HomeMy WebLinkAbout2017-06-19-J13 UICCU_Site Plan AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: June 17, 2017
AGENDA ITEM: Consideration of approval of a resolution approving a site plan for University
of Iowa Community Credit Union (1085 E. Hickman Road)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: University of Iowa Community Credit Union, requests
approval of a site plan to allow for the construction of a 6,100 square feet
credit union. The subject property is 1.13 acres in area located at the
northwest corner of the NE Alice’s Road / E. Hickman Road intersection. In
addition to the credit union building, the site plan identifies parking areas on
the south and east sides, a trash enclosure, and a drive-thru area north of the
building. No public improvements are required as part of this site
development. Existing infrastructure will provide utilities to the site and storm
water detention will be provided underground.
The applicant has provided elevations for proposed building on the site which
meets the intent of the architectural guidelines within the Site Development
and Building Standards Ordinance.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed this project at the June 13, 2017 Commission Meeting and recommended
approval subject to remaining staff comments:
Approval of a site plan for University of Iowa Community Credit Union (1085 E. Hickman
Road)
* Commissioner Streit recuses himself from this agenda item due to a conflict of interest as his
company is providing MEP Design for the project.*
Senior Planner Andy Kass introduced the request for approval of a site plan made by the applicant,
University of Iowa Community Credit Union (UICCU). The property in question is generally located
north of Hickman Road and west of NE Alice’s Road containing approximately 1.13 acres. The
proposed project would include the construction of a 6155 square foot building to be utilized as a
credit union owned and operated by UICCU.
Mr. Kass advised the site plan indicates parking to the south and east of the site with three drive thru
bays and a trash enclosure on the north. Access to the site will be provided from the private drive that
will be shared with the adjacent Hy-Vee store to the north, providing access to ne Alice’s road or
Hickman Road. There are no sidewalks proposed at this time, however, the site will have a pedestrian
connection to the existing private sidewalk located on the south side of the private access drive.
Mr. Kass stated that al utilities are currently available to the site. Storm water detention will be
accommodated with an underground system that will ultimately connect to the existing storm sewer
located on the east side of NE Alice’s Road. All parking, open space, and landscaping requirements
have been met with the current proposed site plan.
At this time staff is comfortable with the site plan and would recommend approval of the site plan
subject to remaining staff comments.
• Commissioner Stonebrook questioned if this project would mimic the UICCU owned credit
union located near Jordan Creek Parkway. Mr. Kass advised that it would be similar, but not
an exact replica as Jordan Creek has its own elevated architecture requirements.
• Commissioner Streit questioned what the anticipated schedule was. Mr. Kass advised the
applicant would like to start right way.
• Commissioner Schmidt questioned if there would be shared access between the Hy-vee
convenience store and the bank. Mr. Kass advised that there was not a shared access between
the two locations.
Commissioner Schmidt moved to approve the Site Plan for University of Iowa Community Credit
Union (1085 E. Hickman Road). Commissioner Shanks Seconded the motion. Ayes: Stonebrook,
Hoifeldt, Shanks, and Schmidt. Nays: None. Motion Carries.
STAFF REVIEW AND COMMENT: At this time all staff comments have been addressed. Staff
recommends approval.
RECOMMENDATION: Approve the resolution
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Andy Kass, Senior Planner
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 17-
APPROVING THE SITE PLAN FOR UNIVERSITY OF IOWA COMMUNITY CREDIT
UNION (1085 E. HICKMAN ROAD)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for University of Iowa Community Credit Union, subject to remaining staff
comments on June 13, 2017; AND,
WHEREAS, the Site Plan for University of Iowa Community Credit Union is in general
conformance with §304 – Site and Building Development Standards Ordinance of the Waukee
Municipal Code; AND,
WHEREAS, the Site Plan for University of Iowa Community Credit Union is in general
conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee
Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 19th day of June, 2017 that the Site Plan for University of Iowa Community Credit Union is
approved.
____________________________
William F. Peard, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
ROLL CALL VOTE AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Brian Harrison
Shelly Hughes
Larry R. Lyon
STAFF REPORT
TO: Planning and Zoning Commission PREPARED BY: Andy Kass
RE: University of Iowa Community Credit Union –
Site Plan
DATE: June 13, 2017
GENERAL INFORMATION:
Applicant: University of Iowa Community Credit Union
Requested Action Site Plan Approval
Location and Size: Property is generally located north of Hickman
Road and west of NE Alice’s Road and
containing approximately 1.13 acres.
LAND USES AND ZONING:
Location Existing Land Use Comprehensive Plan Current
Zoning
Property in Question Vacant Community Village C-1B
North Hy-Vee Grocery Store Neighborhood Residential C-1B
South Waukee Market Place
Plat 1
Community Village PD/C-1
East Vacant Neighborhood Residential A-1
West Hy-Vee Gas Station Community Village C-1B
BACKGROUND:
The subject property is located at the northwest corner of the Hickman Road and NE Alice’s Road
intersection. The subject property was initially platted as an outlot within The Crossing at Alice’s Road
development. In 2016, the lot was platted as part of The Crossing at Alice’s Road Plat 4. The applicant
purchased the lot from Hy-Vee with the intent to construct a credit union on the property.
June 9, 2017
2 of 3
ABOVE: Aerial of the site plan (outlined in RED) in relation to the surrounding properties.
PROJECT DESCRIPTION:
The proposed project includes the construction of a 6,155 square foot building to be utilized as a credit union
owned and operated by University of Iowa Community Credit Union. The site plan identifies the building
located in the center of the site with parking located on the south and east side of the building. The building
will also feature a drive-thru component which is indicated to have three drive-thru bays as is located on the
north side of the building. The trash enclosure is also located on the north side of the site.
ACCESS AND PARKING:
Access to the site will be provided on the north side of the site from the private drive that will be shared with
the adjacent Hy-Vee store to the north. This drive provides access to NE Alice’s Road or Hickman Road.
Two points on ingress/egress are provided to the site on the north side.
The Parking Ordinance requires 3 parking spaces per 1,000 square feet of floor area and 3 queuing spaces per
drive-thru lane for banks. The required amount of parking for this proposed building is 19 spaces and a total of
9 queuing spaces. The applicant proposed to provide 34 parking spaces and indicates 9 queuing spaces for the
three drive-thru lanes.
No public sidewalks are being constructed as part of this project, however, the site plan does identify a
pedestrian connection to the existing private sidewalk that is on the south side of the private access drive.
June 9, 2017
3 of 3
UTILITIES:
Utilities are currently available to the site. The site plan identifies the water connection coming from an
existing private water main on the north side of the site. The sanitary connection will be provided from the
existing 10-inch sanitary sewer that is located along Hickman Road. Storm water detention will be
accommodated with an underground system. The system will connect to an existing 21-inch storm sewer that
is located along the east side of NE Alice’s Road and which will outlet the water to the north.
OPEN SPACE AND LANDSCAPING:
A minimum of 20% of the project area is required to be open space and the site plan indicates that 38.91%
open space will be provided. Landscaped areas fronting the parking areas along Hickman Road and NE Alice’s
Road will be provided. Additional screening around the transformer and trash enclosure is also indicated on
the Landscape Plan.
ELEVATIONS:
The proposed building is a single story building. The proposed materials include cultured stone, architectural
metal paneling, fiber cement paneling, and glazing. Staff feels comfortable with the proposed elevations as they
demonstrate the appropriate use of primary and secondary materials as identified in the Site Plan Ordinance.
In addition, the elevations provide architectural interest on all sides on the building.
MISCELLANEOUS:
The applicant has submitted a photometric plan and associated light fixture cut sheets. The photometric plan and
fixtures meet the requirements outlined within the Site Plan Ordinance.
STAFF RECOMMENDATION:
At this time staff is comfortable with the site plan and would recommend approval of the site plan subject to
remaining staff comments.
CITY OF WAUKEE
Andy Kass, AICP
Senior Planner
BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_01_TSH.dgn5/30/20171:53:37 PMSnyder1:400Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSSINDEX OF SHEETS
PHONE: (319)-341-2103
CONTACT: DICK NOBLE
PO BOX 800, NORTH LIBERTY, IA 52317
UNIVERSITY OF IOWA COMMUNITY CREDIT UNION
VICINITY MAP
1"=200'
Date
IOWALICENSEDPROFESSIONAL EN
GI
NEERLicense Number
Pages or sheets covered by this seal:
My License Renewal Date is December 31, 2017
18954
18954
CANNON
ERIC D.Eric D. Cannon, P.E.
under the laws of the State of Iowa.
licensed Professional Engineer
supervision and that I am a duly
by me or under my direct personal
engineering document was prepared
I hereby certify that this
Sheets 1-7
PROJECT LOCATION
UNIVERSITY OF IOWA COMMUNITY CREDIT UNION TITLE SHEET1 1200'E HICKMAN ROAD / US HW 16 NE ALICES ROADOWNER / DEVELOPER
CITY OF WAUKEE, DALLAS COUNTY, IOWA
1085 E. HICKMAN ROAD
FOR
SITE PLAN
PROJECT MANAGER
(515) 964-2020
ANKENY, IA 50023
2727 SW SNYDER BLVD
SNYDER AND ASSOCIATES, INC.
