AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: June 19, 2017
AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 3 to McAninch
Corporation for the SE Westown Parkway Extension and Grand Prairie
Parkway Greenbelt Weirs SE Parkview Crossing Drive to Grand Prairie
Parkway Project in the amount of $403,556.42
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON:
Partial Payment No.3 is for work completed from April 29, 2017 to May 31,
2017.
FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: $403,556.42
COMMISSION/BOARD/COMMITTEE COMMENT: McAninch Corporation has requested
Payment Estimate No. 3 for the work completed on the SE Westown Parkway
Extension and Grand Prairie Parkway Greenbelt Weirs SE Parkview Crossing
Drive to Grand Prairie Parkway Project in the amount of $403,556.42. Foth
Infrastructure and Environment, LLC has reviewed the payment estimate and
recommends payment.
61 F.13-2 R XIVA 1-W110el WK11310 1 New 19
RECOMMENDATION: Approve Partial Payment No. 3
ATTACHMENTS: I. Partial Payment No. 3
II. Letter of Recommendation
PREPARED BY: Beth Richardson/Rudy Koester�K
REVIEWED BY: John Gibson
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
*Foth
June 12,2017
John Gibson
Director of Public Works
805 University Avenue
Waukee, IA 50263
RE: Pay Request #3
SE Westown Pkwy Extension and GPP Greenbelt Weirs
SE Parkview Crossing Dr. to Grand Prairie Pkwy
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on June 19, 2017.
Submitted Quantity
• 0.13 LS of Item 1.1, Construction Staking
• 0.50 LS of Item 3.1, Dewatering
• 24 LF of Item 4.3, 60" RCP Storm Sewer
• 5 LF of Item 4.4, 72" RCP Storm Sewer
• 0.13 LS of Item 9.7, SWPPP Management
• 379 LF of Item 9.8, Silt Fence Installation
• 49.40 CY of Item 12.3, Structural Concrete (RCB)
• 16,970 LB of Item 12.4, Reinforcing Steel
• 436.93 TON of Item 12.7, Granular Backfill
• 709 CY of Item 12.8, Excavation, Class 20
• 201.5 CY of Item 12.9, Structural Concrete (Misc.)
• 22,989 LB of Item 12.10, Reinforcing Steel
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay McAninch
Corp. of Des Moines, Iowa in the amount of $403,556.42 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Foth Infrastructure and Environment, LLC
"Joshua C. Deflower, P.E., Lead Civil Engineer
Encl: Pay Request #3 dated 06/12/17
8191 Birchwood Court, Suite L Johnston, IA 60131 Phone: (515) 254-1393 Fax: (515) 254-1642
=, Waukee Public Works Department
005UniverS02 Avenue
Wauk-` 63
Phonei51 5078-
Fax (5 5) 987-397920
Fax 1515190]-39]9
V/oukee
Contractor: MCAninch Corporation
4001 Delaware Avenue
Des Moines, IA 50313
Phone (515) 267-2500
PAY REQUEST 3
Projeq Tills
BE we"A'an Pkwy Extension and GPP Green6ell Weis
BE Pan._ Creasing OF in Grand Pmllle Pkwy
Waukee IA
Project File No.
Project Number 1 14Rncea
Purchase Order Number
Orig. Contract Amount B Date
42,833,280.58 V912017
Notice to Proceed Date
V171M17
Estimated Completion Date
911512017
Pay Period
42912017 l0 W3112017
Pay Request Number
3
Data
0NwAC7
Coniractl0
BID ITEMS
Item
No.
Item
Cotle
Description
Unit
Est
Oty.
Unit
Price
Extended
Price
Quantity
Completed
Value
Completed
DIVISION 1 -GENERAL
u
1096 A-1000
CONSTRL'CTIONSTAAING
w
1
$1?TD000
$1170000
03e
$4,46.0F
1.2
f090A2000
MOBILIZATION
LB
1
I S114,80000
$114,600.00
1.00
1 $114600.00
DIVISION 2- EARTH WORK, SUBGRADE AND SUBBASE
2.1
2010 C-1000
CLEARING S GRUBBING
LS
1osnge�
5,0000
1
5360000
22
2010-0-1000
TOPSOIL. ON SITE
OY
3,634
$2009550
tS1LLdu$1045350
23
2010E-1000
EXCAVATION CtAS510. ON SITE
CY
%14]
$40, 115.00
954Z,W
Sd6,11600
2d
2010£�2000
E%GVATION CIASG 10. B0RROW
CY
56.203
5]56,80006
1W32.00
665.493.12
2.5
201OF-102d
BELOW GRADE EXCAVATON (CORE OUT)
CT
1.12]
S6I6200
000
$000
2fi
2010-G-1012
SUBGRAOE PR BEAR. OPLUIN.
