AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: July 10, 2017
AGENDA ITEM: Consideration of approval of proposal from Webster Electric, Inc. [Alice's Rd
Widening Improvements Phase 4]
FORMAT: Consent Agenda.
SYNOPSIS INCLUDING PRO & CON: Webster Electric will be relocating a transformer at 1100
Alice's Rd (Gilerest Jewett) to allow for construction as part of the Alice's Rd
Widening Improvements Phase 4 project. The City's responsibility is for the
installation of 1 4" primary duct for MidAmerican Energy to relocate the
transformer from the existing location to the proposed location.
FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: $7,500.00
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the consent agenda.
ATTACHMENTS: I. Proposal
PREPARED BY: Beth Richardson/Rudy Koester
REVIEWED BY: John Gibson
."X�
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 17-
APPROVING WEBSTER ELECTRIC, INC., PROPOSAL
[ALICE'S ROAD CORRIDOR PHASE 4 PROJECT, DUCT INSTALLATION]
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City is currently construction public improvements as part of the Alice's Road
Corridor Phase 4 Project; AND,
WHEREAS, on July 10, 2017, the Waukee City Council approved a proposal from
MidAmerican Energy Company to relocate a transformer at 1100 SE Alice's Road (Resolution
#17-XXX); AND,
WHEREAS, as part of the transformer relocation, the City of Waukee shall be responsible for
the installation of a primary duct from the existing transformer location to the proposed location;
AND,
WHEREAS, Webster Electric, Inc., has provided a proposal, attached hereto as Exhibit A, for
the duct installation; AND,
WHEREAS, City staff recommends approval of the agreement.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this
10"' day of July, 2017, that it hereby approves the Webster Electric, Inc., proposal [Alice's Road
Corridor Phase 4 Project, Duct Installation].
Attest:
Rebecca D. Schuett, City Clerk
ROLL CALL VOTE
Anna Bergman
R. Charles Bottenberg
Brian Harrison
Shelly Hughes
Larry R. Lyon
William F. Peard, Mayor
AYE NAY ABSENT ABSTAIN
May 11, 2017
Gilcrest Jewett
1100 SE Alices Rd
Waukee, IA 50263
Re: Electrical Transformer relocation
Maintenance Shop / Windows & Doors
Waukee, IA
PROPOSAL
Site Utilities:
Install 500' of 1 - 4" empty underground conduit for Mid American Energy.
Install 3 phase transformer pad with oil containment.
Maintenance Building:
Install 300' - new underground secondary conduit and conductors from the existing
meter setting to the new transformer.
Provide a 1 day generator rental with connections.
e- Windows & Doors Building.
Install 250' - new underground secondary conduit and conductors from the existing
meter setting to the new transformer.
Provide a 1 day generator rental with connections.
s Miscellaneous:
All labor included.
All materials included.
All boring / backhoe / trenching.
Concrete cutting / removal / replacement at 2 locations.
Old concrete transformer pad removal.
SABC
MtlE M Ea'E'X
495 Alice's Road, Suite B < Waukee, Iowa 50263 • Phone 515-987-4949 • Fax 515-987-5065
=o�LELe�40/�19yEPS��F'SS�O.1CilgA�b
�gF9TEq'I llal ES
Page 2
GJL Co
Cont...
Total: $38,900.00 (Thirty Eight Thousand Nine Hundred Dollars)
BREAKDOWN
City of Waukee Responsibilities:
Install 1 - 4' Primary duct for Mid American Energy from the east easement area
by SE Alices Road to the new transformer site. $7,500.00
Mid American Energy charges 0000
Total $7,500.00
Gilcrest Jewett Responsibilities:
Transformer pad with oil containment.
Install 2 new secondary's from the new transformer to Windows & Doors
and Maintenance Shop buildings.
All other associated turnkey items. $31,400.00
Cv t - 0�
Larry Webster
President