ERIC D. CANNON
STORMTECH DETENTION BED DETAILS
STORMTECH DETENTION BED DETAILS
LANDSCAPE PLAN
SIDEWALK RAMP DETAILS
EROSION AND SEDIMENT CONTROL PLAN
GRADING PLAN
UTILITY PLAN
DIMENSION PLAN
PROJECT INFORMATION
TITLE SHEET
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_02_NTS.dgn5/30/20171:53:37 PMSnyder1:1Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSSGENERAL NOTES
BULK REGULATIONS
ZONING
GENERAL USE
IMPERVIOUS AREA
PERVIOUS AREA
LEGAL DESCRIPTION
TOTAL AREA OF DISTURBANCE
BENCHMARKS
IARTN DERIVED - US SURVEY FEET
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET
IOWA STATE PLANE SOUTH COORDINATE SYSTEM
CONTROL POINTS
BM2
BM1
ROAD, EAST SIDE OF SITE.
BURY BOLT ON HYDRANT 50' SOUTH OF DOUBLE INTAKE ON WEST SIDE OF SE ALICE'S
ELEV=1030.15
BURY BOLT ON HYDRANT NORTH OF HY-VEE CAR WASH, NORTHWEST CORNER OF SITE.
ELEV=1032.38
SOUTHWEST CORNER OF SITE.
MAG NAIL IN CENTER OF ASPHALT SIDEWALK IN LINE WITH EAST CURB OF HY-VEE CAR WASH,
N=588675.47 E=1543611.45
QUADRANT OF HICKMAN ROAD & SE ALICE'S ROAD, SOUTHEAST CORNER OF SITE.
CUT "X" IN CONCRETE AT SOUTHWEST CORNER OF TRAFFIC SIGNAL BASE IN THE NORTHWEST
N=588671.50 E=1543856.09
ALICE'S ROAD & SOUTH ENTRANCE TO HY-VEE PARKING LOT, NORTHEAST CORNER OF SITE.
CUT "X" ON BACK OF CURB 2' WEST OF SIDEWALK IN THE NORTHWEST QUADRANT OF SE
N=589001.29 E=1543855.71
SIDE OF HY-VEE PARKING LOT, NORTHWEST CORNER OF SITE.
CUT "X" ON BACK OF CURB ON SOUTH SIDE OF 4TH ISLAND TO THE WEST AT THE SOUTH
N=588992.32 E=1543578.75
CP4
CP3
CP2
CP1
93
93.0
93
C
OC
FO
E
OE
4" G
4" HPG
8" W
8" S
12" ST12" ST
G
G
AST
UST
Features Existing Proposed
G
EB
W
LEGEND
8" W(*)
8" S(*)
4" G(*)
4" HPG(*)
C(*)
OC(*)
FO(*)
E(*)
OE(*)
DUCT(*)
93.0
1
Soil Boring
Mailbox
Satellite Dish
Sign
Above Ground Storage Tank
Underground Storage Tank
Fence Post or Guard Post
Gas Apparatus
Gas Manhole
Gas Valve
Fiber Optic Handhole
Fiber Optic Manhole
Communication Handhole
Communication Manhole
Communication Pedestal
Traffic Sign
Electric Transformer
Electric Box
Yard Light
Street Light
Utility Pole with Transformer
Utility Pole with Light
Guy Anchor
Utility Pole
Well
Water Service Valve
Water Main Valve
Fire Hydrant on Building
Fire Hydrant
Double Storm Sewer Intake
Single Storm Sewer Intake
Storm Manhole
Storm Sewer with Size
Sanitary Manhole
(*) Denotes the survey quality service level for utilities
Test Hole Location for SUE w/ID
Duct Bank
Sanitary Sewer with Size
Water Main with Size
High Pressure Gas Main with Size
Gas Main with Size
Overhead Electric
Underground Electric
Fiber Optic
Overhead Communication
Communication
Coniferous Tree \ Shrub
Deciduous Tree \ Shrub
Tree Stump
Tree Line
Fence (Silt)
Fence (Wood)
Fence (Chain Link)
Fence (Barbed, Field, Hog)
Contour Elevation
Spot Elevation
UTILITY CONTACT INFORMATION
SYSTEM, TICKET NUMBER 551701088.
RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST
UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS
dacheson@urbandalewater.org
515-278-3940
DALE ACHESON
URBANDALE WATER UTILITY
pmay@mediacomcc.com
515-246-2252
PAUL MAY
MEDIACOM COMMUNICATIONS
clark.lundy@upnllc.com
515-321-3336
CLARK LUNDY
UNITE PRIVATE NETWORKS, LLC\
joni.mccabe@consolidated.com
507-387-1770
JONI MCCABE
CONSOLIDATED COMMUNICATIONS
jeff@netins.com
515-830-0445
JEFF KLOCKO
AUREON NETWORK SERVICES
thomas.sturmer@centurylink.com
720-578-8090
TOM STURMER
CENTURYLINK
lvandee@xeniawater.org
515-676-2117
LAIRD VAN DEE
XENIA RURAL WATER DISTRICT
MECDSMDesignLocates@midamerican.com
515-252-6632
CRAIG RANFELD
MIDAMERICAN ENERGY
troyer@waukee.org
515-987-4363
TIM ROYER
CITY OF WAUKEE
CLEAR PER EMAIL
CLEAR PER MAP
CLEAR PER MAP
FO2-FIBER OPTIC
FO1-FIBER OPTIC
C1-COMMUNICATION
W1-WATER
OE1-OVERHEAD ELECTRIC
E1-ELECTRIC
S-SANITARY SEWER
W2-WATER
G1-GAS
UTILITY WARNING
QUALITY LEVEL A.
UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED EXCEPT WHERE NOTED AS
ITEMS IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE
SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE
UTILITY QUALITY SERVICE LEVELS
CHARACTERISTICS.
WELL AS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER
VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS
UNDERGROUND UTILITIES OBTAINED BY ACTUAL EXPOSURE OR
IS HORIZONTAL AND VERTICAL POSITION OF QUALITY LEVEL (A)
OF SUBSURFACE UTILITIES.
DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION
APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO
INFORMATION IS OBTAINED THROUGH THE QUALITY LEVEL (B)
QUALITY D INFORMATION.
PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH
PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND USING
INFORMATION IS OBTAINED BY SURVEYING AND QUALITY LEVEL (C)
RECORDS OR ORAL RECOLLECTIONS.
INFORMATION IS DERIVED FROM EXISTING UTILITY QUALITY LEVEL (D)
ARE BASED ON THE CI / ASCE 38-02 STANDARD.
THE UTILITY TYPE AND WHEN APPLICABLE, SIZE. THE QUALITY LEVELS
QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH PROJECT INFORMATION2 21'BEING AND OFFICIAL PLAT DALLAS COUNTY, IOWA.
LOT 2, THE CROSSING AT ALICE'S ROAD PLAT 4
MINIMUM OPEN SPACE = 15%
REAR YARD = 20 FEET
SIDE YARD = 20 FEET
FRONT YARD= 50 FEET
C-1B
17,735 SF
31,910 SF
1.13 AC
ACCESSIBLE SPACES )
( INCLUDING 2 HANDICAP
34 SPACES PROVIDED
19 SPACES REQUIRED
(6070 SF / 1000 SF) x 3 SPACES = 19 SPACES
RETAIL/ GENERAL COMMERCIAL:
3 SPACES PER 1000 SF OF BUILDING
CREDIT UNION
BUILDING DESCRIPTION
BUILDING HT = 21'-0"
BUILDING SIZE = 6070SF
CONSTRUCTION OF ANY MONUMENT SIGNAGE AND BUILDING SIGNAGE.
FF. CONTRACTOR TO ACQUIRE SIGN PERMITS ISSUED BY THE DEVELOPMENT SERVICES DEPARTMENT PRIOR TO
EE. CONTRACTOR IS TO COORDINATE ANY LANE/ROAD CLOSURES WITH THE CITY OF WAUKEE.
CONSTRUCTION.
DD. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO
CC. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE STORZ FITTINGS.
AND CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TIE-INS.
BB. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT
SLURRY FROM CONCRETE OPERATIONS TO DISCHARGE OFFSITE.
AA. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE
SHALL WITNESS ALL TESTING.
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY
Z. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD
SHALL PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS.
GRADES FOR DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR
Y. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT
EXPANSION JOINTS SHALL BE SEALED.
