HomeMy WebLinkAbout2017-08-21-J01N SE Westown Pkwy Extension, GPP Greenbelt Weirs_Pmt Est 51,l► Waukee
i■f r THE KEY TO GOOD LIVMG
AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: August 21, 2017
AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 5 to McAninch
Corporation for the SE Westown Parkway Extension and Grand Prairie
Parkway Greenbelt Weirs SE Parkview Crossing Drive to Grand Prairie
Parkway Project in the amount of $333,807.83
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON: McAninch Corporation has requested Payment Estimate
No. 5 for the work completed on the SE Westown Parkway Extension and
Grand Prairie Parkway Greenbelt Weirs SE Parkview Crossing Drive to
Grand Prairie Parkway Project in the amount of $333,807.83, Foth
Infrastructure and Environment, LLC has reviewed the payment estimate and
recommends payment.
Partial Payment No.5 is for work completed from June 29, 2017 to July 31,
2017.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $333,807.83
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Partial Payment No. 5
ATTACHMENTS: I. Partial Payment No, 5
II. Letter of Recommendation
PREPARED BY: Beth Richardson/Rudy Koester
REVIEWED BY: John Gibson
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
Foth
August 2, 2017
John Gibson
Director of Public Works
805 University Avenue
Waukee, IA 50263
RE: Pay Request #5
SE Westown Pkwy Extension and GPP Greenbelt Weirs
SE Parkview Crossing Dr. to Grand Prairie Pkwy
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on August 21, 2017
Submitted Quantity
• 0.12 LS of Item 1.1, Construction Staking
• 12,727 CY of Item 2.4, Excavation Class 10, Borrow
• 9,099 SY of Item 2.6, Subgrade Preparation, 12"
• 572 LF of Item 4.1, 15" RCP Storm Sewer
• 329 LF of Item 4.2, 18" RCP Storm Sewer
• 1.0 LS of Item 4.14, Video Inspection of Sewer and Culverts
• 1,110 LF of Item 5.1, 12" PVC Water Main
• 187 LF of Item 5.2, 12" PVC Water Main, Restrained Joint
• 912 LB of Item 5.3, Water Main Fittings
• 3 EA of Item 5.4, 12" Gate Valve
• 1 EA of Item 5.5, Valve Box Adjustment, Minor
• 4 EA of Item 5.6, Fire Hydrant Assembly
• 1 EA of Item 5.7, Removal of Hydrant Assembly
• 0.25 EA of Item 6.1, 84" Dia. SW-401 Manhole
• 0.50 EA of Item 6.2, 72" SW-402 Manhole
• 2.25 EA of Item 6.4, SW-501 Intake
• 1.50 EA of Item 6.5, SW-503 Intake
• 2.25 EA of Item 6.6, SW-505 Intake
• 1.50 EA of Item 6.7, SW-506 Intake
• 1.0 EA of Item 8.7, Handhole Type 3
• 2, 435 LF of Item 8.10, Conduit 2"
• 0.12 LS of Item 9.7, SWPPP Management
• 288 LF of Item 9.8, Silt Fence Installation
• 1 LF of Item 12.5, Ornamental Metal Railing
• 0.1 LF of Item 12.11, Ornamental Metal Railing
• 6,765 SY of Item Al.1, Modified Subbase, 6"
•-1,127.5 CY of Item A1.2, Excavation Class 10, Borrow
8191 Birchwood Court, Suite L Johnston, IA 60131 Phone: (515) 264-1393 Fax: (515) 254.1642
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay McAninch
Corp. of Des Moines, Iowa in the amount of $333,807.83 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Fothh Infrastt\rJucture and Environment, LLC
Joshua C. DeBower, P.E., Lead Civil Engineer
Encl: Pay Request #5 dated 08/02/17
C:\pw workdiApw ie\jcd\dms03954\Ltr-2017-0802-SEWestownPkwyExtension-Recommend PayApp5.docx 8/2/2017
=,
Waukee Public Works Department
805 University Avenue
/
Wauke, IA 50263
v_
Phone (515)978-T920
Fax (515) 987J979
Waukee
ly Yrg4YY »M
Contractor: MCAninoh Corporation
4001 Delaware Avenue
Des MOINS.' IA 50313
Phone (515)26]-2500
PAY REQUEST 5
PrAn'Title
BE Wesbwn Pkwy Erlens ion a rd GPP Gicen ledt Weirs
Be Parkvlew Clossln D 1 IO Gr..J metric Pkwy
WeUNPe IA
Pm'eq File Ne.
