrease: (3) 1000 Recreational Trail, PCC 6" Decrease: (4) 1340 Type B Sign, Extruded Aluminum Structural Panel Increase: (1) 0210 STD/S-F PCC Pavement, CL C CL 3, 10" Increase: (2) 0260 Detour Pavement Increase: (3) 0320 Granular Backfill Increase: (4) 1180 Electrical Circuit Increases/Decreases Project: 25-0803.175, 140819 009 NTF WAIT Category: 0001, WROADWAY ITEMS Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value PAVED SHLD, PCC, 11.5" 2122-5190115 0160 ORIGINAL SY-33.799 57.00000 $-1,926.54 Reason: Items are Plan quantity by Specification and need to be reduced. Field Measurements require a decrease in Quantity. STD/S-F PCC PAV'T, CL C CL 3, 10" 2301-1033100 0210 ORIGINAL SY Reason: Field Measurements require an Increase in quantity. DETOUR PAV'T 2304-0100000 0260 ORIGINAL SY 367.282 49.75000 56A40 65.00000 Reason: Detour Pavement was increased from station 1064+28 to 1064+49.71 on the EBL because the existing asphalt had • deteriorated. GRANULAR BACKFILL $18,272.28 $3,668.60 2402-0425031 0320 ORIGINAL TON 2.860 24.00000 $68.64 Reason: The plan quantity for pipe bedding needs increased to match actual measured quantities. Contract: 25-0803-175 Cont. Mod.: 27 Page 1 of 2 CMJ Iowa Department of Transportation Increases/Decreases Contract Modification 4/4/2017 1:10 PM Field Manager 5.3a Project: 25-0803-175, 140819 009 NTF WAIT Category: 0001, WROADWAY ITEMS Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value LONGITUDINAL GROOVING IN CONC 2412-0000100 0380 ORIGINAL SY-1,146.000 1.65000 $-1,890.90 Reason: The recreational trail on the bridge was not taken into account when the calculations were done for the grooving the bridge deck, therefore the quantity needs reduced. RECREATIONAL TRAIL, PCC, 6" 2511-0302600 1000 ORIGINAL SY-777,106 29,95000 $-23,274.32 Reason: As requested by the City of West Des Moines, a portion of the recreational trail on the South end was not completed, therefore the item needs reduced. ELECTRICAL CIRCUIT 2523-0000200 1180 ORIGINAL LF 1,285.000 10.56000 $13,569.60 Reason: Additional electrical circuits were required to power the existing traffic camera. TYPE B SIGN, EXTRUDED ALUM STRUCT 2524-9380001 1340 ORIGINAL SF-38.350 16.50000 $-632.78 PANEL Reason: Two W3-3 signs were not installed on the south end of the project at station 21079+60 at the request of the City of West Des Moines. Subtotal for Category 0001: $7,854.58 Subtotal for Project 25-0803-175: $7,854.58 When authorized, the contractor agrees to perform the work outlined above in accordance with provisions of the contract documents. Contract: 25-0803-175 Cont. Mod.: 27 Page 2 of 2