AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 6 to Pohlmeier
Construction, Inc. for the Southwest Area Trunk Sewer Extension
Improvement Project in the amount of $204,521.94
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Pohlmeier Construction, Inc. has requested Payment
Estimate No. 6 for the work completed on the Southwest Area Trunk Sewer
Extension Improvements project in the amount of $204,521.94. Veenstra &
Kimm, Inc. has reviewed the payment estimate and recommends payment.
Partial Payment No. 9 is for:
• Seeding and Erosion Control
• EPA Violation and Fine
IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Partial Payment No. 6
ATTACHMENTS: I. Partial Payment No.6
II. Letter of Recommendation
PREPARED BY: Beth Richardson (?;7y-
REVIEWED BY: John Gibson
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
$204,521.94
VEENSTRA & KIMM, INC.
3000 lbesloum PaAkwav • Wt-st Des Moines, lo,va 5026-7320
515-225 8000 • 715-225-7848 UAX) • 800-247-8000 MArs)
June 13, 2017
John R. Gibson
Public Works Director
City of Waukee
805 University Avenue
Waukee, Iowa 50263
WAUKEE, IOWA
SOUTHWEST AREA TRUNK SEWER EXTENSION
PAY ESTIMATE NO. 6
Enclosed are three copies of Partial Payment Estimate No. 6 for the period between May 7,
2017 and June 8, 2017 in accordance with the contract between the City of Waukee and
Pohlmejer Construction, Inc. for the above mentioned project.
Partial Payment Estimate No. 6 is for 8-inch, 12-inch, and 24-inch sewer installed in open
cut. We have checked the estimate and recommend payment by the City Council of the
City of Waukee to Pohlmeier Construction, Inc. in the amount of $204,521.94.
Please sign all three copies of Partial Payment Estimate No. 6 in the space provided.
Return one signed copy to our office and one signed copy to Pohlmeier Construction, Inc.
The remaining copy is for the City of Waukee's records.
If you have any questions or comments, please contact us at 225-8000.
VEENSTRA & KIMM, INC.
Jordan Kappos
JDK
275274
Enclosure
cc: Rudy Koester, City of Waukee (via e-mail)
Becky Schuett, City of Waukee (via e-mail)
Pohlmeier Construction, Inc. w/ enclosure
Wes( Des Wines, Lt • Comlville, IA - Macon Cilt, IA • Sioux Ci(r. IA • Moline, IL • Cp mtt l i0d, 11 • Libvr'p, Mo
VEENSTRA & KIMM, INC.
3000 Westown Parkway • West Des Moines, Iowa 50266-1320
515-225-8000 • 515-225-7848(FAX) • 800-241-8000
ESTIMATE OF CONSTRUCTION COMPLETED
PARTIAL PAYMENT NO. 6
PROJECT TITLE. Southwest Area Trunk Sewer Extension - CITY OF WAUKEE, IOWA
Contractor: Pohlmeier Construction, Inc. Date: 6-12-2017
Original Contract Amount: $871,738.00
Pay Period: May 7, 2017 to June 8, 2017
BID ITEMS
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
VALUE
COMPLETED
TO DATE
ESTIMATED
(ORIG. CONT.)
AUTHORIZED
(INCL. GO.'S)
COMPLETED
TO DATE
1.1
Mobilization
ITS
1.000
L000
0.750
$65 000.00
$48,750.00
1.2
Erosion Control & SWEEP
LS
1.000
1.000
0.500
$10000.00
$5000.00
1.3
Stabilizi ng Material
Tons
504.000
504.000
0.000
$1.00
$0.00
1.4
Steel Sheeting Left in Place
SF
11710000
11,710,000
0.000
$23.00
$0.00
1.5
Sodding
SQ
282.000
282,000
0.000
$75.00
$0.00
1.6
Seeding
LS
1.000
1.000
0.000
$7 500.00
$0.00
1.7
6" Granular Surfacing, Special Gradation
Tons
85.000
85.000
0.000
$22.00
$0.00
1.8
Rip-RapRip-Rap
Tons
347,000
347.000
52.060
$60,00
$3123.60
1.9
8" PVC Sanitary Sewer Pie in Place
LF
624.000
624,000
602.000
$60.00
$36 120.00
1.10
12" Ductile Iron Sanitary Sewer Pipe in Place
LF
60.000
60.000
60.000
$100.00
$6 000.00
1.11
12" Sanitary Sewer Pipe in Place
LF
491.000
491,000
492M00
$67.00
$32 964.00
1.12
24" Sanitary Sewer Angered in Place in Steel Casing
LF
440.000
370.000
370.000
$530.00
$196100.00
Ductile Iron Sanitar Sewer Pi e in Place
LF
340.000
340.000
343.000
$368.00
$126224.00
4" Sanitar Sewer PI e in Place
LF
1 040000
1 110.000
1111.000
$89.00
$98 87A00
8"SW-3015tandard Manholes
Ea.