SY
BD99
$28,115911
000
so To
DIVISION 3-TRENCH AND TRENCE LESS CONSTRUCTION
3.1 1 OEWATERING LS 1 S24,000.00 $24,000.00 Lee I $24000W
DIVISION 4 - SEWERS AND DRAINS
41
4020 A 1015
STORM SEWER, TRENCHED, ROD. CLASS V. 151N.
LF
572
$2000
$44,A600
000
WI
02
4020A1010
STORM SEWER. TRENCHEO PC', CLASS V. 101N
LF
329
Sid 00
$26.320.00
0,00
SOOD
4.3
4020 A1060
STORM SEWER, TRENCHED. RCP. CIFOR III, 601N.
LF
25
S35B D0
5695000
24M
SS.2IF
4.4
4020-A1072
STORM SEWER. TRENCHED. RCP, CUSS III, 721N
LF
114
SEAT 00
553236.01
114.00
$53CIS 0n
45
4020 A2051
STORM SEWER. TRENCHED, ROAR, CLASS kill. 51"%3T
LF
134
$22800
$30.IRS C.
134 In
53055200
46
4030-0-1852
PIPE APRON. CONCRETE. 51"X32"ARCH
EA
1
$34SB D0
$3,4BBW
100
$31000D
47
4030SIO72
PIPE APRON. CONCRETE. 72 IN.
EA
1
$5,90400
$5.90400
1,00
$585400
46
4040-A-1004
SUBORAIN. PVC, (WAUKEE SPECIFICATIONS), 41N.
LF
Ads
51630
510,839SO
can.0
610039.50
49
404OA1006
SHEERAIN,PVC ,CASE D(WAUKEE SPECIFICATIONS, 61N.
LF
2,3fi2
51040
S43,46080
000
Sege
410
404O C-1W0
SUBORAIN CLEANOOT, TYPE A
EA
6
95]00
$214200
300
SI 1100
111
sain.1000
SUBORAIN CONNECTION TO INTAKE OR STORM SEWER
EA
11
525500
54.33500
1n0
$215 An
4.12
dD40.O-K.
SUBORAIN CUTLET ,-ROOENT GUARD
EA
1
$35700
Bill r.
.Be
so PH
413
FIELOTILE AND FlTIINGS, PVQ UNSPECIFIEDOIA
LF
no
$1100
55.500.00
0.00
Sege
4.14
4W0-B4000
110E.1NSPECTION OF STORM SEWER AND CULVERTS
LS
1
$2 au]00
$SSIOGO
000
SOLO
DIVISION 5 - WATER MAIN AND APPURTENANCES
51
5010-A 1012
WATER MAIN, TRENCHED. PVC 0900, DR 1S. 121N.
LF
1,110
53300
536.630.00
aon
SI)
5.2
GOLD 12
WATER MAIN,TRENCHED, PVC C900, DR 16, 121N.. RESTRAINED JOINT
LF
10]
$d000
s0,9]6.00
0.00
Sege
53
Win C-1000
WATER W, N FITTINGS
LB
912
5500
$d.560.00
don
$ege
5.4
5020 A 1012
VALVE. GATE, 12IN
EA
3
5? 939 W
55,51] 00
a an
50 00
5.5
VALVE BOXAOJUSTMENT, MINOR
Ep
1
§98300
$90J.OI1
0.00
500n
56
5020-C-IWO
FIRE HYDRANTASSEMBLY
EA
d
$d.2B300
St],1]200
000
$ege
$]
5020 C-lOn
REMOVAL OF HYDRANTASSEMBLY
EA
1
$?45000
$145000
000
Sege
PNrzwrdQ Imm Pxwy Erlennavlsm
rnamneuucw.n.w.Yu�.w,.m, Page 1 of 3
DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWER
61
0010-A-1084
MANHOLE STORM SEWER, 3W 401. 84 IN.
EA
1
$6,,80.00
$6.18000
075
SA63500
62
6010-A20]2
MANHOLE. STORM SEWER. SW902a21N
EA
1
09 W]00
$9.BTa.00
050
S49BB 50
63
6010�AA108
MANHOLE. STORM SEWER. SVI TAG
E.,,2
$11]i000
$83.590.00
2.0E
063.540.0E
6.4
6010.E-1501
INTAKE. S IN.LE.GATE,SW501
EA
3
$2, 111 D0
$65SS00
000
500E
6.5
6010-B-1503
INTAKE. SINGLE GRATE WTH MANHOLE, SW-503
Be
2
$430 TH
$&612.0.