prefect NuIn bet 1dVA21.02
Purchase Order Number
ON9. Contract Amount &Dole
$2,933,28038 waxiT
Page. to Proceed Date
W1712017
Estimated Completion Date
9NMD17
Pay Period
6129=17 in 7/3112017
Pay Request Number
5
Data
WaDall
Contract lD
BID ITEMS
Item
No.
Item
Lode
Description
UnX
ESL
01y
Out
Price
Extended
Price
Ouan(ty
CarpetedComplotetl
Value
DIVISION 1 -GENERAL
tt
1090.A-1000
CONSTRUCTION STAKING
L$
1
$11,]00.00
$11,]DOOD
062
$]25400
1.2
1090A.2000
MOBILIZATION
Ls
1
1 E11460000
$114,600 001
100
1 $114600.00
DIVISION 2 -EARTH WORK, SUBGRADE AND SUBBASE
2.1
20104100E
CLEARING B GRUBBING
LS
1
53.80000
$3,00 OD
IGo
$]0000.
22
2010�D 1D00
TOPSOIL, ON SIZE
CY
3,634
$5]5
*20895. 50
18180D
1104531.
2.3
2010-E 1000
EXCAVATOR CLASS IO. ON SITE
CY
9.54]
SSW
140.116.0E
954]00
$on IV 80
24
2016E 2000
EXCAVATION CLASS 10. BORROW
CY
58, 283
$8. 18
53569000E
502830E
$356,90000
25
2010E-1024
BELOW GRADE EXCAAh TON(CORE OUT)
CY
1127
$800
$173200
000
SC Ed
26
2014G-lO12
SUBGRADE PREPARATION, 121N.
6Y
SWS
$3 E9
$20, 115.91
gogew
$28.III 91
DIVISION 3 -TRENCH AND TRENCHLESS CONSTRUCTION
31 DEWATERING LS 1 $2400000 52440000 1no $2400000
DIVISION 4-SEWERS AND DRAINS
4.1
402OA 1015
STORM SEWER, TRENCHED, RCP, CUSS V, 151N.
LF
$72
Y18.00
$14.616.00
57200
$44.61600
42
402OAmia
STORM SEWER, TRENCHED, RCP. CLASS V, IV IN.
LF
120
$anon
S2g,12000
32900
526,32000
4.3
4020A1560
STORM SEWER, TRENCHED, FOP. CUSS III. Go IN.
LF
25
$358,00
$8.95000
24.Do
SS512,.
4.4
4023-A 1072
STORM SEWER. TRENCHED. RCP. CLAS5111, 11 IN.
LF
114
$46]EO
$53,238.00
Hong
SIR JEa.
45
4020 A 2051
STORM SEWER, TRENCHED. RCAP, CI -ASS A111. 51"X32"
LF
1.
$2213.
$30,552 So
1340E
$3055200
46
PIPE APRON, CONCRETE. 51'X32"ARCH
EA
1
$3,48600
$3,48a 00
1.EE
S34ea00
47
4030.E-1072
PIPEAPRON, CONCRETE,72 IN.
EA
1
$5.96400
$5114SIT
1Be
SS III
48
4040-A1004
SONORAN, PV4(WAUKEE SPEC FICATONS), 41N.
LF
DES
$1630
S10, S39.50
665.00
$10,839,50
4.9
404OA1006
SUBDRAIN, PVC, CASE D(WAUKEE SPECIFICATIONS, 6 IN.
LF
2.362
$1840
$43,1.SS
OOE
I.