JOINT BETWEEN SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL
X. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION
W. ALL CONSTRUCTION TO EXISTING SANITARY MANHOLES SHALL BE CORE DRILL WITH A LINK SEAL.
TO THE CITY OF WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED.
WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED
V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF
GRANTED APPROVAL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN
CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION.
T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE
PEDESTRIAN FACILITIES.
S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING
CONSTRUCTION ACTIVITIES BEGINNING.
R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO
DISTANCE FROM THE WATER MAIN TO THE STORM SEWER IS AT LEAST TEN FEET.
GREATER. O-RING GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL
SEWER SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR
Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM
SERVICES WITH UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION.
P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY
SHALL BE MET BY CONTRACTOR. A COSESCO PERMIT IS REQUIRED FOR THIS PROJECT.
MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS
NECESSARY. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL
O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS
SITE WORK.
N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE
EVENT.
SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN
M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND
(GUTTER), UNLESS OTHERWISE NOTED.
L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB
GRADES TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL.
K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH
INTO THE PROJECT TO AN APPROVED OFF-SITE WASTE SITE.
J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED
WAUKEE STANDARDS.
ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF
IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE
BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO
THE TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS
I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT
ACCORDINGLY ON THE AS-BUILT DOCUMENTS.
H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED
PLANS SHALL GOVERN.
G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED
COMPACT TO 95% MAXIMUM DENSITY.
F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND
PLANNED WEEKEND OR HOLIDAY WORK.
ALSO NOTIFY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY
E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL
ANTICIPATED LANE CLOSURE.
AND ACTIONS. THE CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY
ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE
D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON
STRUCTURE.
C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF
REPORTS PREPARED BY OTHERS.
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, STATEWIDE URBAN DESIGN AND SPECIFICATIONS AND THE SOILS
B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD
BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL
EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR
PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE,
A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY
3 SPACES PER DRIVE-THRU LANE PROVIDED
3 SPACES PER DRIVE-THRU LANE REQUIRED
DRIVE-THRU QUEING SPACE REQUIREMENTS
PARKING REQUIREMENTS
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
P
AASHTO 2001 (US)
(c) 2016 Transoft Solutions, Inc. All rights reserved.
EB
G G
FO
FO
C
FO
C
E
G
ICV
BM1
BM2
CP1
CP2
CP3
CP4
F.L.=1024.36 18" RCP W
F.L.=1022.32 18" RCP S
F.L.=1022.24 21" RCP N
Rim=1029.01
F.L.=1023.46 15" RCP E
F.L.=1023.30 18" RCP N
Double Intake=1027.46
Rim=1028.12
F.L.=1023.81 15" RCP W
Double Intake=1027.57
18" RCP E
F.E.S.=1025.44
F.L.=1022.99 18" RCP SSW
F.L.=1022.18 24" RCP N
Double Intake=1027.85
F.L.=1024.31 30" RCP W
F.L.=1024.21 42" RCP S
F.L.=1023.97 48" RCP ENE
Throat Intake=1029.60
Rim=1030.46 Concrete SidewalkInv=1011.92 10" Truss E
Inv=1011.88 10" Truss W
Rim=1033.08
Concrete Sidewalk
Asphalt SidewalkConcreteConcrete ConcreteConcrete 21" RCP18" RCP
18" RCP18" RCP18" RCP15" RCP
42" RCP30" RCP
48" RCP
Inv=1020.00 10" Truss S
Inv=1012.97 10" Truss S
Inv=1012.53 10" Truss E
Inv=1012.43 10" Truss N
Inv=1012.21 10" Truss W
Rim=1028.89
18" RCP
15" RCP F.L.=1023.14 18" RCP WSW
F.L.=1023.07 18" RCP NNE
Rim=1029.62
F.L.=1024.22 18" RCP ENE
F.L.=1024.10 15" RCP W
Intake=1029.86
Building10
12
IA HWY 6/ EAST HICKMAN ROAD NE ALICE'S ROAD10
PRIVATE DRIVE
FFE=1031.25
T
EEEEE
6,155 SF BUILDING
167.35' 243.69' 209.01' 187.35' 56.15'20' Building Setback Line20' Building Setback Line
50' Building Setback Line50' Building Setback Line
Bk2001 Pg13970
Existing Sign Easement
Private Sanitary Sewer Easem ent
20' Private Storm Sewer Easement
and Gas Easement
8' Private Water Main
ROW TO BE ACQUIRED
Bk2001 Pg172325' MidAmerican Transmission EasementBk702 Pg2316' Temporary Construction EasementBk2006 Pg19329
Easement
Telecommunications
16.5'
Bk2000 Pg2135
Easement
11.5' Sanitary Sewer BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_03_DIM.dgn5/30/20171:53:40 PMSnyder1:20Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSSDIMENSION PLAN CONSTRUCTION NOTES
Sidewalk 4" min.
6" Adjacent pavement
18"12"
2% max.1" radius
Sealed 'E' joint
FORM
GRADE
ELEV.
per plans
Slope as
''2
14
6"
3"R
R 3"
3
1
3
2
''2
17
6" STANDARD CURB INTEGRAL SIDEWALK AND CURB DETAIL
DIMENSION PLAN3 320'0
SCALE (FEET)
20
TYP
TYP
TYP
10.0'R
10.0'R
25.0'
R 10.5'10.0'10.0'24.0'3.0'R3.0'
R
3.0'R
TYP 37.5'24.0'9.0'9.5'6.0'18.0'25.0'18.0'7.8'
7.5'
24.0'11.3'6.0'6.0'
5.0'
6.0'
50.0'
R4.0'4.0'4.0'4.0'25.0'10.2'
9.0'9.0'9.0'4.4'21.0'20.4'
27.5'
5.0'11.1'8.
0'R1.75'R1.75'R3.5'3.5'100.7'59.7'11. COORDINATE CABLE AND TELEPHONE SERVICES WITH UTILITY PROVICER PRIOR TO CONSTRUCTION.
10. COORDINATE ELECTRICAL AND NATURAL GAS SERVICES WITH UTILITY PROVIDER PRIOR TO CONSTRUCTION.
CONSTRUCTION INFORMATION.
9. SEE ARCHITECTURAL DRAWINGS FOR DETAILED BUILDING, WALL, DRIVE THROUGH CANOPY AND EQUIPMENT FOR
8. SEE STRUCTURAL PLANS FOR BUILDING FOUNDATION AND STOOP LOCATIONS.
B. MONUMENT SIGN. SEE ARCHITECTURAL PLANS FOR DETAILS.
A. TRASH ENCLOSURE AND TRANSFORMER ENCLOSURE, SEE ARCHITECTURAL PLANS FOR DETAIL.
7. SITE AMENITIES, PROVIDE THE FOLLOWING:
CONSTRUCTION.
ASPECTS OF OVERHEAD ELECTRIC LOCATIONS WITH FRANCHISE UTILITY PROVIDERS PRIOR TO
C. FUTURE OVERHEAD ELECTRIC UTILITY POLE LOCATIONS BY OTHERS. CONTRACTOR TO COORDINATE ALL
OWNER ALL ASPECTS SITE LIGHTING PRIOR TO CONSTRUCTION.
B. SITE LIGHTING SHOWN IS FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR TO COORDINATE WITH THE
ELECTRICAL SERVICE AND TRANSFORMER PAD.
A. CONTRACTOR TO COORDINATE WITH THE UTILITY OWNER AND PROPERTY OWNER ALL ASPECTS OF
6. SITE LIGHTING, PROVIDE THE FOLLOWING:
A. PROVIDE VAN ACCESSIBLE PARKING SIGNAGE AS PER ADAAG REQUIREMENTS.
5. SIGNS, PROVIDE THE FOLLOWING:
C. ACCESSIBLE AISLE. 45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN.
B. PAINTED STATE OF IOWA APPROVED ACCESSIBLE PARKING SYMBOL.
A. 4" WIDE PAINTED PARKING STALL LINES.
4. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING:
H. PCC ISLAND WITH 6" PCC INTEGRAL CURB
G. INTEGRAL SIDEWALK AND CURB. SEE DETAIL 2/3.
F. 6" STANDARD CURB. SEE DETAIL 1/3.
E. PEDESTRIAN RAMP WITH A MAXIMUM SLOPE OF 8.33% AND 1.5% CROSS SLOPE.
D. TAPER CURB, 6' DISTANCE.
C. PCC SIDEWALKS, 4" DEPTH PAVEMENT.
DENSITY.
B. 7" DEPTH PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR
DENSITY.
A. 6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR
3. PAVEMENTS, PROVIDE THE FOLLOWING:
C. EXISTING TREE.
B. EXISTING SIDEWALK AND ADJACENT PAVEMENT TO NEAREST JOINT.
A. SAWCUT TO FULL DEPTH AND REMOVE PAVEMENT AT DRIVE CONNECTION.
2. DEMOLITION, REMOVE THE FOLLOWING:
CONSTRUCTION.