0.0E
50..
68
8010.8-1505
INTAKE, OOUBLE GRATE, SW-505
EA
3
S3470.00
0104100E
000
$00E
&7
6010-81506
INTAKE, DOUBLE GRATE WITH MANHOLE WARD
EA
2
SV2B900
$1257800
000
000E
68
601OE9100
MANHOLE ADJUSTMENT, MAJOR
EA
3
53,640.00
3109200E
SW
SO gO
RR
61
REMOVAL OF MANHOLE OR INTAKE, STORM
EA
4
$43200E
$1728000
400
$1728000
DIVISION 7 - STREETS & RELATED WORK
7.1
7010-A.1I90
PAVEMENT. PRO. CLASS C, 91N.
BY
AUG.
$55.00
$45045000
000
000E
72
7010�A 1090
PAVEMENT, REINFORCED ROC. CLASS C, 91N.
BY
299
$70.00
52083000
000
500E
73
7010-I-1000
PCC PAVEMENT SAMPLES AND TESTING
LS
1
$227000
$227000
000
$0.00
TA
7030 C-1006
SHARED USE PATH. PCC, 6 IN.
BY
1.418
33550
050,3390E
000
SIT OF
7.5
ADO -D-1012
SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATHS. 12IN.
BY
2 44
$115
$1
000
000E
78
7036E-1004
SIDEWALK, POE, 41N.
BY
725
IOU 50
$25,01250
000
5000
]]
7030-E-1006
SIDEWALK, PCC, 61N.
BY
53
54000
$2,54400
000
000E
73
703OG1000
DETECTABLE WARNINGS
BE
60
$4300
825000E
000
50.00
7 9
7040IT RGOR
PAVEMENT REMOVAL
BY
95
$1550
$1,47250
0.0E
5000
DIVISION 8 -TRAFFIC SIGNALS AND TRAFFIC CONTROL
St
POSTS FOR SIGNS, STEEL
LF
2g8
$1250
52,6000E
000
5000
AS
TYPE SIGNS
BE
141
$18.5D
52.6085E
0OD
$00E
83
PAINTED PAVEMENT MARKINGS. DURABLE
BOB
05
$13300
$11,289.04
SDD
300E
04
PANTED SYMBOLS AND MARKINGS, DURABLE
EA
24
$20400
$4.8.00
000
50 D0
05
PAINTED PAVEMENT MARKINGS,WATERBORNE
STA
S
$a,0
S)67.34
SEE
500E
08
TRAFRA CONTROL
LS
1
$3.850.00
$3.850. GO
0.0E
IF TV
87
HANDHOLE, TYPE III, 30-X RE
EA
3
$1'.L.
$3,0600c
PUT
$000
BB
FIBER TERMINATION PANEL. IB POSITION, RACK MOUNT
EA
2
$510.
$IO20.0g
0,00
$00D
B.9
FIBER OPTIC TERMINATIONS
EA
72
036.0E
$2,592.00
OOF
5000
B.10
CONDUIT -21N. PVCMDPE
LF
1 3.715
$8.67
$32209.05
000
Go HE
8.11
TRACERWIRE
LF
405E
$038
3145800
000
so OR
812
PULL ROPE
OF
4,050
$015
$60250
000
500E
8.13
]2 SINGLE MODE FIBER OPTIC CABLE, DRY CORE
LF
4,65E
$1.80
$0,3700E
000
5000
B19
TRAFFIC SIGNALIZATICN
L$
1
$10,26000
$10.26000
000
$000
0.15
LIGHTING
US
1
SSS,EGO .00
S8S.000.00
000
SOTS
DIVISION 9-SITEWORK AND LANDSCAPING
91
WROA1300
CUT! THONAL SEEDING& MULCHING, TYPE 3
ACRE
44
$76500
$3,388.00
000
5000
02
9510-A-1100
CONVENTIONAL SEEDING B MULCHING. WELLAND SEEDING
ACRE
00
$400.00
$0.00
000
500E
93
9010.E-1100
HYDRAULIC SEEDING. FERTILIZING &MULCHING. TYPE 1(PERM. LAWN MIXTURE)
ACRE
10
$2,55000
$25500E
000
500E
9.4
9010.61400
HYDRAULIC SEEDING, FERTILIZING BMULCHING. TYPE 4(UBRAN TEMP. MI XTIREI
ACRE
80
$103000
$10,98000
0.0E
50.0E
9S
ANOTOU 00
WATERING
MEAL
523
$4100
$21443,00
0.00
5000
O6
NATE1000
WARRANTY
US
1
S3.$70.00
$3,VOL.