14.000
14.000
14.000
$4000.00
$56000.00
N4"
8" Manhole Extra De th
VF
52.000
52.000
53.000
$185.00
$9 805.00
obilization
LS
1.000
1.000
0.750
$10000.00
$7,500.00
.rosion
Control & SWEEP
LS
1.000
1.000
0.500
$500.00
$250.00
2.3
Stabilizing Material
Tons
158.000
158.000
0.000
$1.00
$0.00
2.4
Steel Sheeting Left in Place
SF
350.000
350.000
0.000
$23.00
$0.00
2.5
SeedingLS
1.000
1.000
0.000
$4900.00
$0.00
2.6
Rip-RapTons
50.000
50.000
0.000
$60.00
$0.00
2.7
12" Ductile Iron SanitarySewer Pipe in Place
LF
58.000
58.000
58.000
$100.00
$5 800.00
2.8
12" SanitarySewer Pipe in Place
LF
902,000
902,000
899.000
$67.00
$60 233.00
2.9
48" SW-301 Standard Manholes
Ea.
4.000
4.000
4.000
$4 000.00
$16 000.00
2.10
48" Manhole Extra Depth
VF
21,000
21.000
22.000
$185.00
$4 070.00
Original Contract Value Completed
$712,818.60
1.17
Ta art Tree Removal Agreement
ITS
1.000
1.000
1.000
$12 500.00
$12500.00
1.18
Taggart Tree Removal
ITS
1.000
1,000
1.000
$600T00
$6000.00
1.19
Taggart Fuel Barrel Removal
LS
I.000
1.000
1.000
$2 500.00
$2 500.00
1.20
The Driller Unused Casing Spacers
ITS
1 1.000
1.0001
1.000
$3 000.00
$3 000.00
Change Order No. 1 Value Completed
$24,000.00
V&Ic1ob No. 275274 Total Value Completed - Bid Iternsl
$736,818.60
Page 1 of 2
SUMMARY
Original Contract I
Total Completed
Bid Item Subtotall
$871,738.001
$712,818.60
APPROVED CHANGE ORDERS
Change Order No.
Description/Notes
Total Approved
Total Completed
1
Taggart Tree Removal
-$6,870.00
$24,000.00
2
$0.00
$0.00
3
$0.00
$0.00
4
$0.00
$0.00
5
$0.00
$0.00
6
$0.00
$0.00
7
$0.001
$0.00
8
$0.00
$0.00
9
$o.00
$0.00
10
$0.001
$0.00
Total Change Orders
-$6,870.001
$24,000.00
Total Approved
I Total Completed
Revised Contract Pricel
$864,868.001
$736,818.60
Total Completed
Total Materials Stored
$30,780.00
Total Completed Plus Materials Stored
$767,598.60
Retainage (59/6)
$38,379.93
Total Earned Less Retainage
$729,218.67
APPROVED PARTIAL PAYMENTS
Partial Payment No.
Period
Total Approved
1
December 9, 2016 to January 10, 2017
$30,875.00
2
January 11, 2017 to February 13, 2017
$83,272.49
3
February 14, 2017 to March 10, 2017
$250,000.67
4
March 11, 2017 to April 7, 2017
$16,674.87
5
April 8, 2017 to May 6, 2017
$143,873.70
6
$0.00
7
$0.00
g
$0.00
9
$0.00
10
$0.00
Total Previously Approved
$524,696.73
Amount Due This Request
$204,521.94
Note: The amount $204.521.94 is recommended for approval for payment in accordance with the terms of the Contract.
CONTRACT SUMMARY
ORIGINAL CONTRACT AMOUNT
$871,738.00
TOTAL CONTRACT AMOUNT PLUS CHANGE ORDERS
$864,868.00
THIS PARTIAL PAYMENT
$204,521.94
TOTAL PARTIAL PAYMENTS INCL THIS PAYMENT
$729,218.67
BALANCE
$135, 649.33
PERCENT COMPLETE
88.8
Recommended By:
Veenstra & Kimm, Inc.
Contractor:
Pohlmeier Construction, Inc.
Approved:
City of Waukee
Signature
Signature
Signature
Name
Jordan Kappos
Name
Chad Pohlmeier
Name
Title
Project Engineer
Title
President
Title
Date
Date
Date
Page 2 of 2