B. PROTECT EXISTING UTILITIES, ADJUST PROPOSED IMPROVEMENTS AND TO GRADE AS REQUIRED FOR
A. PAVEMENTS TO REMAIN.
1. EXISTING FEATURES, PROTECT THE FOLLOWING:25.0'R25.0'R 25.0'R2
5.
0'R1.75'
R
1.75'R24.0'18.0'9.5'3.0'R
3.0'R
35.0'R
3.0'R
9.5'9.0'15.0'10.00'R2A
2A
2B
2B 2B
2B
4A
4A
4A
4B
4C
5A 3E
3E
3G
3F
3B
3A
7A
3F
3F
8 9 10
3G
1A
1A
1A
1B
3B
3B
3F
3E
3E
3A
9
3C
3B
3A
3C
3F
3F
1B
1B
1B1B
1B
1B
3C
11
3F
3C
3C
3C
3C
3E
3E3F
3D
3D
9
9
7B
7B
6B
6B
6B
6B
6B
6B
6A
3G3D
3F
2C
2C
2C
12
2C
6A
6C
6C
3H
EB
G G
FO
FO
C
FO
C
E
G
ICV
BM1
BM2
CP1
CP2
CP3
CP4
F.L.=1024.36 18" RCP W
F.L.=1022.32 18" RCP S
F.L.=1022.24 21" RCP N
Rim=1029.01
F.L.=1023.46 15" RCP E
F.L.=1023.30 18" RCP N
Double Intake=1027.46
Rim=1028.12
F.L.=1023.81 15" RCP W
Double Intake=1027.57
18" RCP E
F.E.S.=1025.44
F.L.=1022.99 18" RCP SSW
F.L.=1022.18 24" RCP N
Double Intake=1027.85
F.L.=1024.31 30" RCP W
F.L.=1024.21 42" RCP S
F.L.=1023.97 48" RCP ENE
Throat Intake=1029.60
Rim=1030.46 Concrete SidewalkInv=1011.92 10" Truss E
Inv=1011.88 10" Truss W
Rim=1033.08
Concrete Sidewalk
Asphalt SidewalkConcreteConcrete ConcreteConcrete 21" RCP18" RCP
18" RCP18" RCP18" RCP15" RCP
42" RCP30" RCP
48" RCP
Inv=1020.00 10" Truss S
Inv=1012.97 10" Truss S
Inv=1012.53 10" Truss E
Inv=1012.43 10" Truss N
Inv=1012.21 10" Truss W
Rim=1028.89
18" RCP
15" RCP F.L.=1023.14 18" RCP WSW
F.L.=1023.07 18" RCP NNE
Rim=1029.62
F.L.=1024.22 18" RCP ENE
F.L.=1024.10 15" RCP W
Intake=1029.86
Building10261027102810281028102910291029102910291029
1029
1029
1029102910291030
1030103010301030103010301030 1030
1030
10301031
1031
103110311031103110311031103110321032103210321032
1033103310341035 10271028102910291029
10301
0
3
0
1030 10301030 103010
3
0
1030
1031
1
0
3
1
1031
1031
10311031
1031103110311032
1032
1033
10
12
IA HWY 6/ EAST HICKMAN ROAD NE ALICE'S ROAD10
PRIVATE DRIVE
FFE=1031.25
GAS GAS6"W6"W
H
T
6"S 6"S150'
Existing Hydrant Coverage
150' Existing Hydrant Coverage
EEEEE
6,155 SF BUILDING
150' Proposed Hydrant Coverage20' Building Setback Line20' Building Setback Line
50' Building Setback Line50' Building Setback Line
Bk2001 Pg13970
Existing Sign Easement
Private Sanitary Sewer Easem ent
20' Private Storm Sewer Easement
and Gas Easement
8' Private Water Main
ROW TO BE ACQUIRED
Bk2001 Pg172325' MidAmerican Transmission EasementBk702 Pg2316' Temporary Construction EasementBk2006 Pg19329
Easement
Telecommunications
16.5'
Bk2000 Pg2135
Easement
11.5' Sanitary Sewer BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_04_UTL.dgn5/30/20171:53:41 PMSnyder1:20Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSS4 420'0
SCALE (FEET)
20 UTILITY PLANUTILITY PLAN CONSTRUCTION NOTES
64 LF OF 12" RCP @ 0.45%85 LF OF 15" RCP @ 0.40%102 LF OF 12"RCP @ 2.3%63 LF OF 12" RCP @ 0.70%50 LF OF 18"RCP @ 0.30%
2B
2A
2A
2C
2D
2D
2A
1B
1C 1A
1D
1D
1E
3
3
CLASS B CONCRETE
MANHOLE WALL
PVC OR DI TEE
1'-0"MANHOLE BASE
STRAP AT 2'-0" O.C.
STAINLESS STEEL
1/4" X 2"
ANCHOR (TYP.)
EXPANSION
STAINLESS STEEL
3/8" DIA.
VARIES
DRAWINGS; LENGTH
SIZE AS SHOWN ON
PVC OR DI PIPE;
CITY OF WAUKEE INTERNAL DROP CONNECTION 48 LF
O
F 15"R
C
P
@ 2.6%
TP=1020.98(Storm)
BP=1022.48(Water)
INV=1025.25
BOTTOM=1020.81
INV=1022.81 (OUT-N)
INV=1022.91 (IN-NW)
INV=1023.84 (OUT-E)
RIM =1030.38
DRAIN BASIN W/ SOLID LID
ST-4B 30" NYLOPLAST
BOTTOM=1020.81
INV=1022.81 (OUT-N)
INV=1022.91 (IN-S)
INV=1023.84 (OUT-W)
RIM=1029.46
W/ SOLID LID
ST-5A 30" NYLOPLAST DRAIN BASIN
INV=1022.47 (OUT-E)
INV=1022.57 (IN-W)
RIM=1026.25
ST-7 INTAKE, TYPE SW-511
INV=1024.57 (OUT-E)
INV=1024.67 (IN-S)
T/C=1030.00
ST-3, INTAKE, TYPE SW-501
INV=1025.11 (OUT-N)
INV=1025.21 (IN-S)
T/C=1030.05
ST-2, INTAKE, TYPE SW-501
INV=1025.25
T/C=1030.00
ST-1, INTAKE, TYPE SW-501
INV=1025.26
T/C=1029.95
ST-5, INTAKE, TYPE SW-501 67.0 LF OF 6" SANITARY @ 2.0%74.0 LF OF 6" SANITARY @ 2.0%
INV=1023.95
INV=1022.55
TP=1021.36(Water)
BP=1022.86(Storm)
4A
4B
1F
NOT TO SCALE
OD
OD+ 6"
3" OD/4
SECTION A-A
A 3"12"OD12"
A
New sewer
material
1 •" compressible
Existing utiltiy
free of concrete.
Keep the 12" utility clear zone
Form interior surface of footings.
New sewer
Undisturbed soil
PCC
material
1 •" compressible
with Figure 3010.101
Bedding: Comply
12" or less
PIPE SUPPORT DETAIL
water, gas, etc.sewer,
4
1
4
2
NEW INV=1022.35
AS NECESSARY
REPAIR WALL OF MANHOLE
INTO EXISTING MANHOLE AND
CORE DRILL AND CONNECT
REMOVE FES AND FOOTING
1G
5
6
6 6
6 6
18" RCP STORM SEWER
REMOVE AND RELAY EXISTING
41 LF OF 18"RCP @ 0.30%
OR SIMILAR
AND PROVIDE TYPE Q CASTING
REMOVE EXISTING CASTING
INV=1022.25
15.0 LF OF 6" SANITARY @ 2.0%
GENERAL CONSTRUCTION NOTES
TESTED AND DECHLORINATED.
E. ALL WATERMAIN SHALL BE PRESSURE AND BACTERIA
D. ALL SANITARY MANHOLES TO BE VACUUM TESTED.
MANHOLES SHALL BE VACUUM TESTED.
REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER
PAVING. THE CITY OF WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE
C. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO
WAUKEE ENGINEERING DEPARTMENT.
PUBLIC IMPROVEMENTS AND ANY TESTING OR TIE-INS SHALL BE WITNESSED BY THE CITY OF
B. ALL UTILITIES SHALL BE TESTED TO THE CITY OF WAUKEE STANDARD SPECIFICATION FOR
UTILITY.