000
SOOT
9.7
9040.A 1000
STORMWATEq POLLUTION PREVENTION PLAN (SWEEP). MANAGEMENT
L$
1
$3,FBI
$306000
038
$1, 1628T
9.8
9040.N-TWO
SILTFENCE. INSTALLATION
IF
AuS
$193
$4,48589
43200E
$6, 18904
BS
ATIN.3000
SILT FENCE. REMOVAL
LF
3I123
5O05
$156.15
000
500E
9.1E
9010.T 1000
INLETPROTECTON
EA
0
$153.00
01,2240E
400
06120E
9.11
B040J03020
RIPSAP, GLARES
TON
127
5560E
07.1120E
142.3D
51 g6580
DIVISION 12-STRUCTURES
CULVERT QUANTITIES
121
FLOODED BACKFILL
CY
DO
W650
$1?70450
S.
$0DO
R2
EXCAVATION. CLASS 20
CY
I 183
1 $2. HD
$5.215.$O
POSI
S5.111 IF
123
STRUCTURAL CONCRETE (RCS)
CY
218
56600E
S187.39400
2179E
$18739400
124
REINFORCING STEEL
LB
41.749
S326
5136,10174
41799TO
$136, 10114
125
ORNAMENTAL METAL RAILING
LF
122
SOL
ST745.00
000
500E
126
ANTLGRAFFITI COATING
SY
482
$23 PEI
59,04000
00A
5000
GREENBELT WEIR QUANTITIES
127
GRANULAR BACKFILL
I TON 1
1.559
1 RBSDI
$41,389 60f
436.93
1 $11,62214
126
EXCAVATION, CLASS 20
CY
1,075
51225
$13,16875
10i500
$13.16875
129
STRUCTURAL CONCRETE(MISCELLANEOUS)
LY
102
STS300
$395.067.70
9019E
$39506770
12.10
REINFORCING STEEL
LB
97.07E
$362
$11SK2238
4707800
S1709Z236
1211
ORNAMEGTAL METAL RAILING
LF
28t
0720E
$15.79B 20
000
000E
12.12
ANTSGRAFFITI COATING
SV
264
8310E
4.HNO0
000
500D
12.13
WEIR OUTLET CONTROL. 4"DIP WITX GATE VALVE
EA
2
SB50O0
$VOO gO
000
BID ALTERNATE M1
A1.1
MODIFIED SUBBASE. B"
BY
0)BO
56.35
055.753.0E
000
$0 TT
Al2
2010.E-2000
EXCAVATION CLASS 10. BORROW
CY
-1465
E630
09,2295E
100
500E
TOTAL
$2.92Q870.59
11A1SGSNS3
Pi11-xonasltsE Keo-11, Cal-o-Asm
Page 2013
MATERIALS STORED SUMMARY
O es ctlpllen
#or Umby
Unit Pl.
Ealentletl Gosl
TOTAL
$0.80
PAY REOUESTSUMMARY
Total Approver
Comm Pnae
$2933.29059
Approver, Change Coreil
5a 120.00
Approver, Change Older
E0.0o
M$70.514
Approved Change Orcar3
S000
Reviser Comratl Prica
$2828,91059
M.H.I. Sharer,
esteems 50%
Total Earner, Leas Relainage
S1 339 78265
Total Previously Approver(Iot each)
Pay Requeall
$191 20420
Pay Request
5]45,022.03
Pay Posner 3
Pay Repuesl4
Pay Request
Pay Request
Pay Request?
Pay Practical
Pay Request
Pay Request 10
Total Previously Approver
S838.22r,
Amount Due This Request
$403.55642
Percent Cossoida
Passed Conned Period UOliaer(In Calendar Days. Based on March N Process! Dale& Contract Compliance Data)
International, 90jr556.43 IConeecla Rcom mane.... approval for Payment.. eccmrence wnh the lerma o(Ihe
Contractor
Passionateness By
dersda,
Title;
Tpt
Thus
Data
Date
Data
PR)i017L631SEV ,tm Pkw Ealenelanalsm
orl--saear—sewvm Pe0e 3 o13