410
4040.G1000
SUBDRAIN UEANOUT TYPE A 1
EA
6
$35'/.00
$2, 1420E
300
$1,0]1 Ed
Lfl
4040.0100E
SUBDRAIN CONNECTION TO INTAKE OR STORM SEWER
EA
1]
$255.110
54,1350E
1,0E
$255.00
412
4040.0.2000
SUBDRAIN OUTLET, Me RODENT GJARD
EA
1
$357g0
1057.00
000
5000
4,13
FIELOTLE ANDENTINGS, PVC, UNSPELIFIEDDIA
IT
an
$1100
$1 Are an
I TOO
In.a0
414
4060B-1000
VIDEO INSPECTION OF STORM SEWER AND WLVERTS
LS
11
$2.910001
$2,910.00
1.00
$2,910.00
DIVISION 5 - WATER MAIN AND APPURTENANCES
5.1
501OA'all
WATER MAIN. TRENCHED, PVC C900, DR 1S, 121N.
I LF
1 1.110
1 $3300
$3S,AW I0
I 11100E
536,63000
52
5n1AAg112
WATER MIN. TRENCHED. 1VCC900 DR 1e, 121N.. RESTRAINED JOINT
LF
10]
$4600
$89I600
NOES
$8m An
5.3
5010C-1W0
WATER MAIN FITTINGS
LB
912
$S.OD
Seem 0
9120E
$4560.00
5.4
5020A1012
VALVE. DATE. 121N.
EA
J
$1.930W
$5.817.00
3.00
$5,81700
5.5
VALVE BOX ADJUSTMENT, MINOR
EA
1
$98300
Sees 00
1.0E
RAI
56
SEGO C-1W0
FIRE HYDRANTASSEMBLY
EA
4
$4,29300
$17,17200
4So
$1117200
5.7
HuRc-l50
REMOVAL OF HYDRANT ASSEMBLY
EA
1
V.use IS
$1 p58ml
100
S1ASa 00
PR6301]-0i315E B1.1-Ple. sAmIlargh.
msmnuri:[wee�..eMunw.am Page 1 of
DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWER
Bt
6010-AHGN
MANHOLE. STORM SEWER, SW401, 841N.
EA
1
$816000
$5LABOR
1W
S6'UF00
6.2
6010 A-207s
MANHOLE. STORM SEWER, SWABS. 72IN.
EA
t
$9.9]].OD
$89]].00
1DO
$9,W]00
63
6010 AFLOS
MANHOLE, STORM SEWER,$W404, BX9
EA
2
$31,]]000
$6354000
200
$83.54000
6.4
fi01OS1501
INTAKE. SINGLE GRATE, SAM 501
EA
3
$2.1 B500
$B, 585.00
225
$1,938.]5
B5
601081503
INTAKE. SI NGLE GRATE WITH MANHOLE, NVFGG
EA
2
$4.s.Go
SES2.00
1.10
$6.459.00
08
SOIO B-1505
INTAKE, DOUBLE GRATE SAFOO
EA
3
$3.47000
$10,410.00
225
$].60].50
6.7
INTAKE. DOUBLE GRATE WITH MANHOLE, SW 506
EA
2
E6269.00
$12578,00
150
$9.43350
08
BOt0-E-1100
MANHOLE ADJUSTMENT. MAJOR
EA
3
E3640.00
E10.92000
000
$000
69
NUDATIDDO
REMOVAL OF MANHOLE OR INTAKE. STORM
EA
4
$4.320.00
$17,28000
4.
$17.28000
DIVISION T - STREETS S RELATED WORK
7,1
7010-A-1090
I PAVEMENT, PCG CLASS C, 91N.
3Y
BI GO
$55AO
$450A5000
000
50.00
7.2
7010 A 2090
PAVEMENT, REINFORCED PCC, CLASS C, 91N.
BY
299
$7000
$20,93OX
000
IF 00
73
7010i1000
PCC PAVEMENT SAMPLES AND TESTING
LS
1
$227000
$2.270.00
BAR
5000
74
]03DL-1006
SHARED USE PATH, PC461N,
3Y
1,418
53550
$50.33000
0:00
5O00
7.5
70ALD1012
SPECIAL SUBGRAOE PREPARATION FOR SHARED USE PATHS, 121N,
BY
CAU
$315
$6,43660
0.00
$000
26
]DSO E-1004
SIOEWALK PCC. 4 IN.