A. NOTIFY THE CITY OF WAUKEE AT LEAST 48 HRS PRIOR TO CONNECTING TO ANY PUBLIC
SEPARATION
AS NECESSARYTO PROVIDE MINIMUM 18"
CROSSING AND LOWER EXISTING WATER
CONTRACTOR VERIFY WATER MAIN
FOR INVERT ELEVATIONS
SEE STORM TECH DESIGN
T/C=1029.00
DRAINAGE BASIN W/ 2'X3' CASTING
ST-6, INTAKE, 30" NYLOPLAST
6. CRITICAL CROSSING. PROVIDE 18" MINIMUM SEPARATION AND VERIFY PRIOR TO CONSTRUCTION.
PRIOR TO CONSTRUCTION.
5. ROOF DRAIN CONNECTION. SEE MECHANICAL PLANS FOR DETAILS AND VERIFY LOCATION, SIZE AND ELEVATION
B. ELECTRICAL SERVICE.
A. TRANSFORMER AS PER UTILITY PROVIDER SPECIFICATIONS.
4. ELECTRICAL SERVICE. COORDINATE WITH UTILITY PROVIDER AND MECHANICAL PLANS PRIOR TO CONSTRUCTION.
CONSTRUCTION.
3. GAS SERVICE AND METER LOCATION. COORDINATE WITH UTILITY PROVIDER AND MECHANICAL PLANS PRIOR TO
D. CLEANOUT.
CONSTRUCTION. VERIFY SIZE, LOCATION AND ELEVATION.
C. CONNECT TO PROPOSED BUILDING SERVICE. REFER TO BUILDING PLUMBING PLANS PRIOR TO
B. CONNECT TO EXISTING SANITARY SEWER MANHOLE WITH INTERNAL DROP CONNECTION. SEE DETAIL.
ACHIEVE DESIRED DEPTH.
A. 6" SANITARY SEWER SERVICE LINE. PROVIDE 2% MINIMUM SLOPE AND 1:1 RISER SECTION AS NECESSARY TO
2. SANITARY SEWER SERVICES; PROVIDE THE FOLLOWING:
K. REMOTE FIRE DEPARTMENT CONNECTION. COORDINATE WITH MECHANICAL PLANS.
J. HYDRANT ASSEMBLY
I. FIRE RISER ROOM . SEE ARCHITECTURAL PLANS FOR DETAILS.
H. REMOVE FIRE DEPARTMENT CONNECTION. SEE MECHANICAL PLANS FOR DETAILS.
G. 6" VALVE.
PLANS PRIOR TO CONSTRUCTION.
F. CONNECT TO BUILDING WATER SERVICE LINE. VERIFY LOCATION AND ELEVATION WITH BUILDING PLUMBING
E. CONNECT TO EXISTING WATER MAIN WITH 6" TAPPING SLEEVE AND VALVE.
D. CRITICAL CROSSING. MAINTAIN 18" MINIMUM PIPE SEPARATION. SEE DETAIL.
C. SPLIT DOMESTIC AND FIRE PROTECTION LINES WITH 6"x6" TEE AND REDUCER.
B. 2" DOMESTIC WATER SERVICE LINE WITH CURB STOP.
A. 6" WATER SERVICE LINE, CONNECT TO EXISTING WATER MAIN.
1. WATER SERVICES, PROVIDE THE FOLLOWING:
1J
INV=1022.71 (OUT-E)
INV=1022.81 (IN-S)
RIM=1030.00
ORIFICE PLATE
W/ SOLID LID AND 6-5/16" DIA
ST-6A 30" NYLOPLAST DRAIN BASIN
INV=1026.07
CLEANOUT
ST-4
INV=1024.14 (OUT-SE)
INV=1024.24 (IN-W)
INV=1024.57(IN-S,NW)
RIM=1030.08
ST-4A MANHOLE, TYPE SW-401
PVC @ 2.0%
41 LF OF 8" 10" PVC @ 0.60%30 LF OF INV=1025.39
CLEANOUT
ST-10
5
1I
1K
10261027102810281028102910291029102910291029
1029
1029
1029102910291030
1030103010301030103010301030 1030
1030
10301031
1031
103110311031103110311031103110321032103210321032
1033103310341035
EB
G G
FO
FO
C
FO
C
E
G
ICV
BM1
BM2
CP1
CP2
CP3
CP4
F.L.=1024.36 18" RCP W
F.L.=1022.32 18" RCP S
F.L.=1022.24 21" RCP N
Rim=1029.01
F.L.=1023.46 15" RCP E
F.L.=1023.30 18" RCP N
Double Intake=1027.46
Rim=1028.12
F.L.=1023.81 15" RCP W
Double Intake=1027.57
18" RCP E
F.E.S.=1025.44
F.L.=1022.99 18" RCP SSW
F.L.=1022.18 24" RCP N
Double Intake=1027.85
F.L.=1024.31 30" RCP W
F.L.=1024.21 42" RCP S
F.L.=1023.97 48" RCP ENE
Throat Intake=1029.60
Rim=1030.46 Concrete SidewalkInv=1011.92 10" Truss E
Inv=1011.88 10" Truss W
Rim=1033.08
Concrete Sidewalk
Asphalt SidewalkConcreteConcrete ConcreteConcrete 21" RCP18" RCP
18" RCP18" RCP18" RCP15" RCP
42" RCP30" RCP
48" RCP
Inv=1020.00 10" Truss S
Inv=1012.97 10" Truss S
Inv=1012.53 10" Truss E
Inv=1012.43 10" Truss N
Inv=1012.21 10" Truss W
Rim=1028.89
18" RCP
15" RCP F.L.=1023.14 18" RCP WSW
F.L.=1023.07 18" RCP NNE
Rim=1029.62
F.L.=1024.22 18" RCP ENE
F.L.=1024.10 15" RCP W
Intake=1029.86
Building10
12
IA HWY 6/ EAST HICKMAN ROAD NE ALICE'S ROAD10
PRIVATE DRIVE
FFE=1031.25
GAS GAS6"W6"W
H
T
6"S 6"SEEEEE
6,155 SF BUILDING20' Building Setback Line20' Building Setback Line
50' Building Setback Line50' Building Setback Line
Bk2001 Pg13970
Existing Sign Easement
Private Sanitary Sewer Easem ent
20' Private Storm Sewer Easement
and Gas Easement
8' Private Water Main
ROW TO BE ACQUIRED
Bk2001 Pg172325' MidAmerican Transmission EasementBk702 Pg2316' Temporary Construction EasementBk2006 Pg19329
Easement
Telecommunications
16.5'
Bk2000 Pg2135
Easement
11.5' Sanitary Sewer BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_05_GRA.dgn5/30/20171:53:42 PMSnyder1:20Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSS1026.25
10271028(1028.14)(1028.49)
1028.50G
1029.00TC
LP
1028.68
1028.73
(1028.83)
(1029.33 TC)
1028.85
1028.90
102910291029
1029.05G
(1029.07)
(1029.57 TC)
1029.10G
1029.10
1029.19
1029.21
1029.25
(1029.28)
1029.30
1029.32
1029.41
1029.42
1029.43
1029.45
1029.45G
1029.95TC
LP
1029.48
1029.50G
1030.00TC
1029.50G
1030.00TC
LP
1029.50G
1030.00TC
LP
(1028.51)
(1029.01TC)
(1029.52)
1029.55G
1030.05TC
LP
1029.60
1029.60
1029.63
1029.71
(1029.75)
(1030.25 TC)
1029.75
1029.75
1029.79
1029.80
1029.80
1029.80
1029.81
1029.85G
1030.35TC
1029.85G
1030.35TC
1029.87
1029.88
1029.90
1029.90G
1030.40TC
1029.90G
1030.40TC
1029.95G
1030.45TC
1029.95G
1030.45TC
1029.95G
1030.45TC
1029.98
1030.0010301
0
3
0
1030 10301030 103010
3
0
1030
1030.00G
1030.50TC 1030.00
1030.00G
1030.50TC
1030.10
1030.10G
1030.60TC
1030.15
1030.20G
1030.70TC
1030.201030.20
1030.25
1030.30G
1030.80TC
1030.30G
10130.80TC
1030.30 1030.30
1030.301030.30
1030.35
1030.35
1030.35
1030.35
1030.40
1030.40 1030.40
1030.401030.451
0
3
0
.
4
5
1030.45
1030.46
1030.50 1030.501030.50
1030.50
1030.50
1030.55
1030.55G
1031.05TC
1030.55G
1031.05TC
1030.60G
1031.70TC
1030.60G
1031.010TC
1030.60G
1031.10TC
1030.62
1030.65
1030.65G
1031.15TC1030.651030.70 1030.721030.72
1030.75
1030.75G
1031.25TC
1030.75G
1031.25TC
1030.75G
1031.25TC
1031.00
1030.90
1031
1
0
3
1
1031
1031
10311031
1031103110311031.10
1031.151031.15 1031.151031.201031.20 1031.201031.20 1031.201031.25G
1031.75TC
1031.251031.25
1031.25
1031.25
1032
1032
1033
5 520'0
SCALE (FEET)
20
GRADING PLAN GENERAL NOTES
CAUSED BY CONSTRUCTION ACTIVITIES.
F. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM STREETS, DRIVEWAYS, AND SIDEWALKS
8" DEPTH TO FINISH GRADES.
E. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM
INCLUDE FLARED END SECTION.
D. ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND
(GUTTER), UNLESS OTHERWISE NOTED.
C. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB
RELOCATIONS WITH UTILITY PROVIDER.
CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE ANY UTILITY
AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S CARELESSNESS SHALL BE
DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES
B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
SHOWN ARE IN THE EXACT LOCATION INDICATED.
IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES
SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE
A. UTILITY WARNING:GRADING PLAN1.4%1.0%1.7%2.8%2.8%1.3 %1.0%1.4%1.0%1.0%1.3%1.0%1.0%1.0%1.0%1.0%1.0%1.3%1.7%
2.0%
2.0%2.0%2.0%2.0%2.7%1.5%
2.0%1.0%1.0%1.2%
1.2%
5.3%
2.1%1.2%1.0%2.0% PATHOVERFLOW PATHOVERFLOW PATHOVERFLOW PATHOVERFLOW PATHOVERFLOW 2.0% MIN2.0% MIN2.0% MIN2.0% MIN
2.0% MIN
2.0% MIN
POLLUTION PREVENTION NOTES
FILING OF THE "NOTICE OF DISCONTINUATION".
REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO k.
MUST BE CONTAINED ONSITE.
A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT
FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO
FACILITIES, MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF
JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY
SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE FOLLOWING:
COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE j.
DELAYED MORE THAN 21 CALENDAR DAYS.
CALENDAR DAYS AFTER CONSTRUCTION ACTIVITY HAS FINISHED OR IS PLANNED TO BE
OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES NO LATER THAN 14
PERMANENT SEED MIX, OR SOD AS SOON AS PRACTICAL UPON COMPLETION OR DELAY
STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, i.
IMPROVEMENTS ARE LOCATED.
ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER
RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) h.
STORM SEWERS ARE INSTALLED.
RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS
GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS
MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL
INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL g.
PREVENTION.
EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR FUTURE
SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY ACCUMULATION OF
ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS,
PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON f.
SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 7 DAYS.
SUBMITTED WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION. REVISE THE
OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A COPY
ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR DAYS. RECORD THE FINDINGS
INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL e.
THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY.
THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN
ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT REMOVAL
MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING d.
TIME.
TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT ANY
PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT c.
DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS.
DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS DOWNSTREAM OF SOIL
INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, b.
REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL COMPACTION.
WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE SEDIMENT
DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND SURFACE
UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN a.
UNLESS INFEASIBLE OR NOT APPLICABLE:
GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S
THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE 4.
CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE.
THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT 3.
IMPLEMENT. ADDITIONAL BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED.
ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND
AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION
(BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S
THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES 2.
PREVENTION PLAN MADE DURING CONSTRUCTION.
SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION
IN ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE
THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT 1.
POLLUTION PREVENTION PLAN:C.
DISCONTINUATION.
TO THE OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF
CONTRACTOR SHALL RETAIN A RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS
BE RETAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE
CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST
STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY EROSION
A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL 3.
IOWA.
PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND THE CODE OF
JURISDICTIONAL AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH THE NPDES
SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED TO ANY
AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS,
NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, DISCHARGE
ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT 2.
(SWPPP) AND POSSIBLY OBTAINING THE GENERAL PERMIT COVERAGE FROM THE IDNR.
INCLUDING CREATING OR MAINTAINING THE STORM WATER POLLUTION PREVENTION PLAN
AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. 2
CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH
IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL
STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FROM THE
THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR 1.
STORM WATER DISCHARGE PERMITB.
THE CONTRACTOR.
NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO
COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED
NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH
ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE
DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE
HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM
DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER 2.
OR AS A RESULT OF PERFORMANCE.
PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE
NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS
WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL
THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN
POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE,
CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL 1.
POLLUTION PREVENTION AND EROSION PROTECTIONA.2.3%2.3%1.6%
EB
G G
FO
FO
C
FO
C
E
G
ICV
BM1
BM2
CP1
CP2
CP3
CP4
F.L.=1024.36 18" RCP W
F.L.=1022.32 18" RCP S
F.L.=1022.24 21" RCP N
Rim=1029.01
F.L.=1023.46 15" RCP E
F.L.=1023.30 18" RCP N
Double Intake=1027.46
Rim=1028.12
F.L.=1023.81 15" RCP W
Double Intake=1027.57
18" RCP E
F.E.S.=1025.44
F.L.=1022.99 18" RCP SSW
F.L.=1022.18 24" RCP N
Double Intake=1027.85
F.L.=1024.31 30" RCP W
F.L.=1024.21 42" RCP S
F.L.=1023.97 48" RCP ENE
Throat Intake=1029.60
Rim=1030.46 Concrete SidewalkInv=1011.92 10" Truss E
Inv=1011.88 10" Truss W
Rim=1033.08
Concrete Sidewalk
Asphalt SidewalkConcreteConcrete ConcreteConcrete 21" RCP18" RCP
18" RCP18" RCP18" RCP15" RCP
42" RCP30" RCP
48" RCP
Inv=1020.00 10" Truss S
Inv=1012.97 10" Truss S
Inv=1012.53 10" Truss E
Inv=1012.43 10" Truss N
Inv=1012.21 10" Truss W
Rim=1028.89
18" RCP
15" RCP F.L.=1023.14 18" RCP WSW
F.L.=1023.07 18" RCP NNE
Rim=1029.62
F.L.=1024.22 18" RCP ENE
F.L.=1024.10 15" RCP W
Intake=1029.86
Building10261027102810281028102910291029102910291029
1029
1029
1029102910291030
1030103010301030103010301030 1030
1030
10301031
1031
103110311031103110311031103110321032103210321032
1033103310341035
10
12
IA HWY 6/ EAST HICKMAN ROAD NE ALICE'S ROAD10
PRIVATE DRIVE
FFE=1031.25
GAS GAS6"W6"W
H
T
6"S 6"SEEEEE
6,155 SF BUILDING20' Building Setback Line20' Building Setback Line
50' Building Setback Line50' Building Setback Line
Bk2001 Pg13970
Existing Sign Easement
Private Sanitary Sewer Easem ent
20' Private Storm Sewer Easement
and Gas Easement
8' Private Water Main
ROW TO BE ACQUIRED
Bk2001 Pg172325' MidAmerican Transmission EasementBk702 Pg2316' Temporary Construction EasementBk2006 Pg19329
Easement
Telecommunications
16.5'
Bk2000 Pg2135
Easement
11.5' Sanitary Sewer BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_06_ERO.dgn5/30/20171:53:43 PMSnyder1:20Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSS10271028102910291029
10301
0
3
0
1030 10301030 103010
3
0
1030
1031
1
0
3
1
1031
1031
10311031
1031103110311032
1032
1033
6 620'0
SCALE (FEET)
20
STORMWATER MANAGEMENT QUANTITIES
ATTACHMENT TO POST
Fabric
Post
cable ties
Wire or 5
TYPICAL SILT FENCE DITCH CHECK
F
oresl
o
p
eVariable (20' for a normal 10' wide ditch.)
(5'-0" max.)
Post spacing
(5'-0" max.)
Post spacing
4
5
1
3
Backslope 902
904
906
908
910
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
individual section of silt fence
Install "J-hook" at each end of an
ground contour
Install parallel to
(Plan View)
(600' if slope is flatter than 5%)
200' max. length per section
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
Ground line
Fabric
Flow
4'-0" minimum
'T' steel fence post
(Profile View)
4
1
1
2
See plans for spacing
NO SCALE
SILT FENCE DETAIL
Ground line
Fabric
1
5
4
or as required to adequately support fence
Reduce post spacing to 5'-0" at water concentration areas,
8'-0"spacing
24"DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES36"6
1
3
4
5
In ditches, extend silt fence up side slope so
the bottom elevation at the end of the fence is
a minimum of 2 in. higher than the top of the
fence in the low point of the ditch.
Steel posts to be embedded 20 in. unless
otherwise allowed by the Jurisdictional
Engineer.
Secure top of engineering fabric to steel posts
using wire or plastic ties (50 lb. min.). See
details of "Attachment to Posts."
documents or as directed by the Jurisdictional Engineer.
