Loading...
HomeMy WebLinkAbout2017-09-05-I05B Windfield-High School Trail Phase 1_Award Contract AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 5, 2017 AGENDA ITEM: Consideration of approval of a resolution awarding contract [Windfield/High School Trail Phase 1 Project] FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at Waukee City Hall on August 29, 2017, at 2:00 p.m. Seven (7) apparent bids were received, with the low bid submitted by Concrete Professionals of Altoona, IA, in the amount of $142,405.20. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $142,405.20 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: City staff recommends awarding contract to Concrete Professionals of Altoona, IA, in the amount of $142,405.20. RECOMMENDATION: Approve the resolution awarding contract to Concrete Professionals of Altoona, IA, in the amount of $142,405.20. ATTACHMENTS: I. Proposed resolution II. Snyder & Associates letter of recommendation III. Bid tabulation PREPARED BY: Becky Schuett REVIEWED BY: RESOLUTION 17- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE WINDFIELD/HIGH SCHOOL TRAIL - PHASE I BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the following bid for the construction of certain public improvements described in general as the Windfield/High School Trail - Phase I, described in the plans and specifications heretofore adopted by this Council on September 5, 2017, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Concrete Professionals of Altoona, IA Amount of bid: $142,405.20 Portion of project: All construction work Section 2. That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 5th day of September, 2017. Mayor ATTEST: City Clerk V:\Projects\2017\117.0519.01\AdvertisingLetting\Letter_2017-08-29_RecommendationAward.docx August 30, 2017 Mr. Rudy Koester, P.E. City of Waukee 805 University Avenue Waukee, IA 50263 RE: RECEIPT OF BIDS AND RECOMMENDATION OF AWARD WINDFIELD / HIGH SCHOOL TRAIL – PHASE I Dear Rudy: Bids were received for the Windfield / High School Trail – Phase I project at 2:00 pm on Tuesday, August 29, 2017. The proposed project includes grading, embankment, pedestrian bridge installation and trail paving from SE Bobwhite Lane to the northwest parking lot at Prairieview School to formalize a public connection from the neighborhood to the school. Seven bids were received and opened. The bids ranged from $142,405.20 to $169,969.69. Our opinion of probable construction cost was $157,000.00. The low bid was submitted by Concrete Professionals of Altoona, Iowa. Please refer to attached bid tabulation. We were pleased with the interest from contractors and the number of bidders, considering we are relatively late in the construction season. We recommend award of the contract to the low bidder, Concrete Professionals of Altoona, Iowa. As a firm we have had limited experience working with this contractor, however, we have checked with references at the City of Altoona and West Des Moines and believe they are fully capable of successfully carrying out the requirements of the contract. Sincerely, SNYDER & ASSOCIATES, INC. Nathan Carhoff, P.E. Project Manager NEC/nec Enclosure (if applicable) cc: John Gibson, P.E. TABULATION OF BIDSWindfield/High School Trail - Phase IFrom SE Bobwhite Lane to NW Parking Lot of Prairieview SchoolCity of WaukeeProject No. 117.0519.01Bid Date/Time: August 29, 2017 at 2:00 PMITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICEEARTHWORK 2.1 Clearing and Grubbing UNIT 1 7,000.00$ 7,000.00$ 10,460.00$ 10,460.00$ 1,500.00$ 1,500.00$ 2,500.00$ 2,500.00$ (1) -$ 12,600.00$ 12,600.00$ 8,500.00$ 8,500.00$ 11,787.00$ 11,787.00$ 2.2 Topsoil, On-Site CY 306 15.00$ 4,590.00$ 6.15$ 1,881.90$ 25.00$ 7,650.00$ 10.00$ 3,060.00$ 31.30$ 9,577.80$ 13.00$ 3,978.00$ 16.00$ 4,896.00$ 29.50$ 9,027.00$ 2.3 Excavation, Class 10 CY 423 20.00$ 8,460.00$ 21.00$ 8,883.00$ 25.00$ 10,575.00$ 20.00$ 8,460.00$ 38.90$ 16,454.70$ 20.00$ 8,460.00$ 16.00$ 6,768.00$ 37.00$ 15,651.00$ SEWERS AND DRAINS 4.1 Pipe Culvert, Trenched, RCP, 12" LF 16 50.00$ 800.00$ 140.50$ 2,248.00$ 75.00$ 1,200.00$ 30.00$ 480.00$ 56.70$ 907.20$ 145.00$ 2,320.00$ 80.00$ 1,280.00$ 54.00$ 864.00$ 4.2 Pipe Apron, RCP, 12" EA 2 700.00$ 1,400.00$ 2,125.00$ 4,250.00$ 750.00$ 1,500.00$ 883.20$ 1,766.40$ 1,350.00$ 2,700.00$ 1,400.00$ 2,800.00$ 1,200.00$ 2,400.00$ 1,281.00$ 2,562.00$ 4.3 Footing for Concrete Pipe Apron, RCP, 12" EA 1 1,000.00$ 1,000.00$ 825.00$ 825.00$ 250.00$ 250.00$ 600.00$ 600.00$ 380.00$ 380.00$ 1,200.00$ 1,200.00$ 800.00$ 800.00$ 359.00$ 359.00$ STREETS AND RELATED WORK 7.1 Curb and Gutter, 2' Wide, 6" LF 20 30.00$ 600.00$ 21.50$ 430.00$ 30.00$ 600.00$ 35.00$ 700.00$ 30.00$ 600.00$ 50.00$ 1,000.00$ 45.00$ 900.00$ 79.50$ 1,590.00$ 7.2 Removal of Sidewalk SY 22 15.00$ 330.00$ 16.50$ 363.00$ 18.00$ 396.00$ 40.00$ 880.00$ 16.00$ 352.00$ 25.00$ 550.00$ 10.00$ 220.00$ 15.00$ 330.00$ 7.3 Removal of Curb LF 19 50.00$ 950.00$ 19.00$ 361.00$ 20.00$ 380.00$ 20.00$ 380.00$ 21.00$ 399.00$ 20.00$ 380.00$ 10.00$ 190.00$ 20.00$ 380.00$ 7.4 Shared Use Path, PCC 6" SY 1001 45.00$ 45,045.00$ 51.60$ 51,651.60$ 50.00$ 50,050.00$ 55.00$ 55,055.00$ 49.30$ 49,349.30$ 51.50$ 51,551.50$ 52.00$ 52,052.00$ 51.50$ 51,551.50$ 7.5 Special Subgrade Prepartion for Shared Use Path SY 952 5.00$ 4,760.00$ 3.10$ 2,951.20$ 3.50$ 3,332.00$ 3.50$ 3,332.00$ 3.25$ 3,094.00$ 6.00$ 5,712.00$ 3.00$ 2,856.00$ 3.05$ 2,903.60$ 7.6 Special Subgrade, Construction of Soil Aggregate Subbase SY 449 8.00$ 3,592.00$ 4.00$ 1,796.00$ 6.70$ 3,008.30$ 3.50$ 1,571.50$ 10.00$ 4,490.00$ 6.00$ 2,694.00$ 8.00$ 3,592.00$ 9.45$ 4,243.05$ 7.7 Sidewalk, PCC, 5" SY 23 60.00$ 1,380.00$ 147.50$ 3,392.50$ 60.00$ 1,380.00$ 50.00$ 1,150.00$ 83.25$ 1,914.75$ 50.00$ 1,150.00$ 50.00$ 1,150.00$ 132.50$ 3,047.50$ 7.8 Detectable Warning SF 50 45.00$ 2,250.00$ 24.10$ 1,205.00$ 40.00$ 2,000.00$ 25.00$ 1,250.00$ 43.00$ 2,150.00$ 50.00$ 2,500.00$ 25.00$ 1,250.00$ 44.50$ 2,225.00$ 7.9 Curb and Gutter Removal LF 20 20.00$ 400.00$ 18.00$ 360.00$ 20.00$ 400.00$ 20.00$ 400.00$ 21.00$ 420.00$ 30.00$ 600.00$ 12.00$ 240.00$ 20.00$ 400.00$ TRAFFIC CONTROL 8.1 Traffic Control LS 1 3,000.00$ 3,000.00$ 3,295.00$ 3,295.