SY
725
$34.50
$25.01260
000
V.
Z]
7030-E-1006
SIDEWALK POD, 61N.
BY
53
$4800
$2,544,00
000
$O.DD
ZB
7030-G5000
DETECTABLE WARNINGS
3F
60
$4300
E2,58000
000
$D.
19
7040 H-1000
PAVEMENT REMOVAL
BY
95
$1550
$1,472,50
000
$000
DIVISION 6 - TRAFFIC SIGNALS AND TRAFFIC CONTROL
B1
POSTS FOR SIGNS, STEEL
LF
Go
$12.
$2,BOOM
0.00
E000
8.2
TYPE ASIGNS
SF
NN
$1850
$2,608.50
BOB
5000
8 3
PAINTED PAVEMENT MARKINGS, DURABLE
STA
85
$1330D
$11,289.04
000
$OBO
6.4
PAINTED SYMBOS AND MARKINGS, DURABLE
EA
24
$04,00
$4,896,00
0,00
wUT
8.5
PAINTED PAVEMENT MARKINGS, WATERBORNE
$TA
9
$87.00
$]0].34
000
5000
B6
TRAFFIC CONTROL
US
1
$GAG
SOA50.00
000
5000
87
HANDHOLE. TYPE III. 30' X 48"
EA
3
$1.02000
$3,0600R
100
8102000
BB
FIBER TERMINATION PANEL, 48 POSITION. RACK MOUNT
EA
2
BIG000
$1,02000
000
SO OF
BB
FIBER OPTIC TERMINATIONS
EA
72
53000
$259200
000
500s
8.10
CONOUIT 2IN, PVCA DPE
LF
3,]t5
$B 6]
1 "Z209,051
2435.00
1 $21, 111.45
8.11
TRACERWIRE
LF
4.050
$0.36
$1,468 SIT
000
$O.00
8.12
PULL ROLE
LF
4,050
$0.15
$50750
000
5000
8.13
TZ$INGLE'MODE FIBER OPTIC CABLE CRY CORE
LF
4,as.
$180
$8,370.00
ODD
$0.00
8.14
TRAFFIC SIGNALILATION
LS
1
$10,26080
$10.280.00
OD0
$s.
.15
LIGHTING
LB
1
SGODD000
$aRDON.00
V.
5000
DIVISION 9 - SITEWORK AND LANDSCAPING
91
9010A-1300
CONWIREONAL SEEDING B MULCHING. TYPE3
ACRE
44
$76500
53,38800
143
$?09395
9.2
901OA-1700
CONVENTIONAL SEEDING B MULCHING, WETLAND SEEDING
ACRE
00
54,00000
$am
0.00
E000
BS
SUBFIS100
HYDRAULIC SEEDING, FERTILONG 8 MULCHING, TYPE t (PES& LAWN MIXTURE)
ACRE
10
52.55800
$2.55000
000
$000
94
901OB-1400
HYDRAULIC SEEDING, FERTILIZING BMULCHING. TYPE 4 (UBRAN TEMP. MIXTURE)
ACRE
60
$1.830.00
IORK000
110
$2, i64G9
9.5
9D10.D-1000
WATERING
MGAL
523
$4100
$21 JI300
000
$000
9.6
9010E-1000
WARRANTY
LS
1
$3570,00
E3,5I0.00
SAL
3000
97
9040-A1000
ST.RMWATER POLLUTION PREVENTION PLAN(3WPPP), MANAGEMENT
LS
1
$3,W000
BE...