Section 9040, 3.07 and at locations shown in the contract
Install silt fence according to the requirements of
GENERAL NOTES:
1
2
Insert 12 in. of fabric a minimum of 6 in. deep
(fabric may be folded below the ground line)
Compact ground by driving along each side of
the silt fence as required to sufficiently
secure the fabric in the trench to prevent
pullout and flow under the fence.EROSION AND SEDIMENT CONTROL PLANENTRANCE/EXIT
STABILIZED CONSTRUCTION
WITH PROPERTY OWNER
COORDINATE SIZE AND FINAL LOCATION
APPROXIMATE TOPSOIL LOCATION
PROPERTY OWNER
COORDINATE WITH
STAGING AREA
BASKET
SEDIMENT
BASKET
SEDIMENT
BASKET
SEDIMENT
BASKET
SEDIMENT
1.13 ACDISTURBED AREA
TYPE 1 PERMANENT LAWN MIXTURE 0.42 AC
SEEDING, FERTILIZING & MULCHING 0.42 AC
SEDIMENT BASKETS 6 EA
SILT FENCE 700 LF
SILT FENCE(TYP)
FENCE(TYP)
SILT
EL=1029.82
100-YR PONDING
EL=1029.92
100-YR PONDING
EL=1029.63
100-YR PONDING
EL=1029.69
100-YR PONDING
EL=1029.02
100-YR PONDING
VERIFY WITH ENGINEER.
WASHOUT LOCATION.
APPROXIMATE CONCRETE
BASKET
SEDIMENT
BASKET
SEDIMENT
BASKET
SEDIMENT
EL=1027.53
100-YR PONDING
Q=3.39 CFS
TO FINAL DISCHARGE TO LITTLE WALNUT CREEK
TO EXISTING STORM SEWER
DISCHARGE LOCATION
BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_07_DTL.dgn5/30/20171:53:46 PMSnyder1:10Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSS10
12
IA HWY 6/ EAST HICKMAN ROAD NE ALICE'S ROAD10
PRIVATE DRIVE
FFE=1031.25
6,155 SF BUILDING
10
PRIVATE DRIVE
RAMP AREA 1
RAMP AREA 2
RAMP AREA 3
SIDEWALK RAMP AREA 2 DETAIL 1"=10'SIDEWALK RAMP AREA 3 DETAIL 1"=10'
SIDEWALK RAMP AREA 1 DETAIL 1"=10'SIDEWALK RAMP DETAILS7 710'RAMP AREA 4
SIDEWALK RAMP AREA 4 DETAIL 1"=10'
X
X X XX
X XX
XX
XX
X
X
XXX
X X X
XXX
X X
X X
XXX
XX
X
X X
XX
X X
XXX X
X
X
X
X
X
X
X
X
XX
X
X
X
1029.75
1029.80
1029.43
1029.48
1029.81
1028.731028.68
1030.62
1030.72
1029.19
1029.13
1028.90
1028.85
1029.25
1029.19
1029.42
1029.42
1029.38
1029.36
1030.46
1031.251031.25 1031.25
1031.20 1031.20 1031.20
1030.65
1030.00G
1030.50TC
1031.151031.15
1031.15 1030.65 1030.65
1030.55 1030.55
1031.15
1030.55G
1031.05TC
1030.55G
1031.05TC
1030.60G
1031.10TC
1030.60G
1031.10TC
1030.60G
1031.10TC
1030.75G
1031.25TC
1030.60G
1031.10TC
1029.211029.30
1029.71 1029.71
1030.65
1030.72
1031.15 1031.15
1029.86
1029.92
1029.88
1029.98
5.5%5.5%
5.5%5.5%1.6%1.6%1.6%1.6%1.6%1.1%1.1%1.3%5.5%6.25%1.4%
0.0%7.16%8.33%1.4%
5.7%
1.
3
%1.3%3.4%1.0%
4.7%1.5%1.3%1.
3
%4.2%
6.4%0.0%1.0%1031.20X
1031.15X1.5%1029.79
X
1029.79
X
5.6%
4.0%
0.5%8.1%1.3%1.3%1.4%
X
1030.40
1.5%
1029.88
1.5%
1.5%
4.0%
5.0%
1.5%
1.0%
1.5%
1.5%2.5%1.5%1.5%2.5%X
1030.46
1030.52X 1.5%1.5%1.5%1.5%0.0%0.5%
EB
G
FO
FO
C
FO
C
ICV
CP2
Concrete SidewalkConcrete Sidewalk
ConcreteConcrete
18" RCP18" RCP18" RCP18" RCP
10
12
10
PRIVATE DRIVE
FFE=1031.25
GAS GAS6"W6"W
H
T
6"S 6"SEEEEE
6,155 SF BUILDING20' Building Setback Line20' Building Setback Line
50' Building Setback Line50' Building Setback Line
Bk2001 Pg13970
Existing Sign Easement
Private Sanitary Sewer Easem ent
20' Private Storm Sewer Easement
and Gas Easement
8' Private Water Main
ROW TO BE ACQUIRED
Bk2001 Pg172325' MidAmerican Transmission EasementBk702 Pg2316' Temporary Construction EasementBk2006 Pg19329
Easement
Telecommunications
16.5'
Bk2000 Pg2135
Easement
11.5' Sanitary Sewer BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_08_LND.dgn5/30/20171:53:47 PMSnyder1:20Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSS8 820'0
SCALE (FEET)
20
PLANTING PLANKEY COMMON NAME SIZE
TREESBOTANICAL NAME COMMENTS
PLANT SCHEDULE
SHRUBSGRASSESPERENNIAL & PLANTING PLAN GENERAL NOTES
PLANTING PLAN CONSTRUCTION NOTES LANDSCAPE CALCULATIONS
3-CS
3-CS
5-JS
5-JS
11-HE
10-HE
6-CA 6-CA
1-JS
8-RB
1-JS
4-CA
15-FI
7-FI
4-PF
1-GB
1-GB
36-PV
12-CA
9-VC
1-AC
8-RB
3-CG
1-GT
1-GT
13-VC
VC
RB
PF
FI
CS
Viburnum carlesii 'SMVCP' (PP25,872)
Rosa blanda
Potentilla fruticosa 'Lundy'
Forsythia x intermedia 'Sunrise'
Cornus stolonifera 'Farrow'
SPICE BABY KOREANSPICE VIBURNUM
EARLY WILD ROSE
HAPPY FACE CINQUEFOIL
SUNRISE FORSYTHIA
ARCTIC FIRE DOGWOOD
18" Ht.
24" Ht.
18" Ht.
36" Ht.
18" Ht.
#1 CONT. (4' O.C.)
#1 CONT. (3' O.C.)
#1 CONT. (3' O.C.)
#2 CONT. (4' O.C.)
#2 CONT. (4' O.C.)
PV
HE
CA
Panicum virgatum 'Northwind'
Hemerocallis 'Going Bananas'
Calamagrostis x acutiflora 'Karl Foerster'
NORTHWIND SWITCHGRASS
GOING BANANAS DAYLILY
KARL FOERSTER FEATHER REED GRASS
24" Ht.
12" Ht.
18" Ht.
#1 CONT. (30" O.C.)
#1 CONT. (18" O.C.)
#1 CONT. (3' O.C.)
24-CA
8-CA
1 - EX. STREET TREE
1 - EX. STREET TREE
1-AC
TREE
STREET
1 - EX.
WAUKEE DEVELOPMENT SERVICES DEPARTMENT.
E. ALL PLANT SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY THE
OF ONE YEAR FROM DATE OF INSTALLATION.
D. CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD
Z60.1-LATEST EDITION).
SHOWN IN THE "AMERICAN STANDARDS FOR NURSERY STOCK" (ANSI
C. ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS
COMPANIES DURING CONSTRUCTION.
CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY
CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED AT THE
AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE
LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES
CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT
B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION.
ARE IN THE EXACT LOCATION INDICATED.
SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE
GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH
INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
A. UTILITY WARNING:
TREES TO A MINIMUM 3-FOOT PERIMETER.
3. PROVIDE 3" DEPTH SHREDDED HARDWOOD MULCH RING AROUND ALL
BLACK STEEL EDGING, UNLESS OTHERWISE DIRECTED BY OWNER.
2. PROVIDE CONTINUOUS SHREDDED HARDWOOD MULCH BED WITH 3/16"
1. SOD ALL AREAS DISTURBED BY CONSTRUCTION.
8
3 DECIDUOUS TREE STAKING DETAIL
NO SCALE
EXISTING SLOPE
FINISH GRADE
TREE OR SHRUB
ROOT BALL
BEGIN TRANSITION AT EDGE OF
2:1 MAXIMUM TRANSITION SLOPE. MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING
BEYOND EDGE OF ROOT BALL
3" HEIGHT WATER RETENTION BERM
LOCATED AT TOP OF ROOTBALL
2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS
FINISH GRADE. DO NOT PLACE MULCH WITHIN
SET ROOT COLLAR AND ROOT FLARE 2" ABOVE
SLOPE PLANTING PIT DETAIL
PLACE ROOT BALL ON UNDISTURBED SOIL
SCARIFY SIDES OF PIT
MINIMUM FOR SHRUBS
2X ROOTBALL
MINIMUM FOR TREES
3X ROOTBALL
ROOT SYSTEM
OR CONTAINER
DEPTH OF ROOT BALL
BASKET MINIMUM.