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,500.00$ 550.00$ 550.00$ 3,000.00$ 3,000.00$ 2,800.00$ 2,800.00$ 2,870.00$ 2,870.00$ 8.2 Signs EA 5 650.00$ 3,250.00$ 470.00$ 2,350.00$ 365.00$ 1,825.00$ 200.00$ 1,000.00$ 300.00$ 1,500.00$ 330.00$ 1,650.00$ 280.00$ 1,400.00$ 286.00$ 1,430.00$ SITE WORK AND LANDSCAPING 9.1 Hydraulic Seeding, Fertilizing, and Mulching ACRE 0.5 10,000.00$ 5,000.00$ 5,885.00$ 2,942.50$ 9,185.00$ 4,592.50$ 5,500.00$ 2,750.00$ 7,000.00$ 3,500.00$ 3,850.00$ 1,925.00$ 2,400.00$ 1,200.00$ 3,587.00$ 1,793.50$ 9.2 Sod SQ 38 125.00$ 4,750.00$ 47.25$ 1,795.50$ 156.00$ 5,928.00$ 70.00$ 2,660.00$ 92.00$ 3,496.00$ 105.00$ 3,990.00$ 120.00$ 4,560.00$ 97.50$ 3,705.00$ 9.3 SWPPP Prepartation LS 1 2,500.00$ 2,500.00$ 1,765.00$ 1,765.00$ 1,950.00$ 1,950.00$ 2,500.00$ 2,500.00$ 1,940.00$ 1,940.00$ 550.00$ 550.00$ 1,500.00$ 1,500.00$ 512.50$ 512.50$ 9.4 SWPPP Management LS 1 1,500.00$ 1,500.00$ 2,650.00$ 2,650.00$ 2,925.00$ 2,925.00$ 1,500.00$ 1,500.00$ 3,900.00$ 3,900.00$ 3,850.00$ 3,850.00$ 3,000.00$ 3,000.00$ 3,587.00$ 3,587.00$ 9.5 Filter Socks, 12" LF 515 4.00$ 2,060.00$ 2.95$ 1,519.25$ 3.25$ 1,673.75$ 3.00$ 1,545.00$ 2.40$ 1,236.00$ 3.20$ 1,648.00$ 3.00$ 1,545.00$ 2.90$ 1,493.50$ 9.6 Filter Socks, Removal LF 515 1.00$ 515.00$ 0.47$ 242.05$ 0.55$ 283.25$ 1.00$ 515.00$ 0.27$ 139.05$ 1.10$ 566.50$ 0.15$ 77.25$ 1.00$ 515.00$ 9.7 Temporary RECP, Type 3B SY 71 15.00$ 1,065.00$ 7.10$ 504.10$ 7.80$ 553.80$ 5.00$ 355.00$ 4.90$ 347.90$ 2.50$ 177.50$ 4.00$ 284.00$ 2.05$ 145.55$ 9.8 Silt Fence or Silt Fence Ditch Check LF 410 3.00$ 1,230.00$ 2.20$ 902.00$ 2.34$ 959.40$ 3.00$ 1,230.00$ 1.90$ 779.00$ 1.75$ 717.50$ 2.00$ 820.00$ 1.55$ 635.50$ 9.9 Silt Fence or Silt Fence Ditch Check, Removal of Device LF 4101.00$ 410.00$ 0.47$ 192.70$ 0.55$ 225.50$ 1.00$ 410.00$ 0.25$ 102.50$ 0.25$ 102.50$ 0.15$ 61.50$ 0.10$ 41.00$ MISCELLANEOUS11.1 Construction Survey LS 1 2,500.00$ 2,500.00$ 2,355.00$ 2,355.00$ 5,000.00$ 5,000.00$ 2,500.00$ 2,500.00$ 4,300.00$ 4,300.00$ 4,250.00$ 4,250.00$ 5,000.00$ 5,000.00$ 4,100.00$ 4,100.00$ 11.2 Mobilization LS 1 15,000.00$ 15,000.00$ 10,700.00$ 10,700.00$ 7,000.00$ 7,000.00$ 6,000.00$ 6,000.00$ 13,800.00$ 13,800.00$ 15,750.00$ 15,750.00$ 19,450.00$ 19,450.00$ 9,400.35$ 9,400.35$ 11.3 Painted Pavement Markings, Durable STA 4.17 500.00$ 2,085.00$ 415.00$ 1,730.55$ 455.00$ 1,897.35$ 5,000.00$ 20,850.00$ 380.00$ 1,584.60$ 375.00$ 1,563.75$ 350.00$ 1,459.50$ 359.00$ 1,497.03$ 11.4 Grooves Cut for Pavement MarkingsSTA4.17 300.00$ 1,251.00$ 255.00$ 1,063.35$ 325.00$ 1,355.25$ 2,000.00$ 8,340.00$ 270.00$ 1,125.90$ 275.00$ 1,146.75$ 250.00$ 1,042.50$ 256.50$ 1,069.61$ 11.5 Concrete Washout LS 1 3,000.00$ 3,000.00$ 590.00$ 590.00$ 2,000.00$ 2,000.00$ 1,000.00$ 1,000.00$ 430.00$ 430.00$ 900.00$ 900.00$ 1,000.00$ 1,000.00$ 512.50$ 512.50$ 11.6 Installation of Prefabricated Truss Bridge and AbutmentsLS 1 25,000.00$ 25,000.00$ 16,750.00$ 16,750.00$ 19,300.00$ 19,300.00$ 17,000.00$ 17,000.00$ 24,400.00$ 24,400.00$ 25,000.00$ 25,000.00$ 36,000.00$ 36,000.00$ 29,741.00$ 29,741.00$ TOTAL BID:156,673.00$ 142,405.20$ 142,690.10$ 153,239.90$ 155,919.70$ 164,283.00$ 168,293.75$ 169,969.69$ BID SECURITY:10% 10% 10% 10% 10% 10% 10%Notes1 Amount not filled in by Contractor. Does not affect bid results.UNIT PRICEConcrete ProfessionalsAltoona, IAUNIT PRICE1234All Star Concrete, LLCAnkeny, IAUNIT PRICEENGINEER'S ESTIMATEConcrete Connection LLCJohnston, IAUNIT PRICERW Excavating Solution, LLCPrairie City, IA7Absolute Concrete ConstructionSlater, IAUNIT PRICE5Howrey Construction, Inc.Rockwell City, IAUNIT PRICE6MPS Engineers (Kingston)Des Moines, IAUNIT PRICEPage 1 of 1