062
$1 ME 20
9.8
91M0-N-HSA
SILT FENCE, INSTALLATION
LF
3123
$1M
$4.46589
3974,00
$S 6B2G2
BH
GN(fNN3000
SILT FENCE, REMOVAL
LF
3.123
$0,05
$15fiS5
000
E000
9.10
91MOT-t000
INLETPROTECTON
EA
6
g153.00
E?221W
4.00
$6t200
9,11
9040.b03020
RIP RAP, CLASSE
TON
12]
$58.00
E].1RW
iB184
E10,]430n
9.12
804O-10012
FILTER BOOKS, ISCIA., INSTALIATIONBREMOVAL
LF
]BO
$330
$2508W
]BOOD
E2.1OB.10
DIVISION 12-STRUCTURES
CULVERT QUANTITIES
12.1
FLOODED BACKFILL
CY
t53
$7650
$11 704 Si
151.
$11 ]04.50
122
EXCAVATION, CLASS 20
CY
10
$2050
55.215. OF
OF B
55.215.50
123
STRUCTURAL CONCRETE(RCS)
CY
216
$ISO00
S187.39400
21190
$18739400
124
REINFORCING STEEL
LB
41.749
$326
S136.101.I4
41749.W
$136,10174
125
ORNAMENTAL METAL RAILING
LF
1.
$7200
$B.71S aD
2600
$1B7200
126
ANTI -GRAFFITI COATING
BY
02
520.00
SAKQ U0
0Us
30.00
GREENBELT WEIR QUANTITIES
127
GRANULAR BACKFILL
TON
1.556
SEsW
$4138B 60
Is5401
$25 F306]
12B
EXCAVATION, CLASS 20
CY
1.075
S12.25
$13.168.75
10I5.00
INS is, ]5
129
STRUCTURAL CONCRETE(MISCELLANEOU31
CY
4@
598300
$395.W170
40t 90
SGO B710
1210
REINFORCING STEEL
L9
4],0]e
$262
$170,42236
4]0]B00
St7042236
1211
ORNAMENTALMETALRAILING
LF
261
$7200
$18.79.20
26110
$16]9920
12.12
ANN GRAFFIP COATING
SY
264
SORB
E6, 16400
000
5200
LOTS
WEIR OUTLET CONTROL, 1 dP ANN GATE VALVE
EA
2
SAAB IF
$170000
210
1171111
PRS;OtFd]115E Wesbvm VMy ON.R.-lea
rparranrsexur.avrmnmxm Page 2 of
BID ALTERNATE N1
At
I
0O0IFIED 3UB8ASE 6'
SY
If go
.SS.JS
E5""'00
8]55.00
SQ.... .]5
AT
2010-E 2000
j EXCAVAT0N CLASS 10. B0RROW
CV
-r465
E6.30
J. 220.50
11-112750
1167.163.25
TOTAL
$2.831.378.69
02.OJ6.d0"If
MATERIALS STORED SUMMARY
Description
pof UAT,
Unit sure
EMentlatl Cast
TOTAL
00.00
PAY REQUEST SUMMARY
Total Approved
Total Committed
Case.. Pnce
1tvat 29059
$2.036. E0]89
Approved Change Cider
-64, 420.00
Approved Change Ont 2
$2,508 TO
AR, roveo Change 0rcar3
E0.00
R¢.firan Con..' Pnce
$2,931,37859
$2.O36. JBT 89
Malenals Stored
SOOT
Relalnage 50%
$Ige.AA36
Teal Earned Less Fec inage
Sl Bersfi O] 1
Total Previously Approved (list each)
Pay Request
$19120420
Pay Request2
$745,02203
Pay Request
$403,I ad
Pay Request
$26TILD 01
Pay Pin, ueat5
Pay ftegrlesl6
Pay Request]
Pay Requeal6
Pay Request
Pay Reques110
Total Previously Approved
EL800.85588
Amount Due This Removed
Parwnt C—*%
fi45%
Percent of Contract Parted Ullllaed(In Calendar Days. Based on Nomea to Proceed Date& Contract Comple4on Date)
The amount "0, 31 Ia racommehaad for approval for payment In accordanne path the terms of the
Contract.
C reactor
Recommended By
nor
Name Don Carter
Name JoshuaC DeBanyor.P.E.
Name
ePPs-3%]J]]1SEPage3 of3 Ealenelen.alsm
amuanrsexesnrnr r�eams.i. Pape of