MINIMUM TOP 1/2 OF BURLAP AND WIRE
BALLED AND BURLAP (B&B) PLANTS REMOVE
MATERIAL. REMOVE ALL TWINE. FOR
IMPEDE THE GROWTH OF THE PLANT
CONTAINERS OR OTHER MATERIAL THAT WILL
REMOVE ALL NON-BIODEGRADABLE MATERIAL, Root Ball Diameter 1 1/2 to 2 Times
FINISH GRADE
SCARIFY SIDES OF PIT
PLACE ROOT BALL ON UNDISTURBED SOILTYPICAL PLANTING PIT DETAIL
BEYOND EDGE OF ROOT BALL
3" HEIGHT WATER RETENTION BERM
LOCATED AT TOP OF ROOTBALL
2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS
FINISH GRADE. DO NOT PLACE MULCH WITHIN
SET ROOT COLLAR AND ROOT FLARE 2" ABOVE
MINIMUM FOR SHRUBS
2X ROOTBALL
MINIMUM FOR TREES
3X ROOTBALL
ROOT SYSTEM
OR CONTAINER
DEPTH OF ROOT BALL
BASKET MINIMUM.
MINIMUM TOP 1/2 OF BURLAP AND WIRE
BALLED AND BURLAP (B&B) PLANTS REMOVE
MATERIAL. REMOVE ALL TWINE. FOR
IMPEDE THE GROWTH OF THE PLANT
CONTAINERS OR OTHER MATERIAL THAT WILL
REMOVE ALL NON-BIODEGRADABLE MATERIAL,
MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING
PLANTING PIT DETAILS
NO SCALE8
2
1
1
Diameter
8" to 12"
IMPERVIOUS SOIL
SEE PLANTING PIT DETAIL
FINISH GRADE
ENGINEERING FABRIC
SEPTIC GRAVEL
6' DEPTH
(IF PRESENT)
PERVIOUS SOIL
BY ENGINEER.
INSTALLATION; AS APPROVED
IMPERVIOUS SOILS ARE FOUND DURING
TREE DRAINAGE WELL ONLY REQUIRED IF
NOTE:
into the pervious soil layer.
extends a minimum of 12 inches
well may be termineated when the well
depth less the 6 feet, the drainage
If pervious soil is encountered at a
TREE DRAINAGE WELL DETAIL
NO SCALE8
1
6''
1
MATERIAL
FLAGGING
GARDEN HOSE
DETAILS
SEE PLANTING PIT
STEEL POSTS
(4'-0" MIN.)
TREE HEIGHT
1/2 TO 2/3
(2'-0" MIN.)
TREE HEIGHT
1/4 TO 1/3
6"
(Trees 2 1/2 inch diameter or smaller)
STAKING PLAN
TO SOUTHWEST
PLACE ON STAKE
1
(Trees larger than 2 1/2 inch diameter)
STAKING PLAN
branch.
Wrap trunk from ground line to first
TO SOUTHWEST
PLACE ON STAKE
15-PF
7-FI
7-FI
30-PV
10-VC
SR
JS
GT
GB
CG
AC
B&B
#10 CONT.
B&B
B&B (MALE)
B&B
B&B
STATE OF
IOWA
PROFESSIO
N
ALLANDSCAPE AR CHITECTDate
License Number
Pages or sheets covered by this seal:
668
NO.
ARCHITECT
LANDSCAPE
under the laws of the State of Iowa.
Professional Landscape Architect
charge. I am a duly licensed
direct supervision and responsible
below was prepared by me or under my
this technical submission described
I hereby certify that the portion of
June 30, 2018
License Expires:
668
GULDENPFENNIG
LARA F.
Lara F. Guldenpfennig, ASLA
SHEET 8
SHRUBS PROVIDED)
HEADLIGHT SCREENING REQUIRED ALONG NE ALICE'S ROAD AND EAST HICKMAN ROAD. (102
ALL LANDSCAPED ISLANDS SHALL HAVE ONE ORNAMENTAL OR OVERSTORY DECIDUOUS TREE.
NE ALICE'S ROAD: 90 LF / 40 LF = 2.25 (3) TREES REQUIRED (3 PROVIDED)
EAST HICKMAN ROAD: 110 LF / 40 LF = 2.75 (3) TREES REQUIRED (3 EXISTING, 1 PROVIDED)
1 OVERSTORY TREE PER 40 LF OF FRONTAGE, EXCLUDING DRIVEWAYS
PAVEMENT FRONTAGE REQUIREMENT:
9.92 PU X 1 SHRUB = 9.92 SHRUBS REQUIRED (10 PROVIDED)
9.92 PU X 1 TREE = 9.92 TREES REQUIRED (3 EXISTING, 7 PROVIDED)
9,929 SF / 1,000SF = 9.92 PLANT UNITS REQUIRED
19,318 SF (38.91%) TOTAL OPEN SPACE PROVIDED
49645 SF TOTAL LOT X 20% MIN. OPEN SPACE = 9,929 SF REQUIRED
OPEN SPACE REQUIREMENT:
(AS PER CITY OF WAUKEE LANDSCAPE AND OPEN SPACE REQUIREMENTS FOR C-1B DISTRICT)
3-SR
Syringa reticulata 'Ivory Silk'
Juniperus scopulorum 'Bailigh'
Gleditsia triacanthos var. inermis 'Draves'
Ginkgo biloba 'Princeton Sentry'
Crategus crusgalli var. inermis
Acer rubrum 'Franksred'
IVORY SILK JAPANESE TREE LILAC
SKY HIGH JUNIPER
STREET KEEPER HONEYLOCUST
PRINCETON SENTRY GINKGO
THORNLESS HAWTHORN
RED SUNSET RED MAPLE
8' Ht.
6' Ht.
1 1/2" Cal.
1 1/2" Cal.
8' Ht.
1 1/2" Cal.
BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_09_StormTech-DTL.dgn5/30/20171:53:48 PMSnyder1:2Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSSNO SCALE
STORMTECH DETAILS
STORMTECH DETENTION BED DETAILS1'NO SCALE
STORMTECH DETAILS
9
2
9
1
NO SCALE
STORMTECH DETAILS
9
3
NO SCALE
STORMTECH DETAILS
9
4 99
BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= KSOKULSKIV:\Projects\2017\117.0250.01\CADD\SP_1170250_10_StormTech-DTL.dgn5/30/20171:54:00 PMSnyder1:2Y:\pen\date.tblY:\print_drivers\Black_Gray\V8iBWHalfWeightPDF.pltcfgSheetofSheet of
Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.UNIVERSITY OF IOWA COMMUNITY CREDIT UNIONWAUKEE, IA117.0250 117.025010 10JALEDCJWM04-20-171AS PER CITY COMMENTS05/12/17LBM2AS PER CITY COMMENTS05/30/17KSSNO SCALE
STORMTECH DETAILS
STORMTECH DETENTION BED DETAILS1'10
1
NO SCALE
STORMTECH DETAILS
10
2
10 10
LEVEL 10"T.O.W. LOW14' - 8"T.O.W. HIGH20' - 4"ALUMINUM SUN SHADE:CLEAR ANNODIZED CULTURED STONE:PLATINUMFAUX WOOD SCREEN:WALNUTFAUX WOOD SIDING: WALNUTFAUX WOOD SIDING:WALNUTDUMPSTER ENCLOSURECULTURED STONE:PLATINUMMETAL WALL PANEL:DARK ANNODIZEDLEVEL 10"T.O.W. LOW14' - 8"T.O.W. HIGH20' - 4"LEVEL 10"T.O.W. LOW14' - 8"T.O.W. HIGH20' - 4"CULTURED STONE:PLATINUMFAUX WOOD SCREEN:WALNUTALUMINUM WINDOW:DARK ANNODIZED CULTURED STONE:PLATINUMFAUX WOOD SCREEN:WALNUTMETAL WALL PANEL:DARK ANNODIZEDMETAL WALL PANEL:DARK ANNODIZEDLEVEL 10"T.O.W. LOW14' - 8"T.O.W. HIGH20' - 4"EastSouthSTEEL GATE. PAINTED TO MATCH METAL PANEL ON BLDG.WestCT CABINET6' - 8"NorthELEVATIONSPRES 2UICCU Waukee15.0475/09/17 1/16" = 1'-0"East Elevation - Pres 1/16" = 1'-0"North Elevation - Pres 1/16" = 1'-0"South Elevation - Pres 1/16" = 1'-0"West Elevation - Pres 1/8" = 1'-0"Trash Enclosure